ML080440034: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Feb. 01, 2008 Page 1 'of 3 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2008-5408 USER INFORMATION:
{{#Wiki_filter:Feb. 01, 2008 Page      1    'of 3 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2008-5408 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
GERLACH*ROSE M          EMPL#:028401    CA#:  0363 Address: NUCSA2 Phone#:  254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 02/01/2008 LOCATION:
TO:    GERLACH*ROSE M      02/01/2008 LOCATION:  USNRC FROM:  NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL,  ENSURE THE UPDATE DOCUMENT ID IS  THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.TRM2 -TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 01/07/2008 ADD MANUAL TABLE OF CONTENTS DATE: 01/31/2008 CATEGORY:
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
DOCUMENTS TYPE: TRM2 Aco (
TRM2 -  TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS    DATE:  01/07/2008 ADD    MANUAL TABLE OF CONTENTS  DATE:  01/31/2008 CATEGORY:  DOCUMENTS  TYPE: TRM2 Aco (
Feb. 01, 2008 Page 2 of 3 ID: TEXT 3.12.2 REMOVE: REV:2 ADD: REV: 3 CATEGORY:
 
DOCUMENTS ID: TEXT 3.7.7 ADD: REV: 1 REMOVE: REV:0 CATEGORY:
Feb. 01, 2008 Page      2    of  3 ID:  TEXT  3.12.2 REMOVE:      REV:2 ADD:    REV:  3 CATEGORY:    DOCUMENTS  TYPE: TRM2 ID:  TEXT 3.7.7 ADD:    REV:  1 REMOVE:      REV:0 CATEGORY:    DOCUMENTS  TYPE: TRM2 ID:  TEXT B3.7.7 ADD:    REV:  2 REMOVE:      REV:I CATEGORY:    DOCUMENTS  TYPE: TRM2 ID:  TEXT LOES ADD:    REV:  43 REMOVE:      REV:42 CATEGORY:    DOCUMENTS  TYPE: TRM2 ID:  TEXT TOC REMOVE:      REV:12 ADD:    REV:  13 ANY DISCREPANCIES    WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107  OR X3136  FOR ASSISTANCE.      UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3  DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.      PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE  IN  YOUR NIMS  INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL
DOCUMENTS ID: TEXT B3.7.7 ADD: REV: 2 TYPE: TRM2 TYPE: TRM2 REMOVE: REV:I CATEGORY:
 
DOCUMENTS ID: TEXT LOES ADD: REV: 43 REMOVE: REV:42 TYPE: TRM2 CATEGORY: ID: TEXT REMOVE
SSES MANUAL Manual Name:        TRM2 Manual
 
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:              0 1/31/2008 Procedure Name                        Rev  .Issue Date        Change ID        Change Number TEXT LOES                              43    01/31/2008
 
==Title:==
LIST OF EF]FECTIVE SECTIONS TEXT TOC                              13    01/31/2008
 
==Title:==
TABLE OF CONTENTS TEXT    1.1                          0    11/19/2002    ,
 
==Title:==
USE AND APPLICATION DEFINITIONS TEXT 2.1                              1    02/04/2005,
 
==Title:==
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2                              6        09'4/092007
 
==Title:==
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP  SETPOINT TABLE TEXT 3.0                              3'    05/02/2007
 
==Title:==
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION    (TRO) APPLICABILITY TEXT 3.1.1                            1    11/09/2007
 
==Title:==
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM
: a. LCO 3.3.6.2(a)
: a. LCO 3.3.6.2(a)
: b. LCO 3.3.7.1 -(b)c. LCO 3.6.4.1(c)
: b. LCO 3.3.7.1 -(b)
: c. LCO 3.6.4.1(c)
: d. LCO 3.6.4.2(c)
: d. LCO 3.6.4.2(c)
: e. LCO 3.6.4.3(d)f. LCO 3.7.3(d)g. LCO 3.7.7(e)h. LCO 3.8.2 i. LCO 3.8.5 j. LCO 3.8.8 k. LCO 3.9.6 (g)I. TRO 3.3.4()M. TRO 3.7.1(')n. TRO 3.9.1 (g)o. TRO 3.11.2.6(h)(a) Functions 3, 4, 5, 6, and 8.(b) Functions 3, 4, 5, 6, 8, and 9.(c) Zone III only.(d) Minimum of one subsystem OPERABLE.(e) Only required for movement of heavy load in the proximity of irradiated fuel in the spent fuel storage pool.f Function 4 from Table 3.3.4-1.(g) Only required for movement of heavy load in the proximity of irradiated fuel in the Reactor Pressure Vessel with the Steam Separator removed.(h) Function 3 from Table 3.11.2.6-1.) Two ESW pumps capable of supplying cooling to the required diesel generators.
: e. LCO 3 .6.4.3(d)
SUSQUEHANNA  
: f. LCO 3.7.3(d)
-UNIT 2 TRM / 3.12-4 EFFECTIVE DATE 01/30/2008 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation.PPL Rev. 2 B 3.7.7 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation BASES TRO Technical Specification 3.7.5, requires that the gross radioactivity release rate of noble gases from the main condenser is maintained within limits. This provides reasonable assurance that the total body exposure to an individual at the exclusion area boundary will not exceed a small fraction of the limits of 10 CFR 50.67 in the event this effluent is inadvertently discharged directly to the environment without treatment.
: g. LCO 3.7.7(e)
This specification ensures that this release path is continuously monitored to ensure that the requirements LCO 3.7.5 and General Design Criteria 60 and 64 of Appendix A to 10 CFR Part 50 are implemented. (References 1 and 2)ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
: h. LCO 3.8.2
The actions required for both the Main Condenser Pretreatment Logarithmic Radioactivity Monitor and the Turbine Building Vent Monitor Low Range Noble Gas Channel inoperable ensure that increases in the offgas radioactivity rate are detected.
: i. LCO 3.8.5
This is consistent with TS 3.7.5 which requires sampling when increases in the radioactivity rate are detected.
: j. LCO 3.8.8
Without continuous monitoring, increases in the radioactivity rates can only be detected by sampling.
: k. LCO 3 .9. 6 (g)
The sampling frequency is set to the Technical Specification 3.7.5 frequency to ensure that the intent of the Technical Specification is met. If both monitors are not restored within 72 hours, sampling every 4 hours will continue and TRO 3.0.3 should be entered to ensure that appropriate actions are being taken to restore the equipment.
I. TRO 3.3.4()
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the monitoring instrumentation is maintained OPERABLE.Performance of the CHANNEL CHECK ensures that a gross failure of the instrument has not occurred.
M. TRO 3.7.1(')
A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels.
: n. TRO 3 .9. 1 (g)
It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between (continued)
: o. TRO 3.11.2.6(h)
SUSQUEHANNA  
(a) Functions 3, 4, 5, 6, and 8.
-UNIT 2 TRM / B 3.7-22 SUSQEHANA -UNI 2 TM IB 3.-22EFFECTIVE DATE 01/30/2008 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation B 3.7.7 PPL Rev. 2 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation BASES TRS (continued) instrument channels could be an indication of excessive instrument drift in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrument continues to operate properly between each CHANNEL CALIBRATION.
(b) Functions 3, 4, 5, 6, 8, and 9.
Agreement criteria, which are developed by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability.
(c) Zone III only.
If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.
(d) Minimum of one subsystem OPERABLE.
The CHANNEL FUNCTIONAL TEST (TRS 3.7.7.3) shall also demonstrate that that control room alarm annunciation occurs if any of the following conditions exists: 1. Instrument indicates measured levels above the alarm/trip setpoint.2. Circuit Failure 3. Instrument indicates a downscale failure. .4. Instrument controls not set in operate mode.The initial Channel Calibration (TRS 3.7.7.4) shall be performed using one or more of the reference standards certified by the National Institute of Standards and Test (NIST) or that have been obtained from suppliers that participate in measurement assurance activities with NIST. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration shall be used.REFERENCES
(e) Only required for movement of heavy load in the proximity of irradiated fuel in the spent fuel storage pool.
: 1. Technical Specification 3.7.5 2. 10 CFR Part 50.SUSQUEHANNA  
f Function 4 from Table 3.3.4-1.
-UNIT 2 TRM / B 3.7-23 EFFECTIVE DATE 01/30/2008}}
(g) Only required for movement of heavy load in the proximity of irradiated fuel in the Reactor Pressure Vessel with the Steam Separator removed.
(h) Function 3 from Table 3.11.2.6-1.
) Two ESW pumps capable of supplying cooling to the required diesel generators.
SUSQUEHANNA - UNIT 2                   TRM / 3.12-4               EFFECTIVE DATE 01/30/2008
 
Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation
.PPL Rev. 2                                                                                   B 3.7.7 B 3.7.7   Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation BASES TRO                   Technical Specification 3.7.5, requires that the gross radioactivity release rate of noble gases from the main condenser is maintained within limits. This provides reasonable assurance that the total body exposure to an individual at the exclusion area boundary will not exceed a small fraction of the limits of 10 CFR 50.67 in the event this effluent is inadvertently discharged directly to the environment without treatment. This specification ensures that this release path is continuously monitored to ensure that the requirements LCO 3.7.5 and General Design Criteria 60 and 64 of Appendix A to 10 CFR Part 50 are implemented. (References 1 and 2)
ACTIONS               The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. The actions required for both the Main Condenser Pretreatment Logarithmic Radioactivity Monitor and the Turbine Building Vent Monitor Low Range Noble Gas Channel inoperable ensure that increases in the offgas radioactivity rate are detected. This is consistent with TS 3.7.5 which requires sampling when increases in the radioactivity rate are detected. Without continuous monitoring, increases in the radioactivity rates can only be detected by sampling. The sampling frequency is set to the Technical Specification 3.7.5 frequency to ensure that the intent of the Technical Specification is met. If both monitors are not restored within 72 hours, sampling every 4 hours will continue and TRO 3.0.3 should be entered to ensure that appropriate actions are being taken to restore the equipment.
TRS                   The TRSs are defined to be performed at the specified Frequency to ensure that the monitoring instrumentation is maintained OPERABLE.
Performance of the CHANNEL CHECK ensures that a gross failure of the instrument has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between (continued)
SUSQUEHANNA - UNIT 2                   TRM / B 3.7-22           SUSQEHANA
                                                                        -UNI 2 TM IBDATE 3.-22EFFECTIVE 01/30/2008
 
Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation PPL Rev. 2                                                                                    B 3.7.7 B 3.7.7     Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation BASES TRS                     instrument channels could be an indication of excessive instrument drift (continued)            in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrument continues to operate properly between each CHANNEL CALIBRATION.
Agreement criteria, which are developed by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability. If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.
The CHANNEL FUNCTIONAL TEST (TRS 3.7.7.3) shall also demonstrate that that control room alarm annunciation occurs if any of the following conditions exists:
: 1. Instrument indicates measured levels above the alarm/trip setpoint.
: 2. Circuit Failure
: 3. Instrument indicates a downscale failure. .
: 4. Instrument controls not set in operate mode.
The initial Channel Calibration (TRS 3.7.7.4) shall be performed using one or more of the reference standards certified by the National Institute of Standards and Test (NIST) or that have been obtained from suppliers that participate in measurement assurance activities with NIST. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration shall be used.
REFERENCES             1. Technical Specification 3.7.5
: 2. 10 CFR Part 50.
SUSQUEHANNA - UNIT 2                       TRM / B 3.7-23         EFFECTIVE DATE 01/30/2008}}

Latest revision as of 08:11, 7 December 2019

Revisions to Technical Requirements Manual
ML080440034
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 02/01/2008
From:
Susquehanna
To: Gerlach R
Document Control Desk, Office of Nuclear Reactor Regulation
References
028401, 2008-5408
Download: ML080440034 (37)


Text

Feb. 01, 2008 Page 1 'of 3 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2008-5408 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 02/01/2008 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 01/07/2008 ADD MANUAL TABLE OF CONTENTS DATE: 01/31/2008 CATEGORY: DOCUMENTS TYPE: TRM2 Aco (

Feb. 01, 2008 Page 2 of 3 ID: TEXT 3.12.2 REMOVE: REV:2 ADD: REV: 3 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT 3.7.7 ADD: REV: 1 REMOVE: REV:0 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT B3.7.7 ADD: REV: 2 REMOVE: REV:I CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES ADD: REV: 43 REMOVE: REV:42 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT TOC REMOVE: REV:12 ADD: REV: 13 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 0 1/31/2008 Procedure Name Rev .Issue Date Change ID Change Number TEXT LOES 43 01/31/2008

