{{#Wiki_filter:FENOC; FirstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President  
{{#Wiki_filter:FENOC                                                                                                                 5501 North State Route 2
-Nuclear Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3284 August 15, 2006 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
; FirstEnergyNuclear OperatingCompany                                                                                  Oak Harbor,Ohio 43449 Mark B. Bezilla                                                                                                               419-321-7676 Vice President- Nuclear                                                                                                   Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3284 August 15,       2006 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001


==Subject:==
==Subject:==
Regulatory Commitment Change Summary Report (May 18, 2002 -May 31, 2006)Ladies and Gentlemen:
Regulatory Commitment Change Summary Report (May 18, 2002 - May 31, 2006)
Ladies and Gentlemen:
The FirstEnergy Nuclear Operating Company (FENOC) hereby submits the attached Regulatory Commitment Change Summary Report for the Davis-Besse Nuclear Power Station, Unit Number 1 (DBNPS), as discussed in NEI Commitment Management guidance and implemented by the DBNPS commitment management procedure.
The FirstEnergy Nuclear Operating Company (FENOC) hereby submits the attached Regulatory Commitment Change Summary Report for the Davis-Besse Nuclear Power Station, Unit Number 1 (DBNPS), as discussed in NEI Commitment Management guidance and implemented by the DBNPS commitment management procedure.
The DBNPS commitment changes identified between the dates of May 18, 2002 and May 31, 2006 are included in Attachment I of this report. This report includes a description of the identified commitments, a summary of the changes made to the commitments, and a brief statement describing the basis for the change. FENOC has reviewed and implemented the commitment changes and has determined that the submittal of this report is the only required notification regarding changes to commitments listed in the attached summary.This report covers four years of commitment changes due to a missed submittal of a Regulatory Commitment Change Summary Report in 2004. This missed submittal was documented in the DBNPS Corrective Action Program. The last submittal of a Regulatory Commitment Change Summary Report was on November 18, 2002 (Serial 2824).Attachment 2 identifies that there are no commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Gregory A. Dunn, Manager-FENOC Fleet Licensing, at (330) 315-7243.Sincerely yours, KJN/kjn Attachments cc: DB-l NRC/NRR Project Manager Regional Administrator, USNRC Region III DB- 1 NRC Senior Resident Inspector Utility Radiological Safety Board ,AoDl Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 1 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
The DBNPS commitment changes identified between the dates of May 18, 2002 and May 31, 2006 are included in Attachment I of this report. This report includes a description of the identified commitments, a summary of the changes made to the commitments, and a brief statement describing the basis for the change. FENOC has reviewed and implemented the commitment changes and has determined that the submittal of this report is the only required notification regarding changes to commitments listed in the attached summary.
This report covers four years of commitment changes due to a missed submittal of a Regulatory Commitment Change Summary Report in 2004. This missed submittal was documented in the DBNPS Corrective Action Program. The last submittal of a Regulatory Commitment Change Summary Report was on November 18, 2002 (Serial 2824).
Attachment 2 identifies that there are no commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Gregory A. Dunn, Manager-FENOC Fleet Licensing, at (330) 315-7243.
Sincerely yours, KJN/kjn Attachments cc: DB-l NRC/NRR Project Manager Regional Administrator, USNRC Region III DB-1 NRC Senior Resident Inspector Utility Radiological Safety Board
                                                                                                                                    ,AoDl
 
Docket Number 50-346 License Number NPF-3                       DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284              REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 001094, 001095, 001102 Serial Letter 0220 2/18/1977 001483 GL 83-028, Serial Letter 1000 11/07/1983 001487 GL 83-028, Serial Letter 1000 11/07/1983 DESCRIPTION Outlines the events during a cooldown or plant startup in which operator actions prevent the possibility of overpressurization and identifies when the HPI (high pressure injection) system will be tested.All nuclear safety related administrative procedures are reviewed and approved by the Quality Assurance department and implementation is verified during audits.Audit reports are reviewed and approved by the Supervisor
REPORT MAY 2002 - MAY 2006 Page 1 of 34 COMMITMENT                    COMMITMENT NUMBER I SOURCE I DATE               DESCRIPTION                         CHANGE                   REASON FOR CHANGE DESCRIPTION 001094, 001095, 001102       Outlines the events during a       Overpressurization controls were DB-SP-10030, HPI Pump 1 Mode Serial Letter 0220            cooldown or plant startup in which implemented through procedural  5 Enhanced Baseline Testing in 2/18/1977                    operator actions prevent the      controls by isolating the BWST  Piggyback, was used in 13RFO to possibility of overpressurization  (borated water storage tank)    develop a curve and to obtain and identifies when the HPI (high  suction to the HPI pump in DB-  additional data for rotor dynamics pressure injection) system will be SP-1 0030.                      analysis, including critical speed.
-Supplier Quality Unit and distributed to management of the audited organization.
tested.                                                            This test was an infrequently performed test that was cancelled after 13RFO so no permanent commitment change was made.
Overpressurization controls were implemented through procedural controls by isolating the BWST (borated water storage tank)suction to the HPI pump in DB-SP-1 0030.Commitment closed.Commitment closed.DB-SP-10030, HPI Pump 1 Mode 5 Enhanced Baseline Testing in Piggyback, was used in 13RFO to develop a curve and to obtain additional data for rotor dynamics analysis, including critical speed.This test was an infrequently performed test that was cancelled after 13RFO so no permanent commitment change was made.With current programmatic (audit)reviews in place, a separate in-line review of procedures by Quality Assurance is redundant and unnecessary.
001483                        All nuclear safety related          Commitment closed.              With current programmatic (audit)
This commitment was redundant with the intent of the requirements of ANSI N45.2.12-1977.
GL 83-028, Serial Letter 1000 administrative procedures are                                      reviews in place, a separate in-line 11/07/1983                    reviewed and approved by the                                        review of procedures by Quality Quality Assurance department                                        Assurance is redundant and and implementation is verified                                      unnecessary.
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 2 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
during audits.
001487                        Audit reports are reviewed and      Commitment closed.              This commitment was redundant GL 83-028, Serial Letter 1000  approved by the Supervisor -                                      with the intent of the requirements 11/07/1983                    Supplier Quality Unit and                                          of ANSI N45.2.12-1977.
distributed to management of the audited organization.
 
Docket Number 50-346 License Number NPF-3                         DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBERISOURCE IDATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 001500 GL 83-028, Serial Letter 1000 11/07/1983 001727 GL 81-004, Serial Letter 0720 6/02/1981 001945 IR 79-003, Serial Letter 1-0053 3/26/1979 All procurement documents identified as Q-list, fire protection and/or ASME must be reviewed/approved by the Facility Engineering Department and by the Quality Engineering Department.
REPORT                                                   MAY 2002 - MAY 2006 Page 2 of 34 COMMITMENT                        COMMITMENT NUMBERISOURCE IDATE                     DESCRIPTION                             CHANGE                     REASON FOR CHANGE 001500                         All procurement documents            Procurement documents are          The Procurement Engineer is GL 83-028, Serial Letter 1000   identified as Q-list, fire protection reviewed/approved by              tasked with this activity and may 11/07/1983                      and/or ASME must be                   Procurement Engineering.          request a formal review by other reviewed/approved by the Facility                                       disciplines as deemed necessary.
The procedure for loss of all AC power is covered in the requalification training during the standard and emergency operating procedure training.
Engineering Department and by the Quality Engineering Department.
Any procedure revisions will be covered in a method appropriate to the magnitude of the revision.In order to prevent another occurrence of unlocked high radiation areas, the location of all areas greater than 1000 MR/HR have been locked and these areas are logged in the high radiation locked area book. These areas have special locks labeled with a tag.Procurement documents are reviewed/approved by Procurement Engineering.
001727                          The procedure for loss of all AC     Commitment closed.                The licensed operator GL 81-004, Serial Letter 0720  power is covered in the                                                 requalification program is now 6/02/1981                      requalification training during the                                     designed using the Systematic standard and emergency                                                   Approach to Training (SAT) operating procedure training. Any                                       process that determines training procedure revisions will be                                             needs based on job analysis and covered in a method appropriate                                         needs analysis.
Commitment closed.Replaced the high radiation locked area book with the Barricade and Barrier Posting and Integrity Checklist.
to the magnitude of the revision.
Deleted the tags on the locks.The Procurement Engineer is tasked with this activity and may request a formal review by other disciplines as deemed necessary.
001945                          In order to prevent another         Replaced the high radiation locked Each lock is stamped (into the IR 79-003, Serial Letter 1-0053 occurrence of unlocked high           area book with the Barricade and  metal of the lock) with a unique 3/26/1979                        radiation areas, the location of all Barrier Posting and Integrity      identifying number that areas greater than 1000 MR/HR       Checklist. Deleted the tags on the corresponds to the key.
The licensed operator requalification program is now designed using the Systematic Approach to Training (SAT)process that determines training needs based on job analysis and needs analysis.Each lock is stamped (into the metal of the lock) with a unique identifying number that corresponds to the key.
have been locked and these areas     locks.
II Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 3 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
are logged in the high radiation locked area book. These areas have special locks labeled with a tag.
 
II Docket Number 50-346 License Number NPF-3                         DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBERISOURCEIDATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 002998 IR 84-012, Serial Letter 1-0463 9/20/1984 The Conditions Adverse to Quality program implements the requirements of 10 CFR 21.Commitment closed.The Corrective Action Program maintains this compliance as it requires a determination if the condition is reportable under 10 CFR 21, and if required, completion of a 10 CFR 21 Decision Checklist.
REPORT                                                 MAY 2002 - MAY 2006 Page 3 of 34 COMMITMENT                        COMMITMENT NUMBERISOURCEIDATE                     DESCRIPTION                           CHANGE                       REASON FOR CHANGE 002998                           The Conditions Adverse to Quality    Commitment closed.                  The Corrective Action Program IR 84-012, Serial Letter 1-0463 program implements the                                                  maintains this compliance as it 9/20/1984                       requirements of 10 CFR 21.                                               requires a determination if the condition is reportable under 10 CFR 21, and if required, completion of a 10 CFR 21 Decision Checklist.
The practice of using a test outline has been discontinued.
003251                          Adequate procedural guidance        Commitment closed.                  The practice of using a test outline IR 84-028                        had been added to prevent the                                            has been discontinued. Approved 1/18/1985                       use of a test outline instead of a                                       procedures are used to perform test procedure.                                                          testing.
Approved procedures are used to perform testing.003251 IR 84-028 1/18/1985 Adequate procedural guidance had been added to prevent the use of a test outline instead of a test procedure.
003520                           The Technical Specifications        Deleted hand delivery of report    The subject report is available on-LER 86-031, Serial Letter 1-0674 Surveillance Specialist will        and that Friday's list will include line to anyone, including the shift 10/13/1986                       maintain a current list of all       tests which will be late up to and  manager and department heads surveillance tests that will go late including Monday.                  and is kept current.
Commitment closed.003520 LER 86-031, Serial Letter 1-0674 10/13/1986 The Technical Specifications Surveillance Specialist will maintain a current list of all surveillance tests that will go late during the next 72 hours. This list will be hand delivered daily to the shift manager and appropriate department heads. Friday's list will include tests which will be late up to and including Monday.Deleted hand delivery of report and that Friday's list will include tests which will be late up to and including Monday.The subject report is available on-line to anyone, including the shift manager and department heads and is kept current.
during the next 72 hours. This list will be hand delivered daily to the shift manager and appropriate department heads. Friday's list will include tests which will be late up to and including Monday.
: 1) 9 Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 4 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
: 1) 9 Docket Number 50-346 License Number NPF-3                           DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                  REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 004716 IEB 80-024, Serial Letter 1-0179 1/05/1981 004848 GL 85-002, Serial Letter 1161 6/24/1985 005558 GL 87-012, Serial Letter 1423 9/23/1987 A general inspection of containment is required to be performed by Plant Startup Procedure prior to reaching criticality on each plant startup.(This inspection is for water damage from open system leakage.)When loose parts are suspected, the Vibration
REPORT                                                   MAY 2002 - MAY 2006 Page 4 of 34 COMMITMENT                          COMMITMENT NUMBER I SOURCE I DATE                   DESCRIPTION                           CHANGE                     REASON FOR CHANGE 004716                           A general inspection of            The inspection is performed when    The station has the capability to IEB 80-024, Serial Letter 1-0179 containment is required to be       there are indications of open       identify leakage and differentiate 1/05/1981                        performed by Plant Startup          system leakage.                    which system is leaking. To limit Procedure prior to reaching                                            dose and for safety reasons criticality on each plant startup.                                      related to low containment oxygen (This inspection is for water                                          levels, this change was made to damage from open system                                                inspect affected areas in leakage.)                                                              containment when there are indications of open system leakage.
& Loose Parts "crash cart" is dispatched to further analyze the noise and determine the location of the suspected loose part.Pumps which may be used to control RCS (reactor coolant system) inventory include.., the primary transfer pumps.The inspection is performed when there are indications of open system leakage.Deleted all references to the crash cart and equipment located on it.Delete primary transfer pumps as part of this commitment.
004848                          When loose parts are suspected,    Deleted all references to the crash The crash cart was rarely used GL 85-002, Serial Letter 1161    the Vibration & Loose Parts "crash  cart and equipment located on it. and created a physical nuisance 6/24/1985                        cart" is dispatched to further                                          to store in the Control Room.
The station has the capability to identify leakage and differentiate which system is leaking. To limit dose and for safety reasons related to low containment oxygen levels, this change was made to inspect affected areas in containment when there are indications of open system leakage.The crash cart was rarely used and created a physical nuisance to store in the Control Room.Newer equipment is available in the Metrology Lab and no longer needs to be stored on a crash cart.These pumps were abandoned in place by plant modification 95-0050-00, Abandon Primary Water Storage Tank (and System).
analyze the noise and determine                                        Newer equipment is available in the location of the suspected                                          the Metrology Lab and no longer loose part.                                                            needs to be stored on a crash cart.
I)Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 5 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
005558                          Pumps which may be used to          Delete primary transfer pumps as  These pumps were abandoned in GL 87-012, Serial Letter 1423    control RCS (reactor coolant        part of this commitment.            place by plant modification 9/23/1987                        system) inventory include.., the                                        95-0050-00, Abandon Primary primary transfer pumps.                                                Water Storage Tank (and System).
 
