MONTHYEARML24248A2112024-09-0303 September 2024 2023 Davis-Besse End-of-Cycle Meeting Presentation ML22222A1102022-07-21021 July 2022 KM Session Final ML22178A1952022-06-27027 June 2022 2021 Davis Besse Nuclear Power Station End-of-Cycle Meeting Presentation ML22028A3922022-02-0101 February 2022 Licensee Regulatory Conference Presentation ML22028A3972022-02-0101 February 2022 NRC Regulatory Conference Presentation ML21176A1992021-06-25025 June 2021 Slideshow Presentation for 2020 End -of-Cycle Public Meeting for Davis-Besse and Perry ML20210M0712020-07-27027 July 2020 Combined End-of-Cycle 2019 Public Meeting Slide Presentation ML19249D0212019-09-0606 September 2019 End-of-Cycle Summary Handout (2018) ML18310A3802018-11-0808 November 2018 Pre-Submittal Meeting Davis-Besse Nuclear Power Station (DB) Post-Shutdown Emergency Plan (PSEP) License Amendment Request ML18180A1962018-06-29029 June 2018 Slides for Davis Besse 2017 EOC Open House ML17229B3382017-08-17017 August 2017 Presentation for 2016 Davis-Besse EOC Open House ML16174A3152016-06-21021 June 2016 Annual Assessment Meeting Open House June 21, 2016 ML15156A6962015-06-11011 June 2015 Annual Assessment Meeting Open House Handout ML14224A1112014-08-25025 August 2014 Safety Culture Presentation for Brazil, U.S. Workshop on Safety and Security Culture - August 25, 2014 ML14218A0542014-08-0707 August 2014 Handout Davis-Besse EOC Mtg ML14050A4002014-02-20020 February 2014 NRC Presentation for Davis-Besse Steam Generator Replacement Webinar ML13322B3112013-11-13013 November 2013 NFPA 805 Transition - Meeting Slides, 11/13/2013 ML13294A5972013-10-21021 October 2013 FENOC Presentation Slides for Public Meeting September 24, 2013 ML13157A0642013-06-0606 June 2013 June 11, 2013 NRC Presentation ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML12269A0612012-09-26026 September 2012 FENOC Presentation for 2012-09-26 Public Meeting ML12227A4172012-08-15015 August 2012 NRC End-Of-Cycle Assessment 2011 Meeting Presentation ML12221A2642012-08-0909 August 2012 NRC Public Meeting NRC Presentation 8/9/12 ML12221A2682012-08-0909 August 2012 FENOC Shield Building Cracking Davis-Besse Public Meeting 8/9/12 ML12132A3442012-05-11011 May 2012 NRC-AERB Bilateral Meeting Slide Presentation (Nro/De), Aerb, India - May 16-17, 2012 ML1206901712012-02-29029 February 2012 Slides and View Graphs - Boric Acid Corrosion Testing Program: Industry Perspective ML12200A2402012-02-23023 February 2012 Presentation Slides on Davis-Besse Shield Building Crack ML1204402842012-02-16016 February 2012 Public Meeting Construction Experiences - Evaluate Impact of Concrete Degradation ML12004A0102012-01-0404 January 2012 Public Meeting NRC Slides ML12200A2492011-12-22022 December 2011 Presentation Slides on Shield Building /Containment Delamination ML11220A2542011-08-0101 August 2011 DBNPS-Info Meeting Slides ML1116400632011-06-15015 June 2011 EOC NRC Slides for Public Meeting ML1117209902011-06-15015 June 2011 Meeting Presentation NRC Annual Assessment Meeting: Davis-Besse Nuclear Power Station. ML1021501112010-07-29029 July 2010 NRC Slides for Davis-Besse; July 29, 2010; Annual Assessment Meeting ML1021501182010-07-29029 July 2010 Licensee Slides for Davis-Besse Annual Assessment Meeting L-02-002, G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse2010-04-15015 April 2010 G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse ML0920202972009-07-15015 July 2009 NRC Slides from EOC Meeting ML0920202872009-07-15015 July 2009 Meeting Slides, NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station ML0725600562007-09-12012 September 