Title:

LIST OF EF]FECTIVE SECTIONS TEXT TOC 13 01/31/2008

Title:

TABLE OF CONTENTS TEXT 1.1 0 11/19/2002 ,

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005,

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 6 09'4/092007

Title:

PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 3' 05/02/2007

Title:

APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/19/2002

Title:

REACTIVITY-CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 3 04/09/2007

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 7 04/19/2007

Title:

CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

Report Date: .01/31/08 Page 1I of of 15

.15 Report Date:.01/31/08

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0 11/19/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 2 11/09/2007

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2 11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 4 1,1/09/2007

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0 11/19/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 2 10/1'9/2005

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 2 04/09/2007

Title:

INSTRUMENTATION LPRM UPSCALE ALARM, INSTRUMENTATION TEXT 3.3.10 1 12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.4.1 1 .04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY Report Date: 01/31/08 Page 22 of of 15 I__5 Report Date: 01/31/08

Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.2 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS)

TEXT 3.4.4 1 12/14/2004

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.5.1 1 02/04/2005

Title:

ECCS AND RCIC ADS MANUAL INHIBIT .-

TEXT 3.5.2 1 11/09/2007

Title:

ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002

Title:

ECCS AND RCIC LONG TERN NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/19/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0 11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1 0 11/19/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN Page 3 of I15 Re-Dort Date: 01/31/08

  • SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1 1 04/26/2006

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3.2 2 04/26/2006

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3 2 08/18/2005

Title:

PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 1 04/26/2006

Title:

PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND .HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26-/2006

Title:

PLANT SYSTEMS FIRE RATED.ASSEMBLIES TEXT 3.7.3.8 7 11/09/2007

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3. 7.4 .1 04/26/.2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM TEXT 3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE Report Date: 01/31/08 Page 44 of of 15

.15 Report Date: 01/31/08

s~

. 'S... MAT\TEAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6 1 03/01/2005

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7 1 01/31/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 6 06/21/2007

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC-TEXT 3.7.10 1 12/1i4/20'04

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.8.1 2 02/04/2005

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATIONCONDUCTOR OVERCURRENT PROTECTIVE DEVICES-TEXT 3.8.2.1 2 11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTIf ONON CONTINUOUS TEXT 3.8.2.2 2 12/14/2004 ON

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTI( ON AUTOMATIC TEXT 3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG)'MAINTENANCE ACTIVITIES TEXT 3.8.4 1 02/04/2005

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL SUBSYSTEM TEXT 3.8.5 0 11/19/2002

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION Rep9rt Date: 01/31/08 Page 5 Page .5~ of of .15 15 01/31/08 Report Date:

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.6 0 11/19/2002

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7 0 12/14/2006

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1 04/26/2006

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 04/09/2007

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST ,RPS- INSTRUMENTATION TEXT 3.10.3 1 04/26/2006

Title:

MISCELLANEOUS INDEPENDENT ,SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 1 ý08/28/2006

Title:

MISCELLANEOUS LEADING EDGE FLOW METER (LEFM)

TEXT 3.11.1.1 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/2-6/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/2.6/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM Page 6 of .15 Report Date: 01/31/08

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.4 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 2 05/02/2007

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/,2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE,-TRITIUM, AND RADIONUCLIDES.IN PARTICULATE FORM TEXT 3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE _EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 3 11/14/2006

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 3 05/02/2007

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 -04/26/2006

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 2 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM Report Date: 01/31/08 Page 72 Page of of 15 i__5 Report Date: 01/31/08

I

SSES .MANUKAL Manual Name
TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT, 2 0 TEXT 3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 3 01/31/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT B3.0 3 05/02/2007

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEM BASES-ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002 --

Title:

REACTIVITY CONTROL 'SYSTEM BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE'OPERATINGLIMITS REPORT (COLR)

TEXT B3.3.1 0 11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1 11/0,9/2007

Title:

INSTRUMENTATION BASES SEISMIC MONITORING -INSTRUMENTATION TEXT B3.3.3 2 11/09/2007

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION Report Date: 01/31/08 Page 88 Page of of 15 15 Report Date: 01/31/08

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.4 3 11/09/2007

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007

Title:

INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 3 10/19/2005

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION' TEXT B3.3.7 1 11/09/2007

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3.3.8 1 10/22/2003

Title:

INSTRUMENTATION BASEST*TMRPS INSTRUMENTATION TEXT B3.3.9 2 04/10/2007

Title:

INSTRUMENTATION BASES LPRM UPSCALE ALARM INSTRUMENTATION TEXT B3.3.10 0 11/19/2002

Title:

INSTRUMENTATION BASES-REACTOR RECIRCULATION'PUMP MGOSET STOPS TEXT B3.3.11 1 10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.4.1 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 0 .11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT RportDate 01/1/0 Page2 of15 Page 9 of 1_55 Report Date: 01/31/08

SSES=, MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.4.5 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS.

TEXT B3.5.1 0 11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING' TEXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION, INDICATION TEXT B3.6.3 1 04/19/2007

Title:

CONTAINMENT BASES SUPPRESSION POOL.ALARM INSTRUMENTATION-TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES-PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT-SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 2 01/07/2008

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006

Title:

PLANT'SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page i__0 of ia 'Report Dat e: 0 1/3i}:

"SSES-MANUJAL Manual Niame: TRM2 WManual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 1 04/26/2006

Title:

PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8 1 01/1'2/2004

Title:

PLANT SYSTEMS BASES FIRE DETECTION'INSTRUMENTATION TEXT B3.7.4 0 1i'/19/2002

Title:

PLANT SYSTEMS BASES SOLID-RADWASTE SYSTEM TEXT B3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR, TEXT B3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6 1 03/01/2005

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7 2 01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Report Date: 01/31/08 Page 11 Page 11 of of 15

.15 Report Date: 01/31/08

- ýSSES- -1ANIAL Manual Narne: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.8 3 06/21/2007

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1 12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC.

