ML17292A361: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATO INFORMATION DISTRIBUTION STEM (RIDS)ACCESSION NBR:9607170076 DOC.DATE: 96/06/30 NOTARIZED:
{{#Wiki_filter:REGULATO     INFORMATION DISTRIBUTION         STEM (RIDS)
NO DOCKET I FACIL:50-397-WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITHiG.O.
ACCESSION NBR:9607170076           DOC.DATE: 96/06/30     NOTARIZED: NO           DOCKET I FACIL:50-397-   WPPSS   Nuclear Project, Unit 2, Washington Public       Powe   05000397 AUTH. NAME           AUTHOR AFFILIATION KASKO,B.             Washington Public Power Supply System SMITHiG.O.           Washington Public Power Supply System RECIP.NAME           RECIPIENT 'AFFILIATION
Washington Public Power Supply System RECIP.NAME RECIPIENT'AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for June 1996 for WNP-2.W/960712 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: AC ILE CENT Ol N COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 NOTE TO ALL"RIDSl'ECIPIENTS:
Monthly operating rept       for June 1996   for WNP-2.W/960712   ltr.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5D-5(EXT~415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED(TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 o I'4~\t'I WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO.Box 968~3000 George Washington Way~Richland, Washington 99352-0968
DISTRIBUTION CODE: IE24D       COPIES RECEIVED:LTR         ENCL     SIZE:
~(509)372-5000 July 12, 1996 G02-96-137 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT           COPIES            RECIPIENT          COPIES ID CODE/NAME          LTTR ENCL        ID CODE/NAME       LTTR ENCL PD4-2 PD                 1     1     COLBURN,T              1     1 INTERNAL: AC                        1     1     AEOD/SPD/RRAB           1    1 ILE  CENT      Ol      1    1      NRR/DRPM/PECB           1     1 N                      1     1 EXTERNAL: LITCO BRYCE,J H           1     1     NOAC                    1     1 NRC PDR                  1     1 NOTE TO ALL "RIDSl'ECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5D-5(EXT 415-2083) TO ELIMINATE YOUR NAME
                        ~                                FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED(
TOTAL NUMBER OF COPIES REQUIRED: LTTR           10   ENCL     10
 
