L-17-088, Independent Spent Fuel Storage Installation Changes, Tests and Experiments

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation Changes, Tests and Experiments
ML17086A146
Person / Time
Site: Davis Besse, Perry, 07200069  Cleveland Electric icon.png
Issue date: 03/27/2017
From: Halnon G
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
L-17-088
Download: ML17086A146 (1)


Text

FENOC

ffi 341 WhitePondDr.

Akron,Ohio44320 March27,2017 L-17-088 10cFR 72.48 ATTN:DocumentControlDesk Director,Divisionof SpentFuelManagement, Officeof NuclearMaterialSafetyand Safeguards U.S.NuclearRegulatory Commission Washington, DC 20555-0001

SUBJECT:

Davis-Besse NuclearPowerStation Part50 DocketNo. 50-346,LicenseNo. NPF-3 Part72 DocketNo.72-014 PerryNuclearPowerPlant Part50 DocketNo. 50-440,LicenseNo. NPF-58 Part 72 DocketNo.72-069 Independent SpentFuelStoraqeInstallation Chanoes.Tests.and Experiments Pursuantto 10 CFR 72.48(d)(2), this letterservesas the FirstEnergy NuclearOperating Companysummaryreportof the changes,tests,and experiments associated withthe Davis-Besse NuclearPowerStation(DBNPS)and the PerryNuclearPowerPlant(PNPP) independent spentfuelstorageinstallations (lSFSls).

ln summary,therewereno 10 CFR72.48evaluations conducted to implement changes, tests,andexperiments to the DBNPSand PNPPlSFSlsduringthe reporting periodof January1,2015throughDecember 31,2016.

Thereare no regulatorycommitments containedin this submittal.lf thereare any questions or if additionalinformation is required,pleasecontactMr.ThomasA. Lentz, Manager- FleetLicensing, at (330)315-6810.

Sincerely, Vice President,RegulatoryAffairs and LaboratoryServices cc: NRCRegionlll Administrator NRCProjectManager NRC ResidentInspectors UtilityRadiological SafetyBoard