TEXT B3.7.10 1 .12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.8.1 1 02/04/2005

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002

Title:

ELECTRICAL ,POWER BASES MOTOR OPERATED VALVES (MOV) .THERMAL OVERLOAD PROTEC-TION -

CONTINUOUS TEXT B3.8.2.2 09/1'7/2004

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV). THERMAL OVERLOAD. PROTECTION -

AUTOMATIC TEXT B3.8.3 0 *ii/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCEACTIVITIES,,-

TEXT B3.8.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 11/19/2002

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 0 12/14/2006

Title:

BATTERY MAINTENANCE AND MONITORING-PROGRAM TEXT B3.9.1 0 11./19/2002

Title:

REFUELING OPERATIONS, BASES DECAY TIME Report Date: 01/31/08 12 Page 12 of of 15 15 Report Date: 01/31/08

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2' TEXT B3.9.2 0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 04/10/2007

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002

Title:

MISCELLANEOUS BASES'INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.10.4 0 11/19/2002

Title:

MISCELLANEOUS BASES LEADING EDGE FLOW METER (LEFM)

TEXT B3.11.1.1 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQU-ID EFFLUENTS CONCENTRATION TEXT B3.11.1.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS DOSE.

TEXT B3.11.1.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 1!1/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1 I ý'12/14/2004 0

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE Report Date: 01/31/08 Page 13 13 of of 15 15 Report Date: 01/31/08

SSES. -MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2-TEXT B3.11.2.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4 11/14/2006

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT-SYSTEM TEXT B3.11.2.6 1 01/27/2004

Title:

RADIOACTIVE EFFLUENTS, BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING, INSTRUMENTATION TEXT B3.11.3 0 11/119/2002

Title:

RADIOACTIVE EFFLUENTS BASES :TOTAL DOSE.

TEXT B3.11.4.1 2 01/06/2006

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING-PROGRAM TEXT B3.11.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002

Title:

' LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report Date: 01/31/08 14 Page 14 of of 15 15 Report Date: 01/31/08

,SSES MANUAL Manual Name: TRM2 W Manual

Title:

TECHN"ICAL REQUIREMENTS MANUAL UNIT 2 TEXT 4.1 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4 0 09/27/2003

Title:

ADMINISTRATIVE' CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 4.6 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM TEXT 4.7 0 09/27;/2003

Title:

ADMINISTRATIVE CONTROLS TRAINING Report Date: 01/31/08 Page 13 15 of of 15

.15 Report Date: 01/31/08

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 13 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 1.0 US E A ND A P P LIC A T IO N ............................................................................ 1.0-1 1.1 De fin itio ns ..................................................................................... T RM/1 .0 -2 2 .0 P LA NT P R O G R A MS ................................................................................... 2 .0-1 2 .1 P la nt P ro g ra m s ...................................................................................... 2 .0 -1 2.2 Instrum ent Trip Setpoint Table ..................................................... TRM/2.0-5 3 .0 AP P LIC ABILITY ................................................................................. T RM/3 .0-1 3.0 (TRO) - TR for Operation (TRO) Applicability ...................... TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability .................. . - *X TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS ......................... ... TRM/3.1-1 3.1.1 Alternate Rod Injection ...................................... ... ...... TRM/3.1-1 3.1.2 CRD Housing Support ........................................ .... ..................... 3.1-4 3.1.3 Control Rod Block Instrumentation ..... .......... 3.....

3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation/ and Check Valve ......................... / ..... ... TRM/3.1-9 3.2 CORE OPERATING LIMITS REPORT-,_........*........................................... 3.2-1 3.2.1 C ore O perating Lim its Report.(.. .. ................................................ 3.2-1 3.3 INSTR UM ENTATIO N ........ . ............................................................. TR M/3.3-1 3.3.1 Radiation Monitoring ^l,'strumie-ntation ........................................... TRM/3.3-1 3.3.2 Seismic Monitoring/ Instrumentation .............................................. TRM/3.3-4 3.3.3 Meteorological'Monitoring Instrumentation ................................... TRM/3.3-7 3.3.4 TRM Post-Accide Monitoring Instrumentation ..... ........ TRM/3.3-9 3.3.5 Section NotUsed ............................... ................................ TRM/3.3-12 3.3.6 TRM ContainmentlIsolation Instrumentation ................................. TRM/3.3-13 3.3.7 Turbine-Overspeed Protection System ......................................... TRM/3.3-17 3.3.8 S ectionN ot Used .......................................................................... T RM/3.3-19 3.3.9 O IrRM ,,,Instr m entation ................................................................. TRM /3.3-21 3.3.10 ((Rea6ior Recirculation Pump MG Set Electrical and IMecdhanical S tops ........................................................................ TRM/3.3-22 3.3.11 MVP Isolation Instrum entation ...................................................... TRM/3.3-24 3.4 REACTOR COOLANT SYSTEM ................................... I....................... TRM/3.4-1 3.4.1 Reactor Coolant System Chem istry ...................................................... 3.4-1 3 .4 .2 Structu ra l Integ rity .................................................................................. 3 .4-6 3.4.3 High/Low Pressure Interface Leakage Monitors .................................... 3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit ............................ TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program ..... ..................... TRM/3.4-13 3.5 EMERGENCY CORE COOLING AND RCIC ...................................... TRM/3.5-1 3.5.1 A DS Manual Inhibit ....................................................................... T R M/3 .5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation ............................ 3.5-3 3.5.3 Long Term Nitrogen Supply to ADS ...................................................... 3.5-6 SUSQUEHANNA - UNIT 2 TRM / TOC-1 EFFECTIVE DATE 01/30/2008