I)
Docket Number 50-346 License Number NPF-3                   DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284          REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE DESCRIPTION CHANGE REASON FOR CHANGE 006761 Serial Letter 1368 4/20/1987 009319 LER 78-019 3/07/1978 An updated list of abbreviations, acronyms, and symbols will be available after the control room indications and controls are re-labeled. When the list is available, it should be added to the writer's guide. Plant abbreviations and acronyms are included in the writer's guide.The mechanical stops of valves DH14A and DH14B are now tagged to prevent incorrect resetting of these stops. The correct settings should be 47 degrees open for DH14A and 45 degrees open for DH14B.Establish controls so that regulatory applicability determinations are written on use-as-is and repair condition reports.Commitment closed.Deleted the specific settings identified in the commitment.
REPORT                                           MAY 2002 - MAY 2006 Page 5 of 34 COMMITMENT                COMMITMENT NUMBER I SOURCE I DATE           DESCRIPTION                             CHANGE               REASON FOR CHANGE DESCRIPTION                             CHANGE             REASON FOR CHANGE 006761                   An updated list of abbreviations,   Commitment closed.            The philosophy for the use of Serial Letter 1368        acronyms, and symbols will be                                     acronyms and abbreviations has 4/20/1987                available after the control room                                   changed and their use should now indications and controls are re-                                   be minimized. When used, it is labeled. When the list is available,                               more appropriate to have the it should be added to the writer's                                 acronym/abbreviation defined guide. Plant abbreviations and                                     within the procedure itself so end acronyms are included in the                                      users can easily locate the writer's guide.                                                   definition.
The philosophy for the use of acronyms and abbreviations has changed and their use should now be minimized.
009319                    The mechanical stops of valves       Deleted the specific settings The valve position is controlled by LER 78-019                DH14A and DH14B are now             identified in the commitment. test procedures and changes 3/07/1978                tagged to prevent incorrect                                        depending on the test results.
When used, it is more appropriate to have the acronym/abbreviation defined within the procedure itself so end users can easily locate the definition.
resetting of these stops. The                                      The Engineering Change Request correct settings should be 47                                      process controls the procedure degrees open for DH14A and 45                                      changes and tag changes degrees open for DH14B.                                            required to reflect the new valve settings.
The valve position is controlled by test procedures and changes depending on the test results.The Engineering Change Request process controls the procedure changes and tag changes required to reflect the new valve settings.Controls are in place to ensure this action is completed.
009551                    Establish controls so that          Commitment closed.            Controls are in place to ensure IR 86-005                regulatory applicability                                          this action is completed. The 4/18/1986                determinations are written on use-                                Corrective Action Program as-is and repair condition reports.                                includes instructions on what documentation is required for a use-as-is or repair disposition.
The Corrective Action Program includes instructions on what documentation is required for a use-as-is or repair disposition.
 
009551 IR 86-005 4/18/1986 Commitment closed.
V)
V )Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment I Page 6 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
Docket Number 50-346 License Number NPF-3                         DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 011711 IR 84-028, Serial Letter 1-0401 1/06/1984 011735 SRTP HVAC-NRR-2 9/30/1986 012113 Serial Letter 1-0132 5/23/1980 The condition report procedure was revised to include the notification of the Regulatory Affairs section if the engineering evaluation indicates the system or component is unable to perform its intended safety function.Initiate complete air flow balance of the control room HVAC system, including vibration testing of all rotating equipment.
REPORT Attachment I                                                MAY 2002 - MAY 2006 Page 6 of 34 COMMITMENT                        COMMITMENT NUMBER I SOURCE I DATE                 DESCRIPTION                           CHANGE                     REASON FOR CHANGE 011711                         The condition report procedure    Commitment closed.                The Corrective Action Program IR 84-028, Serial Letter 1-0401 was revised to include the                                            requires Regulatory Affairs to 1/06/1984                       notification of the Regulatory                                       review all new condition reports Affairs section if the engineering                                   for a reportability determination.
Preventive maintenance activities have been initiated to quarterly monitor the supply and return air fans vibration.
evaluation indicates the system or                                   Also, the SRO notifies/involves component is unable to perform its                                   Regulatory Affairs as required for intended safety function.                                             Operability Determinations or hardware dispositions.
Health Physics procedure was revised to include more stringent requirements for entering locked high radiation areas. These include verbal permission from a Chemistry and Healthy Physics management individual and a requirement to use two different types of high range survey meters.Commitment closed.Changed to periodically monitor the supply and return.Verbal permission is obtained from Chemistry and Radiation Protection Supervisor.
011735                          Initiate complete air flow balance Changed to periodically monitor  The appropriate frequency is SRTP HVAC-NRR-2                of the control room HVAC system,   the supply and return.            determined and controlled by the 9/30/1986                      including vibration testing of all                                     Preventive Maintenance Program rotating equipment. Preventive                                        to ensure equipment reliability.
Deleted the requirement to use two different types of survey meters.The Corrective Action Program requires Regulatory Affairs to review all new condition reports for a reportability determination.
maintenance activities have been initiated to quarterly monitor the supply and return air fans vibration.
Also, the SRO notifies/involves Regulatory Affairs as required for Operability Determinations or hardware dispositions.
012113                          Health Physics procedure was       Verbal permission is obtained    The name of the management Serial Letter 1-0132            revised to include more stringent   from Chemistry and Radiation      individual who provides verbal 5/23/1980                      requirements for entering locked   Protection Supervisor. Deleted    permission is more strictly defined.
The appropriate frequency is determined and controlled by the Preventive Maintenance Program to ensure equipment reliability.
high radiation areas. These         the requirement to use two         Electronic alarming dosimeters did include verbal permission from a    different types of survey meters. not exist when this commitment Chemistry and Healthy Physics                                          was made. The use of this new management individual and a                                            equipment eliminates the need for requirement to use two different                                      two survey meters.
The name of the management individual who provides verbal permission is more strictly defined.Electronic alarming dosimeters did not exist when this commitment was made. The use of this new equipment eliminates the need for two survey meters.
types of high range survey meters.
ii Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 7 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
 
ii Docket Number 50-346 License Number NPF-3                         DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBERISOURCEIDATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 012319 IR 88-012, Serial Letter 1-0839 10/25/1988 012617 SRTP CAC-RR-1 9/26/1986 DESCRIPTION CHANGE Condition Report procedure corrected any interpretive problems with the condition report process to ensure that these types of problems (i.e. once a condition report is initiated it must be processed) do not recur in the future.Create a PM which will provide maintenance in accordance with the manufacturer's recommendations for backdraft dampers. Incorporate the requirements of the American Warming and Ventilating Manual.Commitment closed.Changed the frequency to 24-month interval and modified the commitment to have the frequency of the PM determined and controlled by the Preventative Maintenance Program.The Corrective Action program addresses this aspect and the creation of the electronic process for initiating and processing of a condition report also helps prevent the situation of not processing any that have been initiated.
REPORT                                                 MAY 2002 - MAY 2006 Page 7 of 34 COMMITMENT                        COMMITMENT NUMBERISOURCEIDATE                     DESCRIPTION                           CHANGE                   REASON FOR CHANGE DESCRIPTION                            CHANGE 012319                         Condition Report procedure          Commitment closed.                The Corrective Action program IR 88-012, Serial Letter 1-0839 corrected any interpretive                                            addresses this aspect and the 10/25/1988                     problems with the condition report                                   creation of the electronic process process to ensure that these types                                   for initiating and processing of a of problems (i.e. once a condition                                    condition report also helps prevent report is initiated it must be                                       the situation of not processing any processed) do not recur in the                                       that have been initiated.
Frequencies are adjusted in accordance with the Preventative Maintenance program based on system/component performance and maintenance feedback.
future.
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 8 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
012617                          Create a PM which will provide       Changed the frequency to 24-     Frequencies are adjusted in SRTP CAC-RR-1                  maintenance in accordance with      month interval and modified the accordance with the Preventative 9/26/1986                      the manufacturer's                  commitment to have the frequency Maintenance program based on recommendations for backdraft        of the PM determined and         system/component performance dampers. Incorporate the            controlled by the Preventative   and maintenance feedback.
requirements of the American        Maintenance Program.
Warming and Ventilating Manual.
 
Docket Number 50-346 License Number NPF-3                   DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284          REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 012638 SRTP HVAC-RR-2 9/30/1986 012676 SRTP HVAC-NRR-7 9/30/1986 Preventive Maintenance procedures have been developed for both trains of CREVS. Every three months PM 1188 and 1189 are performed to verify proper oil level and ensure adequate charge on the system in both air-cooled and water-cooled modes.PM 2604 performs an annual check of the control dampers. PM 3075 and PM 2994 annually check the calibration of the chilled water control string. PM 2635 will annually check the calibration of the switchover instrument string.Changed to periodically perform the PMs.Deleted the requirement to inspect these components annually.The appropriate frequency is determined and controlled by the Preventive Maintenance Program to ensure equipment reliability.
REPORT                                           MAY 2002 - MAY 2006 Page 8 of 34 COMMITMENT                  COMMITMENT NUMBER I SOURCE I DATE           DESCRIPTION                           CHANGE                       REASON FOR CHANGE 012638                   Preventive Maintenance              Changed to periodically perform    The appropriate frequency is SRTP HVAC-RR-2           procedures have been developed      the PMs.                          determined and controlled by the 9/30/1986                 for both trains of CREVS. Every                                         Preventive Maintenance Program three months PM 1188 and 1189                                           to ensure equipment reliability.
A review of the maintenance history did not demonstrate a reliability problem. The frequency of preventive maintenance is determined and controlled under the Preventive Maintenance program.
are performed to verify proper oil level and ensure adequate charge on the system in both air-cooled and water-cooled modes.
11 Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 9 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
012676                    PM 2604 performs an annual           Deleted the requirement to inspect A review of the maintenance SRTP HVAC-NRR-7          check of the control dampers. PM these components annually.            history did not demonstrate a 9/30/1986                3075 and PM 2994 annually check                                         reliability problem. The frequency the calibration of the chilled water                                   of preventive maintenance is control string. PM 2635 will                                           determined and controlled under annually check the calibration of                                       the Preventive Maintenance the switchover instrument string.                                       program.
 
11 Docket Number 50-346 License Number NPF-3               DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284      REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBERISOURCEIDATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 012763 IR 81-003 4/17/1981 In order to improve response times on audit finding reports,"Prompt Response to Internal Audit Finding Reports" procedure has been prepared and approved implementing more stringent requirements regarding audit finding report (AFR) response, tracking and time extensions.
REPORT                                     MAY 2002 - MAY 2006 Page 9 of 34 COMMITMENT            COMMITMENT NUMBERISOURCEIDATE           DESCRIPTION                         CHANGE       REASON FOR CHANGE 012763               In order to improve response         Commitment closed. Preventive actions have remained IR 81-003            times on audit finding reports,                          as an integral part of the licensee 4/17/1981            "Prompt Response to Internal                            structure and the corrective Audit Finding Reports" procedure                        actions to prevent recurrence has been prepared and approved                          have been effective. This is implementing more stringent                              covered by the Corrective Action requirements regarding audit                            program. In addition, the FENOC finding report (AFR) response,                          Quality Assurance Program tracking and time extensions.                            Manual commits to Regulatory Guide 1.144, "Auditing of Quality Assurance Programs for Nuclear Power Plants".
Commitment closed.Preventive actions have remained as an integral part of the licensee structure and the corrective actions to prevent recurrence have been effective.
013043                The Davis-Besse requalification      Commitment closed. The licensed operator Serial Letter 0816    program does mandate an                                  requalification program is now 5/10/1982            accelerated requalification for any                      designed using the Systematic operator scoring less than 80%                          Approach to Training (SAT) overall. In addition, the operator is                    process that determines training removed from license duties                              needs based on job analysis and during the accelerated                                  needs analysis. Remediation is requalification.                                        part of the SAT process and is required prior to returning an operator to licensed duties.
This is covered by the Corrective Action program. In addition, the FENOC Quality Assurance Program Manual commits to Regulatory Guide 1.144, "Auditing of Quality Assurance Programs for Nuclear Power Plants".The licensed operator requalification program is now designed using the Systematic Approach to Training (SAT)process that determines training needs based on job analysis and needs analysis.
 
Remediation is part of the SAT process and is required prior to returning an operator to licensed duties.013043 Serial Letter 0816 5/10/1982 The Davis-Besse requalification program does mandate an accelerated requalification for any operator scoring less than 80%overall. In addition, the operator is removed from license duties during the accelerated requalification.
Docket Number 50-346 License Number NPF-3                           DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  
Commitment closed.
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 10 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE CHANGE REASON FOR CHANGE 013351 IR 86-030 3/18/1987 The auxiliary feedwater high speed stop has been increased so that minimum speed during surveillance testing is not less than 3582 rpm.Commitment closed.A Technical Specification change was made to reduce required auxiliary feedwater flow and high speed limiter setpoints were increased in the surveillance test procedures.
REPORT                                                 MAY 2002 - MAY 2006 Page 10 of 34 COMMITMENT                      COMMITMENT NUMBER I SOURCE I DATE                 DESCRIPTION                         CHANGE CHANGE                   REASON FOR REASON     FOR CHANGE CHANGE 013351                         The auxiliary feedwater high       Commitment closed.               A Technical Specification change IR 86-030                      speed stop has been increased so                                    was made to reduce required 3/18/1987                      that minimum speed during                                            auxiliary feedwater flow and high surveillance testing is not less                                    speed limiter setpoints were than 3582 rpm.                                                      increased in the surveillance test procedures. The calculation and engineering change modification processes control any changes to setpoints in the procedures.
The calculation and engineering change modification processes control any changes to setpoints in the procedures.
013442                          Procedure for performance of        Deleted the option of suspending This was part of a common IR 84-001, Serial Letter 1-0431 surveillance & periodic tests was   the test.                       process initiative.
This was part of a common process initiative.
5/22/1984                      modified to instruct the shift manager to either hold or suspend the test if it cannot be completed.
013442 IR 84-001, Serial Letter 1-0431 5/22/1984 Procedure for performance of Deleted the option of suspending surveillance  
 
& periodic tests was the test.modified to instruct the shift manager to either hold or suspend the test if it cannot be completed.
41 Docket Number 50-346 License Number NPF-3               DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284      REGULATORY COMMITMENT CHANGE  
41 Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 11 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBERISOURCEIDATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 013558 IR 85-007 5/14/1985 Procurement procedure contains instructions to ensure that procurement quality requirements are updated on the computer and in procedures when they are changed.Training department procedures were written and implemented to address the documentation of the evaluation of operator and senior operator exams and the inclusion of identified deficiencies into succeeding lesson plans.Procurement technical and quality requirements are updated on the computer only.Commitment closed.This minimizes the risk of conflicting information.
REPORT                                       MAY 2002 - MAY 2006 Page 11 of 34 COMMITMENT              COMMITMENT NUMBERISOURCEIDATE             DESCRIPTION                         CHANGE                     REASON FOR CHANGE 013558               Procurement procedure contains      Procurement technical and quality This minimizes the risk of IR 85-007             instructions to ensure that        requirements are updated on the  conflicting information.
Use of personnel performance and feedback to evaluate and modify training programs is a requirement of accreditation.
5/14/1985             procurement quality requirements   computer only.
This has been captured as part of a process that is subject to a regulated revision/review process.013560 IR85-004 3/27/1985 11 Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 12 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
are updated on the computer and in procedures when they are changed.
013560                Training department procedures     Commitment closed.               Use of personnel performance IR85-004              were written and implemented to                                      and feedback to evaluate and 3/27/1985            address the documentation of the                                      modify training programs is a evaluation of operator and senior                                    requirement of accreditation. This operator exams and the inclusion                                    has been captured as part of a of identified deficiencies into                                      process that is subject to a succeeding lesson plans.                                            regulated revision/review process.
 
