ML13340A160

From kanterella
Jump to navigation Jump to search
Davis-Besse Nuclear Power Station Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (1 of 2)
ML13340A160
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/09/2013
From:
Paul C. Rizzo Associates, FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML13340A277 List:
References
L-13-358
Download: ML13340A160 (202)


Text

APPENDIX B SEISMIC WALKDOWN CHECKLISTS (SWCS)

Sheet I of379 Paul C, Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Drawings C-752 (Section B) and E-854Q-I15-l identify the configuration asfour cast in place bolts and it was confirmed in thefield during walkdown inspection.

Y 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

NiAper row N U Status@N U Equipment ID No. 2NEquip. Class 15.

Battery Racks Equipment DescriptionBATTERY 2NLocation: Bldg.

AUXB Floor El.603 Room 4284Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage l. Is the anchorage configuration verification required (i.e ., is the item oneof the 50Yo of SWEL items requiring such verification)?Mountingframe consists of single tier/two row braced racks.2. Is the anchorage free of bent, broken, missing or loose hardware?Rack to floor anchorage verified and no significant degraded condition identified.3. Is the anchorage free of corrosion that is more than mild surface oxidation?Anchorage inspected and no corrosion identified.

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

forwhich an anchorage configuration verification is required.)

X X X X X X 2 of 379 Paul C. Rizzo Associates, Inc.ENCINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. 2NEquip. Class 15. Battery Racks Equipment Description BATTERY 2N Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Nearby wooden platfurm identified as a seismic concern.During inspection it was verified in control process that scalfold is within working period..8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Seismic capacity of block walls in the area verified.Blockwalls 4016 and 4026 verified to be to be seismically adequate based on ref. VBW20-8001-100, Rev 14 (12/6/88).

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X x X Sheet StatusQN U N/AOther Adverse ConditionsI 1. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Sheet 3 of 379 Paul C. Ri zzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Watkdown Checklist (SWC)StatusG\N u Equipment ID No. 2N Equipment Description Equip. Class BATTERY 2N 15. Battery Racks Other supporting or relevant documents and photos 2N plateID Plate of component 2N general General view of comPonent Paul C. Ri zzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. 2N Equip. Class 15. Battery Racks Equipment Description BATTERY 2N 2N Anchorage Partial view of anchorage, view is typical of all anchors Sheet 4 of 379 Status@N U 2N Masonry Wall Potential interaction hazard from masonry wall near unit Sheet 5 of 379 Paul C, Rizzo Associates, Inc.ENGINEERS & CONSUUTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. 2N Equip. Class 15. Battery Racks Status(?)N uEquipment DescriptionBATTERY 2N2N wood platform Wood platform erected above battery Sheet 6of379 Paul C. Rizzo Associates, Inc.ENGINEf, RS & CONSv- LTANTSSeismic Walkdown Checklist (SWC)Equipment ID No.

2P Equip. Class 15. Battery Racks status$N uEquipment Description BATTERY 2P Location:

Bldg. AUXB Floor El.

603Room 4284 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50Yo of SWEL items requiring such verification)?

Mountingframe consists of single tier/two row braced racks.Same configuration as 2N.2. Is the anchorage free of bent, broken, missing or loose hardware?Rack tofloor anchorage verified and no significant degraded condition identified.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Anchorage inspected and no corrosion identified.4. Is the anchorage free of visible cracks in the concrete near the anchors?

YN x YN U N/A YNUN/A X YNUN/A X 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage configuration verification is required.)

Drawings C-752 (Section B) E-854Q-115-1 identify the configuration asfourcast in place bolts per row and it was confirmed in the field during wqlkdown inspection.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YNUN/A X YNU X X Sheet 7 of379Paul C. Rizzo Associates, Inc.ENCINEf, RS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. 2P Equip. Class 15. Battery RacksEquipment DescriptionBATTERY 2PInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?

Nearby wooden platfurm identified as a seismic concern.

During inspection it was verified in control process that scaffold is within working period..8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Seismic capacity of block walls in the area verified.Blockwalls 4016 and 4026 verified to be to be seismically adequate based on ref. VBW20-8001-100, Rev 14 (12/6/88).

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X X statu{R N uOther Adverse ConditionsI L Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra ,/, 'i /,r*,,0/P,fuir Date: Date: Adam L. Helffrich Sheet 8 of379Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Status:ON U Equipment ID No. AFl9Equipment DescriptionEquip. Class CHECK VALVE AF0d. Other - check/manual valve T9Location: Bldg. AUXBManufacturer, Model, Etc.Floor El.

565 Room 237Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?Valve in line with 6" pipe properly supported.2. Is the anchorage free of bent, broken, missing or loose hardware?Main line supports inspected qnd no missing bolts/parts identified.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage confrguration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Main line supports showed adequate condition and no missing parts.N/A X X X X X X pct? Paul c. Rizzo Associates, [nc.

