ML060610207: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML060610207
| number = ML060610207
| issue date = 03/02/2006
| issue date = 03/02/2006
| title = Dresden (Eco) Annual Assessment Letter (Report 05000237/249/2006-001)
| title = (Eco) Annual Assessment Letter (Report 05000237/249/2006-001)
| author name = Ring M A
| author name = Ring M
| author affiliation = NRC/RGN-III/DRP/RPB1
| author affiliation = NRC/RGN-III/DRP/RPB1
| addressee name = Crane C M
| addressee name = Crane C
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000237, 05000249
| docket = 05000237, 05000249
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:March 2, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer
{{#Wiki_filter:March 2, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
 
Exelon Nuclear
 
Exelon Generation Company, LLC
 
4300 Winfield Road
 
Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
Line 31: Line 23:
==Dear Mr. Crane:==
==Dear Mr. Crane:==


On February 9, 2006, the NRC staff completed its performance review of Dresden Nuclear Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent
On February 9, 2006, the NRC staff completed its performance review of Dresden Nuclear Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2005. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
 
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.
quarter and inspection results for the period from January 1 through December 31, 2005. The
Overall, Dresden Units 2 and 3 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Although plant performance was within the Licensee Response column, the significance of the finding associated with the failure to properly verify the adequacy of the extended power uprate design implementation to respond to changes in post-scram reactor vessel water level is still under review as part of the Significance Determination Process which, when finalized, may change our assessment of your plants safety performance. Based on our performance review, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on performing inspection procedure 71004, Power Uprate, to inspect activities related to the steam dryer replacement on Unit 3 and plan to perform the same inspection procedure during the proposed Unit 2 refueling outage in the Fall 2007.
 
purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Exempt from Public Disclosure in
 
accordance with 10 CFR 2.390" will include the physical protection review and resultant
 
inspection plan.
Overall, Dresden Units 2 and 3 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well
 
as for the first three quarters of the assessment cycle, was within the Licensee Response
 
column of the NRC's Action Matrix, based on all inspection findings being classified as having
 
very low safety significance (Green) and all PIs indicating performance at a level requiring no
 
additional NRC oversight (Green). Although plant performance was within the Licensee
 
Response column, the significance of the finding associated with the failure to properly verify
 
the adequacy of the extended power uprate design implementation to respond to changes in
 
post-scram reactor vessel water level is still under review as part of the Significance
 
Determination Process which, when finalized, may change our assessment of your plant's
 
safety performance. Based on our performance review, we plan to conduct reactor oversight
 
process (ROP) baseline inspections at your facility. We also plan on performing inspection
 
procedure 71004, "Power Uprate," to inspect activities related to the steam dryer replacement
 
on Unit 3 and plan to perform the same inspection procedure during the proposed Unit 2
 
refueling outage in the Fall 2007.
C. Crane The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2007. The inspection plan is provided to allow for the
 
resolution of any scheduling conflicts and personnel availability issues well in advance of
 
inspector arrival onsite. The plan also contains inspections using Independent Spent Fuel
 
Storage Installation procedures. Routine resident inspections are not listed due to their ongoing
 
and continuous nature. The inspections in the last 9 months of the inspection plan are tentative
 
and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC


Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
C. Crane                                        The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2007. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. The plan also contains inspections using Independent Spent Fuel Storage Installation procedures. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.
 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.
 
Sincerely,
questions you may have regarding this letter or the inspection plan.
                                            /RA/
Sincerely,/RA/Mark A. Ring, Chief Reactor Projects Branch 1
Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25
 
Division of Reactor Projects Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25


==Enclosure:==
==Enclosure:==
Dresden Inspection/Activity Plan See Attached Distribution C. Crane The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2007. The inspection plan is provided to allow for the
Dresden Inspection/Activity Plan See Attached Distribution
 
resolution of any scheduling conflicts and personnel availability issues well in advance of
 
inspector arrival onsite. The plan also contains inspections using Independent Spent Fuel
 
Storage Installation procedures. Routine resident inspections are not listed due to their ongoing
 
and continuous nature. The inspections in the last 9 months of the inspection plan are tentative
 
and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC
 
Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any


questions you may have regarding this letter or the inspection plan.
C. Crane                                                                    The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2007. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. The plan also contains inspections using Independent Spent Fuel Storage Installation procedures. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.
Sincerely,/RA/Mark A. Ring, Chief Reactor Projects Branch 1
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.
Division of Reactor Projects Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25
Sincerely,
                                                                          /RA/
Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25