11 Docket Number 50-346 License Number NPF-3                         DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBERISOURCEIDATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 013644 IR 85-030, Serial Letter 1-0604 1/27/1986 013664 IR 05-028, Serial 1-0600 12/26/1985 One procedure will provide a consistent mechanism for identifying items which are potentially adverse to quality.Trending of condition reports will be required to ensure that significant problems will be identified even if systems are not determined to be inoperable.
REPORT                                               MAY 2002 - MAY 2006 Page 12 of 34 COMMITMENT                        COMMITMENT NUMBERISOURCEIDATE                     DESCRIPTION                         CHANGE                   REASON FOR CHANGE 013644                         One procedure will provide a        Commitment closed.              Preventive actions have remained IR 85-030, Serial Letter 1-0604 consistent mechanism for                                            as an integral part of the licensee 1/27/1986                       identifying items which are                                         structure and the corrective potentially adverse to quality.                                     actions to prevent recurrence Trending of condition reports will                                   have been effective. The be required to ensure that                                           Corrective Action Program and the significant problems will be                                         Quality Assurance Program identified even if systems are not                                   Manual addresses these items.
Procedure was revised to include several QC (Quality Control)verification hold points which will allow for appropriate QC review of the BISCO boot seal fabrication and installation.
determined to be inoperable.
Commitment closed.QC maintains hold/witness points via a database in SAP. A statement was added to the procedure that the work document has been processed through QC for determination of QC Hold/Witness Points.Preventive actions have remained as an integral part of the licensee structure and the corrective actions to prevent recurrence have been effective.
013664                          Procedure was revised to include   QC maintains hold/witness points This was a result of a change in IR 05-028, Serial 1-0600        several QC (Quality Control)       via a database in SAP. A         process for QC.
The Corrective Action Program and the Quality Assurance Program Manual addresses these items.This was a result of a change in process for QC.
12/26/1985                      verification hold points which will statement was added to the allow for appropriate QC review of  procedure that the work document the BISCO boot seal fabrication    has been processed through QC and installation.                  for determination of QC Hold/Witness Points.
vt a Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 13 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
 
vt a Docket Number 50-346 License Number NPF-3                   DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284          REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 013722 COA Section 2.B.3 Rev. 6 1/03/1986 013755 COA Section App.3.2 Rev. 6 1/03/1986 Develop a station administrative procedure to assure that identified concerns will be formally elevated to appropriate levels of engineering and management for resolution, will have required response dates, will identify individuals responsible for resolution and for implementing resolution.
REPORT                                           MAY 2002 - MAY 2006 Page 13 of 34 COMMITMENT                  COMMITMENT NUMBER I SOURCE I DATE             DESCRIPTION                       CHANGE       REASON FOR CHANGE 013722                     Develop a station administrative    Commitment closed. The Request for Assistance COA Section 2.B.3 Rev. 6   procedure to assure that identified                    procedure was cancelled. These 1/03/1986                 concerns will be formally elevated                     types of requests are handled as to appropriate levels of                              part of the Corrective Action engineering and management for                        Program for issues pertaining to resolution, will have required                        conditions adverse to quality and response dates, will identify                          part of the FENOC Activity individuals responsible for                            Tracking program for issues that resolution and for implementing                        do not pertain to conditions resolution.                                            adverse to quality.
A dedicated surveillance function is established to supplement the formal audit program.Commitment closed.Commitment closed.The Request for Assistance procedure was cancelled.
013755                    A dedicated surveillance function  Commitment closed. With the current implementation of COA Section App.3.2 Rev. 6 is established to supplement the                      the internal assessment process 1/03/1986                  formal audit program.                                  (continuous assessment) a surveillance function is not needed.
These types of requests are handled as part of the Corrective Action Program for issues pertaining to conditions adverse to quality and part of the FENOC Activity Tracking program for issues that do not pertain to conditions adverse to quality.With the current implementation of the internal assessment process (continuous assessment) a surveillance function is not needed.
 
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 14 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
Docket Number 50-346 License Number NPF-3                   DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284          REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBERISOURCEIDATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 013756 COA Section App.3.2 Rev. 6 1/0311986 Develop a nuclear mission procedure "Request for Assistance" that contains mission wide requirements in this area.Commitment closed.The Request for Assistance procedure was cancelled.
REPORT                                           MAY 2002 - MAY 2006 Page 14 of 34 COMMITMENT                  COMMITMENT NUMBERISOURCEIDATE                 DESCRIPTION                           CHANGE               REASON FOR CHANGE 013756                     Develop a nuclear mission            Commitment closed.            The Request for Assistance COA Section App.3.2 Rev. 6 procedure "Request for                                             procedure was cancelled. These 1/0311986                  Assistance" that contains mission                                 types of requests are handled as wide requirements in this area.                                   part of the Corrective Action Program for issues pertaining to conditions adverse to quality and part of the FENOC Activity Tracking program for issues that do not pertain to conditions adverse to quality.
These types of requests are handled as part of the Corrective Action Program for issues pertaining to conditions adverse to quality and part of the FENOC Activity Tracking program for issues that do not pertain to conditions adverse to quality.The Request for Assistance procedure was cancelled and the Corrective Action Program used to address these types of requests.014274 IR 86-022 11/07/1986 Procedure requires justification for engineering evaluations commensurate with the level of detail of the original question.These requirements were transferred to the Corrective Action Program.  
014274                    Procedure requires justification for These requirements were      The Request for Assistance IR 86-022                  engineering evaluations              transferred to the Corrective procedure was cancelled and the 11/07/1986                 commensurate with the level of       Action Program.              Corrective Action Program used to detail of the original question.                                   address these types of requests.
.1 Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 15 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
 
                                                                                                                  .1 Docket Number 50-346 License Number NPF-3                   DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284          REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 014832 Serial Letter 1066 8/14/1984 014872 Serial Letter 1685 7/31/1989 Verify that samples for offsite laboratory analysis will be transported using licensed carriers.
REPORT                                           MAY 2002 - MAY 2006 Page 15 of 34 COMMITMENT                COMMITMENT NUMBER I SOURCE I DATE           DESCRIPTION                       CHANGE       REASON FOR CHANGE 014832                   Verify that samples for offsite     Commitment closed. Davis-Besse can perform the Serial Letter 1066        laboratory analysis will be                           required analyses and an offsite 8/14/1984                transported using licensed                             laboratory is not required.
Identify the offsite laboratory or laboratories expected to be used.Valves in the fire protection system are locked in the open position and inspected monthly to verify their position.Commitment closed.Commitment closed.Davis-Besse can perform the required analyses and an offsite laboratory is not required.This is part of the Fire Hazards Analysis Report now.
carriers. Identify the offsite laboratory or laboratories expected to be used.
.1 Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 16 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
014872                    Valves in the fire protection       Commitment closed. This is part of the Fire Hazards Serial Letter 1685        system are locked in the open                         Analysis Report now.
7/31/1989                position and inspected monthly to verify their position.
 
                                                                                                                      .1 Docket Number 50-346 License Number NPF-3                   DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284            REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER ISOURCE IDATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 014979 Serial Letter 1368 4/20/1987 Licensed operators will be trained on future revisions of EP 1202.01 prior to implementation or prior to returning control room duties after absences.
REPORT                                             MAY 2002 - MAY 2006 Page 16 of 34 COMMITMENT                  COMMITMENT NUMBER ISOURCE IDATE               DESCRIPTION                       CHANGE       REASON FOR CHANGE 014979                     Licensed operators will be trained Commitment closed. The licensed operator Serial Letter 1368        on future revisions of EP 1202.01                     requalification program is now 4/20/1987                  prior to implementation or prior to                   designed using the Systematic returning control room duties after                   Approach to Training (SAT) absences. Minor editorial                              process that determines training procedure revisions will be exempt                    needs based on job analysis and from this training requirement.                        needs analysis. Significant changes to DB-OP-02000 (EP 1202.01) would trigger a needs analysis under this process to determine what additional skills and knowledge the operators may need as a result of the procedure change.
Minor editorial procedure revisions will be exempt from this training requirement.
015037                    Procedures are developed to        Commitment closed. Preventive actions have remained COA Section App.3.2 Rev. 6 implement the Quality Assurance                        as an integral part of the licensee 1/03/1986                 Program requirements and to                           structure and the corrective define responsibilities for inter-                     actions to prevent recurrence divisional nuclear program                             have been effective. This is an activities. In particular, these                       integral part of the Corrective procedures address the                               Action Program.
Commitment closed.The licensed operator requalification program is now designed using the Systematic Approach to Training (SAT)process that determines training needs based on job analysis and needs analysis.
communication for identification, review, and disposition of condition reports.
Significant changes to DB-OP-02000 (EP 1202.01) would trigger a needs analysis under this process to determine what additional skills and knowledge the operators may need as a result of the procedure change.Preventive actions have remained as an integral part of the licensee structure and the corrective actions to prevent recurrence have been effective.
 
This is an integral part of the Corrective Action Program.015037 COA Section App.3.2 Rev. 6 1/03/1986 Procedures are developed to implement the Quality Assurance Program requirements and to define responsibilities for inter-divisional nuclear program activities.
Docket Number 50-346 License Number NPF-3                         DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  
In particular, these procedures address the communication for identification, review, and disposition of condition reports.Commitment closed.
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 17 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 015050 IR 84-019, Serial Letter 1-0488 12/14/1984 015094 Serial Letter 1-0674 10/13/1986 Qualitative fit test will be performed in accordance with NUREG-0041, Section 8.5. This section requires the individual undergoing respirator fit testing to perform several simulated work activities including "running in place".The Maintenance Training department now reviews procedure changes to determine the need for craft training.Changed to Quantitative fit test and substituted bending at the waist for running in place.Commitment closed.The quantitative fit test is a better method as it verifies a fit factor of 1000 for full factor respirator.
REPORT                                                 MAY 2002 - MAY 2006 Page 17 of 34 COMMITMENT                      COMMITMENT NUMBER I SOURCE I DATE                 DESCRIPTION                           CHANGE                   REASON FOR CHANGE 015050                         Qualitative fit test will be        Changed to Quantitative fit test The quantitative fit test is a better IR 84-019, Serial Letter 1-0488 performed in accordance with        and substituted bending at the  method as it verifies a fit factor of 12/14/1984                     NUREG-0041, Section 8.5. This       waist for running in place.     1000 for full factor respirator.
Davis-Besse environment permits bending, therefore, running in place is not utilized.Maintenance training programs are part of the accreditation process. Training materials are maintained based on meeting the requirements of ACAD 02-001, Accreditation Objectives and Criteria, criterion 6.5. 10 CFR 50.120 requires that nuclear power stations obtain and maintain accreditation and Davis-Besse UFSAR section 13.2.1 commits the station to 10 CFR 50.120 and identifies that the maintenance training programs are accredited.
section requires the individual                                      Davis-Besse environment permits undergoing respirator fit testing to                                  bending, therefore, running in perform several simulated work                                        place is not utilized.
This has been captured as part of a process that is subject to a regulated revision/review process.
activities including "running in place".
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 18 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
015094                          The Maintenance Training            Commitment closed.              Maintenance training programs Serial Letter 1-0674            department now reviews                                                are part of the accreditation 10/13/1986                      procedure changes to determine                                        process. Training materials are the need for craft training.                                          maintained based on meeting the requirements of ACAD 02-001, Accreditation Objectives and Criteria, criterion 6.5. 10 CFR 50.120 requires that nuclear power stations obtain and maintain accreditation and Davis-Besse UFSAR section 13.2.1 commits the station to 10 CFR 50.120 and identifies that the maintenance training programs are accredited. This has been captured as part of a process that is subject to a regulated revision/review process.
 
Docket Number 50-346 License Number NPF-3                 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284          REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 015257 Serial Letter 1437 10/29/1987 015461 Serial Letter 1953 7/12/1991 Periodically (annually) review Physical Security and Contingency Plans and procedures to evaluate their potential impact on plant and personnel safety.Identifies conditions, limitations, and restrictions that apply to the use of MSA GRM-I canisters for radio-iodine protection.
REPORT                                           MAY 2002 - MAY 2006 Page 18 of 34 COMMITMENT                COMMITMENT NUMBER I SOURCE I DATE           DESCRIPTION                       CHANGE       REASON FOR CHANGE 015257                   Periodically (annually) review      Commitment closed. The Industrial Security Plan was Serial Letter 1437       Physical Security and                                  superseded by the Physical 10/29/1987               Contingency Plans and                                 Security Plan that implemented procedures to evaluate their                           new requirements under NRC potential impact on plant and                         Order 03-086.
Commitment closed.Commitment closed.The Industrial Security Plan was superseded by the Physical Security Plan that implemented new requirements under NRC Order 03-086.This commitment existed to ensure compliance to an NRC approved exemption to 10 CFR 20. Davis-Besse is following the code and chose not to utilize this approved exemption.
personnel safety.
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 19 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
015461                    Identifies conditions, limitations, Commitment closed. This commitment existed to Serial Letter 1953        and restrictions that apply to the                     ensure compliance to an NRC 7/12/1991                use of MSA GRM-I canisters for                         approved exemption to 10 CFR radio-iodine protection.                               20. Davis-Besse is following the code and chose not to utilize this approved exemption.
 