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 13 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3 .6 C O NT AINME NT ......................................................................................... 3 .6-1 3.6.1 VENTING or PURGING ........................................................................ 3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Ind ic a tio n .............................................................................................. 3 .6-3 3.6.3 Suppression Pool Alarm Instrumentation ............................................... 3.6-4 3.6.4 Primary Containment Closed System Boundaries ..... I.................. TRM/3.6-7 3.7 PLANT SYSTEMS .............................................................................. TRM/3.7-1 3.7.1 Emergency Service Water System (Shutdown) ............................ TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level ......................................... 3.7-3 3.7.3.1 Fire Suppression Water Supply System ...................................... TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems ...................................................... TRM/3.7-8 3.7.3.3 C02 systems ............................................................................... TRM/3.7-12 3.7.3.4 Halon Systems ............................................................................ TRM/3.7-16 3.7.3.5 Fire Hose Stations ....................................................................... TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................ TRM/3.7-22 3.7.3.7 Fire Rated Assemblies ................................................................. TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation ...................................................... TRM/3.7-26 3.7.4 Solid Radwaste System ................................................................ TRM/3.7-34 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ........................................... 3.7-37 3.7.5.2 Main Condenser Explosive Gas Mixture ....................................... TRM/3.7-38 3.7.5.3 Liquid Holdup Tanks ..................................................................... TRM/3.7-39 3.7.6 ESSW Pumphouse Ventilation .............................................................. 3.7-40 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation ........................................................... TRM/3.7-41 3.7.8 Snubbers ..................................................... TRM/3.7-43 3.7.9 Control Structure HVAC ................................................................ TRM/3.7-49 3.7.10 Spent Fuel Storage Pools (SFSPs) .............................................. TRM/3.7-51 3.8 ELECTRICAL POWER ....................................................................... TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent P rotective Devices ........................................................................ T RM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

Continuous ...................................... TRM/3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

Automatic ....................................... TRM/3.8-11 3.8.3 Diesel Generator (DG) Maintenance Activities ...................................... 3.8-13 3.8.4 24VDC Electrical Power Subsystem ............................................. TRM/3.8-15 3.8.5 Degraded Voltage Protection ....................................................... TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling ................................................. 3.8-24 3.8.7 Battery Monitoring and Maintenance Program .............................. TRM/3.8-26 3.9 REFUELING OPERATIONS ....................................................................... 3.9-1 3.9.1 Decay Time ......................................... 3.9-1 3 .9 .2 C om m unications ................................................................................... 3 .9-2 3 .9 .3 Refue ling P latfo rm ................................................................................. 3 .9-3 SUSQUEHANNA - UNIT 2 TRM / TOC-2 EFFECTIVE DATE 01/30/2008

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 13 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.10 MIS C E LLA NE O US ............................................................................. TR M/3. 10-1 3.10.1 Sealed Source Contamination ...................................................... TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation .......................... 3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) .................... TRM/3.10-7 3.10.4 Leading Edge Flow Meter (LEFM) ................................................ TRM/3.10-8 3.11 RADIOACTIVE EFFLUENTS .............................................................. TRM/3.11-1 3 .11.1 Liq uid E fflue nts ............................................................................. T RM/3 .11-1 3.11.1.1 Liquid Effluents Concentration ...................................................... TRM/3.11-1 3.11.1.2 Liquid Effluents Dose ................................................................... TR M/3.11-4 3.11.1.3 Liquid Waste Treatment System .................................................. TRM/3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation ............................ 3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation ............... TRM/3.11-13 3.11.2 G aseous Effluents ........................................................................ T R M/3.11-17 3.11.2.1 Dose Rate ............ ................................ TRM/3.11-17 3.11.2.2 D ose - Noble G ases ..................................................................... TRM /3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in P articulate Form ........................................................................... T RM/3 .11-2 1 3.11.2.4 Gaseous Radwaste Treatment System ........................................ TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System......................................... TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instru m e nta tio n .................................................................................... 3 .1 1-2 6 3 .11.3 T otal Dose .................................................................................... T RM/3 .11-33 3.11.4 Radiological Environmental Monitoring ......................................... TRM/3.11-35 3.11.4.1 Monitoring Program ................................ TRM/3.11-35 3.11.4.2 Land Use Census ....................................................................... TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program .................... TRM/3.11-47 3.12 LOADS CONTROL PROGRAM .......................... TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool ....................................... TRM/3.12-1 3.12.2 Heavy Loads Requirements ......................................................... TRM/3.12.3 3.12.3 Light Loads Requirements ............................................................ TRM/3.12-5 4.0 ADMINISTRATIVE CONTROLS ................................................................. 4.0-1 4 .1 O rg a niz a tio n .......................................................................................... 4 .0 -1 4 .2 Reportable E vent Action ....................................................................... 4.0-2 4 .3 S afety Lim it Violation ............................................................................. 4 .0-3 4.4 Procedures and Program s .................................................................... 4.0-4 4.5 Reporting Requirem ents ....................................................................... 4.0-5 4.6 Radiation Protection Program 4...................................

4.0-7 4 .7 T ra in in g ............................................................................. ..................... 4 .0-8 TRM / TOC-3 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT 2 2 TRM / TOC-3 EFFECTIVE DATE 01/30/2008

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 13 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.0 (TRO) - TR for Operation (TRO) Applicability .................................. B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability ......................................... B 3.0-9 B 3.1.1 Alternate Rod Injection ................................................................ TRM/B 3.1-1 B 3.1.2 C RD Housing S upport ......................................................................... B 3.1-4 B 3.1.3 Control Rod Block Instrumentation .............................................. TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck Valve ........................................................................ T RM/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR) ................................................. B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation .......................................... TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation ............................................. TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation .................................. TRM/B 3.3-3 B 3,3.4 TRM Post-Accident Monitoring Instrumentation ........................... TRM/B 3.3-4 B 3.3.5 Section Not Used ......................................................................... TRM/B 3.3-9 B 3.3.6 TRM Containment Isolation Instrumentation ....................................... B 3.3-10 B 3.3.7 Turbine Overspeed Protection System ........................................ TRM/B 3.3-14 B 3.3.8 Section Not Used ......................................................................... TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation ................................................................ TRM/B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops ........................................................................ TRM/B 3.3-20 B 3.3.11 MVP Isolation Instrumentation ..................................................... TRM/B 3.3-22 B 3.4.1 Reactor Coolant System Chemistry .................................................... B 3.4-1 B 3.4 .2 S tructural Integrity ................................................................................. B 3 .4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors .......................... TRM/B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit ........................... TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program .................................. B 3.4-6 B 3.5.1 ADS Manual Inhibit .............................................................................. B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation .................. TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS ........................ B[ 3.5-4 B 3.6.1 VENTING or PURGING ............................................................... TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position In d ica tio n ............................................................................................. B 3 .6 -3 B 3.6.3 Suppression Pool Alarm Instrumentation .... ........................................ B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries ....................... TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown) ................................... B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level ....................................... B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System ...................................... TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems ...................................................... TRM/B 3.7-5 B 3.7.3.3 C 0 2 S ystem s .............................................................................. T RM/B 3.7-7 SUSQUEHANNA - UNIT 2 TRM / TOC-4 EFFECTIVE DATE 01/30/2008