==Enclosure:==
==Enclosure:==
Dresden Inspection/Activity Plan See Attached Distribution DOCUMENT NAME:G:\Branch TSS\ALL EOC\EOC CY2005\EOC Letters For CY 2005\Dresden.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIENAMEABarker:dtpMRingDATE02/28/0602/28/06 OFFICIAL RECORD COPY C. Crane-3-cc w/encl:Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager
Dresden Inspection/Activity Plan See Attached Distribution DOCUMENT NAME:G:\Branch TSS\ALL EOC\EOC CY2005\EOC Letters For CY 2005\Dresden.wpd G Publicly Available                       G Non-Publicly Available                 G Sensitive             G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE            RIII                                RIII                      E NAME              ABarker:dtp                        MRing DATE              02/28/06                            02/28/06 OFFICIAL RECORD COPY


Regulatory Assurance Manager - Dresden
C. Crane                                  cc w/encl: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission Will County Executive Will County Sheriff Director, Will County Emergency Management Agency Mayor of Joliet City Manager of Joliet Kendall County Board Chairman Kendall County Sheriff Grundy County Board Chairman Grundy County Sheriff Grundy County Emergency Management Agency Mayor of Morris Minooka Village President Mayor of Coal City Mayor of Carbon Hill Mayor of Diamond Mayor of Braidwood Mayor of Wilmington Channahon Village President Channahon Village Administrator Mayor of Shorewood Shorewood Village Administrator Mayor of Elwood INPO


Chief Operating Officer
C. Crane                                      ADAMS Distribution:
GYS MXB RidsNrrDirsIrib GEG KGO DRC1 CAA1 C. Pederson, DRS (hard copy - IRs only)
DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)


Senior Vice President - Nuclear Services
Page 1 of 2                                                                                    Dresden 03/01/2006    16:03:51                                                                Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit                                                                                                                                No. of Staff    Planned Dates          Inspection Number      Inspection Activity                                                    Title                                              on Site        Start    End            Type HS            - HEAT SINK INSPECTION                                                                                            1 2            IP 7111107B              Heat Sink Performance                                                                                      03/20/2006 03/24/2006 Baseline Inspections 7112103        - RADIOLOGICAL INSTRUMENTATION                                                                                    1 2, 3        IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                                              03/13/2006 03/17/2006 Baseline Inspections 71004          - POWER UPRATE                                                                                                    1 2, 3        IP 71004                Power Uprate                                                                                              04/01/2006 12/31/2006 Other Routine INSP          - ISFSI PREOPERATIONAL INSPECTION                                                                                2 2, 3        IP 60854.1              Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P              05/01/2006 08/15/2006 Other Routine 71111.11      - LIC OPERATOR REQUAL PROGRAM EVALUATION                                                                          2 2, 3        IP 7111111B              Licensed Operator Requalification Program                                                                  05/15/2006 05/19/2006 Baseline Inspections 7112101        - RADIOLOGICAL ACCESS CONTROL                                                                                    1 2, 3        IP 7112101              Access Control to Radiologically Significant Areas                                                        07/17/2006 07/21/2006 Baseline Inspections 2, 3        IP 7112102              ALARA Planning and Controls                                                                                07/17/2006 07/21/2006 Baseline Inspections 2, 3        IP 71151                Performance Indicator Verification                                                                        07/17/2006 07/21/2006 Baseline Inspections 7112203        - REMP & RAD MATL CONTROL                                                                                        1 2, 3        IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P                    08/07/2006 08/11/2006 Baseline Inspections 2, 3        IP 71151                Performance Indicator Verification                                                                        08/07/2006 08/11/2006 Baseline Inspections MOD5059        - MODIFICATION/50.59 INSPECTION                                                                                  2 2, 3        IP 7111102              Evaluation of Changes, Tests, or Experiments                                                              09/18/2006 10/06/2006 Baseline Inspections 2, 3        IP 7111117B              Permanent Plant Modifications                                                                              09/18/2006 10/06/2006 Baseline Inspections ISI            - DRESDEN UNIT 3 ISI INSPECTION                                                                                  1 3        IP 7111108G              Inservice Inspection Activities - BWR                                                                      11/13/2006 11/17/2006 Baseline Inspections 7112102        - ALARA OUTAGE INSP                                                                                              1 2, 3        IP 7112101              Access Control to Radiologically Significant Areas                                                        11/13/2006 11/17/2006 Baseline Inspections 2, 3        IP 7112102              ALARA Planning and Controls                                                                                11/13/2006 11/17/2006 Baseline Inspections ME            - MAINTENANCE EFFECTIVENESS INSPECTION                                                                            1 2, 3        IP 7111112B              Maintenance Effectiveness                                                                                  12/11/2006 12/15/2006 Baseline Inspections ISFSI          - ISFSI INSPECTION                                                                                                4 2            IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants                            01/01/2007 03/31/2007 Other Routine 71122.02      - TRANSPORTATION AND RADWASTE                                                                                    1 2, 3        IP 7112202              Radioactive Material Processing and Transportation                                                        02/05/2007 02/09/2007 Baseline Inspections 7111401        - EP EXERCISE & PI INSP                                                                                          1 2, 3        IP 7111401              Exercise Evaluation                                                                                        03/19/2007 03/23/2007 Baseline Inspections 2, 3        IP 71151                Performance Indicator Verification                                                                        03/19/2007 03/23/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
Senior Vice President - Mid-West Regional
 