Docket Number 50-346 License Number NPF-3                       DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 015555 GL 89-013, Serial Letter 1-1022 9/09/1993 Test requirements for heat exchangers included in performance test program.Removed DB-PF-04729, Containment Air Cooler Monitoring Test, from the GL 89-013 performance test program.Changed PM 5536, 5537 and 5538 to clean inside the tubes at interval determined by the Preventive Maintenance program.Changed to "a five point check from the Technical Specification low level set point to the high level trip set point".This test does not test/determine nor obtain data that can be used to determine the heat transfer capability of the Containment Air Coolers (CAC) as requested by GL 89-013. Also, the frequency of the PMs is determined and controlled by the Preventive Maintenance program.The data package set points were changed to account for the fuel in the tanks that is not usable. The alarming level will be more conservative and the data derived from the level indicators will be more accurate.015845 IR 90-010 7/20/1990 Modification packages were sampled and evaluated.
REPORT                                               MAY 2002 - MAY 2006 Page 19 of 34 COMMITMENT                      COMMITMENT NUMBER I SOURCE I DATE                 DESCRIPTION                         CHANGE                       REASON FOR CHANGE 015555                         Test requirements for heat        Removed DB-PF-04729,                  This test does not test/determine GL 89-013, Serial Letter 1-1022 exchangers included in            Containment Air Cooler Monitoring    nor obtain data that can be used 9/09/1993                       performance test program.         Test, from the GL 89-013             to determine the heat transfer performance test program.             capability of the Containment Air Changed PM 5536, 5537 and             Coolers (CAC) as requested by 5538 to clean inside the tubes at     GL 89-013. Also, the frequency of interval determined by the            the PMs is determined and Preventive Maintenance program.      controlled by the Preventive Maintenance program.
As a result of one of these reviews on the EDG (Emergency Diesel Generator)
015845                          Modification packages were        Changed to "a five point check        The data package set points were IR 90-010                      sampled and evaluated. As a      from the Technical Specification      changed to account for the fuel in 7/20/1990                       result of one of these reviews on low level set point to the high level the tanks that is not usable. The the EDG (Emergency Diesel         trip set point".                      alarming level will be more Generator) Fuel Oil Storage Tank                                       conservative and the data derived Level Indication, data packages                                         from the level indicators will be LI/LT4891 and LI/LT4892 were                                           more accurate.
Fuel Oil Storage Tank Level Indication, data packages LI/LT4891 and LI/LT4892 were changed to incorporate the concerns of the inspection team.This change included a five point check from 32,000 gallons to 39,850 gallons.  
changed to incorporate the concerns of the inspection team.
%I &Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 20 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
This change included a five point check from 32,000 gallons to 39,850 gallons.
 
                                                                                                                %I &
Docket Number 50-346 License Number NPF-3               DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284      REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER ISOURCEIDATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 016304 Serial 1965 7/29/1991 Training of workers on the proper Commitment closed.use and the limitations of the GMR-I canisters will be performed prior to canister issuance.This commitment existed to ensure compliance to an NRC approved exemption to 10 CFR 20. Davis-Besse is following the code and chose not to utilize this approved exemption.
REPORT                                       MAY 2002 - MAY 2006 Page 20 of 34 COMMITMENT              COMMITMENT NUMBER ISOURCEIDATE           DESCRIPTION                       CHANGE       REASON FOR CHANGE 016304                 Training of workers on the proper Commitment closed. This commitment existed to Serial 1965            use and the limitations of the                         ensure compliance to an NRC 7/29/1991              GMR-I canisters will be performed                     approved exemption to 10 CFR prior to canister issuance.                           20. Davis-Besse is following the code and chose not to utilize this approved exemption.
016350 Serial Letter 1-0957 7/31/1991 An annual quality assurance surveillance of randomly selected procedures will be conducted.
016350                 An annual quality assurance         Commitment closed. This commitment originated as a Serial Letter 1-0957  surveillance of randomly selected                      result of a reduction in 7/31/1991              procedures will be conducted.                          commitment to the quality The annual surveillance will                          assurance program description a provide assurance that                                number of years ago. This activity procedures are being maintained                        was deleted during the current.                                              development of the FENOC Quality Assurance Program Manual. The NRC approved this change.
The annual surveillance will provide assurance that procedures are being maintained current.Commitment closed.This commitment originated as a result of a reduction in commitment to the quality assurance program description a number of years ago. This activity was deleted during the development of the FENOC Quality Assurance Program Manual. The NRC approved this change.
 
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 21 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
Docket Number 50-346 License Number NPF-3                 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284          REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 016400 LER 91-002 10101/1991 The administrative procedure governing surveillance test scheduling will be revised to include requirements for a multi-disciplined technical review when surveillance test frequency requirements are relaxed.A multi-disciplined technical review is not performed.
REPORT                                         MAY 2002 - MAY 2006 Page 21 of 34 COMMITMENT                COMMITMENT NUMBER I SOURCE I DATE           DESCRIPTION                           CHANGE                     REASON FOR CHANGE 016400                   The administrative procedure       A multi-disciplined technical       This change was part of a new LER 91-002              governing surveillance test         review is not performed. A          common process.
A change in frequency is defined as an intent change and, as such, will receive a technical review by an individual assigned by the section manager. The section manager will approve the change.Pre-job brief will be performed as determined by the work group supervisor and the work group supervisor will also determine or recommend attendees for the pre-job brief.This change was part of a new common process.Briefing attendees are determined based on the scope and nature of work. There may be times when Operations or Maintenance may not be required to attend the brief, depending on the work scope and potential impact on the plant.016682 LER 92-002 R1 5/08/1992 Pre-job briefs will be performed except for frequently performed PMs and routine shop work.Personnel to be present at the pre-job brief as a minimum include the discipline maintenance supervisor and Operations SRO.
10101/1991              scheduling will be revised to      change in frequency is defined as include requirements for a multi-  an intent change and, as such, will disciplined technical review when  receive a technical review by an surveillance test frequency        individual assigned by the section requirements are relaxed.          manager. The section manager will approve the change.
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 22 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
016682                  Pre-job briefs will be performed    Pre-job brief will be performed as Briefing attendees are determined LER 92-002 R1            except for frequently performed    determined by the work group       based on the scope and nature of 5/08/1992                 PMs and routine shop work.         supervisor and the work group      work. There may be times when Personnel to be present at the     supervisor will also determine or  Operations or Maintenance may pre-job brief as a minimum include recommend attendees for the pre-  not be required to attend the brief, the discipline maintenance         job brief.                          depending on the work scope and supervisor and Operations SRO.                                         potential impact on the plant.
 
Docket Number 50-346 License Number NPF-3                 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284        REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER ISOURCE IDATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 016912 IR 92-015 10/09/1992 Low level radioactivity was found on HEPA filters near personnel clothing change out area. The vent pre-filter will be changed out every six months.Changed to periodically change out the pre-filter.
REPORT                                           MAY 2002 - MAY 2006 Page 22 of 34 COMMITMENT                COMMITMENT NUMBER ISOURCE IDATE             DESCRIPTION                             CHANGE                 REASON FOR CHANGE 016912                 Low level radioactivity was found     Changed to periodically change  The appropriate frequency is IR 92-015              on HEPA filters near personnel       out the pre-filter.            determined and controlled by the 10/09/1992              clothing change out area. The                                         Preventive Maintenance Program vent pre-filter will be changed out                                   to ensure equipment reliability.
The appropriate frequency is determined and controlled by the Preventive Maintenance Program to ensure equipment reliability.
every six months.
016935 Serial Letter 2183 11/10/1993 Control room programmer lamp fault light will illuminate if any of the contacts for any control rod groups programmer opens.Deleted "programmer lamp fault" and added "electronic trip" The programmers have been changed to solid state devices, eliminating the lamp fault light.
016935                 Control room programmer lamp         Deleted "programmer lamp fault" The programmers have been Serial Letter 2183      fault light will illuminate if any of and added "electronic trip"     changed to solid state devices, 11/10/1993              the contacts for any control rod                                      eliminating the lamp fault light.
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 23 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
groups programmer opens.
 
Docket Number 50-346 License Number NPF-3               DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284        REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER ISOURCE IDATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 017029 IR 92-019 2/1011993 To address root cause of boric acid addition from seat leakage past MU23, a temporary procedure change was issued to close manual isolation valve MU363 when recirculating a BAAT. This was to provide an additional isolation to prevent inadvertent addition of boric acid to the makeup tank when the BAAT (Boric Acid Addition Tank)system is pressurized.
REPORT                                         MAY 2002 - MAY 2006 Page 23 of 34 COMMITMENT              COMMITMENT NUMBER ISOURCE IDATE           DESCRIPTION                           CHANGE                     REASON FOR CHANGE 017029                 To address root cause of boric     MU40 is required to be closed, not The final resolution of the IR 92-019              acid addition from seat leakage     MU363.                            condition report identified that 2/1011993              past MU23, a temporary                                                 MU40 was to be closed while procedure change was issued to                                         performing recirculation of BAAT.
To prevent future pressure transients from occurring, changes must be made to prevent a void from forming in the high elevations of the piping or slowly collapse any voids formed. In the procedures, the inlet valves are kept open.MU40 is required to be closed, not MU363.The final resolution of the condition report identified that MU40 was to be closed while performing recirculation of BAAT.MU363 is not required to be closed.017069 Telecon NLD93-05186 4/01/1993 The inlet isolations are kept closed.This was a result of a condition report that requires that the CAC (containment air cooler) operating procedure be changed to have the inlet isolations closed while the CAC is in Standby.
close manual isolation valve                                           MU363 is not required to be MU363 when recirculating a                                             closed.
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 24 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
BAAT. This was to provide an additional isolation to prevent inadvertent addition of boric acid to the makeup tank when the BAAT (Boric Acid Addition Tank) system is pressurized.
017069                  To prevent future pressure         The inlet isolations are kept     This was a result of a condition Telecon NLD93-05186    transients from occurring, changes  closed.                            report that requires that the CAC 4/01/1993              must be made to prevent a void                                        (containment air cooler) operating from forming in the high elevations                                    procedure be changed to have the of the piping or slowly collapse                                      inlet isolations closed while the any voids formed. In the                                              CAC is in Standby.
procedures, the inlet valves are kept open.
 
Docket Number 50-346 License Number NPF-3                         DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER ISOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 017160 IR 93-009, Serial Letter 1-1014 6/15/1993 017161 IR 93-009, Serial Letter 1-1014 6/15/1993 Increase the operating speed of AFW (auxiliary feedwater)
REPORT                                                 MAY 2002 - MAY 2006 Page 24 of 34 COMMITMENT                      COMMITMENT NUMBER ISOURCE I DATE                   DESCRIPTION                           CHANGE                     REASON FOR CHANGE 017160                         Increase the operating speed of    The high speed stop for AFW          This was a result of Engineering IR 93-009, Serial Letter 1-1014 AFW (auxiliary feedwater) Pump    Pump 1-1 has been changed to        Change Package 03-0411 (design 6/15/1993                       1-1. This will raise the pump     3676 (3666 to 3686) rpm.            change).
Pump 1-1. This will raise the pump operating parameters to a point well above the minimum values such that instrument uncertainties are not significant.
operating parameters to a point well above the minimum values such that instrument uncertainties are not significant. The high speed stop for AFW Pump 1-1 has been increased from 3600 to 3700 rpm.
The high speed stop for AFW Pump 1-1 has been increased from 3600 to 3700 rpm.Increase the operating speed of AFW (auxiliary feedwater)
017161                          Increase the operating speed of   Procedures were changed to          This was a result of Engineering IR 93-009, Serial Letter 1-1014 AFW (auxiliary feedwater) Pump     reflect that the high speed stop for Change Package 03-0411 (design 6/15/1993                      1-1. This will raise the pump     AFW Pump 1-1 has been changed        change).
Pump 1-1. This will raise the pump operating parameters to a point well above the minimum values such that instrument uncertainties are not significant.
operating parameters to a point   to 3676 (3666 to 3686) rpm.
Procedures will be revised to change the acceptance criteria for AFW pump testing to allow for instrument uncertainties and to specify that measured pump flow and discharge pressure will be used to demonstrate pump operability.
well above the minimum values such that instrument uncertainties are not significant. Procedures will be revised to change the acceptance criteria for AFW pump testing to allow for instrument uncertainties and to specify that measured pump flow and discharge pressure will be used to demonstrate pump operability.
The high speed stop for AFW Pump 1-1 has been changed to 3676 (3666 to 3686) rpm.Procedures were changed to reflect that the high speed stop for AFW Pump 1-1 has been changed to 3676 (3666 to 3686) rpm.This was a result of Engineering Change Package 03-0411 (design change).This was a result of Engineering Change Package 03-0411 (design change).
 
