NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station July 29, 2010
2 Davis-Besse Nuclear Power Station NRC Annual Assessment Meeting 7-29-10 Participants
Barry Allen - Site Vice President
Brian Boles - Director, Site Operations
Clark Price - Director, Performance Improvement
John Dominy - Director, Maintenance
Vito Kaminskas - Director, Engineering
3 Davis-Besse Nuclear Power Station NRC Annual Assessment Meeting 7-29-10 2009 Accomplishments
Safe, Reliable, and Cost-Effective Operations
- Unit Capability Factor = 95.07%
- Force Loss Rate = 0.03%
Successful ERO Evaluated Exercise
Key Regulatory Activities
- Problem Identification and Resolution Inspection (April)
- Emergency Preparedness Evaluated Exercise (May)
- Initial Licensed Operator NRC Examinations (July)
- Emergency Actions Levels Conversion (September)
- Component Design Bases Inspection (October - November)
4 Davis-Besse Nuclear Power Station NRC Annual Assessment Meeting 7-29-10 June 25, 2009 - Switchyard Event Inadequate Emergency Classification
Root cause investigation performed as a result of the NRC finding
- Inadequate Change Management - procedure change that revised the Explosion Definition was not communicated effectively
- Less than adequate communications - Security personnel who witnessed the switchyard explosion did not effectively communicate the information to the Control Room
Corrective Actions
- Training for Security on EALs, interface with Operations, and the importance of precise communications
- Revised Emergency Response continuing training to include off-normal procedures
- Revised Emergency Classification procedure to provide direct tie to off-normal procedures
5 Davis-Besse Nuclear Power Station NRC Annual Assessment Meeting 7-29-10 2010 Key Regulatory Interest Activities
Inspections
- Engineering Inservice Inspection (March)
- Special Inspection Team (March-Present)
- Radiation Protection Outage Baseline (Access Control, ALARA) Inspection (March)
- Triennial Fire Protection Inspection (April-May)
- Emergency Preparedness Baseline Inspection (April)
- Radiation Protection Access Control, ALARA Planning, NRC PIs (August)
- Security Access Control, Control of Safeguards Information, Performance Indicators Inspection (August)
- Radiological Monitoring & Radioactive Material Control (November)
6 Davis-Besse Nuclear Power Station NRC Annual Assessment Meeting 7-29-10 2010 Key Focus Areas
Station Priorities
- Safe, Reliable, and Cost-Effective Operations
- 16th Refueling Outage
- Operations Training Accreditation Renewal
- Defect-Free Fuel Performance
- Human Performance and Industrial Safety Performance Improvements
- Plant Life Extension
- Recognize and Celebrate Success