2007 9/12/2007 Meeting to Discuss Davis-Besse License Amendment Request for Conversion to Improved Technical Specifications (ITS) 9/12/2007 NRC Meeting Slides ML0725600462007-09-11011 September 2007 9/11/2007-Meeting to Discuss Davis-Besse License Amendment Request for Conversion to Improved Technical Specifications (ITS) - 9/11/2007 NRC Meeting Slides ML0722201892007-08-0808 August 2007 NRC EOC Public Meeting Slides ML0717905962007-06-27027 June 2007 Slides from Public Meeting Between NRC and FENOC Regarding Response to May 14, 2007, Demand for Information ML0702603952007-01-31031 January 2007 Summary of Conference Telephone Call Regarding the Spring 2006 Steam Generator Inspections - Handouts ML0706502022007-01-23023 January 2007 Slides to Summary of Pre-Application Meeting with FENOC Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML0632003672006-12-11011 December 2006 Slides, Improved Technical Specification Conversion from Category 1 Pre-submittal Meeting with Fenco to Discuss Davis-Besse's' Proposed Conversion to Improved Technical Specifications ML0612404142006-05-0202 May 2006 NRC Annual Assessment Meeting ML0601801602006-01-18018 January 2006 Industry Safety Culture Presentation for January 18, 2006 Public Meeting ML0603002272006-01-10010 January 2006 Multi-Regional NRC Public Meeting Licensee (FENOC) Slide Presentation ML0802205572005-09-12012 September 2005 NRC Commissioners Briefing by Firstenergy Nuclear Operating Co ML0525604472005-08-17017 August 2005 B&W Owners Group Reactor Vessel Working Group Summary of the Plans of the B&Wog Reactor Vessel Integrity Program 2024-09-03
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24248A2112024-09-0303 September 2024 2023 Davis-Besse End-of-Cycle Meeting Presentation ML23152A2022023-06-0101 June 2023 2022 Davis-Besse End-of-Cycle Meeting Presentation ML22222A1102022-07-21021 July 2022 KM Session Final ML22178A1952022-06-27027 June 2022 2021 Davis Besse Nuclear Power Station End-of-Cycle Meeting Presentation ML22028A3922022-02-0101 February 2022 Licensee Regulatory Conference Presentation ML22028A3972022-02-0101 February 2022 NRC Regulatory Conference Presentation ML21176A1992021-06-25025 June 2021 Slideshow Presentation for 2020 End -of-Cycle Public Meeting for Davis-Besse and Perry ML20210M0712020-07-27027 July 2020 Combined End-of-Cycle 2019 Public Meeting Slide Presentation ML19249D0212019-09-0606 September 2019 End-of-Cycle Summary Handout (2018) ML18310A3802018-11-0808 November 2018 Pre-Submittal Meeting Davis-Besse Nuclear Power Station (DB) Post-Shutdown Emergency Plan (PSEP) License Amendment Request ML18180A1962018-06-29029 June 2018 Slides for Davis Besse 2017 EOC Open House ML17229B3382017-08-17017 August 2017 Presentation for 2016 Davis-Besse EOC Open House ML16174A3152016-06-21021 June 2016 Annual Assessment Meeting Open House June 21, 2016 ML16117A1822016-04-22022 April 2016 Industry Slides for the Spring 2016 Conference Call Regarding the Steam Generator Tube Inservice Inspections ML15156A6962015-06-11011 June 2015 Annual Assessment Meeting Open House Handout ML14224A1112014-08-25025 August 2014 Safety Culture Presentation for Brazil, U.S. Workshop on Safety and Security Culture - August 25, 2014 ML14218A0542014-08-0707 August 2014 Handout Davis-Besse EOC Mtg ML14050A4002014-02-20020 February 2014 NRC Presentation for Davis-Besse Steam Generator Replacement Webinar ML13322B3112013-11-13013 November 2013 NFPA 805 Transition - Meeting Slides, 11/13/2013 ML13294A5972013-10-21021 October 2013 FENOC Presentation Slides for Public Meeting September 24, 2013 ML13220A0632013-08-30030 