Meeting Slides, NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station
ML092020287
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/15/2009
From:
FirstEnergy Nuclear Operating Co
To:
NRC/RGN-III
References
Download: ML092020287 (5)


Text

NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station July 15, 2009

Participants Q Barry Allen - Site Vice President Q Vito Kaminskas - Director, Site Operations Q Clark Price - Director, Performance Improvement Q Bi B Brian Boles l - Director, Di t M Maintenance i t Q Don Moul - Director, Engineering NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station 7-15-09 2

2008 Accomplishments Q Implemented Improved Standard Technical Specifications Q Implemented Measurement Uncertainty Recapture Power Uprate Q Completed 15th Refueling Outage Q Safety Record: OSHA Incident Rate = 0.2

- Worked W k d >10 million illi person-hours h without ith t a llostt titime accident id t since i A Augustt 2003 Q Unit Capability Factor = 92.31%

Q Forced Loss Rate = 0.74%

NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station 7-15-09 3

2009 Key Regulatory Interest Activities Q Scheduled Activities

- Problem Identification and Resolution Inspection (April)

- Emergency Preparedness Evaluated Exercise (May)

- Initial Licensed Operator p NRC Examinations ((July) y)

- Component Design Bases Inspection (October - November)

- Emergency Actions Levels Conversion (September)

NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station 7-15-09 4

2009 Key Focus Areas Q Station Priorities

- Safe, Reliable, and Cost-Effective Operations

- Successful Industry Plant Evaluation

- Successful ERO Evaluated Exercise

- Plan and prepare for 16RFO

- Operations Training Accreditation Renewal

- Effective Maintenance Strategy Implementation

- Plant Life Extension

- Recognize and Celebrate Success NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station 7-15-09 5