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 13 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.7.3.4 Halon S ystem s ............................................................................ T RM/B 3.7-8 B 3.7.3.5 Fire Hose Stations ....................................................................... TR M/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ............................ TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assem blies ................................................................. TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation ..................................................... TRM/B 3.7-14 B 3.7.4 Solid Radw aste System ............................................................... TRM/B,3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ......................................... B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture .............................................. B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks ............................................................................ B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation .................................................... TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrum entation ......................................................... TRM/B 3.7-22 B 3 .7 .8 S nubbers .................................................................................... T RM/B 3 .7-24 B 3.7.9 Control Structure HVAC ............................................................... TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools ........................................................... TRM/B 3.7-33 B 3.8.1 Primary Containment Penetration Conductor Overcurrent P rotective Devices ....................................................................... T RM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

C ontinuo us .................................................................................. T RM/B 3 .8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

Auto m atic ..................................................................................... T RM/B 3 .8-4 B 3.8.3 Diesel Generator (DG) Maintanence Activities ............................ TRM/B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem ............................................ TRM/B 3.8-6 B 3.8.5 Degraded Voltage Protection ...................................................... TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling .................. TRM/B 318 B 3.8.7 Battery Monitoring and Maintenance Program ............................. TRM/B 3.8-18 B.3 .9 .1 De ca y T im e ......................................................................................... B 3 .9-1 B 3 .9 .2 C om m unications .................................................................................. B 3 .9-2 B 3.9 .3 Refueling P latform ............................................................................... B 3 .9-3 B 3.10.1 Sealed Source Contam ination ............................................................. B 3. 10-1 B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation ........................ B 3.10-2 B 3.10,3 Independent Spent Fuel Storage Installation (ISFSI) ................... TRM/B 3.10-4 B 3.10.4 Leading Edge Flow Meter (LEFM) ............................................... TRM/B 3.10-6 B 3.11.1.1 Liquid Effluents C oncentration ............................................................. B 3.11-1 B 3,11A12 Liquid Effluents Dose . ........................ B 3.11-4 B 3.11.1.3 Liquid Waste Treatment System ................... ..................................... B 3.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation .......................... B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation .............. TRM/B 3.11-10 B 3.11.2.1 Dose Rate ...................................... TRM/B 3.11-12 B 3.11.2.2 Dose - Noble G ases ........................................................................... B 3.11-16 TRM / TOC-5 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA -

UNIT 2 SUSQUEHANNA - UNIT 2 TRM /TOC-5 EFFECTIVE DATE 01/30/2008

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 13 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form ..................... B 3.11-18 B 3.11.2.4 Gaseous Radwaste Treatment System ....................................... TRM/B 3.11-20 B 3.11.2.5 Ventilation Exhaust Treatment System ........................................ TRM/B 3.11-21 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrum entation ............................................................................ T R M/B 3.11-24 B 3.11.3 T o ta l D o se ........................................................................................... B 3 .1 1-2 6 B 3.11.4.1 Monitoring Program ...............................................  :..................... T R M/B 3.11-28 B 3.11.4.2 La nd Use C e nsu s ................................................................................ B 3. 11-34 B 3.11.4.3 Interfaboratory Comparison Program ........................................... TRM/B 3.11-36 B 3.12 LOADS CONTROL PROGRAM ................................................... TRM/B 3.12-1 B.3.12.1 Crane Travel - Spent Fuel Storage Pool ..................................... TRM/B 3.12-1 B.3.12.2 Heavy Loads Requirements ........................................................ TRM/B 3.12-2 B.3.12.3 Light Loads Requirements ........................................................... TRM/B 3.12-3 TRM2 Text TOC 1/28/08 TRM/TOC-6 EFFECTIVE DATE 01/30/2008 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT 2 2 TRM /TOC-6 EFFECTIVE DATE 01/30/2008

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC TABLE OF CONTENTS 01/30/2008 1.0 USE AND APPLICATION Page TRM / 1.0-1 08/31/1998 Page TRM / 1.0-2 10/04/2002 Page TRM / 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 04/12/1999 Pages TRM / 2.0-6 and TRM / 2.0-7 03/27/2007 Page TRM / 2.0-8 12/03/2004 Pages TRM / 2.0-9 through TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 03/27/2007 Pages TRM / 2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Page TRM / 3.0-1 01/10/2007 Page TRM / 3.0-2 04/12/2007 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM / 3.1-2 through TRM / 3.1-5 08/31/1998 Pages TRM / 3.1-6 through TRM / 3.1-8 03/27/2007 Pages TRM / 3.1-9 and TRM / 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 08/31/1998 Pages TRM / 3.2-2 through TRM / 3.2-48 03/30/2007 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Pages TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page 3.3-6 08/31/1998 Page TRM 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 Page TRM / 3.3-9 04/12/2007 Page TRM / 3.3-9a 12/17/1998 Page TRM / 3.3-10 10/31/2007 Page TRM / 3.3-11 06/02/2005 Page TRM / 3.3-11a 05/30/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 01/30/2008

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 -09/13/2005 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 10/22/2003 Page TRM / 3.3-16 06/27/2001 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/2003 Page TRM / 3.3-21 03/27/2007 Page TRM / 3.3-21a 11/15/2004 Pages TRM /3.3-21b through TRM / 3.3-21d 03/27/2007 Page TRM / 3.3-22 12/03/2004 Pages TRM / 3.3-23 and TRM / 3.3-24 05/16/2003 Page TRM / 3.3-25 10/22/2003 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages 3.4-6 through 3.4-9 08/31/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM / 3.4-12 12/03/2004 Page TRM / 3.4-13 03/31/2006 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM / 3.6-9, 12/31/2002 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 07/29/1999 Page 3.7-3 08/31/1998 Pages TRM / 3.7-4 and TRM / 3.7-5 03/31/2006 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Page TRM / 3.7-9 03/31/2006 Page TRM / 3.7-10 08/16/2005 Page TRM / 3.7-11 0.1/21/2000 Pages TRM / 3.7-12 and TRM / 3.7-13 08/02/1999 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 03/31/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 01/30/2008