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 25 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
Docket Number 50-346 License Number NPF-3                         DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 017321, 017322 LER 93-006, Serial Letter 1-1036 3/14/1994 017422 GL 89-013, IR 93-016 12/29/1993 Locking mechanisms for the CAC (containment air cooler) SW (service water) inlet valves will be fabricated.
REPORT                                                 MAY 2002 - MAY 2006 Page 25 of 34 COMMITMENT                        COMMITMENT NUMBER I SOURCE I DATE                 DESCRIPTION                           CHANGE                   REASON FOR CHANGE 017321, 017322                   Locking mechanisms for the CAC      Commitment closed.              CAC SW Inlet Valves (SW64, LER 93-006, Serial Letter 1-1036 (containment air cooler) SW                                           SW65, SW68, SW69, SW72, 3/14/1994                        (service water) inlet valves will be                                 SW73) were removed from the fabricated. Once fabrication is                                      plant as a result of Boric Acid complete the valves will be locked                                    Corrosion (Engineering Work open and controlled under the                                        Package, EWR 02-0343-00).
Once fabrication is complete the valves will be locked open and controlled under the Locked Valve program.Develop more definitive acceptance criteria for heat exchanger performance and system flow testing. (ECCS RM CLRS shall be greater than or equal to 100 gpm.)Commitment closed.The acceptance criteria was changed for ECCS RM CLRS (emergency core cooling system room coolers) to be greater than 90 gpm.CAC SW Inlet Valves (SW64, SW65, SW68, SW69, SW72, SW73) were removed from the plant as a result of Boric Acid Corrosion (Engineering Work Package, EWR 02-0343-00).
Locked Valve program.                                                Their removal facilitates deleting them from having to be locked open and controlled under the Locked Valve program.
Their removal facilitates deleting them from having to be locked open and controlled under the Locked Valve program.This was determined by adding a calculated value from Proto-Power Calc #03-013 of 50 gpm, a degradation due to fouling value of 15 gpm, instrument error value of 22.9 gpm plus a rounding value of 2.1 for a total value of 90 gpm.This is in compliance with UFSAR Table 9.2-1, Note 1.
017422                          Develop more definitive              The acceptance criteria was      This was determined by adding a GL 89-013, IR 93-016            acceptance criteria for heat        changed for ECCS RM CLRS        calculated value from Proto-Power 12/29/1993                      exchanger performance and            (emergency core cooling system  Calc #03-013 of 50 gpm, a system flow testing. (ECCS RM        room coolers) to be greater than degradation due to fouling value of CLRS shall be greater than or        90 gpm.                          15 gpm, instrument error value of equal to 100 gpm.)                                                    22.9 gpm plus a rounding value of 2.1 for a total value of 90 gpm.
9%Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 26 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
This is in compliance with UFSAR Table 9.2-1, Note 1.
 
9%
Docket Number 50-346 License Number NPF-3                 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284        REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER ISOURCE IDATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 017534 Serial Letter 1-1036 3/14/1994 017678 Serial Letter 1-1033 1/28/1994 Upper management and quality assurance are involved in the timeliness of corrective actions for significant conditions adverse to quality.Modify procedure prerequisites to include PM test by voltage drop measurements on these relays GE type HFA and SFSEQ 1, 2, 3,& 4 relays. Trending of degradation is required.Commitment closed.No trending is required for SFSEQ 1, 2, 3, and 4.Preventive actions have remained as an integral part of the licensee structure and the corrective actions to prevent recurrence have been effective.
REPORT                                       MAY 2002 - MAY 2006 Page 26 of 34 COMMITMENT              COMMITMENT NUMBER ISOURCE IDATE           DESCRIPTION                           CHANGE                   REASON FOR CHANGE 017534                 Upper management and quality         Commitment closed.               Preventive actions have remained Serial Letter 1-1036    assurance are involved in the                                          as an integral part of the licensee 3/14/1994              timeliness of corrective actions for                                  structure and the corrective significant conditions adverse to                                      actions to prevent recurrence quality.                                                              have been effective. The Corrective Action Program addresses this as an integral part of the program.
The Corrective Action Program addresses this as an integral part of the program.The SFSEQ 1, 2, 3, and 4 relays are replaced every 24 months and relay contacts are tested quarterly by voltage drop measurements (with zero voltage drop criteria specified) under the PM program.Based on this conservative replacement interval, combined with quarterly testing of the relay contacts, no trending is required.
017678                  Modify procedure prerequisites to    No trending is required for SFSEQ The SFSEQ 1, 2, 3, and 4 relays Serial Letter 1-1033    include PM test by voltage drop      1, 2, 3, and 4.                  are replaced every 24 months and 1/28/1994              measurements on these relays                                          relay contacts are tested quarterly GE type HFA and SFSEQ 1, 2, 3,                                        by voltage drop measurements
41I s Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 27 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
                        & 4 relays. Trending of                                                (with zero voltage drop criteria degradation is required.                                              specified) under the PM program.
Based on this conservative replacement interval, combined with quarterly testing of the relay contacts, no trending is required.
 
41I s Docket Number 50-346 License Number NPF-3                           DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 017843 IR 85-025 12/17/1985 A list of critical periodic tests has been compiled.
REPORT                                                   MAY 2002 - MAY 2006 Page 27 of 34 COMMITMENT                        COMMITMENT NUMBER I SOURCE I DATE                   DESCRIPTION                             CHANGE                   REASON FOR CHANGE 017843                         A list of critical periodic tests has Remove DB-PF-03012, ECCS          This procedure was upgraded to a IR 85-025                      been compiled. These critical         (emergency core cooling system)  scheduled surveillance test and is 12/17/1985                      periodic tests have been identified   Integrated Train 2 Leakage Test,  no longer a periodic test.
These critical periodic tests have been identified as "critical" on the ST/PT (surveillance tests/periodic tests)computer schedule.Remove DB-PF-03012, ECCS (emergency core cooling system)Integrated Train 2 Leakage Test, as a critical periodic test.An alternative to the computer-based training was added. This alternative is an instructor-led presentation.
as "critical" on the ST/PT           as a critical periodic test.
The site training section administers both courses.This procedure was upgraded to a scheduled surveillance test and is no longer a periodic test.This is a process improvement.
(surveillance tests/periodic tests) computer schedule.
017902 IR 94-016, Serial Letter 1-1063 3/10/1995 Improved 10CFR50.59 program by implementing a new computer-based training program and revising the procedure and screening form.
017902                          Improved 10CFR50.59 program          An alternative to the computer-   This is a process improvement.
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 28 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
IR 94-016, Serial Letter 1-1063 by implementing a new computer-       based training was added. This 3/10/1995                      based training program and           alternative is an instructor-led revising the procedure and           presentation. The site training screening form.                      section administers both courses.
 
Docket Number 50-346 License Number NPF-3                         DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER ISOURCE IDATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 018733 LER 97-008 4/17/1997 The 18 month surveillance test (SFAS Interchannel Logic Test)was performed and completed satisfactorily with no equipment deficiencies.
REPORT                                                 MAY 2002 - MAY 2006 Page 28 of 34 COMMITMENT                        COMMITMENT NUMBER ISOURCE IDATE                     DESCRIPTION                           CHANGE                 REASON FOR CHANGE 018733                         The 18 month surveillance test       The frequency was changed back The test frequency was changed LER 97-008                      (SFAS Interchannel Logic Test)       to monthly for SFAS.          from monthly to quarterly in 4/17/1997                      was performed and completed                                         License Amendment 230. This satisfactorily with no equipment                                   change was reported in the deficiencies. The combination of                                   Commitment Change Summary this test and the existing quarterly                               Report (May, 1998 - May, 2000).
The combination of this test and the existing quarterly tests provide an overlapping check of all required two-out-of-four logic in the output modules of SFAS (safety features actuation system). The 18 month surveillance test will continue to be performed on a quarterly frequency along with the quarterly tests so that a complete check of the two-out-of four logic gates in the individual SFAS output modules is performed.
tests provide an overlapping                                       This change of frequency applied check of all required two-out-of-                                   to ARTS (anticipatory reactor trip four logic in the output modules of                                 system) only. The SFAS SFAS (safety features actuation                                     frequency remained monthly so system). The 18 month                                               the commitment text was surveillance test will continue to                                   corrected to reflect monthly for be performed on a quarterly                                         SFAS and quarterly for ARTS.
Procedure was revised to specify the survey instrument to be utilized, an Extender 2000W, and to require two independent radiological surveys for all radioactive material shipments.
frequency along with the quarterly tests so that a complete check of the two-out-of four logic gates in the individual SFAS output modules is performed.
The frequency was changed back to monthly for SFAS.Deleted the specific survey instrument and added "use the appropriate G-M tube survey instrument".
019092                          Procedure was revised to specify     Deleted the specific survey    This supports using new IR 97-012, Serial Letter 1-1144  the survey instrument to be         instrument and added "use the  equipment as existing instruments 12/4/1997                        utilized, an Extender 2000W, and     appropriate G-M tube survey    become obsolete, like the to require two independent           instrument".                  Extender 2000W.
The test frequency was changed from monthly to quarterly in License Amendment 230. This change was reported in the Commitment Change Summary Report (May, 1998 -May, 2000).This change of frequency applied to ARTS (anticipatory reactor trip system) only. The SFAS frequency remained monthly so the commitment text was corrected to reflect monthly for SFAS and quarterly for ARTS.This supports using new equipment as existing instruments become obsolete, like the Extender 2000W.019092 IR 97-012, Serial Letter 1-1144 12/4/1997 Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 29 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
radiological surveys for all radioactive material shipments.
 
Docket Number 50-346 License Number NPF-3                         DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 019094 IR 97-009, Serial Letter 1-1142 11/14/1997 019125 Serial Letter 1-0658 8/29/1986 The condition report process procedure will ensure that a condition report identifying an increase in CDF (core damage frequency) beyond the non-risk significant criteria defined in EPRI will be elevated to a category requiring management oversight.
REPORT                                                 MAY 2002 - MAY 2006 Page 29 of 34 COMMITMENT                      COMMITMENT NUMBER I SOURCE I DATE                 DESCRIPTION                         CHANGE         REASON FOR CHANGE 019094                         The condition report process        Commitment closed. This was a result of an analysis IR 97-009, Serial Letter 1-1142 procedure will ensure that a                            conducted under the Corrective 11/14/1997                     condition report identifying an                         Action Program.
The condition report procedure requires the designated on-shift SRO to review each condition report immediately after generation for conditions affecting plant operations.
increase in CDF (core damage frequency) beyond the non-risk significant criteria defined in EPRI will be elevated to a category requiring management oversight.
Commitment closed.Commitment closed.This was a result of an analysis conducted under the Corrective Action Program.Preventive actions have remained as an integral part of the licensee structure and the corrective actions to prevent recurrence have been effective.
019125                          The condition report procedure       Commitment closed. Preventive actions have remained Serial Letter 1-0658            requires the designated on-shift                      as an integral part of the licensee 8/29/1986                        SRO to review each condition                          structure and the corrective report immediately after                              actions to prevent recurrence generation for conditions affecting                    have been effective. The plant operations.                                      Corrective Action program covers this issue as an integral part of the program.
The Corrective Action program covers this issue as an integral part of the program.
 
a , 1 Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 30 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
a, 1 Docket Number 50-346 License Number NPF-3                         DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 019129 LER 97-016 1/16/1998 Valves DH10 and DH26 were verified to be in the correct position which satisfies SR 4.5.2.These valves will be added to the monthly ECCS valve verification surveillance procedure.
REPORT                                                 MAY 2002 - MAY 2006 Page 30 of 34 COMMITMENT                        COMMITMENT NUMBER I SOURCE I DATE                 DESCRIPTION                       CHANGE       REASON FOR CHANGE 019129                         Valves DH10 and DH26 were           Commitment closed. The normal position of DH10 LER 97-016                      verified to be in the correct                         changed from a closed valve to a 1/16/1998                      position which satisfies SR 4.5.2.                     locked open valve and the normal These valves will be added to the                     position of DH26 changed to a monthly ECCS valve verification                       locked closed valve.
Commitment closed.Commitment closed.The normal position of DH10 changed from a closed valve to a locked open valve and the normal position of DH26 changed to a locked closed valve.Current Quality Assurance audit system is more rigorous and has more depth to ensure activities that require audit are accomplished.
surveillance procedure.
019340 IR 98-010, Serial Letter 1-1169 7/27/1998 Additional enhancements will be made to the current audit schedule to separate certain activities into audit separate from the Radiation Protection audit.  
019340                          Additional enhancements will be    Commitment closed. Current Quality Assurance audit IR 98-010, Serial Letter 1-1169 made to the current audit                              system is more rigorous and has 7/27/1998                       schedule to separate certain                           more depth to ensure activities activities into audit separate from                   that require audit are the Radiation Protection audit.                        accomplished.
& ýDocket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 31 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
 
                                                                                                                        &ý Docket Number 50-346 License Number NPF-3                       DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284              REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 019383 IR 98-009, Serial Letter 1-1172 8/27/1998 019819 Serial Letter 2633 3/15/2000 Containment Emergency Sump visual inspection procedure has been changed to include a verification of the lead brick placement and proper spacing.Specific guidance will be provided to control room operators to ensure that no vapor entrainment will damage the DHR/LPI (decay heat removal/low pressure injection) pump [for the backup BPC (boric acid precipitation control) method].Commitment closed.Commitment closed.Lead bricks have been removed from the Containment Emergency Sump.The old backup method took a suction from the hot leg. This method is no longer used. A new boric acid precipitation control method was installed in accordance with an NRC approved exemption request.
REPORT                                                 MAY 2002 - MAY 2006 Page 31 of 34 COMMITMENT                      COMMITMENT NUMBER I SOURCE I DATE                 DESCRIPTION                       CHANGE         REASON FOR CHANGE 019383                         Containment Emergency Sump          Commitment closed. Lead bricks have been removed IR98-009, Serial Letter 1-1172 visual inspection procedure has                        from the Containment Emergency 8/27/1998                     been changed to include a                             Sump.
mks ..Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 32 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
verification of the lead brick placement and proper spacing.
019819                        Specific guidance will be provided Commitment closed. The old backup method took a Serial Letter 2633            to control room operators to                           suction from the hot leg. This 3/15/2000                      ensure that no vapor entrainment                       method is no longer used. A new will damage the DHR/LPI (decay                         boric acid precipitation control heat removal/low pressure                               method was installed in injection) pump [for the backup                         accordance with an NRC BPC (boric acid precipitation                           approved exemption request.
control) method].
 
