L-17-088, Independent Spent Fuel Storage Installation Changes, Tests and Experiments
ML17086A146 | |
Person / Time | |
---|---|
Site: | Davis Besse, Perry, 07200069 |
Issue date: | 03/27/2017 |
From: | Halnon G FirstEnergy Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
References | |
L-17-088 | |
Download: ML17086A146 (1) | |
Category:Letter type:L
MONTHYEARL-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024
[Table view]30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-049, Core Operating Limits Report for Operating Cycle 202023-03-30030 March 2023 Core Operating Limits Report for Operating Cycle 20 L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-085, 1 to Emergency Plan2023-03-10010 March 2023 1 to Emergency Plan L-23-059, Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-0022023-03-0909 March 2023 Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-002 L-22-212, CFR 50.55a Request RP-5 Regarding Inservice Pump Testing2023-03-0606 March 2023 CFR 50.55a Request RP-5 Regarding Inservice Pump Testing L-23-048, Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2023-03-0101 March 2023 Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-23-017, Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 192023-01-31031 January 2023 Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 19 L-22-253, Submittal of Pressure and Temperature Limits Report, Revision 52023-01-10010 January 2023 Submittal of Pressure and Temperature Limits Report, Revision 5 L-22-284, Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS)2022-12-28028 December 2022 Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS) L-22-271, Emergency Plan2022-12-20020 December 2022 Emergency Plan L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)2022-12-16016 December 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) L-22-263, Spent Fuel Storage Cask Registration2022-12-12012 December 2022 Spent Fuel Storage Cask Registration L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 222022-11-18018 November 2022 Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 L-22-250, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 192022-11-0808 November 2022 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19 L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-211, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2022-09-29029 September 2022 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-22-216, Submittal of Pressure and Temperature Limits Report. Revision 42022-09-27027 September 2022 Submittal of Pressure and Temperature Limits Report. Revision 4 L-22-213, Occupational Radiation Exposure Report for Year 2021 - Correction2022-09-23023 September 2022 Occupational Radiation Exposure Report for Year 2021 - Correction 2024-01-24 Category:Report MONTHYEARL-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023
[Table view]CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-22-253, Submittal of Pressure and Temperature Limits Report, Revision 52023-01-10010 January 2023 Submittal of Pressure and Temperature Limits Report, Revision 5 L-22-211, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2022-09-29029 September 2022 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-22-216, Submittal of Pressure and Temperature Limits Report. Revision 42022-09-27027 September 2022 Submittal of Pressure and Temperature Limits Report. Revision 4 L-22-149, Post Accident Monitoring Report2022-06-23023 June 2022 Post Accident Monitoring Report ML22202A4362022-04-0808 April 2022 Enclosure F: Updated Inputs to 52 EFPY P-T Operating Curves ML22202A4372022-03-0202 March 2022 Enclosure G: Framatome Inc. Document 86-9344713-000, Davis-Besse Reactor Vessel Embrittlement Fluence Reconciliation Through 60 Years IR 05000346/20210902021-12-16016 December 2021 Reissue Davis-Besse NRC Inspection Report (05000346/2021090) Preliminary White Finding ML21322A2892021-12-0909 December 2021 Approval of Plant-Specific Analysis of Certain Reactor Vessel Internal Components in Accordance with License Renewal Commitment No. 53 L-21-045, 10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension2021-02-0808 February 2021 10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension ML20302A3022020-09-25025 September 2020 1 to Technical Requirements Manual ML19255H0992019-10-10010 October 2019 Staff Assessment of Flooding Focused Evaluation L-19-189, 54010-CALC-01, Davis-Besse Nuclear Power Station: Evaluation of Risk Significance of Permanent ILRT Extension.2019-07-29029 July 2019 54010-CALC-01, Davis-Besse Nuclear Power Station: Evaluation of Risk Significance of Permanent ILRT Extension. ML22262A1522019-05-0101 May 2019 Framatome Inc., Document ANP-2718NP, Revision 007, Appendix G