Operating Group
 
Vice President - Mid-West Operations Support
 
Vice President - Licensing and Regulatory Affairs
 
Director Licensing - Mid-West Regional
 
Operating Group
 
Manager Licensing - Dresden and Quad Cities
 
Senior Counsel, Nuclear, Mid-West Regional
 
Operating Group
 
Document Control Desk - Licensing
 
Assistant Attorney General
 
Illinois Emergency Management Agency
 
State Liaison Officer
 
Chairman, Illinois Commerce Commission
 
Will County Executive
 
Will County Sheriff
 
Director, Will County Emergency
 
Management Agency
 
Mayor of Joliet
 
City Manager of Joliet
 
Kendall County Board Chairman
 
Kendall County Sheriff
 
Grundy County Board Chairman
 
Grundy County Sheriff
 
Grundy County Emergency Management Agency
 
Mayor of Morris
 
Minooka Village President
 
Mayor of Coal City
 
Mayor of Carbon Hill
 
Mayor of Diamond
 
Mayor of Braidwood
 
Mayor of Wilmington
 
Channahon Village President
 
Channahon Village Administrator
 
Mayor of Shorewood
 
Shorewood Village Administrator
 
Mayor of Elwood


INPO C. Crane ADAMS Distribution
Page 2 of 2                                                                                     Dresden 03/01/2006     16:03:51                                                               Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit                                                                                                          No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                        on Site       Start    End            Type FY 2007       - DRESDEN INIT PREP 04/2007                                                                 3 2               W90160               OL - INITIAL EXAM - DRESDEN - APR/MAY 2007                                           04/02/2007 04/06/2007 Not Applicable 71122.01      - RADIOLOGICAL EFFLUENTS                                                                    1 2, 3         IP 7112201               Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems             04/16/2007 04/20/2007 Baseline Inspections 2, 3         IP 71151                 Performance Indicator Verification                                                   04/16/2007 04/20/2007 Baseline Inspections FY 2007       - DRESDEN INIT EXAM 04&05/2007                                                               3 2               W90160               OL - INITIAL EXAM - DRESDEN - APR/MAY 2007                                           04/23/2007 05/04/2007 Not Applicable 71121.01       - RADIOLOGICAL ACCESS CONTROL                                                               1 2, 3         IP 7112101               Access Control to Radiologically Significant Areas                                   07/09/2007 07/13/2007 Baseline Inspections 2, 3         IP 71151                 Performance Indicator Verification                                                   07/09/2007 07/13/2007 Baseline Inspections CDBI           - COMPONENT DESIGN BASES INSPECTION                                                         5 2, 3        IP 7111121              Component Design Bases Inspection                                                    08/27/2007 09/28/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
: GYS MXB RidsNrrDirsIrib
 
GEG KGO DRC1 CAA1 C. Pederson, DRS (hard copy - IR's only)
 
DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)
Dresden Inspection / Activity Plan 03/01/2006
-09/30/2007 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2006 16:03:51 Report 22 1 HS-HEAT SINK INSPECTION Baseline Inspections 03/20/2006 03/24/2006 2  7111107B IP Heat Sink Performance 1 7112103-RADIOLOGICAL INSTRUMENTATION Baseline Inspections 03/13/2006 03/17/2006 2, 3 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1 71004-POWER UPRATE Other Routine 04/01/2006 12/31/2006 2, 3 71004 IP Power Uprate 2 INSP-ISFSI PREOPERATIONAL INSPECTION Other Routine 05/01/2006 08/15/2006 2, 3 60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P 2 71111.11-LIC OPERATOR REQUAL PROGRAM EVALUATION Baseline Inspections 05/15/2006 05/19/2006 2, 3 7111111B IP Licensed Operator Requalification Program 1 7112101-RADIOLOGICAL ACCESS CONTROL Baseline Inspections 07/17/2006 07/21/2006 2, 3 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 07/17/2006 07/21/2006 2, 3 7112102 IP A LARA Planning and Controls Baseline Inspections 07/17/2006 07/21/2006 2, 3 71151 IP Performance Indicator Verification 1 7112203-REMP & RAD MATL CONTROL Baseline Inspections 08/07/2006 08/11/2006 2, 3 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 08/07/2006 08/11/2006 2, 3 71151 IP Performance Indicator Verification 2 MOD5059-MODIFICATION/50.59 INSPECTION Baseline Inspections 09/18/2006 10/06/2006 2, 3 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 09/18/2006 10/06/2006 2, 3 7111117B IP Permanent Plant Modifications 1 ISI-DRESDEN UNIT 3 ISI INSPECTION Baseline Inspections 11/13/2006 11/17/2006 3 7111108G IP Inservice Inspection Activities - BWR 1 7112102-ALARA OUTAGE INSP Baseline Inspections 11/13/2006 11/17/2006 2, 3 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 11/13/2006 11/17/2006 2, 3 7112102 IP A LARA Planning and Controls 1 ME-MAINTENANCE EFFECTIVENESS INSPECTION Baseline Inspections 12/11/2006 12/15/2006 2, 3 7111112B IP Maintenance Effectiveness 4 ISFSI-ISFSI INSPECTION Other Routine 01/01/2007 03/31/2007 2  60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1 71122.02-TRANSPORTATION AND RADWASTE Baseline Inspections 02/05/2007 02/09/2007 2, 3 7112202 IP Radioactive Material Processing and Transportation 1 7111401-EP EXERCISE & PI INSP Baseline Inspections 03/19/2007 03/23/2007 2, 3 7111401 IP Exercise Evaluation Baseline Inspections 03/19/2007 03/23/2007 2, 3 71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Dresden Inspection / Activity Plan 03/01/2006
-09/30/2007 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2006 16:03:51 Report 22 3 FY 2007-DRESDEN INIT PREP 04/2007 Not Applicable 04/02/2007 04/06/2007 2   W90160 OL - INITIAL EXAM - DRESDEN - APR/MAY 2007 1 71122.01-RADIOLOGICAL EFFLUENTS Baseline Inspections 04/16/2007 04/20/2007 2, 3 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 04/16/2007 04/20/2007 2, 3 71151 IP Performance Indicator Verification 3 FY 2007-DRESDEN INIT EXAM 04&05/2007 Not Applicable 04/23/2007 05/04/2007 2   W90160 OL - INITIAL EXAM - DRESDEN - APR/MAY 2007 1 71121.01-RADIOLOGICAL ACCESS CONTROL Baseline Inspections 07/09/2007 07/13/2007 2, 3 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 07/09/2007 07/13/2007 2, 3 71151 IP Performance Indicator Verification 5 CDBI-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 08/27/2007 09/28/2007 2, 3 7111121 IP Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 22:39, 23 November 2019

(Eco) Annual Assessment Letter (Report 05000237/249/2006-001)
ML060610207
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/02/2006
From: Ring M
NRC/RGN-III/DRP/RPB1
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
IR-06-001
Download: ML060610207 (7)


Text

March 2, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

ANNUAL ASSESSMENT LETTER - DRESDEN NUCLEAR POWER STATION (REPORT 50-237/06-01; 50-249/06-01)

Dear Mr. Crane:

On February 9, 2006, the NRC staff completed its performance review of Dresden Nuclear Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2005. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.

Overall, Dresden Units 2 and 3 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Although plant performance was within the Licensee Response column, the significance of the finding associated with the failure to properly verify the adequacy of the extended power uprate design implementation to respond to changes in post-scram reactor vessel water level is still under review as part of the Significance Determination Process which, when finalized, may change our assessment of your plants safety performance. Based on our performance review, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on performing inspection procedure 71004, Power Uprate, to inspect activities related to the steam dryer replacement on Unit 3 and plan to perform the same inspection procedure during the proposed Unit 2 refueling outage in the Fall 2007.