En*CINEERS

& CONSU LTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. AF19 Equipment DescriptionEquip. ClassCHECK VALVE AF0d. Other - checVmanual valve l9 Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y X Y X Y X Y X Sheet9 of 379 status(f)N u N/A N/A Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

Y X Comments (Additional pages may be added as necessary)

Evaluated bv:Eddie M. Guerra Date: 7/25/2012 Date: 712512012Adam L. Helfftich Sheet 10 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULIANTS Seismic Walkdown Checklist (SWC)Equipment ID No. AFl9 Equip. Class 0d. Other - check/manual valveEquipment Description CHECK VALVE AF 19 Other supporting or relevant documents and photos (if any): AF 19 PlateID Plate of componentAF 19 GeneralGeneral view of component Status(?)N u

Sheet 11 of379Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS StatusO N USeismic Walkdown ChecklistEquipment ID No. AF608Equipment Description (swc)Equip. Class 8A. Motor-Operated ValvesAUX FEED TO STEAM GEN I-I LINE STOP VLVLocation: Bldg.

AUXB Manufacturer, Model, Etc.Floor El.585 Room 303Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage l. Is the anchorage configuration verification required (i.e., is the item oneof the 50oh of SWEL items requiring such verification)?

Valve in line wilh 8" pipe properly supported.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free oxidation?of corrosion that is more than mild surface4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

forwhich an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X X X X x X Sheet 12of379 Paul C. Rizzo Associates, Inc.ENCINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No.

AF608 Equip. Class 8A. Motor-Operated ValvesEquipment DescriptionAUX FEED TO STEAM GEN I-I LINE STOP VLV StatusG)N U Interaction Effects7. Are soft targets free from impactby nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Pipe runs through shield buildingfrom Auxiliary Building.The ffict of seismic dffirential displacement between the Auxiliary Building and the Building on this pipingwas verifiedfro* Calc No.lB R/l2 andfound acceptable.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

N/A Shield Y X X X XOther Adverse ConditionsI L Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by:Eddie M. Guerra Date: 7t25t20t2 Date: 712512012#rr'/P i Adam L. Helffrich Sheet 13 of 379 Paul C. Rizzo Associates, Inc.

ENGINEERS Gl CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. AF608 Equip. Class 8A. Motor-Operated ValvesEquipment DescriptionAUX FEED TO STEAM GEN I-I LINE STOP VLV Other supporting or relevant documents and photos (if any): AF608 plate ID Plate of component Status@N U AF608 general General view of component Sheet 14 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. AF608 Equip. Class 8A. Motor-Operated ValvesEquipment Description AUX FEED TO STEAM GEN I-I LINE STOP VLVstatus(?)N u Run of pipe from AF608 from Auxiliary Building to Shield Building Subject to seismic anchor movements Sheet 15 of379Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Status@N UEquipment ID No. BW10Equipment Description Equip. Class Flush Connection0d. Other - check valve or manual valveLocation: Bldg.

AUXB 565'10.25" Floor El.Room Manufacturer, Model, Etc.

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50o/o of SWEL items requiring such verification)?Valve located on pipe around 3" diameter.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the SOYo for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

NiA N/A X X x X X X Sheet 16 of379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. BWIO Equip. Class Equipment Description Flush Connection0d. Other - check valve or manual valvestatus(?\N u Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by: 7/25t20t2 7/2512012 Eddie M. Guerra Adam L. Helffrich 17 of 379 Paul C. Rizz.o Associates, Inc.ENGIN EERS & CONSU LTAr*-TS Seismic Walkdown Checklist (SWC)Equipment ID No. BWl0 Equip.

Class0d. Other - check valve or manual valve Equipment Description Flush ConnectionOther supporting or relevant documents and photos (if any):BW l0 Plate and General ID plate and general view of component Sheet Status@N U Sheet 18 of379Paul C. Rizzo Associates, Inc.

ENGINEERS *. CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. BW2l Equip. Class 0d. Other - check valve or manual valve Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50Yo of SWEL items requiring such verification)?

No degraded conditionfound. Valve located on

-10" pipe.2. Is the anchorage free of bent, broken, missing or loose hardware?StatusSN U Equipment Description Borated Water Storage Tank Outlet IsolationLocation: Bldg. AUXB Floor El.

586'Room 304 Manufacfurer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YN X YN U N/A YNUN/A X YNUN/A X YNUN/A X YNU X X PCe Paul C. Rizzo Associates, [nc.ENCINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. BW2l Equip. Class 0d. Other - check valve or manual valveEquipment Description Borated Water Storage Tank Outlet Isolation Sheet 19 of379 status(f)N uInteraction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YNUN/A X YNUN/A X YNUN/A X YNU X Other Adverse ConditionsI 1. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

YNU X Comments (Additional pages may be added as necessary)

Evaluated bv: Date: 712512012 Eddie M. Guerra Adam L. Helffrich Sheet 20 of 379Paul C. Rizzo Associates, Inc.ENGINEERS & CONSUI.JTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. BW2l Equip. Class 0d. Other - check valve or manual valve Equipment DescriptionBorated Water Storage Tank Outlet IsolationOther supporting or relevant documents and photos (if any): StatusON U BW2l Plate ID plate of component BW2l General General view of component Sheet 2l of379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. Cl Equip. Class 3. Medium Voltage SwitchgearStatus:Qw U Equipment Description Location:

Bldg. AUXBFloor El.

