ML17292B134: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)ACCESSION NBR:9712150118 DOC.DATE: 97/11/30 NOTARIZED:
{{#Wiki_filter:CATEGORY REGULA     Y INFORMATION     DISTRIBUTI       SYSTEM (RIDS)
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AU'fH.NAME AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITH,G.E.
ACCESSION NBR:9712150118             DOC.DATE: 97/11/30 NOTARIZED: NO                     DOCKET  ¹ FACIL:50-397     WPPSS   Nuclear Project, Unit 2, Washington Public               Powe   05000397 AU'fH.NAME           AUTHOR AFFILIATION KASKO,B.             Washington Public Power Supply System SMITH,G.E.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET¹05000397


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Nov 1997 for WNP-2.W/971205 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: INTERNAL: RECIPIENT ID CODE/NAME PD4-2 PD FILE CENTER 0 N4 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME POSLUSNY,C AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1 1 1 1 1 1 E EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D E N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept         for Nov 1997   for WNP-2.W/971205     ltr.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF.COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 e 0 1'e~
DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR         ENCL       SIZE:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO.Box 968~Richland, Washington 99352-0968 December 5, 1997 G02-97-220 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
E RECIPIENT            COPIES              RECIPIENT             COPIES ID  CODE/NAME          LTTR ENCL          ID CODE/NAME         LTTR ENCL PD4-2 PD                   1     1       POSLUSNY,C                1     1 INTERNAL:                              1     1       AEOD/SPD/RRAB             1    1 FILE  CENTER    0        1      1      OC/DBA/PAD               1     1 N4                      1     1 EXTERNAL: LITCO BRYCE,J H             1     1       NOAC                      1     1 NRC PDR                    1     1 D
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF. COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL     10
 
e 0 1
      'e ~
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ Richland, Washington 99352-0968 December 5, 1997 G02-97-220 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT NOVEMBER 1997 Transmitted herewith is the Monthly Operating Report for the month of November 1997 as required by Technical Specification 5.6.4.Respectfully, pp(~)g f$PAWICN G.O.Smith Plant General Manager Mail Drop 927M CC: EW Merschoff-NRC RIV TG Colburn-NRR C Poslusny, Jr.-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/399+8&i r.~r.~-~97i2i50iia 9'7ii30 PDR ADQCK 05000897 R PDR Illlffflllfllllllllllfflllllllllllllll' OPERATING STATUS REPORT for WNP-2 Date: December 1, 1997 2.3.4.5.Docket: 50-397 Reporting Period: NOVEMBER 1997 Utility Contact: Bernice Kasko (509)377-4473 Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Net MW,): 1153 1107 6.7.8.9.Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)MONTH 720.0 720.0 0.0 818,029 YEAR 5,628.7 5,504.9 1,081.3 5,261,075 CUMULATIVE 81,501.3 78,755.0 3,037.5 75,569,350 10.Challenges to safety/relief valves: None UNIT SHUTDOWNS REPORT PERIOD: NOVEMBER 1997 DOCKET NO.: 50-397 UNIT NAME: Wlg'-2 DATE: December 1, 1997 COMPLETED BY: B Kasko TELEPHONE:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT NOVEMBER 1997 Transmitted herewith is the Monthly Operating Report for the month of November 1997 as required by Technical Specification 5.6.4.
(509)377M73 No.Date Type F: Forced S: Scheduled Duration (Hours)Reason (I)Method (2)Cause and Corrective Action To Prevent Recurrence None  
Respectfully, pp(~) g f$ PAWICN G. O. Smith Plant General Manager Mail Drop 927M CC:     EW Merschoff - NRC RIV TG Colburn - NRR C Poslusny, Jr. - NRR KE Perkins, Jr. - NRC RIV, WCFO
                                                                                          +8&
NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 399 i r. ~r.~                                         Illlffflllfllllllllllfflllllllllllllll'
- ~97i2i50iia 9'7ii30 PDR   ADQCK     05000897 R                     PDR
 
