Meeting Presentation NRC Annual Assessment Meeting: Davis-Besse Nuclear Power Station
ML111720990
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/15/2011
From:
FirstEnergy Nuclear Operating Co
To:
NRC/RGN-III
References
Download: ML111720990 (6)


Text

NRC Annual Assessment Meeting Davis-Besse Nuclear Power Station June 15, 2011

2 Davis-Besse Nuclear Power Station NRC Annual Assessment Meeting 6-15-11 Participants

Barry Allen - Site Vice President

Brian Boles - Director, Site Operations

Ken Byrd - Director, Performance Improvement

John Dominy - Director, Maintenance

Clark Price - Director, Special Projects

3 Davis-Besse Nuclear Power Station NRC Annual Assessment Meeting 6-15-11 2010 Accomplishments

Safe, Reliable, and Cost-Effective Operations

- Unit Capability Factor = 80.45%

- Forced Loss Rate = 0.32%

Key Davis-Besse Activities

- Control Rod Drive Mechanism Nozzle Modifications - 16 RFO

- Alloy 600 Mitigation

- Defect-Free Fuel Operation

- Operations Training Accreditation

- License Renewal Submittal

4 Davis-Besse Nuclear Power Station NRC Annual Assessment Meeting 6-15-11 2010 Accomplishments

Key Regulatory Activities

- Special Inspection for CRDM Nozzle Degradation (March-September)

- Triennial Fire Protection Inspection (April)

- Force On Force Inspection (September)

- Licensed Operator Requalification (November)

5 Davis-Besse Nuclear Power Station NRC Annual Assessment Meeting 6-15-11 2010 Key Regulatory Activities

Inspections

- Emergency Preparedness Baseline Inspection (May)

- Security Protective Strategy Evaluation, Access Authorization, Equipment Performance, Training, FFD (May)

- Independent Spent Fuel Storage Operational Inspection (July)

- Security Access Control, Control of Safeguards Information, Performance Indicators Inspection (July)

- Solid Radwaste Processing and Material Handling, NRC PIs (September)

- Radioactive Effluent Treatment, RCS Activity Performance, Indicator Inspection (November)

- Radiological Hazard Assessment & Exposure Controls, NSTS Tracking Verification, ALARA Planning (December)

6 Davis-Besse Nuclear Power Station NRC Annual Assessment Meeting 6-15-11 2011 Focus Areas

Station Priorities

- Safe, Reliable, and Cost-Effective Operations

- Excellent Personnel Safety Behaviors

- Mid-Cycle Outage Preparation and Execution

- 17th Refueling Outage Preparation

- Technical Skills Accreditation Renewal

- Emergency Response Evaluated Exercise

- Industry Evaluation and Assistance Visit

- Plant Life Extension

- Recognize and Celebrate Success