585 BUS CI Room 325 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.AnchorageL Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet could not be opened during walkdown.

Mounting basefound in adequate condition. (See also item 5 below)

3. Is the anchorage free of corrosion oxidation?

that is more than mild surface NiA NiA4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)

Panel door was closed snd anchorage inside cabinet could not be verified.

However, SQUG C-CSS-CI calculation was used and it was verified that anchorage capacity is adequatefor the configuration shown.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X X X X X X PCte Paul c. Rizzo Associates, Inc.

ENCINEERS & CONSULTAI{TS Seismic Walkdown Checklist (SWC)Equipment ID No.

ClEquipment Description BUS Cl Sheet Equip. Class 3. Medium Voltage SwitchgearInteraction Effects 7 . Are soft targets free from impact by nearby equipment or structures?

Nearbyfire extinguisher notfixed to wall. Judged not to be significant interaction8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y x Y X Y X Y X of379Status:O\r U N/A N/A Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y X Comments (Additional pages may be added as necessary)

Evaluated bv: Eddie M. Guerra#"/p,{fr,#

Date: 7/25t20r2 Date: 7tzs/2012Adam L. Helffrich Sheet 23 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS

& CTONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. Cl Equip. ClassEquipment Description BUS ClStatus'O U3. Medium Voltage Switchgear Other supporting or relevant documents and photos (if any):C I Plate ID Plate of component Cl General General view of component Sheet 24 of 379Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. Cl l-l Equip. Class 12. Air Compressors StatusG)rl u Equipment Description Location:

Bldg. AUXBEmergency Diesel Generator Starting Air compressor l - lFloor El.585 Room 318Manufacturer, Model, Etc.

Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50Yo of SWEL items requiring such verification)?

Compressor rigidly mounted on skid with 4-I/2" bolts.Skid is welded to a larger skid. Larger skid anchored tofloor with eight l/2" bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?Bolts onframe-skid mountingfound in adequate condition

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50Tofor which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N Y N Y N Y N Y N Y N/A N/A N Y X X X X X X Sheet 25 of 379 ENGINEERS 6( CONSULIAI\YTSSeismic Walkdown Checklist (StilC)Paul C. Rizzo Associates, Inc.Equip. Class 12. Air CompressorsEmergency Diesel Generator Starting Air compressorEquipment ID No. Cl l-lEquipment DescriptionInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X X statusG)N uOther Adverse ConditionsI L Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by:Eddie M. GuerraAdam L. Helffrich Sheet 26 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C I I - I Equip. Class 12. Air Compressors Equipment Description Emergency Diesel Generator Starting Air compressor I - I Cl l-l plateID Plate of component status(?\N uOther supporting or relevant documents and photos (if any): CI l-l generalGeneral view of component Sheet 27 of 379 Paul C. Ri zzo Associates, Inc.ENGINEERS 6{ C]ONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. Cl l-l Equip. Class 12. Air CompressorsEquipment Description Emergency Diesel Generator Starting Air compressor l - l Cl l-l skid anchor Partial view of anchorage, view is typical of all anchors Cl l-l connection to skid underneath Attachment of component to skid underneath Status@N U Sheet 28 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS &

CONSUXTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. C2l-lStatus:QN UEquip. Class 9. FansEquipment Description CNTRL RM EMERG VENT SYS FANI-ILocation: Bldg.

AUXBFloor El.638 Room 603Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50%o of SWEL items requiring such verification)?Mounted on 4 spring isolators, each with 2-5/8" anchor bolts foundin good conditton.2. Is the anchorage free of bent, broken, missing or loose hardware?No degraded conditionfoundfor bolts on component baseframe 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

forwhich an anchorage conf,rguration verification is required.)

SQUG C-CSS-C2l-l calculation identifies the configuration asfour springisolators and it was confirmed in thefield during walkdown inspection.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?SQUG calculation C-CSS-C21-1 identified outlier - vibration isolators onfan basedid not provide adequate restraint of overturning moment.

Fixity provided to resolve outlier presented in SQUG calc (MOD95-003I).

X x X X N/A X X pcte Paul c. Rizzo Associates, Inc.ENCINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C2l-l Equip. Class 9. Fans Equipment Description CNTRL RM EMERG VENT SYS FANI-I SheetInteraction Effects

7. Are soft targets free from impact by nearby equipment or structures?No maintenance equipment identified in the congested area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?[0. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X X Other Adverse ConditionsI 1. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?29 of 379 StatusON U N/A N/A N/A 7125/2012 X Comments (Additional pages may be added as necessary)Evaluated bv:

Eddie M. GuerraAdam L. Helffrich Date: Date:

Sheet 30 of 379 Paul C, Rizza Associates, Inc.

ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)StatusG\N UEquipment ID No. Czl-lEquipment DescriptionEquip. Class

9. Fans CNTRL RM EMERG VENT SYS FANI-IOther supporting or relevant documents and photos (if any):Czl-l Plate ID Plate of component Czl-l GeneralGeneral view of component of 379Paul C. Ri zzo Associates, Inc.ENGINEERS 6. CTONSULTANTS Seismic Walkdown Checklist (SWC)Equip. Class 9. Fans Equipment ID No. Czl-l Equipment Description CNTRL RM EMERG VENT SYS FANI-I Czl- I anchorage typical View of anchorage Sheet 3 I StatusG)N u

Sheet 32 of379 Paul C. Rizzo Associates, lnc.ENCINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C25-3 Equip. Class 9. Fans Status:QN U Equipment Description VENT FAN 3 Location:

Bldg. AUXB Floor El.585 Room 3r9 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?Fan suspendedfrom aframe, anchor bolted to ceiling.2. Is the anchorage free of bent, broken, missing or loose hardware?Fan is part of ventilation system.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage configuration verification is required.)Previous SQUG calculation C-CSS-C25-3 identified connection has adequateflexibility (p.5 of 8).SQUG calculation identified anchors that did not achievefull embedment.

Anchorage found acceptable after calculation (p. I of 8).6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A NiA X X X X X X Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. C25-3 Equip. Class 9. Fans Equipment DescriptionVENT FAN 3 Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?

No potential interaction due tofan location.8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

Sheet33of379 status(?)N u N/A 7lzsl20r2 X Comments (Additional pages may be added as necessary)Evaluated bv:

Eddie M. Guerra ,/#"r,'/PrWo/, Date: Date:Adam L. Helffrich Paul C. Rizzo Associates, Inc.ENGINEERS 6( CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C25-3Equip. Class 9. Fans Equipment DescriptionVENT FAN 3 Sheet 34 of 379 Status@N U Other supporting or relevant documents and photos (if any):Vent Fan C25-3 Sheet 35 of 379 Paul C" Rizzo Associates, Inc.ENCINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C3l-4 Equip. Class 9. Fans Status:ON UEquipment Description FAN C3l-4Location: Bldg.

AUXB Floor El.

545Room 105Manufactureq Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50To of SWEL items requiring such verification)?

Mounted on 4 W-shape supports.Each lT-shape is anchored with two 5/8" diameter anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?Missing closure nuts along one side of the unit.Confirmed with maintenance that sheet metal screws are used and nuts are not required.3. Is the anchorage free of corrosion that is more than mild surface oxidation?Slight corrosion found in wide Jlanges used for mounting base.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

forwhich an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YN X YN U NiA YNUN/A X YNUN/A X YNUN/A X YNU X X Pc\e Pau[ c. Rizzo Associates, Inc.ENGINEERS & CONSUXTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. C3l-4 Equip. Class Equipment Description FAN C3l-49. Fans Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?

Several pipe lines running intofan housing properly supported withfloormounted HSS sections.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X X Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Sheetof 379 Status(?\N U 7125/2012 712512012 X Comments (Additional pages may be added as necessary)

Evaluated bv: Eddie M. Guerra Date: Date:.r#r,r/pr%r/, Adam L. Helffrich Sheet 37 of 379Paul C. Rizzo Associates, Inc.ENGINEERS 6( CONSULTANTS Seismic Walkdown Checklist (SWC)Status(ilN U Equipment ID No. C3l-4 Equip. ClassFAN C3I-4 9. Fans Equipment DescriptionOther supporting or relevant documents and photos (if any): C3l -4 plate ID Plate of component C3l -4 general General view of comPonent

\Sheet 38 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS 6l. CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment

[D No. C3l-4 Equip. Class Equipment Description FAN C3l-4 9. FansC3 I -4 anchorage Partial view of anchorage, view is typical of all anchors StatusON U PCe Paul C. Rizzo Associates, lnc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C3615 Equip. Class 20. Instrument and Control PanelsSheet 39 of379StatusON U Equipment DescriptionEDG I CONTROL PANELLocation: Bldg.

AUXB Floor El.585Room 318 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?3 section panel anchoredwith I0-1/2" bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?Cabinet was openedfor inspection and no degraded conditionor missing parts were observed.3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o forwhich an anchorage configuration verification is required.)Calculation C-CSS-C3615 identifies the configuration as ten anchor bolts and itwasconfirmed in the field during walkdown inspection.
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y Y Y Y Y N/A Y X X X X X x Sheet 40of379Paul C. Rizzo Associates, Inc.

ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C3615Equipment DescriptionEquip. Class 20. Instrument and Control PanelsEDG I CONTROL PANELInteraction Effects

7. Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X Xstatus(f)N u N/A Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra',#rrr/PtW'/, Date: Date: Adam L. Helffrich Paul C. Rizzo Associates, Inc.ENGINEERS & CONSUXTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C3615 Equipment Description EDG I Equip. Class 20. Instrument and Control PanelsCONTROL PANEL Other C3615 plateID Plate of component Sheet 4 Iof 379Status(?\N u ing or relevant documents and photos (if any): C3615 general General view of component Sheet 42 of 379 Paul C. Rizzo Associates, Inc.

ENGINEERS E. CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. C3615 Equip.

Class 20. Instrument and Control PanelsEquipment DescriptionEDG I CONTROL PANEL Anchorcge from unit C3616 is similar to C3615 which is cuffently energizedStatus(hN U Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Status$v uEquipment ID No. C3645 Equip. Class 20. Instrument and Control PanelsEquipment Description CONTROL PANEL (AUX FEEDWATER)Location: Bldg.

AUXBFloor El.585Room 325 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?Cabinet anchoredwith 6-I" bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?

Mounting base found in adequate condition.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?No signs of significant corrosionfound.4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracks identified in mounting base.
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/ofor which an anchorage configuration verification is required.)SQUG C-CSS-C3645 and C-CSS-C4625 calculations were used and it was verffied that anchorage capacityis adequatefor the configuration shown.
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N Y N Y U N Y U N Y U N Y U N Y X X X X X X Sheet 44 of379Paul C. Rizzo Associates, Inc.ENGTNEERS {T CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No.

C3645Equip. Class

20. Instrument and Control PanelsEquipment DescriptionCONTROL PANEL (AUX FEEDWATER)

Interaction Effects 7. Ate soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X XStatus(f)N UOther Adverse ConditionsI l Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

x Comments (Additional pages may be added as necessary)

Mantainance or movable equipmentfound in the area with proper tight conditians.

Evaluated by: Eddie M. GuerraAdam L. Helffrich Sheet 45 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS 6t. CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C3645 Equip. Class 20. Instrument and Control PanelsEquipment Description CONTROL PANEL (AUX FEEDWATER)Other supporting or relevant documents and photos (if any):C3645 PlateID Plate of component Status@N U C3645 General General view of component Sheet 46 of 379 Paul C. Rizzo Associates, I nc.ENC; TNEERS .\ CONSI.,:LTANTS Seismic Walkdown Checklist (SWC)

StatusfiN U Equipment EquipmentID No. C3645 Equip. Class 20. Instrument and Control Panels DescriptionCONTROL PANEL (AuX FEEDWATER)

C3645 Achor Bolts Partial view of anchorage, view is typical of all anchors Sheet 47 of379 Paul C" Rizzo Associates, Inc.ENGINEERS & CONSULTANTS statusflN u Seismic Walkdown Checklist (SWC)Equipment ID No. C4606 Equip.

Class 2.Low Voltage Switchgear Equipment DescriptionREACTOR TRIP BREAKER A (TYPICAL OF 4)Location: Bldg.

AUXBFloor El.

603 Room 428 Manufacturer, Model, Etc.

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50Yo of SWEL items requiring such verification)?Panel is welded to embed with stitch welds around the perimeter of the panelbase, similar to as-built shown in Calc.

C-CSS-4603.

2. Is the anchorage free of bent, broken, missing or loose hardware?

Component could not be opened duringwalkdown.

Mounting basefound inadequate condition.3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)SQUG C-CSS-C4606 and C-CSS-C4603 calculations were used and it wasverified that anchorage cqpacity is adequatefor the configuration shown.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X X X x X X pcte Paul c. Rizzo Associates, [nc.ENGINEERS & CONSUTTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C4606 Equip. Class 2.Low Voltage Switchgear Equipment DescriptionREACTOR TRIP BREAKER A (TYPICAL OF 4)Sheet Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Monorail-hoist located in vicinitv deemed not an interaction concern.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?Rigid conduits on end have rigid supports and will provide lateral restraint10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X Xof 379 status(?)N u N/A N/A N/A Other Adverse ConditionsI l. Have you looked for andadversely affect the safetyfound no other seismic conditions that could functions of the equipment?

X Comments (Additional pages may be added as necessary)Evaluated by:Eddie M. Guerra Date: Date:Adam L. Helffrich Sheet 49 of 379 Pau[ C. Rizzo Associates, Inc.ENGINEERS C( CONSUUTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. C4606 Equip. Class 2. Low Voltage SwitchgearEquipment DescriptionREACTOR TRIP BREAKER A (TYPICAL OF 4)Other supporting or relevant documents and photos (if any): C4606 Plate ID Plate of component Status(?'\N UC4606 GeneralGeneral view of component Sheet 50 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No.

C4606Equip. Class 2. Low Voltage SwitchgearEquipment Description REACTOR TRIP BREAKER A (TYPICAL OF 4) statusG'\N uC4606 stitch weldPartial view of anchorage, view is typical of all anchorsC4606 crane int Sliding crane located in component vicinity.