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 03/31/2006 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Pages TRM / 3.7-23 and TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25 and TRM / 3.7-26 .08/02/1999 Page TRM / 3.7-27 10/31/2007 Page TRM / 3.7-28 11/29/2006 Page TRM / 3.7-29 11/16/2001 Page TRM / 3.7-30 11/30/2005 Page TRM / 3.7-31 11/16/2001 Page TRMI. 3.7-32 01/09/2004 Page TRM / 3.7-33 10/05/2002 Page TRM / 3.7-34 03/31/2006 Pages TRM / 3.7-35 and TRM / 3.7-36 02/01/1999 Pages 3.7-37 through 3.7-38 08/31/1998 Page TRM / 3.7-39 03/31/2006 Pages TRM / 3.7-40 and TRM / 3.7-40a 02/14/2005 Page TRM / 3.7-41 01/30/2008 Page 3.7-42 08/31/1998 Pages TRM / 3.7-43 through TRM / 3.7-45 10/05/2006.

Page TRM / 3.7-46 06/07/2007 Page TRM / 3.7-47 10/05/2006 Page TRM / 3.7-48 06/07/2007 Page TRM / 3.7-49 03/09/2001 Page TRM / 3.7-50 08/16/2006 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 Page TRM / 3.7-53 07/29/1999 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Pages TRM / 3.8-2 and TRM / 3.8-3 01/28/2005 Page TRM / 3.8-4 01/31/2005 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-10 10/31/2007 Page TRM / 3.8-11 08/10/2004 Page TRM / 3.8-12 12/03/2004 Pages 3.8-13 and 3.8-14 08/31/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 Pages TRM / 3.8-26 through TRM / 3.8-29 11/29/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 01/30/2008

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Pages TRM / 3.10-5 and TRM /3.10-6 03/27/2007 Page TRM / 3.10-7 03/31/2006 Page TRM / 3.10-8 08/16/2006 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages 3.11-7 through 3.11-9 08/31/1998 Page TRM / 3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998 Page TRM / 3.11-13 04/12/2007 Page TRM / 3.11-14 12/03/1004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 05/13/2005 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 through TRM / 3.11-28 01/21/2004 Page TRM / 3.11-29 12/03/2004 Pages TRM 3.11-30 through TRM / 3.11-32 01/21/2004 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-44 08/31/1998 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 01/30/2008

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 01/30/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 01/30/2008

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 01/10/2007 Pages TRM / B 3.0-5 and TRM / B 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/13/1999 Pages TRM / B 3.1-2 and TRM / B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Pages TRM / B 3.1-5 through TRM / B 3.1-7 03/27/2007 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Pages TRM / B 3.3-2 and TRM / B-3.3-2a 10/31/2007 Pages TRM / B 3.3-3 and TRM / B 3.3-3a 10/31/2007 Pages TRM / B 3.3-4 and TRM / B 3.3-5 05/30/2006 Pages TRM / B 3.3-6 through TRM / B 3.3-9 10/31/2007 Page B 3.3-10 08/31/1998 Pages TRM / B 3.3-11 and TRM / B 3.3-12 09/13/2005 Page TRM / B 3.3-13 12/03/2004 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 06/14/2002 Pages TRM / B 3.3-15 through TRM / B 3.3-17 10/22/2003 Pages TRM / B 3.3-18 and TRM / B 3.3-19 03/27/2007 Pages TRM / B 3.3-19a through TRM / B 3.3-19e 03/27/2007 Pages TRM / B 3.3-20 and TRM / B 3.3-21 05/16/2003 Page TRM / B 3.3-22 10/22/2003 Page TRM / B 3.3-23 05/16/2003 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-3 08/31/1998 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 SUSQUEHANNA -. UNIT 2 TRM / LOES-6 EFFECTIVE DATE 01/30/2008

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 and TRM / B 3.5-3a 10/31/2007 Page B 3.5-4 08/31/1998 Page TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/29/2007 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B 3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Pages TRM / B 3.7-3 and TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Pages TRM / B 3.7-6 and TRM / B 3.7-6a 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 08/02/1999 Page TRM / B 3.7-9 03/31/2006 Page TRM / B 3.7-10 08/02/1999 Pages TRM / B 3.7-10a through TRM / B 3.7-11a 03/31/2006 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Pages TRM / B 3.7-14a and TRM / B 3.7-14b 01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Pages TRM / B 3.7-21 and TRM / B3.7-21a 02/14/2005 Pages TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Pages TRM / B 3.7-24 through TRM / B 3.7-29 10/05/2006 Page TRM / B 3.7-30 06/07/2007 Pages TRM / B 3.7-30a and TRM / B 3.7-30b 10/05/2006 Page TRM / B 3.7-31 12/03/2004 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 01/30/2008

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 43 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8 04/02/2002 Pages TRM / B 3.8-2 and TRM / B 3.8-2a 01/28/2005 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 04/02/2002 Page TRM / B 3.8-4a 08/10/2004 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 04/02/2002 Page TRM / B 3.8-17 01/28/2005 Pages TRM / B 3.8-18 through TRM / B 3.8-24 11/29/2006 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/27/2007 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 Pages TRM / B 3.10-6 and TRM / 3.10-7 04/17/2002 B,3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-11a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23 11/14/2006 Page TRM / B 3.11-23a 05/13/2005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Page TRM / B 3.11-30 12/03/2004 Pages B 3.11-31 through B 3.11-35 08/31/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 09/19/2007 Pages TRM / B 3.12-2 and TRM / B 3.12-3 02/05/1999 TRM2 text LOES.doc 1/28/08 SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 01/30/2008

Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation PPL Rev. 1 3.7.7 3.7 Plant Systems 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation TRO 3.7.7 One channel of Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation shall be OPERABLE.

APPLICABILITY: During operation of the Main Condenser Air Ejector and Offgas Treatment System.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A Main Condenser Offgas A. 1 Verify that the Offgas System Immediately Pretreatment Logarithmic is not bypassed

.Radioactivity Monitor AND inoperable.

