ML17292B664: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/30/1999
| issue date = 04/30/1999
| title = Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr
| title = Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr
| author name = KASKO B, SMITH G O
| author name = Kasko B, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULA Z INFORMATION DISTRIBUTIO
{{#Wiki_filter:REGULA       Z INFORMATION     DISTRIBUTIO . YSTEM (RIDS)
.YSTEM (RIDS)ACCESSION NBR:9905190121 DOC.DATE: 99/04/30 NOTARIZED:
ACCESSION NBR:9905190121             DOC.DATE: 99/04/30 NOTARIZED: NO                     DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public               Powe   05000397 AUTH.NAME             AUTHOR     AFFILIATION KASKO,B.             Washington Public Power Supply System SMITH, G. O.         Washington Public Power Supply System RECIP.NAME         'ECIPIENT AFFILIATION
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITH, G.O.Washington Public Power Supply System RECIP.NAME
'ECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating'ept for Apr 1999 for WNP-2.With 990507 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME LPD4-2 PD I NTERNAL: ACRS LE CENTER 01 NC COPIES LTTR ENCL 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CUSHING,J AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LMITCO MARSHALL NRC PDR 1 1 1 1 NOAC D'E NOTE TO ALL"RZDS" RECIPIENTS:
Monthly   operating'ept for         Apr 1999   for WNP-2.With 990507 ltr.
PLEASE HELP US TO REDUCE WASTETH'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~Richland, Washington 99352-0968 May 7, 1999 GO2-99-089 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR           ENCL       SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT              COPIES              RECIPIENT           COPIES ID CODE/NAME            LTTR ENCL        ID CODE/NAME         LTTR ENCL LPD4-2   PD                 1     1     CUSHING,J                1     1 INTERNAL:  ACRS                        1     1     AEOD/SPD/RRAB             1      1 LE CENTER    01                1      OC/DBA/PAD               1     1 NC                              1 EXTERNAL: LMITCO MARSHALL               1      1      NOAC NRC PDR                     1     1 D
                                                                                                      'E NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTETH 'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT DISTRIBUTION LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL     10
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 May 7, 1999 GO2-99-089 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT APRIL 1999 Transmitted herewith is the Monthly Operating Report for the month of April 1999 as required by Technical Specification 5,6.4, Respectfully, G.O.Smith Vice President, Generation Mail Drop 927M/i CC: EW Merschoff-NRC RIV JS Cushing-NRR.q Q 8 Q NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/1399 9905i90i2i 990430 PDR ADGCK 05000397 R PDR OPERATING STATUS REPORT for WNP-2 Date: May 1, 1999 2.3.4.5.Docket: 50-397 Reporting Period: APRIL 1999 Utility Contact: Bernice Kasko (509)377-4473 Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Net MW,): 1153 1107 6.7.8.9 Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)MONTH 388.2 386.2'.0 366,627 YEAR 2,548.2 2,546.2 0.0 2,636,819 CUMULATIVE 91,389.5 88,420.4 3,037.5 85,966,750 10.Challenges to safety/relief valves: None UNIT SHVIOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: May 1, 1999 COMPLETED BY: B Kasko TELEPHONE:
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT APRIL     1999 Transmitted herewith is the Monthly Operating Report for the month of April 1999 as required by Technical Specification 5,6.4, Respectfully, G. O. Smith Vice President, Generation
(509)377M73 REPORT PERIOD: APRIL 1999 No.99-001 Date 04/17/99 Type F: Forced S: Scheduled Duration (Hours)332.8 Reason (1)Method (2)H Cause and Corrective Action To Prevent Recurrence
                                                                                              /i Mail Drop 927M CC:     EW Merschoff - NRC RIV JS Cushing - NRR                               .q Q 8Q NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 1399 9905i90i2i 99043005000397 PDR     ADGCK R                     PDR
 
OPERATING STATUS REPORT for WNP-2 Date: May 1, 1999 Docket: 50-397
: 2. Reporting Period: APRIL 1999
: 3. Utility
 