August 2013 Dsd ED2013 3267 Presentation, Primary Water Stress Corrosion Cracking Tests and Metallurgical Analyses of Davis-Besse Control Rod Drive Mechanism Nozzle #4. ML13157A0642013-06-0606 June 2013 June 11, 2013 NRC Presentation ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML13078A2492013-03-20020 March 2013 Project Overview-Public Mtg 3-20-13 Non Proprietary ML12269A0612012-09-26026 September 2012 FENOC Presentation for 2012-09-26 Public Meeting ML12227A4172012-08-15015 August 2012 NRC End-Of-Cycle Assessment 2011 Meeting Presentation ML12221A2682012-08-0909 August 2012 FENOC Shield Building Cracking Davis-Besse Public Meeting 8/9/12 ML12221A2642012-08-0909 August 2012 NRC Public Meeting NRC Presentation 8/9/12 ML12138A0732012-05-14014 May 2012 FENOC-Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346, License No. NPF-3 Submittal of Contractor Root Cause Assessment Report-Section 5 ML12132A3442012-05-11011 May 2012 NRC-AERB Bilateral Meeting Slide Presentation (Nro/De), Aerb, India - May 16-17, 2012 ML1206901712012-02-29029 February 2012 Slides and View Graphs - Boric Acid Corrosion Testing Program: Industry Perspective ML12200A2402012-02-23023 February 2012 Presentation Slides on Davis-Besse Shield Building Crack ML1204402842012-02-16016 February 2012 Public Meeting Construction Experiences - Evaluate Impact of Concrete Degradation ML1200501462012-01-0505 January 2012 Public Meeting FENOC Slides ML12004A0102012-01-0404 January 2012 Public Meeting NRC Slides ML12200A2492011-12-22022 December 2011 Presentation Slides on Shield Building /Containment Delamination ML11220A2542011-08-0101 August 2011 DBNPS-Info Meeting Slides ML11221A3012011-08-0101 August 2011 521- R326C B&W Tech Cross Training - Chapter 16 Davis-Besse Loss of All Feedwater ML1117303602011-06-21021 June 2011 FENOC Licensee Slides for 6-21-11 All FENOC Meeting ML1116400632011-06-15015 June 2011 EOC NRC Slides for Public Meeting ML1117209902011-06-15015 June 2011 Meeting Presentation NRC Annual Assessment Meeting: Davis-Besse Nuclear Power Station. ML1032103472010-11-16016 November 2010 FENOC 11/16/10 Public Meeting Presentation Slides ML1025103462010-09-0909 September 2010 SIT Exit Meeting Presentation Slides ML1021501182010-07-29029 July 2010 Licensee Slides for Davis-Besse Annual Assessment Meeting ML1021501112010-07-29029 July 2010 NRC Slides for Davis-Besse; July 29, 2010; Annual Assessment Meeting ML1015400332010-06-0303 June 2010 Licensee Slides for June 3, 2010 Public Meeting Presentation ML1015400342010-06-0303 June 2010 NRC Slides for June 3, 2010 Public Meeting Presentation ML1009102662010-03-31031 March 2010 Slides FENOC and NRC Senior Management Briefing, 3-31-10 ML0920202872009-07-15015 July 2009 Meeting Slides, NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station ML0920202972009-07-15015 July 2009 NRC Slides from EOC Meeting 2024-09-03
[Table view] |
Text
NRC 2023 END-OF-CYCLE PUBLIC MEETING DAVIS-BESSE NUCLEAR POWER STATION
HOST 2
James Beavers Acting Branch Chief Division of Operating Reactor Safety Reactor Project Branch 2
PURPOSE OF TODAYS OPEN HOUSE To inform the public on NRCs mission and functions.
To discuss the 2023 performance of Davis-Bess Nuclear Power Station 3
ABOUT THE NRC The NRC licenses and regulates the Nations civilian use of radioactive material to achieve the following goals:
To provide reasonable assurance of adequate protection of public health and safety To promote the common defense and security To protect the environment 4
SOME NUCLEAR FACTS 94 nuclear power plants supply about 20 percent of the electricity in the U.S.
