ML17284A869: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/31/1999
| issue date = 07/31/1999
| title = Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr
| title = Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr
| author name = KASKO B, SMITH G O
| author name = Kasko B, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCESSION NBR:9908200110 DOC.DAT FACXL:50-397+WPPSS Nuclear Project, Unit AUTH.NAME>>+AUTHOR AFFILIATION KASKO,B..Washington Public Power SMITH,G.O.
{{#Wiki_filter:ACCESSION NBR:9908200110           DOC.DAT                   OTARIZED: NO              DOCKET  ¹ FACXL:50-397+WPPSS Nuclear Project, Unit 2, Washington Public Powe                      05000397 AUTH. NAME>> +         AUTHOR AFFILIATION KASKO,B.         . Washington Public Power Supply System SMITH,G.O.           Washington Public Power Supply System RECIP.NAME           RECIPXENT AFFILIATION
Washington Public Power RECIP.NAME RECIPXENT AFFILIATION OTARIZED: NO DOCKET¹2, Washington Public Powe 05000397 Supply System Supply System


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for July 1999 for WN-2.With 990813 ltr.DISTRIBUTION CODE: XE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT XD CODE/NAME CUSHING, J XNTERNAL: ACRS OC/DBA/PAD RGN4 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME FILE CENTER 01 COPIES LTTR ENCL 1 1 1 EXTERNAL: LMITCO MARSHALL NRC PDR 1 1 1 1 NOAC 1 1 D'E N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept       for July   1999   for WN   -2.With   990813 ltr.
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 V  
DISTRIBUTION CODE: XE24D         COPIES RECEIVED:LTR         ENCL       SIZE:
~~~e 8ÃESR" NORTH WES T PO.Box 968 o Richland, Washington 99352-0968 August 13, 1999 GO2-99-156 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT           COPIES              RECIPIENT            COPIES XD CODE/NAME           LTTR ENCL        ID  CODE/NAME        LTTR ENCL CUSHING, J               1      1 XNTERNAL: ACRS                       1      1      FILE  CENTER    01              1 OC/DBA/PAD               1     1                               1     1 RGN4                      1     1 EXTERNAL: LMITCO MARSHALL             1     1     NOAC                      1     1 NRC PDR                  1     1 D
                                                                                                    'E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               9   ENCL     9
 
V
    ~
      ~
~ e 8ÃESR" NORTH WES T PO. Box 968 o Richland, Washington 99352-0968 August 13, 1999 GO2-99-156 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT JULY 1999 Transmitted herewith is the Monthly Operating Report for the month of July 1999 as required by Technical Specification 5,6.4.Respectfully,\.O.Smith Vice President, Generation Mail Drop 927M cc: EW Merschoff-NRC RIV JS Cushing-NRR NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library'..-.,Utility Data Institute DL Williams-BPA/1399"~(>>>>.>>(>>>>t=r~>>,~,~908VOOXXO ee07SalPDR AMCK OS000397 (q(t>>R PDRI't-I'~~'~
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JULY 1999 Transmitted herewith is the Monthly Operating Report for the month             of July 1999 as required by Technical Specification 5,6.4.
A OPERATING STATUS REPORT for WNP-2 Date: August 1, 1999 2.3.4.5.Docket: 50-397 Reporting Period: July 1999 Utility Contact: Bernice Kasko (509)377-4473 Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Net MW,): 1153 1107 6.7.8.9.Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)MONTH 744.0 674.8 0.0 629,109 YEAR 3,292.5 3,221.0 167.7 3,252,133 CUMULATIVE 92,133.8 89,095.2 3,205.2 86,582,064 10.Challenges to safety/relief valves: None  
Respectfully,
~'I h" h I I 4 l v I I~C,h~e I It ,I tt I I UNIT SHUTDOWNS REPORT PERIOD: JULY 1999 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: August 1, 1999 COMPLETED BY: B K8ko TELEPHONE:
                                \
(509)377M>~3 No.Date Type F: Forced S: Scheduled Duration (Hours)Reason (1)Method (2)Cause and Corrective Action To Prevent Recurrence
          . O. Smith Vice President, Generation Mail Drop 927M cc:         EW Merschoff - NRC RIV JS Cushing - NRR NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library
            '.. - .,Utility Data Institute DL Williams - BPA / 1399
                  "~ (>>>>.>> (>>>>t =r >>,~,
                                  ~
          ~908VOOXXO ee07Sa                  l PDR          AMCK OS000397 't-(q(t>>
R                               PDRI     I
                                                    '~