                                                                                                                                    ..
mks Docket Number 50-346 License Number NPF-3                   DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284          REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 019821 Serial Letter 2633 3/15/2000 During implementation of the planned plant modification...
REPORT                                           MAY 2002 - MAY 2006 Page 32 of 34 COMMITMENT                COMMITMENT NUMBER I SOURCE I DATE           DESCRIPTION                         CHANGE                     REASON FOR CHANGE 019821                   During implementation of the       Commitment closed.                The old backup method took a Serial Letter 2633        planned plant modification...                                       suction on the hot leg and pumped 3/15/2000                procedural controls will be                                         highly borated water through the established to ensure that the                                       DHR Heat Exchanger. This no CCW (component cooling water)                                       longer occurs with the new inlet flow to the DHR (decay heat                                   method. A new boric acid removal) cooler is at least 95                                       precipitation control method was degrees Fahrenheit prior to                                         installed in accordance with an establishing the backup BPC                                         NRC approved exemption (boric acid precipitation control)                                   request.
procedural controls will be established to ensure that the CCW (component cooling water)inlet flow to the DHR (decay heat removal) cooler is at least 95 degrees Fahrenheit prior to establishing the backup BPC (boric acid precipitation control)method.Include in the Auxiliary Feedwater System procedure the weekly drain evolution.
method.
The procedure has a signoff to throttle open the 10 valves needed to perform the drain activities for both AFPT 1 and 2. Once each of the drains has been completed, a signoff and an Independent Verification are required for restoration.
019938                    Include in the Auxiliary Feedwater Operators will perform the drain Water level indicators were LER 00-005                System procedure the weekly        whenever the water level reaches installed on the AFPTs so that 7/07/2000                drain evolution. The procedure      2 inches.                        Operators can monitor the casing has a signoff to throttle open the                                  water level at least once per 12 10 valves needed to perform the                                      hour shift in modes 1 through 3.
Commitment closed.Operators will perform the drain whenever the water level reaches 2 inches.The old backup method took a suction on the hot leg and pumped highly borated water through the DHR Heat Exchanger.
drain activities for both AFPT 1                                    The 2 inch level will indicate that and 2. Once each of the drains                                        no water has yet accumulated in has been completed, a signoff and                                    the casing of the AFPTs.
This no longer occurs with the new method. A new boric acid precipitation control method was installed in accordance with an NRC approved exemption request.Water level indicators were installed on the AFPTs so that Operators can monitor the casing water level at least once per 12 hour shift in modes 1 through 3.The 2 inch level will indicate that no water has yet accumulated in the casing of the AFPTs.019938 LER 00-005 7/07/2000 AL Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 1 Page 33 of 34 DAVIS-BESSE NUCLEAR POWER STATION REGULATORY COMMITMENT CHANGE  
an Independent Verification are required for restoration.
 
AL Docket Number 50-346 License Number NPF-3                         DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284                REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT MAY 2002 -MAY 2006 COMMITMENT NUMBER I SOURCE I DATE COMMITMENT DESCRIPTION CHANGE REASON FOR CHANGE 021100 IR 03-010, Serial Letter 1-1336 11/23/2003 Establish criteria and modify appropriate procedures to restrict the use of At-Risk Changes in the plant modification process. At-Risk Changes shall only be used to alter SSCs that are out of service and physically isolated from electrical and mechanical sources.Structures are addressed differently than Systems and Components regarding inservice and out of service. At-Risk Changes can be used to alter or modify a Structure when the design and licensing bases functions of the Structure are maintained for plant conditions while the At-Risk Change is being implemented.
REPORT                                               MAY 2002 - MAY 2006 Page 33 of 34 COMMITMENT                      COMMITMENT NUMBER I SOURCE I DATE                 DESCRIPTION                           CHANGE                   REASON FOR CHANGE 021100                         Establish criteria and modify      Structures are addressed          This was to clarify the use of an IR 03-010, Serial Letter 1-1336 appropriate procedures to restrict differently than Systems and      At-Risk Change with respect to 11/23/2003                     the use of At-Risk Changes in the Components regarding inservice    Structures, Systems, and plant modification process. At-   and out of service. At-Risk      Components (SSCs).
This was to clarify the use of an At-Risk Change with respect to Structures, Systems, and Components (SSCs).
Risk Changes shall only be used    Changes can be used to alter or to alter SSCs that are out of      modify a Structure when the service and physically isolated    design and licensing bases from electrical and mechanical    functions of the Structure are sources.                          maintained for plant conditions while the At-Risk Change is being implemented.
X-% ,7' 0 Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE  
 
X-% ,7' 0 Docket Number 50-346 License Number NPF-3                       DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284               REGULATORY COMMITMENT CHANGE  


==SUMMARY==
==SUMMARY==
REPORT Attachment 1 MAY 2002 -MAY 2006 Page 34 of 34 List of Abbreviations Used ANSI American Nuclear Standards Institute ASME American Society of Mechanical Engineers COA Course Of Action associated with June 9, 1985 Loss of Feedwater Event at Davis-Besse CREVS Control Room Emergency Ventilation System DH Decay Heat GL Nuclear Regulatory Commission Generic Letter HVAC Heating, Ventilation, and Air Conditioning IEB Nuclear Regulatory Commission Information Bulletin IR Nuclear Regulatory Commission Inspection Report LER Licensee Event Report MU Make-Up NRC Nuclear Regulatory Commission PM Preventive Maintenance SAP A computer application used to store information about plant equipment and plant maintenance activities SERIAL Letter from Davis-Besse Nuclear Power Station to Nuclear Regulatory Commission SRTP Pre-Startup System Review and Test Program SW Service Water UFSAR Updated Final Safety Analysis Report Docket Number 50-346 License Number NPF-3 Serial Number 3284 Attachment 2 Page 1 of 1 COMMITMENT LIST THE FOLLOWING LIST IDENTIFIES THOSE ACTIONS COMMITTED TO BY THE DAVIS-BESSE NUCLEAR POWER STATION (DBNPS) IN THIS DOCUMENT.
REPORT                                                 MAY 2002 - MAY 2006 Page 34 of 34 List of Abbreviations Used ANSI               American Nuclear Standards Institute ASME               American Society of Mechanical Engineers COA               Course Of Action associated with June 9, 1985 Loss of Feedwater Event at Davis-Besse CREVS             Control Room Emergency Ventilation System DH                 Decay Heat GL                 Nuclear Regulatory Commission Generic Letter HVAC               Heating, Ventilation, and Air Conditioning IEB               Nuclear Regulatory Commission Information Bulletin IR                 Nuclear Regulatory Commission Inspection Report LER               Licensee Event Report MU                 Make-Up NRC               Nuclear Regulatory Commission PM                 Preventive Maintenance SAP               Acomputer application used to store information about plant equipment and plant maintenance activities SERIAL             Letter from Davis-Besse Nuclear Power Station to Nuclear Regulatory Commission SRTP               Pre-Startup System Review and Test Program SW                 Service Water UFSAR             Updated Final Safety Analysis Report
ANY OTHER ACTIONS DISCUSSED IN THE SUBMITTAL REPRESENT INTENDED OR PLANNED ACTIONS BY THE DBNPS. THEY ARE DESCRIBED ONLY FOR INFORMATION AND ARE NOT REGULATORY COMMITMENTS.
 
IF THERE ARE ANY QUESTIONS OR IF ADDITIONAL INFORMATION IS REQUIRED, PLEASE CONTACT MR. GREGORY A. DUNN, MANAGER- FENOC FLEET LICENSING (330) 315-7243.COMMITMENTS DUE DATE None N/A}}
Docket Number 50-346 License Number NPF-3 Serial Number 3284 Page 1 of 1 COMMITMENT LIST THE FOLLOWING LIST IDENTIFIES THOSE ACTIONS COMMITTED TO BY THE DAVIS-BESSE NUCLEAR POWER STATION (DBNPS) IN THIS DOCUMENT. ANY OTHER ACTIONS DISCUSSED IN THE SUBMITTAL REPRESENT INTENDED OR PLANNED ACTIONS BY THE DBNPS. THEY ARE DESCRIBED ONLY FOR INFORMATION AND ARE NOT REGULATORY COMMITMENTS. IF THERE ARE ANY QUESTIONS OR IF ADDITIONAL INFORMATION IS REQUIRED, PLEASE CONTACT MR. GREGORY A. DUNN, MANAGER- FENOC FLEET LICENSING (330) 315-7243.
COMMITMENTS                           DUE DATE None                               N/A}}

Revision as of 15:55, 23 November 2019

Regulatory Commitment Change Summary Report for the Davis-Besse, Unit 1 (Dbnps), for May 18, 2002 - May 31, 2006
ML062300025
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/15/2006
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
32849
Download: ML062300025 (36)


Text

FENOC 5501 North State Route 2

FirstEnergyNuclear OperatingCompany Oak Harbor,Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President- Nuclear Fax
419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3284 August 15, 2006 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Subject:

Regulatory Commitment Change Summary Report (May 18, 2002 - May 31, 2006)

Ladies and Gentlemen:

The FirstEnergy Nuclear Operating Company (FENOC) hereby submits the attached Regulatory Commitment Change Summary Report for the Davis-Besse Nuclear Power Station, Unit Number 1 (DBNPS), as discussed in NEI Commitment Management guidance and implemented by the DBNPS commitment management procedure.

The DBNPS commitment changes identified between the dates of May 18, 2002 and May 31, 2006 are included in Attachment I of this report. This report includes a description of the identified commitments, a summary of the changes made to the commitments, and a brief statement describing the basis for the change. FENOC has reviewed and implemented the commitment changes and has determined that the submittal of this report is the only required notification regarding changes to commitments listed in the attached summary.

This report covers four years of commitment changes due to a missed submittal of a Regulatory Commitment Change Summary Report in 2004. This missed submittal was documented in the DBNPS Corrective Action Program. The last submittal of a Regulatory Commitment Change Summary Report was on November 18, 2002 (Serial 2824).

Attachment 2 identifies that there are no commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Gregory A. Dunn, Manager-FENOC Fleet Licensing, at (330) 315-7243.

Sincerely yours, KJN/kjn Attachments cc: DB-l NRC/NRR Project Manager Regional Administrator, USNRC Region III DB-1 NRC Senior Resident Inspector Utility Radiological Safety Board

,AoDl

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 1 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE DESCRIPTION 001094, 001095, 001102 Outlines the events during a Overpressurization controls were DB-SP-10030, HPI Pump 1 Mode Serial Letter 0220 cooldown or plant startup in which implemented through procedural 5 Enhanced Baseline Testing in 2/18/1977 operator actions prevent the controls by isolating the BWST Piggyback, was used in 13RFO to possibility of overpressurization (borated water storage tank) develop a curve and to obtain and identifies when the HPI (high suction to the HPI pump in DB- additional data for rotor dynamics pressure injection) system will be SP-1 0030. analysis, including critical speed.

tested. This test was an infrequently performed test that was cancelled after 13RFO so no permanent commitment change was made.

001483 All nuclear safety related Commitment closed. With current programmatic (audit)

GL 83-028, Serial Letter 1000 administrative procedures are reviews in place, a separate in-line 11/07/1983 reviewed and approved by the review of procedures by Quality Quality Assurance department Assurance is redundant and and implementation is verified unnecessary.

during audits.

001487 Audit reports are reviewed and Commitment closed. This commitment was redundant GL 83-028, Serial Letter 1000 approved by the Supervisor - with the intent of the requirements 11/07/1983 Supplier Quality Unit and of ANSI N45.2.12-1977.

distributed to management of the audited organization.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 2 of 34 COMMITMENT COMMITMENT NUMBERISOURCE IDATE DESCRIPTION CHANGE REASON FOR CHANGE 001500 All procurement documents Procurement documents are The Procurement Engineer is GL 83-028, Serial Letter 1000 identified as Q-list, fire protection reviewed/approved by tasked with this activity and may 11/07/1983 and/or ASME must be Procurement Engineering. request a formal review by other reviewed/approved by the Facility disciplines as deemed necessary.

Engineering Department and by the Quality Engineering Department.

001727 The procedure for loss of all AC Commitment closed. The licensed operator GL 81-004, Serial Letter 0720 power is covered in the requalification program is now 6/02/1981 requalification training during the designed using the Systematic standard and emergency Approach to Training (SAT) operating procedure training. Any process that determines training procedure revisions will be needs based on job analysis and covered in a method appropriate needs analysis.

to the magnitude of the revision.

001945 In order to prevent another Replaced the high radiation locked Each lock is stamped (into the IR 79-003, Serial Letter 1-0053 occurrence of unlocked high area book with the Barricade and metal of the lock) with a unique 3/26/1979 radiation areas, the location of all Barrier Posting and Integrity identifying number that areas greater than 1000 MR/HR Checklist. Deleted the tags on the corresponds to the key.

have been locked and these areas locks.

are logged in the high radiation locked area book. These areas have special locks labeled with a tag.

II Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 3 of 34 COMMITMENT COMMITMENT NUMBERISOURCEIDATE DESCRIPTION CHANGE REASON FOR CHANGE 002998 The Conditions Adverse to Quality Commitment closed. The Corrective Action Program IR 84-012, Serial Letter 1-0463 program implements the maintains this compliance as it 9/20/1984 requirements of 10 CFR 21. requires a determination if the condition is reportable under 10 CFR 21, and if required, completion of a 10 CFR 21 Decision Checklist.

003251 Adequate procedural guidance Commitment closed. The practice of using a test outline IR 84-028 had been added to prevent the has been discontinued. Approved 1/18/1985 use of a test outline instead of a procedures are used to perform test procedure. testing.

003520 The Technical Specifications Deleted hand delivery of report The subject report is available on-LER 86-031, Serial Letter 1-0674 Surveillance Specialist will and that Friday's list will include line to anyone, including the shift 10/13/1986 maintain a current list of all tests which will be late up to and manager and department heads surveillance tests that will go late including Monday. and is kept current.

during the next 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This list will be hand delivered daily to the shift manager and appropriate department heads. Friday's list will include tests which will be late up to and including Monday.

1) 9 Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 4 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 004716 A general inspection of The inspection is performed when The station has the capability to IEB 80-024, Serial Letter 1-0179 containment is required to be there are indications of open identify leakage and differentiate 1/05/1981 performed by Plant Startup system leakage. which system is leaking. To limit Procedure prior to reaching dose and for safety reasons criticality on each plant startup. related to low containment oxygen (This inspection is for water levels, this change was made to damage from open system inspect affected areas in leakage.) containment when there are indications of open system leakage.

004848 When loose parts are suspected, Deleted all references to the crash The crash cart was rarely used GL 85-002, Serial Letter 1161 the Vibration & Loose Parts "crash cart and equipment located on it. and created a physical nuisance 6/24/1985 cart" is dispatched to further to store in the Control Room.

analyze the noise and determine Newer equipment is available in the location of the suspected the Metrology Lab and no longer loose part. needs to be stored on a crash cart.

005558 Pumps which may be used to Delete primary transfer pumps as These pumps were abandoned in GL 87-012, Serial Letter 1423 control RCS (reactor coolant part of this commitment. place by plant modification 9/23/1987 system) inventory include.., the 95-0050-00, Abandon Primary primary transfer pumps. Water Storage Tank (and System).