C. Crane The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2007. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. The plan also contains inspections using Independent Spent Fuel Storage Installation procedures. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25

Enclosure:

Dresden Inspection/Activity Plan See Attached Distribution

C. Crane The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2007. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. The plan also contains inspections using Independent Spent Fuel Storage Installation procedures. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Ring, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25

Enclosure:

Dresden Inspection/Activity Plan See Attached Distribution DOCUMENT NAME:G:\Branch TSS\ALL EOC\EOC CY2005\EOC Letters For CY 2005\Dresden.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII E NAME ABarker:dtp MRing DATE 02/28/06 02/28/06 OFFICIAL RECORD COPY

C. Crane cc w/encl: Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer Chairman, Illinois Commerce Commission Will County Executive Will County Sheriff Director, Will County Emergency Management Agency Mayor of Joliet City Manager of Joliet Kendall County Board Chairman Kendall County Sheriff Grundy County Board Chairman Grundy County Sheriff Grundy County Emergency Management Agency Mayor of Morris Minooka Village President Mayor of Coal City Mayor of Carbon Hill Mayor of Diamond Mayor of Braidwood Mayor of Wilmington Channahon Village President Channahon Village Administrator Mayor of Shorewood Shorewood Village Administrator Mayor of Elwood INPO

C. Crane ADAMS Distribution:

GYS MXB RidsNrrDirsIrib GEG KGO DRC1 CAA1 C. Pederson, DRS (hard copy - IRs only)

DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

Page 1 of 2 Dresden 03/01/2006 16:03:51 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type HS - HEAT SINK INSPECTION 1 2 IP 7111107B Heat Sink Performance 03/20/2006 03/24/2006 Baseline Inspections 7112103 - RADIOLOGICAL INSTRUMENTATION 1 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/13/2006 03/17/2006 Baseline Inspections 71004 - POWER UPRATE 1 2, 3 IP 71004 Power Uprate 04/01/2006 12/31/2006 Other Routine INSP - ISFSI PREOPERATIONAL INSPECTION 2 2, 3 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P 05/01/2006 08/15/2006 Other Routine 71111.11 - LIC OPERATOR REQUAL PROGRAM EVALUATION 2 2, 3 IP 7111111B Licensed Operator Requalification Program 05/15/2006 05/19/2006 Baseline Inspections 7112101 - RADIOLOGICAL ACCESS CONTROL 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 07/17/2006 07/21/2006 Baseline Inspections 2, 3 IP 7112102 ALARA Planning and Controls 07/17/2006 07/21/2006 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 07/17/2006 07/21/2006 Baseline Inspections 7112203 - REMP & RAD MATL CONTROL 1 2, 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 08/07/2006 08/11/2006 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 08/07/2006 08/11/2006 Baseline Inspections MOD5059 - MODIFICATION/50.59 INSPECTION 2 2, 3 IP 7111102 Evaluation of Changes, Tests, or Experiments 09/18/2006 10/06/2006 Baseline Inspections 2, 3 IP 7111117B Permanent Plant Modifications 09/18/2006 10/06/2006 Baseline Inspections ISI - DRESDEN UNIT 3 ISI INSPECTION 1 3 IP 7111108G Inservice Inspection Activities - BWR 11/13/2006 11/17/2006 Baseline Inspections 7112102 - ALARA OUTAGE INSP 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 11/13/2006 11/17/2006 Baseline Inspections 2, 3 IP 7112102 ALARA Planning and Controls 11/13/2006 11/17/2006 Baseline Inspections ME - MAINTENANCE EFFECTIVENESS INSPECTION 1 2, 3 IP 7111112B Maintenance Effectiveness 12/11/2006 12/15/2006 Baseline Inspections ISFSI - ISFSI INSPECTION 4 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 01/01/2007 03/31/2007 Other Routine 71122.02 - TRANSPORTATION AND RADWASTE 1 2, 3 IP 7112202 Radioactive Material Processing and Transportation 02/05/2007 02/09/2007 Baseline Inspections 7111401 - EP EXERCISE & PI INSP 1 2, 3 IP 7111401 Exercise Evaluation 03/19/2007 03/23/2007 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 03/19/2007 03/23/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Dresden 03/01/2006 16:03:51 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type FY 2007 - DRESDEN INIT PREP 04/2007 3 2 W90160 OL - INITIAL EXAM - DRESDEN - APR/MAY 2007 04/02/2007 04/06/2007 Not Applicable 71122.01 - RADIOLOGICAL EFFLUENTS 1 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 04/16/2007 04/20/2007 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 04/16/2007 04/20/2007 Baseline Inspections FY 2007 - DRESDEN INIT EXAM 04&05/2007 3 2 W90160 OL - INITIAL EXAM - DRESDEN - APR/MAY 2007 04/23/2007 05/04/2007 Not Applicable 71121.01 - RADIOLOGICAL ACCESS CONTROL 1 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 07/09/2007 07/13/2007 Baseline Inspections 2, 3 IP 71151 Performance Indicator Verification 07/09/2007 07/13/2007 Baseline Inspections CDBI - COMPONENT DESIGN BASES INSPECTION 5 2, 3 IP 7111121 Component Design Bases Inspection 08/27/2007 09/28/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.