o   I'4 ~
\
t
  'I
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 July 12, 1996 G02-96-137 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT JUNE 1996 Transmitted herewith is the Monthly Operating Report for the month of June 1996 as required by Technical Specification 6.9.1.6.Respectfully, G.O.Smith Plant General Manager (Mail Drop 9270)cc: LJ Callan-NRC RIV TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N NS Reynolds-Winston&Strawn INPO ANI Library Utility Data Institute;-DLWilliams
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JUNE 1996 Transmitted herewith is the Monthly Operating Report for the month               of June   1996 as required by Technical Specification 6.9.1.6.
-BPA/399 f v~o7i7oo7s 9sosso PDR~"ADGCK 0500039'7 R PDR.~~>/i l 4%'1'W 8=%N P 4'I t C l H OPERATING STATUS REPORT for WNP-2 Date: July 1, 1996 2.3.4.5.6.7.8.9.Outage+On-line Hours: 720.0 3486 1199 1153 1153 1107 none Docket: 50-397 Reporting Period: JUNE 1996 Utility Contact: Bernice Kasko (509)377-4473 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Gross MW,): Maximum Dependable Capacity-summer (Net MW,): If changes occur above since last report, give reasons: 10.Power to which restricted, if any (Net MW,): 11.Reasons for restrictions, if any: none 12.13.14.15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MwH)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours ONT 720.0 334.7 0.0 109.0 0.0 121,343 17,980 6,312 15.1%15.1%0.8%0.8%53.3%123.3 YEAR 4,367.0 1,819.8 985.9 1,582.6 997.4 4,546,703 1,523,270 1,435,103 36.2%59.1%29.7%28.5%7.3%123.3 CUMULATllUg 101,215.2 71,455.6 1,730.8 68,833.1 1,956.2 205,004,253 69,100,750 66,193,421 68.0%69.9%59.9%59.0%10.9%8,443.0 26.Shutdowns scheduled over the next 6 months (type, date, duration):
Respectfully, G. O. Smith Plant General Manager (Mail Drop 9270) cc:     LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston & Strawn INPO ANI Library Utility Data Institute
None 27.If currently shutdown, estimated startup date: Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.
        ;-DLWilliams - BPA/399 f   v~o7i7oo7s 9sosso PDR R
4 I~4 0 I Lv 4v-Iv%1 v vh'l4 Iv iv 44 v 4 r~t t AVERAGE DAILY UNIT POWER LEVEL C~REPORT PERIOD: JUNE 1996 DOCKET NO.: 50-397 UNIT: WNP-2 DATE: July 1, 1996 COMPLETED BY: B Kasko TELEPHONE:
          ~ "ADGCK     0500039'7 PDR.                                                                     ~~>/ i
(509)377-4473 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)10 12 13 14 15-14-14-14-14-15-15-14-14-14-14-14-14-14-14 16'17 18 19 20 21 22 23 24 25 26 27 28 29 30-17-16-16-16-16 69 136 160 145-18-18-17-18-16 136 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
1 k e E 4 il l UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD: JUNE 1996 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: July 1, 1996 COMPLETED BY B Kasko TELEPHONE:
l 4%'1 ' W 8 = %N P
(509)377M73 No.Date Type Hours Reason Method LER Number System, Component Cause and Corrective Action To Prevent Recurrence 96-08 4/13/96 S 487.7 NA RC t FUELXX Continuation from previous month-Plant entered annual refueling and maintenance outage (R-11)on April 13, 1996.96-09 6/25/96 F 124.3 A 96~3 CH INSTRU Digital feedwater controller error, change made to the controller software to prevent recurrence.
4'I t
C l
H
 
OPERATING STATUS REPORT for WNP-2 Date:   July 1, 1996 Docket: 50-397
: 2. Reporting Period: JUNE 1996                                  Outage   + On-line Hours: 720.0
: 3. Utility
 
==Contact:==
Bernice Kasko (509) 377-4473
: 4. Licensed Thermal Power (MW, ):                                                             3486
: 5. Nameplate Rating (Gross MW, ):                                                             1199
: 6. Design Electrical Rating (Net MW,):                                                         1153
: 7. Maximum Dependable Capacity - summer (Gross MW,):                                           1153
: 8. Maximum Dependable Capacity - summer (Net MW, ):                                           1107
: 9. Ifchanges occur above since last report, give reasons:                                      none
: 10. Power to which restricted, if any (Net MW,):                                                none
: 11. Reasons for restrictions, if any:
ONT              YEAR          CUMULATllUg
: 12. Report Period Hours                                720.0            4,367.0          101,215.2
: 13. Hours Reactor Critical                            334.7            1,819.8          71,455.6
: 14. Rx Reserve Shutdown Hours                            0.0              985.9            1,730.8
: 15. Hours Generator On-Line                           109.0            1,582.6          68,833.1
: 16. Unit Reserve Shutdown Hours                           0.0              997.4            1,956.2
: 17. Gross Thermal Energy (MwH)                     121,343            4,546,703        205,004,253
: 18. Gross Electrical Energy (MWH)                   17,980          1,523,270          69,100,750
: 19. Net Electrical Energy (MWH)                       6,312          1,435,103          66,193,421
: 20. Unit Service Factor                               15.1%              36.2%              68.0%
: 21. Unit Availability Factor                          15.1%               59.1%               69.9%
: 22. Unit Capacity Factor (MDC Net)                    0.8%               29.7%               59.9%
: 23. Unit Capacity Factor (DER Net)                    0.8%              28.5%               59.0%
: 24. Unit Forced Outage Rate                          53.3%                 7.3%               10.9%
: 25. Forced Outage Hours                                123.3              123.3            8,443.0
: 26. Shutdowns scheduled over the next 6 months (type, date, duration):                         None
: 27. Ifcurrently shutdown,     estimated startup date:
Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.
 
4             I
  ~ 4 0   I Lv 4v - Iv%1 v vh 'l4 Iv iv                                   44 v   4
 
r ~
t AVERAGE DAILY UNIT POWER LEVEL t
          ~
C DOCKET NO.: 50-397 UNIT: WNP-2 DATE: July 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377-4473 REPORT PERIOD:              JUNE 1996 AVERAGE DAILYPOWER LEVEL                                        AVERAGE DAILYPOWER LEVEL DAY                    (Net MWe)                                 DAY                 (Net MWe)
                                    -14                                   16                      -17
                                    -14                                   '17                      -16
                                    -14                                   18                      -16
                                    -14                                   19                      -16
                                    -15                                   20                      -16
                                    -15                                   21                      69 22                      136
                                    -14                                   23                      160
                                    -14                                   24                      145 10                        -14                                   25                      -18
                                    -14                                   26                      -18 12                        -14                                   27                     -17 13                        -14                                    28                      -18 14                        -14                                    29                      -16 15                        -14                                    30                      136 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
1 k e E
4 il l
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: July 1, 1996 COMPLETED BY B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:      JUNE 1996 No.
96-08 Date 4/13/96 Type S
Hours 487.7 Reason     Method   LER Number NA System, RC Component FUELXX Cause and Corrective Action To Prevent Recurrence Continuation from previous month - Plant entered annual refueling and maintenance outage (R-11) on April 13, 1996.
t 96-09     6/25/96     F       124.3       A                     96~3           CH     INSTRU       Digital feedwater controller error, change made to the controller software to prevent recurrence.


==SUMMARY==
==SUMMARY==
: WNP-2 exited the annual refueling and maintenance outage (R-11)on June 21.The reactor was manually scrammed on June 24 due to an unexpected plant response during testing of the new adjustable speed drives.At the end of the month WNP-2 was operating at 25%power and continuing with startup testing.TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREG%161 Exhibits F&H 0~'P D}}
:             WNP-2 exited the annual refueling and maintenance outage (R-11) on June 21. The reactor was manually scrammed on June 24 due to an unexpected plant response during testing of the new adjustable speed drives. At the end of the month WNP-2 was operating at 25% power and continuing with startup testing.
TYPE                     REASON                                                            METHOD                    SYSTEM & COMPONENT F - Forced               A - Equipment Failure             E - Operator Training &         1 - Manual                NUREG%161 Exhibits F & H S - Scheduled            B - Maintenance or Test                  License Examination      2 - Manual Scram C - Refueling                    F - Administration              3 - Auto Scram D - Regulatory Restriction        G - Operational Error            4 - Continued H - Other                        5 - Reduced Load 9 - Other
 
0 ~
      'P D}}

Latest revision as of 03:46, 4 December 2019

Monthly Operating Rept for June 1996 for WNP-2.W/960712 Ltr
ML17292A361
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1996
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-137, NUDOCS 9607170076
Download: ML17292A361 (10)


Text

REGULATO INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBR:9607170076 DOC.DATE: 96/06/30 NOTARIZED: NO DOCKET I FACIL:50-397- WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITHiG.O. Washington Public Power Supply System RECIP.NAME RECIPIENT 'AFFILIATION

SUBJECT:

Monthly operating rept for June 1996 for WNP-2.W/960712 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 COLBURN,T 1 1 INTERNAL: AC 1 1 AEOD/SPD/RRAB 1 1 ILE CENT Ol 1 1 NRR/DRPM/PECB 1 1 N 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDSl'ECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN 5D-5(EXT 415-2083) TO ELIMINATE YOUR NAME

~ FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED(

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

o I'4 ~

\

t

'I

WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352-0968 ~ (509) 372-5000 July 12, 1996 G02-96-137 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JUNE 1996 Transmitted herewith is the Monthly Operating Report for the month of June 1996 as required by Technical Specification 6.9.1.6.

Respectfully, G. O. Smith Plant General Manager (Mail Drop 9270) cc: LJ Callan - NRC RIV TG Colburn - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N NS Reynolds - Winston & Strawn INPO ANI Library Utility Data Institute

-DLWilliams - BPA/399 f v~o7i7oo7s 9sosso PDR R

~ "ADGCK 0500039'7 PDR. ~~>/ i

l 4%'1 ' W 8 = %N P

4'I t

C l

H

OPERATING STATUS REPORT for WNP-2 Date: July 1, 1996 Docket: 50-397

2. Reporting Period: JUNE 1996 Outage + On-line Hours: 720.0
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Licensed Thermal Power (MW, ): 3486
5. Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW,): 1153
7. Maximum Dependable Capacity - summer (Gross MW,): 1153
8. Maximum Dependable Capacity - summer (Net MW, ): 1107
9. Ifchanges occur above since last report, give reasons: none
10. Power to which restricted, if any (Net MW,): none
11. Reasons for restrictions, if any:

ONT YEAR CUMULATllUg

12. Report Period Hours 720.0 4,367.0 101,215.2
13. Hours Reactor Critical 334.7 1,819.8 71,455.6
14. Rx Reserve Shutdown Hours 0.0 985.9 1,730.8
15. Hours Generator On-Line 109.0 1,582.6 68,833.1
16. Unit Reserve Shutdown Hours 0.0 997.4 1,956.2
17. Gross Thermal Energy (MwH) 121,343 4,546,703 205,004,253
18. Gross Electrical Energy (MWH) 17,980 1,523,270 69,100,750
19. Net Electrical Energy (MWH) 6,312 1,435,103 66,193,421
20. Unit Service Factor 15.1% 36.2% 68.0%
21. Unit Availability Factor 15.1% 59.1% 69.9%
22. Unit Capacity Factor (MDC Net) 0.8% 29.7% 59.9%
23. Unit Capacity Factor (DER Net) 0.8% 28.5% 59.0%
24. Unit Forced Outage Rate 53.3% 7.3% 10.9%
25. Forced Outage Hours 123.3 123.3 8,443.0
26. Shutdowns scheduled over the next 6 months (type, date, duration): None
27. Ifcurrently shutdown, estimated startup date:

Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

4 I

~ 4 0 I Lv 4v - Iv%1 v vh 'l4 Iv iv 44 v 4

r ~

t AVERAGE DAILY UNIT POWER LEVEL t

~

C DOCKET NO.: 50-397 UNIT: WNP-2 DATE: July 1, 1996 COMPLETED BY: B Kasko TELEPHONE: (509) 377-4473 REPORT PERIOD: JUNE 1996 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe)

-14 16 -17

-14 '17 -16

-14 18 -16

-14 19 -16

-15 20 -16

-15 21 69 22 136

-14 23 160

-14 24 145 10 -14 25 -18

-14 26 -18 12 -14 27 -17 13 -14 28 -18 14 -14 29 -16 15 -14 30 136 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

1 k e E

4 il l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: July 1, 1996 COMPLETED BY B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: JUNE 1996 No.

96-08 Date 4/13/96 Type S

Hours 487.7 Reason Method LER Number NA System, RC Component FUELXX Cause and Corrective Action To Prevent Recurrence Continuation from previous month - Plant entered annual refueling and maintenance outage (R-11) on April 13, 1996.

t 96-09 6/25/96 F 124.3 A 96~3 CH INSTRU Digital feedwater controller error, change made to the controller software to prevent recurrence.

SUMMARY

WNP-2 exited the annual refueling and maintenance outage (R-11) on June 21. The reactor was manually scrammed on June 24 due to an unexpected plant response during testing of the new adjustable speed drives. At the end of the month WNP-2 was operating at 25% power and continuing with startup testing.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG%161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

0 ~

'P D