I)

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 5 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE DESCRIPTION CHANGE REASON FOR CHANGE 006761 An updated list of abbreviations, Commitment closed. The philosophy for the use of Serial Letter 1368 acronyms, and symbols will be acronyms and abbreviations has 4/20/1987 available after the control room changed and their use should now indications and controls are re- be minimized. When used, it is labeled. When the list is available, more appropriate to have the it should be added to the writer's acronym/abbreviation defined guide. Plant abbreviations and within the procedure itself so end acronyms are included in the users can easily locate the writer's guide. definition.

009319 The mechanical stops of valves Deleted the specific settings The valve position is controlled by LER 78-019 DH14A and DH14B are now identified in the commitment. test procedures and changes 3/07/1978 tagged to prevent incorrect depending on the test results.

resetting of these stops. The The Engineering Change Request correct settings should be 47 process controls the procedure degrees open for DH14A and 45 changes and tag changes degrees open for DH14B. required to reflect the new valve settings.

009551 Establish controls so that Commitment closed. Controls are in place to ensure IR 86-005 regulatory applicability this action is completed. The 4/18/1986 determinations are written on use- Corrective Action Program as-is and repair condition reports. includes instructions on what documentation is required for a use-as-is or repair disposition.

V)

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT Attachment I MAY 2002 - MAY 2006 Page 6 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 011711 The condition report procedure Commitment closed. The Corrective Action Program IR 84-028, Serial Letter 1-0401 was revised to include the requires Regulatory Affairs to 1/06/1984 notification of the Regulatory review all new condition reports Affairs section if the engineering for a reportability determination.

evaluation indicates the system or Also, the SRO notifies/involves component is unable to perform its Regulatory Affairs as required for intended safety function. Operability Determinations or hardware dispositions.

011735 Initiate complete air flow balance Changed to periodically monitor The appropriate frequency is SRTP HVAC-NRR-2 of the control room HVAC system, the supply and return. determined and controlled by the 9/30/1986 including vibration testing of all Preventive Maintenance Program rotating equipment. Preventive to ensure equipment reliability.

maintenance activities have been initiated to quarterly monitor the supply and return air fans vibration.

012113 Health Physics procedure was Verbal permission is obtained The name of the management Serial Letter 1-0132 revised to include more stringent from Chemistry and Radiation individual who provides verbal 5/23/1980 requirements for entering locked Protection Supervisor. Deleted permission is more strictly defined.

high radiation areas. These the requirement to use two Electronic alarming dosimeters did include verbal permission from a different types of survey meters. not exist when this commitment Chemistry and Healthy Physics was made. The use of this new management individual and a equipment eliminates the need for requirement to use two different two survey meters.

types of high range survey meters.

ii Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 7 of 34 COMMITMENT COMMITMENT NUMBERISOURCEIDATE DESCRIPTION CHANGE REASON FOR CHANGE DESCRIPTION CHANGE 012319 Condition Report procedure Commitment closed. The Corrective Action program IR 88-012, Serial Letter 1-0839 corrected any interpretive addresses this aspect and the 10/25/1988 problems with the condition report creation of the electronic process process to ensure that these types for initiating and processing of a of problems (i.e. once a condition condition report also helps prevent report is initiated it must be the situation of not processing any processed) do not recur in the that have been initiated.

future.

012617 Create a PM which will provide Changed the frequency to 24- Frequencies are adjusted in SRTP CAC-RR-1 maintenance in accordance with month interval and modified the accordance with the Preventative 9/26/1986 the manufacturer's commitment to have the frequency Maintenance program based on recommendations for backdraft of the PM determined and system/component performance dampers. Incorporate the controlled by the Preventative and maintenance feedback.

requirements of the American Maintenance Program.

Warming and Ventilating Manual.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 8 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 012638 Preventive Maintenance Changed to periodically perform The appropriate frequency is SRTP HVAC-RR-2 procedures have been developed the PMs. determined and controlled by the 9/30/1986 for both trains of CREVS. Every Preventive Maintenance Program three months PM 1188 and 1189 to ensure equipment reliability.

are performed to verify proper oil level and ensure adequate charge on the system in both air-cooled and water-cooled modes.

012676 PM 2604 performs an annual Deleted the requirement to inspect A review of the maintenance SRTP HVAC-NRR-7 check of the control dampers. PM these components annually. history did not demonstrate a 9/30/1986 3075 and PM 2994 annually check reliability problem. The frequency the calibration of the chilled water of preventive maintenance is control string. PM 2635 will determined and controlled under annually check the calibration of the Preventive Maintenance the switchover instrument string. program.

11 Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 9 of 34 COMMITMENT COMMITMENT NUMBERISOURCEIDATE DESCRIPTION CHANGE REASON FOR CHANGE 012763 In order to improve response Commitment closed. Preventive actions have remained IR 81-003 times on audit finding reports, as an integral part of the licensee 4/17/1981 "Prompt Response to Internal structure and the corrective Audit Finding Reports" procedure actions to prevent recurrence has been prepared and approved have been effective. This is implementing more stringent covered by the Corrective Action requirements regarding audit program. In addition, the FENOC finding report (AFR) response, Quality Assurance Program tracking and time extensions. Manual commits to Regulatory Guide 1.144, "Auditing of Quality Assurance Programs for Nuclear Power Plants".

013043 The Davis-Besse requalification Commitment closed. The licensed operator Serial Letter 0816 program does mandate an requalification program is now 5/10/1982 accelerated requalification for any designed using the Systematic operator scoring less than 80% Approach to Training (SAT) overall. In addition, the operator is process that determines training removed from license duties needs based on job analysis and during the accelerated needs analysis. Remediation is requalification. part of the SAT process and is required prior to returning an operator to licensed duties.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 10 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE CHANGE REASON FOR REASON FOR CHANGE CHANGE 013351 The auxiliary feedwater high Commitment closed. A Technical Specification change IR 86-030 speed stop has been increased so was made to reduce required 3/18/1987 that minimum speed during auxiliary feedwater flow and high surveillance testing is not less speed limiter setpoints were than 3582 rpm. increased in the surveillance test procedures. The calculation and engineering change modification processes control any changes to setpoints in the procedures.

013442 Procedure for performance of Deleted the option of suspending This was part of a common IR 84-001, Serial Letter 1-0431 surveillance & periodic tests was the test. process initiative.

5/22/1984 modified to instruct the shift manager to either hold or suspend the test if it cannot be completed.

41 Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 11 of 34 COMMITMENT COMMITMENT NUMBERISOURCEIDATE DESCRIPTION CHANGE REASON FOR CHANGE 013558 Procurement procedure contains Procurement technical and quality This minimizes the risk of IR 85-007 instructions to ensure that requirements are updated on the conflicting information.

5/14/1985 procurement quality requirements computer only.

are updated on the computer and in procedures when they are changed.

013560 Training department procedures Commitment closed. Use of personnel performance IR85-004 were written and implemented to and feedback to evaluate and 3/27/1985 address the documentation of the modify training programs is a evaluation of operator and senior requirement of accreditation. This operator exams and the inclusion has been captured as part of a of identified deficiencies into process that is subject to a succeeding lesson plans. regulated revision/review process.

11 Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 12 of 34 COMMITMENT COMMITMENT NUMBERISOURCEIDATE DESCRIPTION CHANGE REASON FOR CHANGE 013644 One procedure will provide a Commitment closed. Preventive actions have remained IR 85-030, Serial Letter 1-0604 consistent mechanism for as an integral part of the licensee 1/27/1986 identifying items which are structure and the corrective potentially adverse to quality. actions to prevent recurrence Trending of condition reports will have been effective. The be required to ensure that Corrective Action Program and the significant problems will be Quality Assurance Program identified even if systems are not Manual addresses these items.

determined to be inoperable.

013664 Procedure was revised to include QC maintains hold/witness points This was a result of a change in IR 05-028, Serial 1-0600 several QC (Quality Control) via a database in SAP. A process for QC.

12/26/1985 verification hold points which will statement was added to the allow for appropriate QC review of procedure that the work document the BISCO boot seal fabrication has been processed through QC and installation. for determination of QC Hold/Witness Points.

vt a Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 13 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 013722 Develop a station administrative Commitment closed. The Request for Assistance COA Section 2.B.3 Rev. 6 procedure to assure that identified procedure was cancelled. These 1/03/1986 concerns will be formally elevated types of requests are handled as to appropriate levels of part of the Corrective Action engineering and management for Program for issues pertaining to resolution, will have required conditions adverse to quality and response dates, will identify part of the FENOC Activity individuals responsible for Tracking program for issues that resolution and for implementing do not pertain to conditions resolution. adverse to quality.

013755 A dedicated surveillance function Commitment closed. With the current implementation of COA Section App.3.2 Rev. 6 is established to supplement the the internal assessment process 1/03/1986 formal audit program. (continuous assessment) a surveillance function is not needed.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 14 of 34 COMMITMENT COMMITMENT NUMBERISOURCEIDATE DESCRIPTION CHANGE REASON FOR CHANGE 013756 Develop a nuclear mission Commitment closed. The Request for Assistance COA Section App.3.2 Rev. 6 procedure "Request for procedure was cancelled. These 1/0311986 Assistance" that contains mission types of requests are handled as wide requirements in this area. part of the Corrective Action Program for issues pertaining to conditions adverse to quality and part of the FENOC Activity Tracking program for issues that do not pertain to conditions adverse to quality.

014274 Procedure requires justification for These requirements were The Request for Assistance IR 86-022 engineering evaluations transferred to the Corrective procedure was cancelled and the 11/07/1986 commensurate with the level of Action Program. Corrective Action Program used to detail of the original question. address these types of requests.

.1 Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 15 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 014832 Verify that samples for offsite Commitment closed. Davis-Besse can perform the Serial Letter 1066 laboratory analysis will be required analyses and an offsite 8/14/1984 transported using licensed laboratory is not required.

carriers. Identify the offsite laboratory or laboratories expected to be used.

014872 Valves in the fire protection Commitment closed. This is part of the Fire Hazards Serial Letter 1685 system are locked in the open Analysis Report now.

7/31/1989 position and inspected monthly to verify their position.

.1 Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 16 of 34 COMMITMENT COMMITMENT NUMBER ISOURCE IDATE DESCRIPTION CHANGE REASON FOR CHANGE 014979 Licensed operators will be trained Commitment closed. The licensed operator Serial Letter 1368 on future revisions of EP 1202.01 requalification program is now 4/20/1987 prior to implementation or prior to designed using the Systematic returning control room duties after Approach to Training (SAT) absences. Minor editorial process that determines training procedure revisions will be exempt needs based on job analysis and from this training requirement. needs analysis. Significant changes to DB-OP-02000 (EP 1202.01) would trigger a needs analysis under this process to determine what additional skills and knowledge the operators may need as a result of the procedure change.

015037 Procedures are developed to Commitment closed. Preventive actions have remained COA Section App.3.2 Rev. 6 implement the Quality Assurance as an integral part of the licensee 1/03/1986 Program requirements and to structure and the corrective define responsibilities for inter- actions to prevent recurrence divisional nuclear program have been effective. This is an activities. In particular, these integral part of the Corrective procedures address the Action Program.

communication for identification, review, and disposition of condition reports.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 17 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 015050 Qualitative fit test will be Changed to Quantitative fit test The quantitative fit test is a better IR 84-019, Serial Letter 1-0488 performed in accordance with and substituted bending at the method as it verifies a fit factor of 12/14/1984 NUREG-0041, Section 8.5. This waist for running in place. 1000 for full factor respirator.

section requires the individual Davis-Besse environment permits undergoing respirator fit testing to bending, therefore, running in perform several simulated work place is not utilized.

activities including "running in place".

015094 The Maintenance Training Commitment closed. Maintenance training programs Serial Letter 1-0674 department now reviews are part of the accreditation 10/13/1986 procedure changes to determine process. Training materials are the need for craft training. maintained based on meeting the requirements of ACAD 02-001, Accreditation Objectives and Criteria, criterion 6.5. 10 CFR 50.120 requires that nuclear power stations obtain and maintain accreditation and Davis-Besse UFSAR section 13.2.1 commits the station to 10 CFR 50.120 and identifies that the maintenance training programs are accredited. This has been captured as part of a process that is subject to a regulated revision/review process.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 18 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 015257 Periodically (annually) review Commitment closed. The Industrial Security Plan was Serial Letter 1437 Physical Security and superseded by the Physical 10/29/1987 Contingency Plans and Security Plan that implemented procedures to evaluate their new requirements under NRC potential impact on plant and Order 03-086.

personnel safety.

015461 Identifies conditions, limitations, Commitment closed. This commitment existed to Serial Letter 1953 and restrictions that apply to the ensure compliance to an NRC 7/12/1991 use of MSA GRM-I canisters for approved exemption to 10 CFR radio-iodine protection. 20. Davis-Besse is following the code and chose not to utilize this approved exemption.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 19 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 015555 Test requirements for heat Removed DB-PF-04729, This test does not test/determine GL 89-013, Serial Letter 1-1022 exchangers included in Containment Air Cooler Monitoring nor obtain data that can be used 9/09/1993 performance test program. Test, from the GL 89-013 to determine the heat transfer performance test program. capability of the Containment Air Changed PM 5536, 5537 and Coolers (CAC) as requested by 5538 to clean inside the tubes at GL 89-013. Also, the frequency of interval determined by the the PMs is determined and Preventive Maintenance program. controlled by the Preventive Maintenance program.

015845 Modification packages were Changed to "a five point check The data package set points were IR 90-010 sampled and evaluated. As a from the Technical Specification changed to account for the fuel in 7/20/1990 result of one of these reviews on low level set point to the high level the tanks that is not usable. The the EDG (Emergency Diesel trip set point". alarming level will be more Generator) Fuel Oil Storage Tank conservative and the data derived Level Indication, data packages from the level indicators will be LI/LT4891 and LI/LT4892 were more accurate.

changed to incorporate the concerns of the inspection team.

This change included a five point check from 32,000 gallons to 39,850 gallons.

%I &

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 20 of 34 COMMITMENT COMMITMENT NUMBER ISOURCEIDATE DESCRIPTION CHANGE REASON FOR CHANGE 016304 Training of workers on the proper Commitment closed. This commitment existed to Serial 1965 use and the limitations of the ensure compliance to an NRC 7/29/1991 GMR-I canisters will be performed approved exemption to 10 CFR prior to canister issuance. 20. Davis-Besse is following the code and chose not to utilize this approved exemption.