OPERATING STATUS REPORT for WNP-2 Date:   December 1, 1997 Docket: 50-397
: 2. Reporting Period: NOVEMBER 1997
: 3. Utility
 
==Contact:==
Bernice Kasko (509) 377-4473
: 4. Design Electrical Rating (Net MW,):                                     1153
: 5. Maximum Dependable Capacity - summer (Net MW,):                         1107 MONTH        YEAR  CUMULATIVE
: 6. Hours Reactor Critical                        720.0      5,628.7   81,501.3
: 7. Hours Generator On-Line                       720.0     5,504.9  78,755.0
: 8. Unit Reserve Shutdown Hours                      0.0     1,081.3    3,037.5
: 9. Net Electrical Energy (MWH)                818,029  5,261,075 75,569,350
: 10. Challenges to safety/relief valves:                                   None
 
UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: Wlg'-2 DATE: December 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:      NOVEMBER 1997 Type F: Forced       Duration No.        Date      S: Scheduled     (Hours)     Reason (I) Method (2)             Cause and Corrective Action To Prevent Recurrence None


==SUMMARY==
==SUMMARY==
: At the end of the month WNP-2 was operating at 100%power.l REASON A-u>pment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other 2 METHOD 1-anua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other 0~-~l'sg}}
:                 At the end of the month WNP-2 was operating at       100% power.
l REASON                                                             2 METHOD A-   u>pment Failure               E - Operator Training &            1 - anua B - Maintenance or Test                     License Examination      2 - Manual Scram C - Refueling                       F - Administration                3 - Auto Scram D - Regulatory Restriction         G - Operational Error             4 - Continued H - Other                         5 - Reduced Load 9 - Other
 
0 ~- ~
sg l'}}

Latest revision as of 03:42, 4 December 2019

Monthly Operating Rept for Nov 1997 for WNP-2.W/971205 Ltr
ML17292B134
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1997
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-220, NUDOCS 9712150118
Download: ML17292B134 (6)


Text

CATEGORY REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:9712150118 DOC.DATE: 97/11/30 NOTARIZED: NO DOCKET ¹ FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AU'fH.NAME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.E. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Nov 1997 for WNP-2.W/971205 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 POSLUSNY,C 1 1 INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 FILE CENTER 0 1 1 OC/DBA/PAD 1 1 N4 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF. COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

e 0 1

'e ~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO. Box 968 ~ Richland, Washington 99352-0968 December 5, 1997 G02-97-220 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT NOVEMBER 1997 Transmitted herewith is the Monthly Operating Report for the month of November 1997 as required by Technical Specification 5.6.4.

Respectfully, pp(~) g f$ PAWICN G. O. Smith Plant General Manager Mail Drop 927M CC: EW Merschoff - NRC RIV TG Colburn - NRR C Poslusny, Jr. - NRR KE Perkins, Jr. - NRC RIV, WCFO

+8&

NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 399 i r. ~r.~ Illlffflllfllllllllllfflllllllllllllll'

- ~97i2i50iia 9'7ii30 PDR ADQCK 05000897 R PDR

OPERATING STATUS REPORT for WNP-2 Date: December 1, 1997 Docket: 50-397

2. Reporting Period: NOVEMBER 1997
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Design Electrical Rating (Net MW,): 1153
5. Maximum Dependable Capacity - summer (Net MW,): 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 720.0 5,628.7 81,501.3
7. Hours Generator On-Line 720.0 5,504.9 78,755.0
8. Unit Reserve Shutdown Hours 0.0 1,081.3 3,037.5
9. Net Electrical Energy (MWH) 818,029 5,261,075 75,569,350
10. Challenges to safety/relief valves: None

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: Wlg'-2 DATE: December 1, 1997 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: NOVEMBER 1997 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (I) Method (2) Cause and Corrective Action To Prevent Recurrence None

SUMMARY

At the end of the month WNP-2 was operating at 100% power.

l REASON 2 METHOD A- u>pment Failure E - Operator Training & 1 - anua B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

0 ~- ~

sg l'