Sheet 5I of379Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C57A2 Equip. Class 20. Instrument and Control Panels StatusON U Equipment Description operator console panels - left Location:

Bldg.AUXB Floor El.623 RoomManufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verifrcation)?

Anchorage not verified since is covered withfire proofing material.Back panel doors are adequately attached to panel structure with4-l/2" screws.2. Is the anchorage free of bent, broken, missing or loose hardware?None observed during inspection.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

No significant corrosion observed in the component.4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed.

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%ofor which an anchorage configuration verification is required.)SQUG C-CSS-C5702 calculation was used and it was verified that anchoragecapacity is adequatefor the configuration shown.
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

505 NiA N/A X X X X X X pcte Paul c. Rizzo Associates, Inc.ENGINEERS & CONSULIANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C5702Equipment Descriptionoperator console panels - left SheetEquip. Class 20. Instrument and ControlInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?No maintenance equipment identffied in the area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X Xof 379 Status(f)N u PanelsOther Adverse ConditionsI l Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated bv: Eddie M. Guerra#u'//Adam L. Helffrich Sheet 53 of 379 Paul C. Rizzlo Associates, Inc.EN(;INEERS d; C-ONSt ; UI AN'TS Seismic Walkdown Checklist (SWC)Status0N U Equipment Equipment ID No. C5702 Description Equip. Class 20. Instruntent and Control Panels operator console panels - left Other supporting or relevant documents and photos (if any): cs702 General view of component Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C5706 Equipment Description Location:

Bldg. AUXBFloor El.623 Room 505 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?2. Is the anchorage free of bent, broken, missing or loose hardware?Anchorage not accessible during inspection since it was covered with fireproofing material.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

None observed due tofireproofing material.4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed during walkdown.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)SQUG C-CSS-C5702 and C-CSS-C5706 calculations were used and it was verifiedthat anchorage capacity is adequatefor the configuration shown.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N Y N Y U N Y U N Y U N Y U N Y Status9 N UEquip. Class 2. Low Voltage SwitchgearMANUAL REACTOR TRrP SWTTCHES (2) IN CONTROL ROOM X X X X X X of 379 Paul C. Rizzo Associates, Inc.ENGINEERS e. CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C5706Equip. Class 2.Low Voltage Switchgear Equipment DescriptionMANUAL REACTOR TRrP SWITCHES (2) IN CONTROL ROOM Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

No msintenance equipment identified in the qrea.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X X Sheet 55status(?)N u Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by:Eddie M. Guerra

,#r,,/Prt&/oAdam L. Helffrich Sheet 56 of 379 Paul C. Ri zzo Associates, Inc.ENGINEERS E( CONSULTANTS StatusG)N u Seismic Walkdown Checklist (SWC)Equipment ID No. C5706 Equip. Class 2. Low Voltage Switchgear Equipment Description MANUAL REACTOR TRIP SWITCHES (2) OM Other supporting or relevant documents and photos (if any): C5706 plate ID Plate of component ,w C5706 front General view of comPonent Sheet 57 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C5706Equip. Class 2. Low Voltage Switchgear Equipment DescriptionMANUAL REACTOR TRrP SWTTCHES (2) IN CONTROL ROOM C57 06 typical interior3 Typical view of interior componentsStatusG\N U C5706 rear General view of component Sheet 58 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS 6( CONSULTANTS Status(?)N USeismic Walkdown Checktist (SWC)

Equipment ID No. C5706 Equip. Class 2. Low Voltage Switchgear Equipment Description MANUAL REACTOR TRIP SWITCHES (2)

IN CONTROL ROOM C5706 bolted to left and right sides Cabinets are bolted together on both sides Sheet Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C5712 Equip. Class

20. Instrument and Control PanelsStatusON UEquipment Descriptionoperator console panels - right Location:

Bldg. AUXBFloor El.623 Room 505Manufacturer, Model. Etc.

Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?Anchorage not verified since is covered withfire proofing material.Back panel doors are adequately attached to panel structure with4-l/2" screws.2. Is the anchorage free of bent, broken, missing or loose hardware?

None observed during inspection.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?No significant corrosion observed in the component.4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed.
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

forwhich an anchorage configuration verification is required.)Panel is similar to Panel C5702. SQUG calculation C-CSS-C5702 verifies thatanchorage capacity is adequatefor the configuration shown.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N Y N Y N Y N Y N Y N Y X X X X X X Sheet 60 of379Paul C. Rizzo Associates, Inc.ENCINEERS & CONSULTA}STS Seismic Walkdown Checklist (SWC)Equipment ID No. C5712 Equip. Class 20. Instrument and Control PanelsEquipment Description operator console panels - rightStatusON UInteraction Effects 7 . Are soft targets free fromNo maintenance equipment impact by nearby equipment or structures?

identtfied in the area.