016350 An annual quality assurance Commitment closed. This commitment originated as a Serial Letter 1-0957 surveillance of randomly selected result of a reduction in 7/31/1991 procedures will be conducted. commitment to the quality The annual surveillance will assurance program description a provide assurance that number of years ago. This activity procedures are being maintained was deleted during the current. development of the FENOC Quality Assurance Program Manual. The NRC approved this change.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 21 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 016400 The administrative procedure A multi-disciplined technical This change was part of a new LER 91-002 governing surveillance test review is not performed. A common process.

10101/1991 scheduling will be revised to change in frequency is defined as include requirements for a multi- an intent change and, as such, will disciplined technical review when receive a technical review by an surveillance test frequency individual assigned by the section requirements are relaxed. manager. The section manager will approve the change.

016682 Pre-job briefs will be performed Pre-job brief will be performed as Briefing attendees are determined LER 92-002 R1 except for frequently performed determined by the work group based on the scope and nature of 5/08/1992 PMs and routine shop work. supervisor and the work group work. There may be times when Personnel to be present at the supervisor will also determine or Operations or Maintenance may pre-job brief as a minimum include recommend attendees for the pre- not be required to attend the brief, the discipline maintenance job brief. depending on the work scope and supervisor and Operations SRO. potential impact on the plant.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 22 of 34 COMMITMENT COMMITMENT NUMBER ISOURCE IDATE DESCRIPTION CHANGE REASON FOR CHANGE 016912 Low level radioactivity was found Changed to periodically change The appropriate frequency is IR 92-015 on HEPA filters near personnel out the pre-filter. determined and controlled by the 10/09/1992 clothing change out area. The Preventive Maintenance Program vent pre-filter will be changed out to ensure equipment reliability.

every six months.

016935 Control room programmer lamp Deleted "programmer lamp fault" The programmers have been Serial Letter 2183 fault light will illuminate if any of and added "electronic trip" changed to solid state devices, 11/10/1993 the contacts for any control rod eliminating the lamp fault light.

groups programmer opens.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 23 of 34 COMMITMENT COMMITMENT NUMBER ISOURCE IDATE DESCRIPTION CHANGE REASON FOR CHANGE 017029 To address root cause of boric MU40 is required to be closed, not The final resolution of the IR 92-019 acid addition from seat leakage MU363. condition report identified that 2/1011993 past MU23, a temporary MU40 was to be closed while procedure change was issued to performing recirculation of BAAT.

close manual isolation valve MU363 is not required to be MU363 when recirculating a closed.

BAAT. This was to provide an additional isolation to prevent inadvertent addition of boric acid to the makeup tank when the BAAT (Boric Acid Addition Tank) system is pressurized.

017069 To prevent future pressure The inlet isolations are kept This was a result of a condition Telecon NLD93-05186 transients from occurring, changes closed. report that requires that the CAC 4/01/1993 must be made to prevent a void (containment air cooler) operating from forming in the high elevations procedure be changed to have the of the piping or slowly collapse inlet isolations closed while the any voids formed. In the CAC is in Standby.

procedures, the inlet valves are kept open.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 24 of 34 COMMITMENT COMMITMENT NUMBER ISOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 017160 Increase the operating speed of The high speed stop for AFW This was a result of Engineering IR 93-009, Serial Letter 1-1014 AFW (auxiliary feedwater) Pump Pump 1-1 has been changed to Change Package 03-0411 (design 6/15/1993 1-1. This will raise the pump 3676 (3666 to 3686) rpm. change).

operating parameters to a point well above the minimum values such that instrument uncertainties are not significant. The high speed stop for AFW Pump 1-1 has been increased from 3600 to 3700 rpm.

017161 Increase the operating speed of Procedures were changed to This was a result of Engineering IR 93-009, Serial Letter 1-1014 AFW (auxiliary feedwater) Pump reflect that the high speed stop for Change Package 03-0411 (design 6/15/1993 1-1. This will raise the pump AFW Pump 1-1 has been changed change).

operating parameters to a point to 3676 (3666 to 3686) rpm.

well above the minimum values such that instrument uncertainties are not significant. Procedures will be revised to change the acceptance criteria for AFW pump testing to allow for instrument uncertainties and to specify that measured pump flow and discharge pressure will be used to demonstrate pump operability.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 25 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 017321, 017322 Locking mechanisms for the CAC Commitment closed. CAC SW Inlet Valves (SW64, LER 93-006, Serial Letter 1-1036 (containment air cooler) SW SW65, SW68, SW69, SW72, 3/14/1994 (service water) inlet valves will be SW73) were removed from the fabricated. Once fabrication is plant as a result of Boric Acid complete the valves will be locked Corrosion (Engineering Work open and controlled under the Package, EWR 02-0343-00).

Locked Valve program. Their removal facilitates deleting them from having to be locked open and controlled under the Locked Valve program.

017422 Develop more definitive The acceptance criteria was This was determined by adding a GL 89-013, IR 93-016 acceptance criteria for heat changed for ECCS RM CLRS calculated value from Proto-Power 12/29/1993 exchanger performance and (emergency core cooling system Calc #03-013 of 50 gpm, a system flow testing. (ECCS RM room coolers) to be greater than degradation due to fouling value of CLRS shall be greater than or 90 gpm. 15 gpm, instrument error value of equal to 100 gpm.) 22.9 gpm plus a rounding value of 2.1 for a total value of 90 gpm.

This is in compliance with UFSAR Table 9.2-1, Note 1.

9%

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 26 of 34 COMMITMENT COMMITMENT NUMBER ISOURCE IDATE DESCRIPTION CHANGE REASON FOR CHANGE 017534 Upper management and quality Commitment closed. Preventive actions have remained Serial Letter 1-1036 assurance are involved in the as an integral part of the licensee 3/14/1994 timeliness of corrective actions for structure and the corrective significant conditions adverse to actions to prevent recurrence quality. have been effective. The Corrective Action Program addresses this as an integral part of the program.

017678 Modify procedure prerequisites to No trending is required for SFSEQ The SFSEQ 1, 2, 3, and 4 relays Serial Letter 1-1033 include PM test by voltage drop 1, 2, 3, and 4. are replaced every 24 months and 1/28/1994 measurements on these relays relay contacts are tested quarterly GE type HFA and SFSEQ 1, 2, 3, by voltage drop measurements

& 4 relays. Trending of (with zero voltage drop criteria degradation is required. specified) under the PM program.

Based on this conservative replacement interval, combined with quarterly testing of the relay contacts, no trending is required.

41I s Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 27 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 017843 A list of critical periodic tests has Remove DB-PF-03012, ECCS This procedure was upgraded to a IR 85-025 been compiled. These critical (emergency core cooling system) scheduled surveillance test and is 12/17/1985 periodic tests have been identified Integrated Train 2 Leakage Test, no longer a periodic test.

as "critical" on the ST/PT as a critical periodic test.

(surveillance tests/periodic tests) computer schedule.

017902 Improved 10CFR50.59 program An alternative to the computer- This is a process improvement.

IR 94-016, Serial Letter 1-1063 by implementing a new computer- based training was added. This 3/10/1995 based training program and alternative is an instructor-led revising the procedure and presentation. The site training screening form. section administers both courses.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 28 of 34 COMMITMENT COMMITMENT NUMBER ISOURCE IDATE DESCRIPTION CHANGE REASON FOR CHANGE 018733 The 18 month surveillance test The frequency was changed back The test frequency was changed LER 97-008 (SFAS Interchannel Logic Test) to monthly for SFAS. from monthly to quarterly in 4/17/1997 was performed and completed License Amendment 230. This satisfactorily with no equipment change was reported in the deficiencies. The combination of Commitment Change Summary this test and the existing quarterly Report (May, 1998 - May, 2000).

tests provide an overlapping This change of frequency applied check of all required two-out-of- to ARTS (anticipatory reactor trip four logic in the output modules of system) only. The SFAS SFAS (safety features actuation frequency remained monthly so system). The 18 month the commitment text was surveillance test will continue to corrected to reflect monthly for be performed on a quarterly SFAS and quarterly for ARTS.

frequency along with the quarterly tests so that a complete check of the two-out-of four logic gates in the individual SFAS output modules is performed.

019092 Procedure was revised to specify Deleted the specific survey This supports using new IR 97-012, Serial Letter 1-1144 the survey instrument to be instrument and added "use the equipment as existing instruments 12/4/1997 utilized, an Extender 2000W, and appropriate G-M tube survey become obsolete, like the to require two independent instrument". Extender 2000W.

radiological surveys for all radioactive material shipments.

Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 29 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 019094 The condition report process Commitment closed. This was a result of an analysis IR 97-009, Serial Letter 1-1142 procedure will ensure that a conducted under the Corrective 11/14/1997 condition report identifying an Action Program.

increase in CDF (core damage frequency) beyond the non-risk significant criteria defined in EPRI will be elevated to a category requiring management oversight.

019125 The condition report procedure Commitment closed. Preventive actions have remained Serial Letter 1-0658 requires the designated on-shift as an integral part of the licensee 8/29/1986 SRO to review each condition structure and the corrective report immediately after actions to prevent recurrence generation for conditions affecting have been effective. The plant operations. Corrective Action program covers this issue as an integral part of the program.

a, 1 Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 30 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 019129 Valves DH10 and DH26 were Commitment closed. The normal position of DH10 LER 97-016 verified to be in the correct changed from a closed valve to a 1/16/1998 position which satisfies SR 4.5.2. locked open valve and the normal These valves will be added to the position of DH26 changed to a monthly ECCS valve verification locked closed valve.

surveillance procedure.

019340 Additional enhancements will be Commitment closed. Current Quality Assurance audit IR 98-010, Serial Letter 1-1169 made to the current audit system is more rigorous and has 7/27/1998 schedule to separate certain more depth to ensure activities activities into audit separate from that require audit are the Radiation Protection audit. accomplished.

&ý Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 31 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 019383 Containment Emergency Sump Commitment closed. Lead bricks have been removed IR98-009, Serial Letter 1-1172 visual inspection procedure has from the Containment Emergency 8/27/1998 been changed to include a Sump.

verification of the lead brick placement and proper spacing.

019819 Specific guidance will be provided Commitment closed. The old backup method took a Serial Letter 2633 to control room operators to suction from the hot leg. This 3/15/2000 ensure that no vapor entrainment method is no longer used. A new will damage the DHR/LPI (decay boric acid precipitation control heat removal/low pressure method was installed in injection) pump [for the backup accordance with an NRC BPC (boric acid precipitation approved exemption request.

control) method].

..

mks Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 32 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 019821 During implementation of the Commitment closed. The old backup method took a Serial Letter 2633 planned plant modification... suction on the hot leg and pumped 3/15/2000 procedural controls will be highly borated water through the established to ensure that the DHR Heat Exchanger. This no CCW (component cooling water) longer occurs with the new inlet flow to the DHR (decay heat method. A new boric acid removal) cooler is at least 95 precipitation control method was degrees Fahrenheit prior to installed in accordance with an establishing the backup BPC NRC approved exemption (boric acid precipitation control) request.

method.

019938 Include in the Auxiliary Feedwater Operators will perform the drain Water level indicators were LER 00-005 System procedure the weekly whenever the water level reaches installed on the AFPTs so that 7/07/2000 drain evolution. The procedure 2 inches. Operators can monitor the casing has a signoff to throttle open the water level at least once per 12 10 valves needed to perform the hour shift in modes 1 through 3.

drain activities for both AFPT 1 The 2 inch level will indicate that and 2. Once each of the drains no water has yet accumulated in has been completed, a signoff and the casing of the AFPTs.

an Independent Verification are required for restoration.

AL Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 33 of 34 COMMITMENT COMMITMENT NUMBER I SOURCE I DATE DESCRIPTION CHANGE REASON FOR CHANGE 021100 Establish criteria and modify Structures are addressed This was to clarify the use of an IR 03-010, Serial Letter 1-1336 appropriate procedures to restrict differently than Systems and At-Risk Change with respect to 11/23/2003 the use of At-Risk Changes in the Components regarding inservice Structures, Systems, and plant modification process. At- and out of service. At-Risk Components (SSCs).

Risk Changes shall only be used Changes can be used to alter or to alter SSCs that are out of modify a Structure when the service and physically isolated design and licensing bases from electrical and mechanical functions of the Structure are sources. maintained for plant conditions while the At-Risk Change is being implemented.

X-% ,7' 0 Docket Number 50-346 License Number NPF-3 DAVIS-BESSE NUCLEAR POWER STATION Serial Number 3284 REGULATORY COMMITMENT CHANGE

SUMMARY

REPORT MAY 2002 - MAY 2006 Page 34 of 34 List of Abbreviations Used ANSI American Nuclear Standards Institute ASME American Society of Mechanical Engineers COA Course Of Action associated with June 9, 1985 Loss of Feedwater Event at Davis-Besse CREVS Control Room Emergency Ventilation System DH Decay Heat GL Nuclear Regulatory Commission Generic Letter HVAC Heating, Ventilation, and Air Conditioning IEB Nuclear Regulatory Commission Information Bulletin IR Nuclear Regulatory Commission Inspection Report LER Licensee Event Report MU Make-Up NRC Nuclear Regulatory Commission PM Preventive Maintenance SAP Acomputer application used to store information about plant equipment and plant maintenance activities SERIAL Letter from Davis-Besse Nuclear Power Station to Nuclear Regulatory Commission SRTP Pre-Startup System Review and Test Program SW Service Water UFSAR Updated Final Safety Analysis Report

Docket Number 50-346 License Number NPF-3 Serial Number 3284 Page 1 of 1 COMMITMENT LIST THE FOLLOWING LIST IDENTIFIES THOSE ACTIONS COMMITTED TO BY THE DAVIS-BESSE NUCLEAR POWER STATION (DBNPS) IN THIS DOCUMENT. ANY OTHER ACTIONS DISCUSSED IN THE SUBMITTAL REPRESENT INTENDED OR PLANNED ACTIONS BY THE DBNPS. THEY ARE DESCRIBED ONLY FOR INFORMATION AND ARE NOT REGULATORY COMMITMENTS. IF THERE ARE ANY QUESTIONS OR IF ADDITIONAL INFORMATION IS REQUIRED, PLEASE CONTACT MR. GREGORY A. DUNN, MANAGER- FENOC FLEET LICENSING (330) 315-7243.

COMMITMENTS DUE DATE None N/A