                                                        ~'~
 
A OPERATING STATUS REPORT for WNP-2 Date:   August 1, 1999 Docket: 50-397
: 2. Reporting Period: July 1999
: 3. Utility
 
==Contact:==
Bernice Kasko (509) 377-4473
: 4. Design Electrical Rating (Net MW,):                                   1153
: 5. Maximum Dependable Capacity - summer (Net MW,):                       1107 MONTH        YEAR CUMULATIVE
: 6. Hours Reactor Critical                       744.0     3,292.5   92,133.8
: 7. Hours Generator On-Line                      674.8    3,221.89,095.2
: 8. Unit Reserve Shutdown Hours                      0.0      167.7    3,205.2
: 9. Net Electrical Energy (MWH)                629,109  3,252,133  86,582,064
: 10. Challenges to safety/relief valves:                                   None
 
                                ~ 'I h"
h II      4 l v
I I ~
C,h I
        ~   e       It tt I I
  ,I
 
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: August 1, 1999 COMPLETED BY: B K8ko TELEPHONE: (509) 377M>~3 REPORT PERIOD: JULY 1999 Type F: Forced       Duration No.      Date      S: Scheduled     (Hours)     Reason (1) Method (2)             Cause and Corrective Action To Prevent Recurrence


==SUMMARY==
==SUMMARY==
: The Plant exited the Fuel Savings Dispatch and achieved 100%power on July 13~.1 REASON A-qulpment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other 2 METHOD 1-anua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other 0 k a}}
:                 The Plant exited the Fuel Savings Dispatch and achieved 100% power on July 13~.
1 REASON                                                             2 METHOD A - qulpment Failure               E - Operator Training &          1 - anua B - Maintenance or Test                     License Examination      2 - Manual Scram C - Refueling                       F - Administration                3 - Auto Scram D - Regulatory Restriction         G - Operational Error             4 - Continued H - Other                         5 - Reduced Load 9 - Other
 
0 k
a}}

Latest revision as of 04:12, 4 December 2019

Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr
ML17284A869
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/31/1999
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-99-156, NUDOCS 9908200110
Download: ML17284A869 (8)


Text

ACCESSION NBR:9908200110 DOC.DAT OTARIZED: NO DOCKET ¹ FACXL:50-397+WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME>> + AUTHOR AFFILIATION KASKO,B. . Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPXENT AFFILIATION

SUBJECT:

Monthly operating rept for July 1999 for WN -2.With 990813 ltr.

DISTRIBUTION CODE: XE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL CUSHING, J 1 1 XNTERNAL: ACRS 1 1 FILE CENTER 01 1 OC/DBA/PAD 1 1 1 1 RGN4 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D

'E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DZSTRZBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

V

~

~

~ e 8ÃESR" NORTH WES T PO. Box 968 o Richland, Washington 99352-0968 August 13, 1999 GO2-99-156 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JULY 1999 Transmitted herewith is the Monthly Operating Report for the month of July 1999 as required by Technical Specification 5,6.4.

Respectfully,

\

. O. Smith Vice President, Generation Mail Drop 927M cc: EW Merschoff - NRC RIV JS Cushing - NRR NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library

'.. - .,Utility Data Institute DL Williams - BPA / 1399

"~ (>>>>.>> (>>>>t =r >>,~,

~

~908VOOXXO ee07Sa l PDR AMCK OS000397 't-(q(t>>

R PDRI I

'~

~'~

A OPERATING STATUS REPORT for WNP-2 Date: August 1, 1999 Docket: 50-397

2. Reporting Period: July 1999
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Design Electrical Rating (Net MW,): 1153
5. Maximum Dependable Capacity - summer (Net MW,): 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 744.0 3,292.5 92,133.8
7. Hours Generator On-Line 674.8 3,221.0 89,095.2
8. Unit Reserve Shutdown Hours 0.0 167.7 3,205.2
9. Net Electrical Energy (MWH) 629,109 3,252,133 86,582,064
10. Challenges to safety/relief valves: None

~ 'I h"

h II 4 l v

I I ~

C,h I

~ e It tt I I

,I

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: August 1, 1999 COMPLETED BY: B K8ko TELEPHONE: (509) 377M>~3 REPORT PERIOD: JULY 1999 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence

SUMMARY

The Plant exited the Fuel Savings Dispatch and achieved 100% power on July 13~.

1 REASON 2 METHOD A - qulpment Failure E - Operator Training & 1 - anua B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

0 k

a