N Y N Y N Y N Y 8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X XOther Adverse Conditions I l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

N Y X Comments (Additional pages may be added as necessary)Evaluated by:

Eddie M. Guerra{#,,,/Pril*/'

Date: 7/2st20r2 Date: 7/2s12012 Adam L. Helffiich PCe Paul C. Rizzo Associates, Inc.

ENGINEERS

& CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No.

C5755 Equip. Class 20. Instrument and Control PanelsSheet 6lstatus9 N uEquipment Description Control Room cabinet roomLocation: Bldg.

AUXBFloor El.623 Room 502Manufacturer, Model.

Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item oneof the 50oh of SWEL items requiring such verification)?

7-Sections cabinet. End cabinets connected by -I/4" welded plates.No access available inside of cabinet.2. Is the anchorage free of bent, broken, missing or loose hardware?Anchor bolts are inaccessible for inspection. However, calculation references C-CSS-C5755C, D & G shows anchorage oultiers were resolved.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

None observed during inspection.4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed during inspection.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50Yoforwhich an anchorage configuration verification is required.)

Panel door was closed and anchorage instde cobinet could not be verified.

However, C-CSS-C5755C, D & G calculations indicate that MOD95-0032 resolves anchorage concerns.Anchorage adequacy deemed seismically adequate.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N Y N Y N Y N Y N Y N Y X X X X X X Sheet 62 of379Paul C. Rizzo Associates, Inc.ENGINEERS & CONSUXTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C5755Equip. Class 20. Instrument and Control Panelsstatus/?)N u Equipment Description Control Room cabinet roomInteraction Effects

7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?Attached lines found with adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y X Y X Y x Y XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)C-CSS-C1755C, D & G indicate cabinets A to G need to be bolted together to prevent pounding interaction.Issue resolved by MOD95-0032.

Field walkdown verified top connection of adjacent panels are per MOD95-0032.Evaluated by:

Date: 712512012Eddie M. Guerra ,,#-'/P'&'il Date: 7/2512012Adam L. Helffrich Y

X Sheet 63 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS & C]ONSUUTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C5755 Equip. Class 20. Instrument and Control Panels Equipment Description Control Room cabinet roomOther supporting or relevant documents and photos (if any): StatusON UC57 55 plateID Plate of component C5755 anchorageGeneral view of anchorage detailC57 55 general General view of component C5755 anchorage Closeup of anchor bolts and channel mounting base.

Sheet 64 of 379Paul C. Rizzo Associates, Inc.ENCINEERS G( CONSUUTANTS Seismic Walkdown Checklist (SWC)Status(?)N u Equipment ID No. C5755 Equipment DescriptionControl Room cabinet roomEquip. Class 20. Instrument and Control PanelsC5755 anchorage blocked interior C57 55 Cabinet bracingTop bracing detail for end cabinets C5755 Cabinets welding Welded plates detail for middle cabinets pcta Paul c. Rizzo Associates, Inc.ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No.

C5792ALB2 Equip. Class 20a. Inst. in control panel/cabinetEquipment Description SFRCS CHANNEL 2 LOGIC BOARDLocation: Bldg.

AUXBFloor El.623 Room 502Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50%o of SWEL items requiring such verification)?

No degraded condition identified.Cabinet is attached to adjacent panelC5782 at top. Panel is composed of 2 sections which are attachedtogether at top and mounted on same skid with I2-l/2" bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?

Anchor bolts are inaccessiblefor inspection. However, SQUG calculation C-CSS-C5792A presents no significant degraded condition.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

None observed during walkdown.4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracl<s identified near cabinet base.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 5oo/ofor which an anchorage configuration verification is required.)

At the time of the walkdown the equipment could not be openedfor inspection.SQUG C-CSS-CJ792 calculation was used and it was verified that anchorage capacityis adequate for the configuration shown.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?Skid mounting and baseframingfound in adequate conditions.Sheet 65 of379Status@N U X Y Y Y Y Y NiA N/A N/A Y X X X X X Sheet 66of379Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic \ilalkdown Checklist (SWC)Equipment ID No. C5792ALBZ Equip. Class 20a. Inst. in control panel/cabinetEquipment Description SFRCS CHANNEL 2 LOGIC BOARD StatusON UInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?Seismic capacity of blockwalls in the area verified.Wall identified as 5197 confirmed to be adequqate based on Ref C-CSS-C57929. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y X Y X Y X Y X Other Adverse Conditions11. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

Y X Comments (Additional pages may be added as necessary)

Evaluated by:Eddie M. Guerra Date: 7/2s12012 Date: 7/25t20r2 ,{drr/P,Adam L. Helffrich Sheet 67 of 379Paul C. Ri zzo Associates, Inc.ENG INEE RS 6*. CON SU LTAr -NTS Seismic Walkdown Checklist (SWC)Equipment ID No. C5792ALB2 Equip. Class 20a.