Nuclear materials are used in medicine for diagnosis and cancer treatment Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators 5
THE NRC REGULATES Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial, and academic use Nuclear waste - transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities Nuclear security - physical security of nuclear facilities and materials from sabotage or attacks 6
HOW WE REGULATE Establish rules and regulations Issue licenses Provide oversight through inspection, enforcement, and evaluation of operational experience Conduct research to provide support for regulatory decisions Respond to events and emergencies 7
WHAT WE DONT DO Regulate nuclear weapons, military reactors, or space vehicle reactors Own or operate nuclear power plants Regulate some radioactive materials, such as X-rays and naturally occurring radon 8
REACTOR OVERSIGHT PROCESS (ROP) 9
REACTOR OVERSIGHT PROCESS (ROP)
Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas 10
SAFETY/SECURITY SIGNIFICANCE 11
ROP ACTION MATRIX 12 Licensee
Response
Regulatory
Response
Degraded Performance Multiple/Repetitive Degraded Cornerstone Unacceptable Performance Increasing:
Safety Significance Inspection Management Involvement Regulatory Action
EXAMPLES OF BASELINE INSPECTIONS 13
~80 hrs/yr
- Quadrennial Fire Protection
~240 hrs every 4 yrs
~125 hrs/yr
~80 hrs/yr
~110 hrs every 2 yrs
- Worker Radiation Protection
~95 hrs/yr
- Corrective Action Program
~250 hrs every 2 yrs
- Corrective Action Case Reviews ~60 hrs/yr
NATIONAL
SUMMARY
OF PLANT PERFORMANCE 14 Status as of 12/31/2023 Licensee Response 88 Regulatory Response 6
Degraded Cornerstone 0
Multiple/Repetitive Deg. Cornerstone 0
Unacceptable 0
IMC 0350 Oversight 0
Total 94
NATIONAL
SUMMARY
15
- Performance Indicator Results for 2023*
- Green 6240
- White 0
- Yellow 0
- Red 0
- PIs are counted per unit per quarter
- Total Inspection Findings in 2023#
- Green 447
- Greater-than-Green 5
- White 9
- Yellow 0
- Red 0
- Finding data current as of 2/14/2024
DAVIS BESSE RESIDENT INSPECTORS Brian Towne Senior Resident Inspector 16 Russell Cassara Resident Inspector
2023 ANNUAL ASSESSMENT DAVIS BESSE NUCLEAR POWER STATION 17 The plant operated safely Regulatory Response Column All performance indicators were Green One or more Greater-Than-Green security inspection finding Licensee
Response
Regulatory
Response
Degraded Performance Multiple/Repetitive Degraded Cornerstone Unacceptable Performance
2023 NRC INSPECTIONS 18 2340 hours0.0271 days <br />0.65 hours <br />0.00387 weeks <br />8.9037e-4 months <br /> of direct inspection 11 regional inspections 5 major team inspections Commercial Grade Dedication Inspection Emergency Preparedness Exercise Inspection Problem Identification and Resolution Inspection Force-on-Force Testing Cyber Security Inspection 1 supplemental Inspection 1 special inspection
SAFETY SIGNIFICANT FINDINGS OR PIS 19
- One or more Greater-than-Green finding and associated violation of the Davis-Besse License Condition 2.D requirement to fully implement and maintain in effect all provisions of the Commission-approved Cyber Security Plan.
- The finding was closed on June 15, 2023.
NRC PLANS FOR 2024 NRC plans baseline inspections at the Davis-Besse Power Station for the remainder of 2024 20
NRC Social Media Channels Facebook:
https://www.facebook.com/nrcgov/
Twitter:
https://twitter.com/nrcgov YouTube:
http://www.youtube.com/user/NRCgov Flickr:
http://www.flickr.com/photos/nrcgov/
Linkedin:
https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/
21
Meeting Feedback
- 1. Mail in the NRC feedback form.
This form will be emailed to all attendees.
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
- 2. On Any Device or Computer:
- Go to the Public Meeting Schedule at (www.nrc.gov/pmns/mtg?do=recent30days)
- Locate this meeting using the sorting buttons and click on the Meeting Feedback Form Link.
Note: Meetings are sorted by date and time. Use Last to get to todays date.
- or -
22
Questions Public Affairs Prema Chandrathil Public Affairs Officer 630-829-9663 Prema.Chandrathil@nrc.gov Viktoria Mitlyng Senior Public Affairs Officer 630-201-1345 Viktoria.Mitlyng@nrc.gov 23