ML102450628: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML102450628
| number = ML102450628
| issue date = 09/02/2010
| issue date = 09/02/2010
| title = 08/25/2010 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation
| title = Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation
| author name = Miller G B
| author name = Miller G
| author affiliation = NRC/RGN-III/DRP
| author affiliation = NRC/RGN-III/DRP
| addressee name = Sunseri M W
| addressee name = Sunseri M
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| docket = 05000482
| docket = 05000482
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 September 2, 2010 Mr. Matthew W. Sunseri, President and Chief Executive Officer  
{{#Wiki_filter:UNITE D S TATES NUC LEAR RE GULATOR Y C OMMIS SI ON R EG IO N I V 6 12 EAST LAMAR BLVD , SU ITE 4 00 AR L I N GTON , TEXAS 7 601 1- 4125 September 2, 2010 Mr. Matthew W. Sunseri, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
 
Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF PUBLIC MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION  
OF PUBLIC MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION


==Dear Mr. Sunseri:==
==Dear Mr. Sunseri:==


On August 25, 2010, representatives of Wolf Creek Nuclear Operating Corporation met with NRC personnel at the NRC Region IV Offices in Arlington, Texas, to discuss on the initiatives being implemented to improve station performance and the station's preparations for an upcoming 95002 supplemental inspection. The list of attendees and a copy of the presentation are included as Enclosures 1 and 2.
On August 25, 2010, representatives of Wolf Creek Nuclear Operating Corporation met with NRC personnel at the NRC Region IV Offices in Arlington, Texas, to discuss on the initiatives being implemented to improve station performance and the stations preparations for an upcoming 95002 supplemental inspection. The list of attendees and a copy of the presentation are included as Enclosures 1 and 2.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADA MS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
Sincerely, /RA/ Geoffrey Miller  
Sincerely,
 
                                                  /RA/
Chief, Project Branch B  
Geoffrey Miller Chief, Project Branch B Division of Reactor Projects Docket: 50-482 License: NPF-42
 
Division of Reactor Projects Docket:   50-482 License: NPF-42  


==Enclosures:==
==Enclosures:==
: 1. Attendance List
: 1. Attendance List
: 2. Presentation Slides  
: 2. Presentation Slides
 
Wolf Creek Nuclear Operating Corporation 
 
Site Vice President Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS  66839
 
Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC  20037 Supervisor Licensing
 
Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS  66839
 
Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road
 
Topeka, KS  66604-4027
 
Office of the Governor
 
State of Kansas Topeka, KS  66612-1590
 
Attorney General 120 S.W. 10th Avenue, 2nd Floor
 
Topeka, KS  66612-1597 Chairman Coffey County Courthouse
 
110 South 6th Street Burlington, KS  66839 Chief, Radiation and Asbestos  Control Section
 
Bureau of Air and Radiation Kansas Department of Health and Environment 1000 SW Jackson, Suite 310 Topeka, KS  66612-1366


Chief, Technological Hazards  
Wolf Creek Nuclear Operating Corporation Site Vice President Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC 20037 Supervisor Licensing Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027 Office of the Governor State of Kansas Topeka, KS 66612-1590 Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597 Chairman Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 Chief, Radiation and Asbestos Control Section Bureau of Air and Radiation Kansas Department of Health and Environment 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Chief, Technological Hazards Branch FEMA, Region VII 9221 Ward Parkway Suite 300 Kansas City, MO 64114-3372


Branch FEMA, Region VII 9221 Ward Parkway Suite 300 Kansas City, MO  64114-3372
Wolf Creek Nuclear Operating Corporation    Institute of Nuclear Power Operations (INPO)
Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339


Wolf Creek Nuclear Operating Corporation
Wolf Creek Nuclear Operating Corporation       Electronic distribution by RIV:
 
Institute of Nuclear Power Operations (INPO)
Records Center 700 Galleria Parkway SE, Suite 100
 
Atlanta, GA  30339
 
Wolf Creek Nuclear Operating Corporation 
 
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)  
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
 
DRP Acting Director (Tony.Vegel@nrc.gov)
DRP Acting Director (Tony.Vegel@nrc.gov)
DRP Acting Deputy Director (Troy.Pruett@nrc.gov)
DRP Acting Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov) DRS Acting Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Chris.Long@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
Resident Inspector (Charles.Peabody@nrc.gov) WC Administrative Assistant (Shirley.Allen@nrc.gov)  
DRS Acting Deputy Director (Jeff.Clark@nrc.gov)
 
