ML17292B664: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/30/1999
| issue date = 04/30/1999
| title = Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr
| title = Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr
| author name = KASKO B, SMITH G O
| author name = Kasko B, Smith G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULAZINFORMATION DISTRIBUTIO
{{#Wiki_filter:REGULA      Z INFORMATION      DISTRIBUTIO . YSTEM (RIDS)
.YSTEM(RIDS)ACCESSION NBR:9905190121 DOC.DATE:
ACCESSION NBR:9905190121             DOC.DATE: 99/04/30 NOTARIZED: NO                      DOCKET FACIL:50-397   WPPSS  Nuclear Project, Unit 2, Washington Public                Powe    05000397 AUTH.NAME            AUTHOR    AFFILIATION KASKO,B.             Washington Public Power Supply System SMITH, G. O.         Washington Public Power Supply System RECIP.NAME         'ECIPIENT AFFILIATION
99/04/30NOTARIZED:
NODOCKETFACIL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPowe05000397AUTH.NAMEAUTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITH,G.O.Washington PublicPowerSupplySystemRECIP.NAME
'ECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthlyoperating'ept forApr1999forWNP-2.With 990507ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:RECIPIENT IDCODE/NAME LPD4-2PDINTERNAL:ACRSLECENTER01NCCOPIESLTTRENCL111111RECIPIENT IDCODE/NAME CUSHING,J AEOD/SPD/RRAB OC/DBA/PAD COPIESLTTRENCL111111EXTERNAL:
Monthly    operating'ept for        Apr 1999    for  WNP-2.With 990507 ltr.
LMITCOMARSHALLNRCPDR1111NOACD'ENOTETOALL"RZDS"RECIPIENTS:
DISTRIBUTION CODE: IE24D          COPIES RECEIVED:LTR           ENCL        SIZE:
PLEASEHELPUSTOREDUCEWASTETH'TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
TITLE: Monthly Operating Report (per Tech Specs)
LTTR10ENCL10 WASHINGTON PUBLICPOWERSUPPLYSYSTEMP.O.Box968~Richland, Washington 99352-0968 May7,1999GO2-99-089 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:
NOTES:
RECIPIENT              COPIES              RECIPIENT           COPIES ID CODE/NAME           LTTR ENCL        ID  CODE/NAME        LTTR ENCL LPD4-2  PD                1      1      CUSHING,J                 1      1 INTERNAL:  ACRS                        1      1      AEOD/SPD/RRAB             1      1 LE CENTER    01                1      OC/DBA/PAD               1      1 NC                              1 EXTERNAL: LMITCO MARSHALL              1      1      NOAC NRC PDR                    1      1 D
                                                                                                      'E NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTETH 'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT DISTRIBUTION LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                10    ENCL    10
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 May 7, 1999 GO2-99-089 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTAPRIL1999Transmitted herewithistheMonthlyOperating ReportforthemonthofApril1999asrequiredbyTechnical Specification 5,6.4,Respectfully, G.O.SmithVicePresident, Generation MailDrop927M/iCC:EWMerschoff
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT APRIL      1999 Transmitted herewith is the Monthly Operating Report for the month of April 1999 as required by Technical Specification 5,6.4, Respectfully, G. O. Smith Vice President, Generation
-NRCRIVJSCushing-NRR.qQ8QNRCSr.ResidentInspector
                                                                                              /i Mail Drop 927M CC:     EW Merschoff - NRC RIV JS Cushing - NRR                               .q Q 8Q NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 1399 9905i90i2i 99043005000397 PDR    ADGCK R                      PDR
-927NPDRobinson-Winston&StrawnINPOANILibraryUtilityDataInstitute DLWilliams-BPA/13999905i90i2i 990430PDRADGCK05000397RPDR OPERATING STATUSREPORTforWNP-2Date:May1,19992.3.4.5.Docket:50-397Reporting Period:APRIL1999UtilityContact:BerniceKasko(509)377-4473DesignElectrical Rating(NetMW,):MaximumDependable Capacity-summer(NetMW,):115311076.7.8.9HoursReactorCriticalHoursGenerator On-LineUnitReserveShutdownHoursNetElectrical Energy(MWH)MONTH388.2386.2'.0366,627YEAR2,548.22,546.20.02,636,819 CUMULATIVE 91,389.588,420.43,037.585,966,750 10.Challenges tosafety/relief valves:None UNITSHVIOWNSDOCKETNO.:50-397UNITNAME:WNP-2DATE:May1,1999COMPLETED BY:BKaskoTELEPHONE:
 