Pressure-Temperature Limits for 52 EFPY for the Davis-Besse Nuclear Power Station ML22202A4332019-04-30030 April 2019 Enclosure C: Framatome ANP-2718NP, Rev. 7, Appendix G Pressure-Temperature Limits for 52 EFPY for the Davis-Besse Nuclear Power Station L-18-186, Proposed Alternative to Use ASME Code Case N-8312018-09-0707 September 2018 Proposed Alternative to Use ASME Code Case N-831 L-18-108, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile....2018-04-12012 April 2018 Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.... ML18149A2812018-02-16016 February 2018 2017 ATI Environmental Inc. Midwest Laboratory Radiological Environmental Monitoring Program L-17-270, Notification of Emergency Core Cooling System (ECCS) Evaluation Model Change Pursuant to 10 CFR 50.462017-09-0101 September 2017 Notification of Emergency Core Cooling System (ECCS) Evaluation Model Change Pursuant to 10 CFR 50.46 L-17-234, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the ...2017-08-11011 August 2017 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(0 Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the ... L-17-229, Mitigating Strategies Assessment (MSA) for Flooding2017-07-24024 July 2017 Mitigating Strategies Assessment (MSA) for Flooding L-17-039, 2016 Annual Report of Emergency Core Cooling System Errors and Model Changes2017-04-0505 April 2017 2016 Annual Report of Emergency Core Cooling System Errors and Model Changes ML17086A0322017-03-31031 March 2017 Enclosure B to L-17-105, Areva Report ANP-3542NP, Revision 1, Time-Limited Aging Analysis (TLAA) Regarding Reactor Vessel Internals Loss of Ductility at 60 Years L-17-088, Independent Spent Fuel Storage Installation Changes, Tests and Experiments2017-03-27027 March 2017 Independent Spent Fuel Storage Installation Changes, Tests and Experiments ML17026A0082016-12-31031 December 2016 Areva Report ANP-3542NP, Time-Limited Aging Analysis (TLAA) Regarding Reactor Vessel Internals Loss of Ductility for Davis-Besse Nuclear Power Station, Unit No. 1 at 60 Years (Non Proprietary) L-16-229, Submittal of Pressure and Temperature Limits Report, Revision 32016-07-28028 July 2016 Submittal of Pressure and Temperature Limits Report, Revision 3 ML21106A0222016-05-31031 May 2016 Enclosure a - Evaluation Attachment 5 - FLO-2D Verification Report (Report Attachment 2) L-16-148, Fatigue Monitoring Program Evaluation of Reactor Coolant Pressure Boundary Components for Effects of the Reactor Coolant Environment on Fatigue Usage (I.E., Environmentally-Assisted Fatigue)2016-04-21021 April 2016 Fatigue Monitoring Program Evaluation of Reactor Coolant Pressure Boundary Components for Effects of the Reactor Coolant Environment on Fatigue Usage (I.E., Environmentally-Assisted Fatigue) L-16-091, Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush2016-03-24024 March 2016 Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush L-15-281, Submittal of Report of Facility Changes, Tests and Experiments2015-10-23023 October 2015 Submittal of Report of Facility Changes, Tests and Experiments L-15-288, Response to NRC Letter. Request for Information, Per 10 CFR 50.54(f) Regarding Recommendations 2.1. 2.3. and 9.3. of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-10-0202 October 2015 Response to NRC Letter. Request for Information, Per 10 CFR 50.54(f) Regarding Recommendations 2.1. 2.3. and 9.3. of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML15230A2892015-08-25025 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review ML15208A0342015-08-0303 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force L-15-193, Submittal of the 2015 Silicone Sealant Report Pursuant to License Commitment 172015-06-12012 June 2015 Submittal of the 2015 Silicone Sealant Report Pursuant to License Commitment 17 L-15-108, ISFSI - Summary Report of Changes, Tests and Experiments for the Period of January 1, 2013 Through December 31, 20142015-04-0303 April 2015 ISFSI - Summary Report of Changes, Tests and Experiments for the Period of January 1, 2013 Through December 31, 2014 L-14-401, First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In2014-12-19019 December 2014 First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In ML14353A0602014-11-0303 November 2014 2734296-R-010, Rev. 0, Expedited Seismic Evaluation Process (ESEP) Report Davis-Besse Nuclear Power Station L-14-289, Pressure and Temperature Limits Report. Revision 22014-09-22022 September 2014 Pressure and Temperature Limits Report. Revision 2 L-14-259, Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-28028 August 2014 Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) L-14-254, 10 CFR 71.95 Report on the TN-RAM Package2014-08-15015 August 2014 10 CFR 71.95 Report on the