Senior Resident Inspector (Chris.Long@nrc.gov)
Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov) Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov) Project Engineer, DRP/B (Greg.Tutak@nrc.gov)
Resident Inspector (Charles.Peabody@nrc.gov)
WC Administrative Assistant (Shirley.Allen@nrc.gov)
Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
Project Engineer, DRP/B (Greg.Tutak@nrc.gov)
Project Engineer, DRP/B (Nestor.Makris@nrc.gov)
Project Engineer, DRP/B (Nestor.Makris@nrc.gov)
Reactor Inspector, DRP/B (Christie.Denissen@nrc.gov)
Reactor Inspector, DRP/B (Christie.Denissen@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Balwant.Singal@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Balwant.Singal@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource OEDO RIV Coordinator, (Margie.Kotzalas@nrc.gov)  
OEMail Resource OEDO RIV Coordinator, (Margie.Kotzalas@nrc.gov)
 
R:\_REACTORS\_WC\2010\WC08-25-10MS-DRP.doc SUNSI Rev Compl. X Yes No             ADAMS       X Yes No       Reviewer Initials   RWD Publicly Avail           X Yes No     Sensitive     Yes X No     Sens. Type Initials RWD RIV/DRP:SPE/B           C:DRP/B RWDeese                 GBMiller
R:\_REACTORS\_WC\2010\WC08-25-10MS-DRP.doc SUNSI Rev Compl. X Yes No ADAMS X Yes No Reviewer Initials RWDPublicly Avail X Yes No Sensitive Yes X No Sens. Type Initials RWDRIV/DRP:SPE/B C:DRP/B   RWDeese GBMiller   /RA/ /RA/     9/1/10 9/2/10   OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax}}
/RA/                   /RA/
9/1/10                 9/2/10 OFFICIAL RECORD COPY                                   T=Telephone       E=E-mail     F=Fax}}

Latest revision as of 18:13, 6 December 2019

Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation
ML102450628
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/02/2010
From: Geoffrey Miller
Division Reactor Projects III
To: Matthew Sunseri
Wolf Creek
References
Download: ML102450628 (11)


Text

UNITE D S TATES NUC LEAR RE GULATOR Y C OMMIS SI ON R EG IO N I V 6 12 EAST LAMAR BLVD , SU ITE 4 00 AR L I N GTON , TEXAS 7 601 1- 4125 September 2, 2010 Mr. Matthew W. Sunseri, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT:

SUMMARY

OF PUBLIC MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION

Dear Mr. Sunseri:

On August 25, 2010, representatives of Wolf Creek Nuclear Operating Corporation met with NRC personnel at the NRC Region IV Offices in Arlington, Texas, to discuss on the initiatives being implemented to improve station performance and the stations preparations for an upcoming 95002 supplemental inspection. The list of attendees and a copy of the presentation are included as Enclosures 1 and 2.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

Sincerely,

/RA/

Geoffrey Miller Chief, Project Branch B Division of Reactor Projects Docket: 50-482 License: NPF-42

Enclosures:

1. Attendance List
2. Presentation Slides

Wolf Creek Nuclear Operating Corporation Site Vice President Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Jay Silberg, Esq.

Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC 20037 Supervisor Licensing Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027 Office of the Governor State of Kansas Topeka, KS 66612-1590 Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597 Chairman Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 Chief, Radiation and Asbestos Control Section Bureau of Air and Radiation Kansas Department of Health and Environment 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Chief, Technological Hazards Branch FEMA, Region VII 9221 Ward Parkway Suite 300 Kansas City, MO 64114-3372

Wolf Creek Nuclear Operating Corporation Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

Wolf Creek Nuclear Operating Corporation Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Acting Director (Tony.Vegel@nrc.gov)

DRP Acting Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Acting Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Chris.Long@nrc.gov)

Resident Inspector (Charles.Peabody@nrc.gov)

WC Administrative Assistant (Shirley.Allen@nrc.gov)

Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Project Engineer, DRP/B (Greg.Tutak@nrc.gov)

Project Engineer, DRP/B (Nestor.Makris@nrc.gov)

Reactor Inspector, DRP/B (Christie.Denissen@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource OEDO RIV Coordinator, (Margie.Kotzalas@nrc.gov)

R:\_REACTORS\_WC\2010\WC08-25-10MS-DRP.doc SUNSI Rev Compl. X Yes No ADAMS X Yes No Reviewer Initials RWD Publicly Avail X Yes No Sensitive Yes X No Sens. Type Initials RWD RIV/DRP:SPE/B C:DRP/B RWDeese GBMiller

/RA/ /RA/

9/1/10 9/2/10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax