ML17292B134: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/30/1997
| issue date = 11/30/1997
| title = Monthly Operating Rept for Nov 1997 for WNP-2.W/971205 Ltr
| title = Monthly Operating Rept for Nov 1997 for WNP-2.W/971205 Ltr
| author name = KASKO B, SMITH G O
| author name = Kasko B, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORYREGULAYINFORMATION DISTRIBUTI SYSTEM(RIDS)ACCESSION NBR:9712150118 DOC.DATE:
{{#Wiki_filter:CATEGORY REGULA      Y INFORMATION    DISTRIBUTI       SYSTEM (RIDS)
97/11/30NOTARIZED:
ACCESSION NBR:9712150118             DOC.DATE: 97/11/30 NOTARIZED: NO                    DOCKET  ¹ FACIL:50-397     WPPSS  Nuclear Project, Unit 2, Washington Public              Powe  05000397 AU'fH.NAME           AUTHOR AFFILIATION KASKO,B.             Washington Public Power Supply System SMITH,G.E.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION
NOFACIL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPoweAU'fH.NAME AUTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITH,G.E.
Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT AFFILIATION DOCKET¹05000397


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptforNov1997forWNP-2.W/971205 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:INTERNAL:
Monthly operating rept          for  Nov 1997    for WNP-2.W/971205     ltr.
RECIPIENT IDCODE/NAME PD4-2PDFILECENTER0N4COPIESLTTRENCL11111111RECIPIENT IDCODE/NAME POSLUSNY,C AEOD/SPD/RRAB OC/DBA/PAD COPIESLTTRENCL111111EEXTERNAL:
DISTRIBUTION CODE: IE24D          COPIES RECEIVED:LTR         ENCL        SIZE:
LITCOBRYCE,JHNRCPDR1111NOAC11DENNOTETOALL"RIDS"RECIPIENTS:
TITLE: Monthly Operating Report (per Tech Specs)
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROF.COPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
NOTES:
LTTR10ENCL10 e01'e~
E RECIPIENT             COPIES              RECIPIENT            COPIES ID  CODE/NAME         LTTR ENCL          ID CODE/NAME        LTTR ENCL PD4-2 PD                  1      1      POSLUSNY,C               1    1 INTERNAL:                              1      1      AEOD/SPD/RRAB             1    1 FILE  CENTER    0        1      1      OC/DBA/PAD               1    1 N4                      1      1 EXTERNAL: LITCO BRYCE,J H              1      1      NOAC                      1    1 NRC PDR                    1      1 D
WASHINGTON PUBLICPOWERSUPPLYSYSTEMPO.Box968~Richland, Washington 99352-0968 December5,1997G02-97-220 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:
E N
NOTE TO ALL  "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF. COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                10  ENCL    10
 
e 0 1
      'e ~
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ Richland, Washington 99352-0968 December 5, 1997 G02-97-220 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTNOVEMBER1997Transmitted herewithistheMonthlyOperating ReportforthemonthofNovember1997asrequiredbyTechnical Specification 5.6.4.Respectfully, pp(~)gf$PAWICNG.O.SmithPlantGeneralManagerMailDrop927MCC:EWMerschoff
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT NOVEMBER 1997 Transmitted herewith is the Monthly Operating Report for the month of November 1997 as required by Technical Specification 5.6.4.
-NRCRIVTGColburn-NRRCPoslusny, Jr.-NRRKEPerkins,Jr.-NRCRIV,WCFONRCSr.ResidentInspector
Respectfully, pp(~) g f$ PAWICN G. O. Smith Plant General Manager Mail Drop 927M CC:     EW Merschoff - NRC RIV TG Colburn - NRR C Poslusny, Jr. - NRR KE Perkins, Jr. - NRC RIV, WCFO
-927NPDRobinson-Winston&StrawnINPOANILibraryUtilityDataInstitute DLWilliams-BPA/399+8&ir.~r.~-~97i2i50iia 9'7ii30PDRADQCK05000897RPDRIlllffflllfllllllllllfflllllllllllllll' OPERATING STATUSREPORTforWNP-2Date:December1,19972.3.4.5.Docket:50-397Reporting Period:NOVEMBER1997UtilityContact:BerniceKasko(509)377-4473DesignElectrical Rating(NetMW,):MaximumDependable Capacity-summer(NetMW,):115311076.7.8.9.HoursReactorCriticalHoursGenerator On-LineUnitReserveShutdownHoursNetElectrical Energy(MWH)MONTH720.0720.00.0818,029YEAR5,628.75,504.91,081.35,261,075 CUMULATIVE 81,501.378,755.03,037.575,569,350 10.Challenges tosafety/relief valves:None UNITSHUTDOWNS REPORTPERIOD:NOVEMBER1997DOCKETNO.:50-397UNITNAME:Wlg'-2DATE:December1,1997COMPLETED BY:BKaskoTELEPHONE:
                                                                                          +8&
(509)377M73No.DateTypeF:ForcedS:Scheduled Duration(Hours)Reason(I)Method(2)CauseandCorrective ActionToPreventRecurrence NoneSUMMARY:AttheendofthemonthWNP-2wasoperating at100%power.lREASONA-u>pmentFailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration G-Operational ErrorH-Other2METHOD1-anua2-ManualScram3-AutoScram4-Continued 5-ReducedLoad9-Other 0~-~l'sg}}
NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 399 i r. ~r.~                                         Illlffflllfllllllllllfflllllllllllllll'
- ~97i2i50iia 9'7ii30 PDR    ADQCK    05000897 R                      PDR
 
OPERATING STATUS REPORT for WNP-2 Date:   December 1, 1997 Docket: 50-397
: 2. Reporting Period: NOVEMBER 1997
: 3. Utility
 
==Contact:==
Bernice Kasko (509) 377-4473
: 4. Design Electrical Rating (Net MW,):                                     1153
: 5. Maximum Dependable Capacity - summer (Net MW,):                         1107 MONTH        YEAR  CUMULATIVE
: 6. Hours Reactor Critical                        720.0      5,628.7   81,501.3
: 7. Hours Generator On-Line                      720.0      5,504.9  78,755.0
: 8. Unit Reserve Shutdown Hours                      0.0    1,081.3    3,037.5
: 9. Net Electrical Energy (MWH)                818,029  5,261,075 75,569,350
: 10. Challenges to safety/relief valves:                                   None
 
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: Wlg'-2 DATE: December 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:      NOVEMBER 1997 Type F: Forced        Duration No.         Date      S: Scheduled     (Hours)     Reason (I) Method (2)             Cause and Corrective Action To Prevent Recurrence None
 
==SUMMARY==
:                 At the end of the month WNP-2 was operating at        100% power.
l  REASON                                                              2 METHOD A-   u>pment Failure              E - Operator Training &            1 - anua B - Maintenance or Test                      License Examination      2 - Manual Scram C - Refueling                       F - Administration                3 - Auto Scram D - Regulatory Restriction         G - Operational Error              4 - Continued H - Other                          5 - Reduced Load 9 - Other
 
0 ~- ~
sg l'}}

Latest revision as of 03:42, 4 December 2019

Monthly Operating Rept for Nov 1997 for WNP-2.W/971205 Ltr
ML17292B134
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1997
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-220, NUDOCS 9712150118
Download: ML17292B134 (6)


Text

CATEGORY REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9712150118 DOC.DATE: 97/11/30 NOTARIZED: NO DOCKET ¹ FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AU'fH.NAME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.E. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Nov 1997 for WNP-2.W/971205 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 POSLUSNY,C 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 FILE CENTER 0 1 1 OC/DBA/PAD 1 1 N4 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF. COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

e 0 1

'e ~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ Richland, Washington 99352-0968 December 5, 1997 G02-97-220 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT NOVEMBER 1997 Transmitted herewith is the Monthly Operating Report for the month of November 1997 as required by Technical Specification 5.6.4.

Respectfully, pp(~) g f$ PAWICN G. O. Smith Plant General Manager Mail Drop 927M CC: EW Merschoff - NRC RIV TG Colburn - NRR C Poslusny, Jr. - NRR KE Perkins, Jr. - NRC RIV, WCFO

+8&

NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 399 i r. ~r.~ Illlffflllfllllllllllfflllllllllllllll'

- ~97i2i50iia 9'7ii30 PDR ADQCK 05000897 R PDR

OPERATING STATUS REPORT for WNP-2 Date: December 1, 1997 Docket: 50-397

2. Reporting Period: NOVEMBER 1997
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Design Electrical Rating (Net MW,): 1153
5. Maximum Dependable Capacity - summer (Net MW,): 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 720.0 5,628.7 81,501.3
7. Hours Generator On-Line 720.0 5,504.9 78,755.0
8. Unit Reserve Shutdown Hours 0.0 1,081.3 3,037.5
9. Net Electrical Energy (MWH) 818,029 5,261,075 75,569,350
10. Challenges to safety/relief valves: None

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: Wlg'-2 DATE: December 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: NOVEMBER 1997 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (I) Method (2) Cause and Corrective Action To Prevent Recurrence None

SUMMARY

At the end of the month WNP-2 was operating at 100% power.

l REASON 2 METHOD A- u>pment Failure E - Operator Training & 1 - anua B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

0 ~- ~

sg l'