Davis-Besse Annual Assessment Meeting Reactor Oversight Program - CY 2006 Nuclear Regulatory Commission - Region III Oak Harbor, Ohio 1

August 8, 2007

Meeting Agenda z Meeting Purpose and Introductions z Review of Reactor Oversight Process z National Summary of Plant Performance z Discussion of Plant Performance Results z Licensee Response and Remarks z NRC Closing Remarks

<Break>

z Public Comments and Questions of NRC 2

Purpose of Todays Meeting A public forum for discussion of the licensees performance NRC will address the licensee performance issues identified in the annual assessment letter Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance 3

Region III Organization James Caldwell Regional Administrator Mark Satorius Deputy Regional Administrator Cynthia Pederson Steve West Director Division of Reactor Projects Director Division of Reactor Safety Tony Hsia Anne Boland Acting Deputy Director Deputy Director Bruce Burgess Regional Specialists Branch Chief Davis-Besse Project/Reactor Engineers Resident Inspectors Geoffrey Wright Jack Rutkowski Robert Ruiz Paul Zarawski Richard Smith 4

NRC Representatives z Bruce Burgess, Chief, Division Reactor Projects Phone: (630) 829-9629 z Jack Rutkowski, Senior Resident Inspector Phone: (419) 244-4494 z Richard Smith, Resident Inspector Phone: (419) 244-4494 z Russell Gibbs, Chief, NRR Division Operating Reactor Licensing z Phone: (301) 415-2988 z Tom Wengert, Project Manager, NRR Phone: (301) 415-4037 z Paul Zurawski, Reactor Engineer, RIII Phone: (630) 829-9621 5

NRC Performance Goals z Safety: Ensure protection of the public health and safety and the environment z Security: Ensure the secure use and management of radioactive materials z Openness: Ensure openness in our regulatory process z Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely z Management: Ensure excellence in agency management to carry out the NRCs strategic objectives 6

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response 7

Examples of Baseline Inspections z Equipment Alignment ~80 hrs/yr z Triennial Fire Protection ~200 hrs every 3 yrs z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Rad Release Controls ~110 hrs every 2 yrs z Worker Radiation Protection ~90 hrs/yr z Corrective Action Program ~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr 8

Significance Threshold Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue 9

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 10

National Summary of Plant Performance Status at End of CY 2006 Licensee Response 70 Regulatory Response 24 Degraded Cornerstone 6 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 103 11

National Summary z Performance Indicator Results (End of CY 2006)

Green 1843 White 11 Yellow 0 Red 0 z Total Inspection Findings (CY 2006)

Green 676 White 13 Yellow 0 Red 0 12

Davis-Besse Annual Assessment Summary January 1 - December 31, 2006 z FENOC operated Davis-Besse in a manner that preserved public health and safety z Licensee Response Column of NRC Action Matrix z No substantive cross-cutting issues identified z NRC plans ROP baseline inspections and inspections of Confirmatory Order required independent assessments 13

Davis-Besse Inspection Activities (Jan 1 - Dec 31, 2006)

Approximately 2200 Baseline Inspection Hours Nearly 250 Additional Inspection Hours 14 Total Findings and Violations Refueling Outage 14: March 6 - May 5, 2006 14

Confirmatory Order Required Independent Assessments Confirmatory Order (EA-03-214) - August 31, 2003 Requires independent assessments for 5 years 3/4 Operations Performance 3/4 Organizational Safety Culture, including SCWE 3/4 Engineering Program Effectiveness 3/4 Corrective Action Program Implementation All third year independent assessments complete No significant issues identified in NRC inspections FENOC requested, and subsequently withdrew its request, for the NRC to relax remaining Operations Performance independent assessments 15

Licensee Response and Remarks FENOC 16

Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:

(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs 17

Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free) 18

Davis-Besse Annual Assessment Summary January 1 - December 31, 2006 z FENOC operated Davis-Besse in a manner that preserved public health and safety z Licensee Response Column of NRC Action Matrix z No substantive cross-cutting issues identified z NRC plans ROP baseline inspections and inspections of Confirmatory Order required independent assessments 19