TN-RAM Package ML14141A4602014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14141A5252014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 L-14-198, Report of Changes and Errors Pursuant to 10 CFR 50.462014-06-18018 June 2014 Report of Changes and Errors Pursuant to 10 CFR 50.46 L-14-167, Report of Facility Changes, Tests and Experiments for the Period Ending May 26, 20142014-06-18018 June 2014 Report of Facility Changes, Tests and Experiments for the Period Ending May 26, 2014 ML14115A2342014-05-30030 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14134A5172014-05-30030 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident L-14-148, CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2014-05-19019 May 2014 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models ML14112A3152014-04-21021 April 2014 Review of Draft Plant-Specific Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding 2023-08-07 Category:Miscellaneous MONTHYEARL-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023
[Table view]CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000346/20210902021-12-16016 December 2021 Reissue Davis-Besse NRC Inspection Report (05000346/2021090) Preliminary White Finding L-18-186, Proposed Alternative to Use ASME Code Case N-8312018-09-0707 September 2018 Proposed Alternative to Use ASME Code Case N-831 L-18-108, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile....2018-04-12012 April 2018 Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.... L-17-229, Mitigating Strategies Assessment (MSA) for Flooding2017-07-24024 July 2017 Mitigating Strategies Assessment (MSA) for Flooding L-17-039, 2016 Annual Report of Emergency Core Cooling System Errors and Model Changes2017-04-0505 April 2017 2016 Annual Report of Emergency Core Cooling System Errors and Model Changes L-17-088, Independent Spent Fuel Storage Installation Changes, Tests and Experiments2017-03-27027 March 2017 Independent Spent Fuel Storage Installation Changes, Tests and Experiments L-16-148, Fatigue Monitoring Program Evaluation of Reactor Coolant Pressure Boundary Components for Effects of the Reactor Coolant Environment on Fatigue Usage (I.E., Environmentally-Assisted Fatigue)2016-04-21021 April 2016 Fatigue Monitoring Program Evaluation of Reactor Coolant Pressure Boundary Components for Effects of the Reactor Coolant Environment on Fatigue Usage (I.E., Environmentally-Assisted Fatigue) L-16-091, Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush2016-03-24024 March 2016 Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush L-15-281, Submittal of Report of Facility Changes, Tests and Experiments2015-10-23023 October 2015 Submittal of Report of Facility Changes, Tests and Experiments ML15230A2892015-08-25025 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review ML15208A0342015-08-0303 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force L-15-193, Submittal of the 2015 Silicone Sealant Report Pursuant to License Commitment 172015-06-12012 June 2015 Submittal of the 2015 Silicone Sealant Report Pursuant to License Commitment 17 L-15-108, ISFSI - Summary Report of Changes, Tests and Experiments for the Period of January 1, 2013 Through December 31, 20142015-04-0303 April 2015 ISFSI - Summary Report of Changes, Tests and Experiments for the Period of January 1, 2013 Through December 31, 2014 L-14-401, First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In2014-12-19019 December 2014 First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In ML14353A0602014-11-0303 November 2014 2734296-R-010, Rev. 0, Expedited Seismic Evaluation Process (ESEP) Report Davis-Besse Nuclear Power Station L-14-259, Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-28028 August 2014 Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) L-14-254, 10 CFR 71.95 Report on the TN-RAM Package2014-08-15015 August 2014 10 CFR 71.95 Report on the TN-RAM Package ML14141A5252014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14141A4602014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident L-14-167, Report of Facility Changes, Tests and Experiments for the Period Ending May 26, 20142014-06-18018 June 2014 Report of Facility Changes, Tests and Experiments for the Period Ending May 26, 2014 L-14-198, Report of Changes and Errors Pursuant to 10 CFR 50.462014-06-18018 June 2014 Report of Changes and Errors Pursuant to 10 CFR 50.46 ML14115A2342014-05-30030 May 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident L-14-104, Firstenergy Nuclear Operating Co. Response to NRC Request for Information Pursuant to 10 CFR 50.54 (F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2014-03-11011 March 2014 Firstenergy Nuclear Operating Co. Response to NRC Request for Information Pursuant to 10 CFR 50.54 (F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML13340A1592013-11-26026 November 2013 Davis-Besse Nuclear Power Station Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix a ML13340A1472013-11-26026 November 2013 Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant - Response to RAI Associated with Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (TAC Nos. MF0116 & MF0 ML13340A1632013-10-0909 October 2013 Davis-Besse Nuclear Power Station Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix C to Appendix G ML13340A1622013-10-0909 October 2013 Davis-Besse Nuclear Power Station Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (2 of 2) ML13340A1602013-10-0909 October 2013 Davis-Besse Nuclear Power Station Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (1 of 2) ML13340A1582013-10-0909 October 2013 Davis-Besse Nuclear Power Station Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1 L-13-358, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (2 of 2)2013-10-0909 October 2013 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (2 of 2) ML13340A1572013-10-0909 October 2013 Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (1 of 2) ML13340A1562013-10-0909 October 2013 Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix a ML13340A1552013-10-0909 October 2013 Perry Nuclear Power Plant Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1 L-13-300, Submittal of 10 CFR 71.95 Report on the 8-120B Cask2013-10-0101 October 2013 Submittal of 10 CFR 71.95 Report on the 8-120B Cask L-13-164, Addendum to Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report2013-06-18018 June 2013 Addendum to Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report L-13-157, Generic Safety Issue 191 Resolution Plan2013-05-15015 May 2013 Generic Safety Issue 191 Resolution Plan L-12-347, FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2012-11-27027 November 2012 FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident ML13008A0502012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 1 of 513 Through Sheet 122 of 513 ML13135A2512012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B - Seismic Walk-Down Checklists (Swcs), Sheet 204 of 461 Through Sheet 461 of 461 ML13135A2482012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix a - Resumes and Qualifications ML13135A2492012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B - Seismic Walk-Down Checklists (Swcs), Sheet 1 of 461 Through Sheet 203 of 461 ML13008A0522012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 248 of 513 Through Sheet 367 of 513 ML13008A0512012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 123 of 513 Through Sheet 247 of 513 ML13008A0492012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Cover Through Appendix a, Resumes and Qualifications, Page A-36 ML13008A0552012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C: Area Walk-by Checklists, Sheet 86 of 212 Through End ML13135A2292012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendices C Through End ML13135A2472012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Cover Through Page 153 ML13008A0542012-09-28028 September 2012 Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B: Seismic Walkdown Checklists, Page B-1, Sheet 482 of 513 Through Appendix C: Area Walk-by Checklists, Sheet 85 of 212 2023-08-07 |
Text
- ffi 341 WhitePondDr.
Akron,Ohio44320 March27,2017 L-17-088 10cFR 72.48 ATTN:DocumentControlDesk Director,Divisionof SpentFuelManagement, Officeof NuclearMaterialSafetyand Safeguards U.S.NuclearRegulatory Commission Washington, DC 20555-0001
SUBJECT:
Davis-Besse NuclearPowerStation Part50 DocketNo. 50-346,LicenseNo. NPF-3 Part72 DocketNo.72-014 PerryNuclearPowerPlant Part50 DocketNo. 50-440,LicenseNo. NPF-58 Part 72 DocketNo.72-069 Independent SpentFuelStoraqeInstallation Chanoes.Tests.and Experiments Pursuantto 10 CFR 72.48(d)(2), this letterservesas the FirstEnergy NuclearOperating Companysummaryreportof the changes,tests,and experiments associated withthe Davis-Besse NuclearPowerStation(DBNPS)and the PerryNuclearPowerPlant(PNPP) independent spentfuelstorageinstallations (lSFSls).
ln summary,therewereno 10 CFR72.48evaluations conducted to implement changes, tests,andexperiments to the DBNPSand PNPPlSFSlsduringthe reporting periodof January1,2015throughDecember 31,2016.
Thereare no regulatorycommitments containedin this submittal.lf thereare any questions or if additionalinformation is required,pleasecontactMr.ThomasA. Lentz, Manager- FleetLicensing, at (330)315-6810.
Sincerely, Vice President,RegulatoryAffairs and LaboratoryServices cc: NRCRegionlll Administrator NRCProjectManager NRC ResidentInspectors UtilityRadiological SafetyBoard