(509)377M73REPORTPERIOD:APRIL1999No.99-001Date04/17/99TypeF:ForcedS:Scheduled Duration(Hours)332.8Reason(1)Method(2)HCauseandCorrective ActionToPreventRecurrence SUMMARY:Theplantbeganthemonthat100%powerandcontinued economicdispatchuntilApril17whentheplantwasshutdownforaFuelSavingsDispatchOutage.1REASONA-u>pmentFailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration G-Oyerational ErrorH-Other2METHOD1-Manua2-ManuaScram3-AutoScram4-Continued 5-ReducedLoad9-Other A'tg~}}
OPERATING STATUS REPORT for WNP-2 Date: May 1, 1999 Docket: 50-397
: 2. Reporting Period: APRIL 1999
: 3. Utility
 
==Contact:==
Bernice Kasko (509) 377-4473
: 4. Design Electrical Rating (Net MW,):                                 1153
: 5. Maximum Dependable Capacity - summer (Net MW,):                     1107 MONTH      YEAR  CUMULATIVE
: 6. Hours Reactor Critical                      388.2    2,548.2    91,389.5
: 7. Hours Generator On-Line                      386.2    2,546.2   88,420.4
: 8. Unit Reserve Shutdown Hours                  '.0        0.0    3,037.5 9  Net Electrical Energy (MWH)              366,627  2,636,819 85,966,750
: 10. Challenges to safety/relief valves:                                 None
 
UNIT SHVIOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: May 1, 1999 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD:      APRIL      1999 Type F: Forced      Duration No.       Date      S: Scheduled     (Hours)     Reason (1)   Method (2)             Cause and Corrective Action To Prevent Recurrence 99-001    04/17/99                      332.8          H
 
==SUMMARY==
:                 The plant began the month at 100% power and continued economic dispatch until April 17 when the plant was shutdown for a Fuel Savings Dispatch Outage.
1  REASON                                                              2 METHOD A - u>pment Failure                E - Operator Training &            1 - Manua B - Maintenance or Test                      License Examination      2- Manua Scram C - Refueling                       F - Administration                3 - Auto Scram D - Regulatory Restriction         G - Oyerational Error              4 - Continued H - Other                          5 - Reduced Load 9 - Other
 
A
't
      ~
g}}

Latest revision as of 03:40, 4 December 2019

Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr
ML17292B664
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1999
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-99-089, GO2-99-89, NUDOCS 9905190121
Download: ML17292B664 (5)


Text

REGULA Z INFORMATION DISTRIBUTIO . YSTEM (RIDS)

ACCESSION NBR:9905190121 DOC.DATE: 99/04/30 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH, G. O. Washington Public Power Supply System RECIP.NAME 'ECIPIENT AFFILIATION

SUBJECT:

Monthly operating'ept for Apr 1999 for WNP-2.With 990507 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD4-2 PD 1 1 CUSHING,J 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 LE CENTER 01 1 OC/DBA/PAD 1 1 NC 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC NRC PDR 1 1 D

'E NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH 'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT DISTRIBUTION LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 May 7, 1999 GO2-99-089 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT APRIL 1999 Transmitted herewith is the Monthly Operating Report for the month of April 1999 as required by Technical Specification 5,6.4, Respectfully, G. O. Smith Vice President, Generation

/i Mail Drop 927M CC: EW Merschoff - NRC RIV JS Cushing - NRR .q Q 8Q NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute DL Williams - BPA / 1399 9905i90i2i 99043005000397 PDR ADGCK R PDR

OPERATING STATUS REPORT for WNP-2 Date: May 1, 1999 Docket: 50-397

2. Reporting Period: APRIL 1999
3. Utility

Contact:

Bernice Kasko (509) 377-4473

4. Design Electrical Rating (Net MW,): 1153
5. Maximum Dependable Capacity - summer (Net MW,): 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 388.2 2,548.2 91,389.5
7. Hours Generator On-Line 386.2 2,546.2 88,420.4
8. Unit Reserve Shutdown Hours '.0 0.0 3,037.5 9 Net Electrical Energy (MWH) 366,627 2,636,819 85,966,750
10. Challenges to safety/relief valves: None

UNIT SHVIOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: May 1, 1999 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: APRIL 1999 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence 99-001 04/17/99 332.8 H

SUMMARY

The plant began the month at 100% power and continued economic dispatch until April 17 when the plant was shutdown for a Fuel Savings Dispatch Outage.

1 REASON 2 METHOD A - u>pment Failure E - Operator Training & 1 - Manua B - Maintenance or Test License Examination 2- Manua Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Oyerational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

A

't

~

g