A.2 Verify the turbine building vent Immediately monitor low range noble gas channel is in operation AND A.3 Perform TS SR 3.7.5.1 Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND A.4 Restore Main Condenser 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Offgas Pretreatment Radioactivity Monitor to OPERABLE status B. Main Condenser Offgas B.1 Verify that the Offgas System Immediately Pretreatment Logarithmic is not bypassed Radioactivity Monitor and AND Turbine Building Vent Monitor Low Range Noble B.2 Perform TS SR 3.7.5.1 Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Gas Channel inoperable AND B.3 Restore Main Condenser 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Offgas Pretreatment Radioactivity Monitor OR Turbine Building Vent Monitor Low Range Noble Gas Channel to OPERABLE status SUSQUEHANNA - UNIT 2 TRM / 3.7-41 EFFECTIVE DATE 01/30/2008

Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation PPL Rev. 1 3.7.7 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.7.7.1 Perform CHANNEL CHECK 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TRS 3.7.7.2 Perform SOURCE CHECK 31 days TRS 3.7.7.3 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.7.7.4 Perform CHANNEL CALIBRATION 24 Months SUSQUEHANNA - UNIT 2 3.7-42 EFFECTIVE DATE 08/31/1998

Heavy Loads Requirements PPL Rev. 3 3.12.2 312 Loads Control Program 3.12.2 Heavy Loads Requirements TRO 3.12.2 'The Technical Specification Limiting Conditions of Operation and Technical Requirements for Operation listed in Table 3.12.2-1 shall be met..

APPLICABILITY: During movement of heavy loads in the proximity of irradiated fuel.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. The Conditions of A.1 Suspend movement of Immediately TRO 3.12.2 are not met. heavy loads in the proximity of irradiated fuel.

TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.12.2.1 Administratively verify that all requirements of Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior TRO are met. to commencing movement of heavy loads AND Every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter SUSQUEHANNA - UNIT 2 TRM / 3.12-3 EFFECTIVE DATE 02/05/1999

Heavy Loads Requirements PPL Rev. 3 3.12.2 TABLE 3.12.2-1 TRO 3.12.2 REQUIREMENTS

a. LCO 3.3.6.2(a)
b. LCO 3.3.7.1 -(b)
c. LCO 3.6.4.1(c)
d. LCO 3.6.4.2(c)
e. LCO 3 .6.4.3(d)
f. LCO 3.7.3(d)
g. LCO 3.7.7(e)
h. LCO 3.8.2
i. LCO 3.8.5
j. LCO 3.8.8
k. LCO 3 .9. 6 (g)

I. TRO 3.3.4()

M. TRO 3.7.1(')

n. TRO 3 .9. 1 (g)
o. TRO 3.11.2.6(h)

(a) Functions 3, 4, 5, 6, and 8.

(b) Functions 3, 4, 5, 6, 8, and 9.

(c) Zone III only.

(d) Minimum of one subsystem OPERABLE.

(e) Only required for movement of heavy load in the proximity of irradiated fuel in the spent fuel storage pool.

f Function 4 from Table 3.3.4-1.

(g) Only required for movement of heavy load in the proximity of irradiated fuel in the Reactor Pressure Vessel with the Steam Separator removed.

(h) Function 3 from Table 3.11.2.6-1.

) Two ESW pumps capable of supplying cooling to the required diesel generators.

SUSQUEHANNA - UNIT 2 TRM / 3.12-4 EFFECTIVE DATE 01/30/2008

Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation

.PPL Rev. 2 B 3.7.7 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation BASES TRO Technical Specification 3.7.5, requires that the gross radioactivity release rate of noble gases from the main condenser is maintained within limits. This provides reasonable assurance that the total body exposure to an individual at the exclusion area boundary will not exceed a small fraction of the limits of 10 CFR 50.67 in the event this effluent is inadvertently discharged directly to the environment without treatment. This specification ensures that this release path is continuously monitored to ensure that the requirements LCO 3.7.5 and General Design Criteria 60 and 64 of Appendix A to 10 CFR Part 50 are implemented. (References 1 and 2)

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. The actions required for both the Main Condenser Pretreatment Logarithmic Radioactivity Monitor and the Turbine Building Vent Monitor Low Range Noble Gas Channel inoperable ensure that increases in the offgas radioactivity rate are detected. This is consistent with TS 3.7.5 which requires sampling when increases in the radioactivity rate are detected. Without continuous monitoring, increases in the radioactivity rates can only be detected by sampling. The sampling frequency is set to the Technical Specification 3.7.5 frequency to ensure that the intent of the Technical Specification is met. If both monitors are not restored within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, sampling every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> will continue and TRO 3.0.3 should be entered to ensure that appropriate actions are being taken to restore the equipment.

TRS The TRSs are defined to be performed at the specified Frequency to ensure that the monitoring instrumentation is maintained OPERABLE.

Performance of the CHANNEL CHECK ensures that a gross failure of the instrument has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel against a similar parameter on other channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between (continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.7-22 SUSQEHANA

-UNI 2 TM IBDATE 3.-22EFFECTIVE 01/30/2008

Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation PPL Rev. 2 B 3.7.7 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation BASES TRS instrument channels could be an indication of excessive instrument drift (continued) in one of the channels or something even more serious. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying the instrument continues to operate properly between each CHANNEL CALIBRATION.

Agreement criteria, which are developed by the plant staff based on an investigation of a combination of the channel instrument uncertainties, may be used to support this parameter comparison and include indication and readability. If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit and does not necessarily indicate the channel is inoperable.

The CHANNEL FUNCTIONAL TEST (TRS 3.7.7.3) shall also demonstrate that that control room alarm annunciation occurs if any of the following conditions exists:

1. Instrument indicates measured levels above the alarm/trip setpoint.
2. Circuit Failure
3. Instrument indicates a downscale failure. .
4. Instrument controls not set in operate mode.

The initial Channel Calibration (TRS 3.7.7.4) shall be performed using one or more of the reference standards certified by the National Institute of Standards and Test (NIST) or that have been obtained from suppliers that participate in measurement assurance activities with NIST. These standards shall permit calibrating the system over its intended range of energy and measurement range. For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration shall be used.

REFERENCES 1. Technical Specification 3.7.5

2. 10 CFR Part 50.

SUSQUEHANNA - UNIT 2 TRM / B 3.7-23 EFFECTIVE DATE 01/30/2008