==Contact:==
Bernice Kasko (509) 377-4473
: 4. Design Electrical Rating (Net MW,):                                 1153
: 5. Maximum Dependable Capacity - summer (Net MW,):                     1107 MONTH      YEAR  CUMULATIVE
: 6. Hours Reactor Critical                       388.2   2,548.2   91,389.5
: 7. Hours Generator On-Line                      386.2   2,546.2   88,420.4
: 8. Unit Reserve Shutdown Hours                  '.0        0.0    3,037.5 9  Net Electrical Energy (MWH)              366,627  2,636,819  85,966,750
: 10. Challenges to safety/relief valves:                                 None
 
UNIT SHVIOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: May 1, 1999 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:       APRIL     1999 Type F: Forced       Duration No.        Date      S: Scheduled     (Hours)     Reason (1)   Method (2)             Cause and Corrective Action To Prevent Recurrence 99-001    04/17/99                      332.8          H


==SUMMARY==
==SUMMARY==
: The plant began the month at 100%power and continued economic dispatch until April 17 when the plant was shutdown for a Fuel Savings Dispatch Outage.1 REASON A-u>pment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Oyerational Error H-Other 2 METHOD 1-Manua 2-Manua Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other A't g~}}
:                 The plant began the month at 100% power and continued economic dispatch until April 17 when the plant was shutdown for a Fuel Savings Dispatch Outage.
1 REASON                                                             2 METHOD A - u>pment Failure                 E - Operator Training &            1 - Manua B - Maintenance or Test                     License Examination      2- Manua Scram C - Refueling                       F - Administration                3 - Auto Scram D - Regulatory Restriction         G - Oyerational Error             4 - Continued H - Other                         5 - Reduced Load 9 - Other
 
A
't
      ~
g}}

Latest revision as of 03:40, 4 December 2019

Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr
ML17292B664
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1999
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-99-089, GO2-99-89, NUDOCS 9905190121
Download: ML17292B664 (5)


Text

REGULA Z INFORMATION DISTRIBUTIO . YSTEM (RIDS)

ACCESSION NBR:9905190121 DOC.DATE: 99/04/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH, G. O. Washington Public Power Supply System RECIP.NAME 'ECIPIENT AFFILIATION

SUBJECT:

Monthly operating'ept for Apr 1999 for WNP-2.With 990507 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD4-2 PD 1 1 CUSHING,J 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 LE CENTER 01 1 OC/DBA/PAD 1 1 NC 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC NRC PDR 1 1 D

'E NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH 'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT DISTRIBUTION LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 May 7, 1999 GO2-99-089 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT APRIL 1999 Transmitted herewith is the Monthly Operating Report for the month of April 1999 as required by Technical Specification 5,6.4, Respectfully, G. O. Smith Vice President, Generation

/i Mail Drop 927M CC: EW Merschoff - NRC RIV JS Cushing - NRR .q Q 8Q NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 1399 9905i90i2i 99043005000397 PDR ADGCK R PDR

OPERATING STATUS REPORT for WNP-2 Date: May 1, 1999 Docket: 50-397

2. Reporting Period: APRIL 1999
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Design Electrical Rating (Net MW,): 1153
5. Maximum Dependable Capacity - summer (Net MW,): 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 388.2 2,548.2 91,389.5
7. Hours Generator On-Line 386.2 2,546.2 88,420.4
8. Unit Reserve Shutdown Hours '.0 0.0 3,037.5 9 Net Electrical Energy (MWH) 366,627 2,636,819 85,966,750
10. Challenges to safety/relief valves: None

UNIT SHVIOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: May 1, 1999 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: APRIL 1999 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence 99-001 04/17/99 332.8 H

SUMMARY

The plant began the month at 100% power and continued economic dispatch until April 17 when the plant was shutdown for a Fuel Savings Dispatch Outage.

1 REASON 2 METHOD A - u>pment Failure E - Operator Training & 1 - Manua B - Maintenance or Test License Examination 2- Manua Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Oyerational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

A

't

~

g