Summary of Category 1 Pre-submittal Meeting with Fenco to Discuss Davis-Besse's' Proposed Conversion to Improved Technical Specifications
ML063200123
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/11/2006
From: Thomas Wengert
NRC/NRR/ADRO/DORL/LPLIII-2
To:
Wengert, Thomas
Shared Package
ML063200134 List:
References
TAC MD3229
Download: ML063200123 (6)


Text

December 11, 2006 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station, Unit 1

SUBJECT:

SUMMARY

OF NOVEMBER 7, 2006, PRE-SUBMITTAL MEETING WITH FENOC TO DISCUSS DAVIS-BESSES PROPOSED CONVERSION TO IMPROVED TECHNICAL SPECIFICATIONS (TAC NO. MD3229)

On November 7, 2006, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of FirstEnergy Nuclear Operating Company (FENOC), the licensee for Davis-Besse Nuclear Power Station (Davis-Besse), Unit 1, and its contractor, EXCEL Services Corporation (EXCEL) at the NRC headquarters located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss Davis-Besses proposed conversion to Improved Technical Specifications (ITS).

A list of attendees is provided as Enclosure 1. FENOCs presentation slides are provided as .

The presentation to the NRC staff included an overview of the planned scope, schedule, and implementation approach of the conversion effort. FENOC advised that the scope of the ITS project would include preparation of a license amendment request to convert the Davis-Besse current technical specifications to the ITS as described in NUREG-1430, ?Standard Technical Specifications - Babcock and Wilcox Plants, Revision 3.1. FENOC presented details of the four major phases planned for the conversion project: (1) Initial Planning; (2) License Amendment Request Development; (3) NRC Review and Approval; and (4) Implementation.

Following their presentation, FENOC and the NRC staff discussed roles and responsibilities, lessons learned from the Beaver Valley Nuclear Plant ITS conversion, review time for requests for additional information, treatment of beyond scope items, resources/schedule support, and FENOC/NRC communications.

No members of the public were in attendance.

CONTACT: Thomas Wengert, NRR 301-415-4037 tjw2@nrc.gov

FENOC Please direct any inquiries to me at 301-415-4037, or tjw2@nrc.gov.

/RA/

Thomas J. Wengert, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosure:

1. List of Attendees
2. Licensee Handouts cc w/encl: See next page

FENOC Please direct any inquiries to me at 301-415-4037, or tjw2@nrc.gov.

/RA/

Thomas J. Wengert, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346

Enclosure:

1. List of Attendees
2. Licensee Handouts cc w/encl: See next page Distribution PUBLIC LPL3-2 R/F RidsNrrDorlDpl3-2 RidsNrrDorl RidsNrrItsb RidsNrrPMTWengert RidsNrrLAEWhitt RidsOgcRp RidsAcrsAcnwMailCenter RJasinski, NRR RTelson, NRR PHearn, NRR CSchultin, NRR RGrover, NRR DCollins, NRR TKobetz, NRR Tammy Bloomer (TEB), EDO Region III RidsRgn3MailCenter Package Accession number ML063200134 Meeting Summary Accession number ML063200123 Slides Accession number ml063200367 OFFICE LPL3-2/PM LPL3-2/LA ITSB/BC LPL3-2/BC NAME TWengert:mw EWhitt TKobetz MMarshall (CSchulten for)

DATE 12/7/2006 12/7/2006 12/8/2006 12/11/2006 OFFICIAL RECORD COPY

LIST OF ATTENDEES PRE-SUBMITTAL MEETING FOR IMPROVED TECHNICAL SPECIFICATION CONVERSION FOR DAVIS-BESSE NUCLEAR POWER STATION NOVEMBER 7, 2006 1:00 PM - 3:00 PM NAME ORGANIZATION

1. T. Wengert NRC
2. T. Kobetz NRC
3. R. Telson NRC
4. P. Hearn NRC
5. D. Collins NRC
6. C. Schulten NRC
7. R. Grover NRC
8. R. Schrauder FENOC - Director, Performance Improvement
9. B. Bentley FENOC - Project Manager, Davis-Besse ISTS
10. G. Dunn FENOC - Manager, Fleet Licensing
11. R. Schiele EXCEL Services - Project Manager, ITS Conversion Enclosure 1

Davis-Besse Nuclear Power Station, Unit 1 cc:

Manager, Site Regulatory Compliance Attorney General FirstEnergy Nuclear Operating Company Office of Attorney General Davis-Besse Nuclear Power Station 30 East Broad Street Mail Stop A-DB-3065 Columbus, OH 43216 5501 North State Route 2 Oak Harbor, OH 43449-9760 President, Board of County Commissioners of Ottawa County Director, Ohio Department of Commerce Port Clinton, OH 43252 Division of Industrial Compliance Bureau of Operations & Maintenance President, Board of County 6606 Tussing Road Commissioners of Lucas County P.O. Box 4009 One Government Center, Suite 800 Reynoldsburg, OH 43068-9009 Toledo, OH 43604-6506 Regional Administrator The Honorable Dennis J. Kucinich U.S. Nuclear Regulatory Commission United States House of Representatives 801 Warrenville Road Washington, D.C. 20515 Lisle, IL 60523-4351 The Honorable Dennis J. Kucinich Resident Inspector United States House of Representatives U.S. Nuclear Regulatory Commission 14400 Detroit Avenue 5503 North State Route 2 Lakewood, OH 44107 Oak Harbor, OH 43449-9760 Gary R. Leidich Dennis Clum President and Chief Nuclear Officer Radiological Assistance Section Supervisor FirstEnergy Nuclear Operating Company Bureau of Radiation Protection Mail Stop A-GO-19 Ohio Department of Health 76 South Main Street P.O. Box 118 Akron, OH 44308 Columbus, OH 43266-0118 Joseph J. Hagan Carol OClaire, Chief, Radiological Branch Senior Vice President of Operations and Ohio Emergency Management Agency Chief Operating Officer 2855 West Dublin Granville Road FirstEnergy Nuclear Operating Company Columbus, OH 43235-2206 Mail Stop A-GO-14 76 South Main Street Zack A. Clayton Akron, OH 44308 DERR Ohio Environmental Protection Agency David W. Jenkins, Attorney P.O. Box 1049 FirstEnergy Corporation Columbus, OH 43266-0149 Mail Stop A-GO-18 76 South Main Street State of Ohio Akron, OH 44308 Public Utilities Commission 180 East Broad Street Columbus, OH 43266-0573

Davis-Besse Nuclear Power Station, Unit 1 cc:

Danny L. Pace Senior Vice President, Fleet Engineering FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Mail Stop A-GHE-115 395 Ghent Road Akron, OH 44333 Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GHE-315 395 Ghent Road Akron, OH 44333 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308