Inst. in control panel/cabinet Equipment Description SFRCS CHANNEL 2 LOGIC BOARD C5792A plate ID Plate of component Status(?)N u C5792A general General view of comPonentOther supporting or relevant documents and photos (if any):

Paul C, Rizzo Associates, Inc.

ENCINEERS 6. CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. C5792ALB2 Equip. Class 20a. Inst. in control paneVcabinetEquipment DescriptionSFRCS CHANNELZ LOGIC BOARD C5792A anchorage Partial view of anchorage, view is tlpical of all anchorsC5792A bolted to cabinet at rightAdjacent cabinets are bolted together Sheet 68 of 379 status(?\N u

Paul C. Rizzo Associates, Inc.ENGTNEERS 6. CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. C5792ALB2 Equip. Class 20a. Inst.

in control paneVcabinet Equipment DescriptionSFRCS CHANNEL 2 LOGIC BOARD C5792A bolted to cabinet at leftAdjacent cabinets are bolted together C5792A logic board inside cabinetView of Logic Board inside the cabinet Sheet 69 of 379 StatusG\N U

Sheet 70 of379Paul C. Rizzo Associates, Inc.ENCINEERS 6. CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. C73-l StatusG)N u Equip. Class 9. FansEquipment DescriptionAFP ROOM EXHAUST FANLocation: Bldg.

AUXB Floor El.565 Room 237Manufacfurer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage l. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?

Fan is mounted onfour spring isolators supported by rod hangers.Rod hangers are attsched to steel support structure, which is anchored to the Q-deckwithfour 3/8" diameter anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?

No missing bolts identffied associated with component supports.3. Is the anchorage free of corrosion that is more than mild surface oxidation?None observed during inspection.

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)

3/8" diameter anchor bolts supporting thefan support assembly are shown tobe seismically adequate in Calculation C-CSS-73-1.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X N/A X X X X X Sheet 7l of379 Paul C. Rizzo Associates, Inc.ENGTNEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Status(f\tN u Equipment ID No. C73-lEquipment Description Equip. Class 9. Fans AFP ROOM EXHAUST FANInteraction Effects

7. Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?U N Y U N Y N Y U N Y N/A N/A U N/A X X X XOther Adverse ConditionsI l Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?Calculation C-CSS-73-l evaluates the expansion joints and shows seismic adequacy.

Comments (Additional pages may be added as necessary)

Evaluated by: U N YEddie M. GuerraDate: 712512012 XAdam L. Helffrich Date: 7tzs/2012 Sheet 72 of 379Paul C. Rizzo Associates, Inc.ENGINEERS 6L CONSUUIANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C73-lEquip. Class 9. Fans Equipment DescriptionAFP ROOM EXHAUST FANOther supporting or relevant documents and photos (if any): StatusG)N u C73-l General General view of component C73-l plate and anchorage no lateral bracingView of anchorage, no lateral bracing is visible for hanging fan Sheet 73 of 379Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULIANTSSeismic Walkdown Checklist (SWC)Status: QN UEquipment ID No. C78-2 Equip. Class 9. FansEquipment Description BATTERY ROOM VENT FAN 2.2 Location:

Bldg. AUXBFloor El.

603 Room 4281lManufacfurer, Model, Etc.

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?Anchors identified to be installed into decking ridges.SQUG calc C-CSS-C79-I used as reference since is similar component.2. Is the anchorage free of bent, broken, missing or loose hardware?None observed during walkdown.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

None observed during walkdown.4. Is the anchorage free of visible cracks in the concrete near the anchors?Anchors installed through steel decking.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o forwhich an anchorage configuration verification is required.)

Yes. Verification based on calculations for component C78-1, calc ID C-CSS-C78-1.Calcualtion C-CSS-C78-l shows l/2"diam anchors inserted into ridges are acceptable.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X N/A X X x X X PCe Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. C78-2Equip. Class 9. FansEquipment DescriptionBATTERY ROOM VENT FAN 2-2 Sheet 74 of379Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?Scaffold in the area not a concern due to fan elevation.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Seismic capacity of blockwalls in the area verified.

Blockwall 4016 verffied to be seismically adequate based on ref. VBW20-8001-100, Rev 14 (12/6/88).9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X XStatus(f)N UOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)Fanfound to be adequately stffined against lateral motion with bracing and componentframing.

Evaluated by: Eddie M. Guerra#,r'/Pr#'i" Adam L. Helffrich Sheet 75 of 379 Paul C. Rizzo Associates, Inc.ENGTNEERS CL CONSUUTANTS Seismic Walkdown Checktist (SWC)Equipment ID No. C78-2 Equip. Class 9. Fans Equipment Description BATTERY ROOM VENT FAN 2-2 Other supporting or relevant documents and photos (if any): C78-2 PlateID Plate of component StatusON U C78-2 General General view of comPonent Sheet 76 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. C78-2 Equip. Class 9. Fans Equipment DescriptionBATTERY ROOM VENT FAN 2-2 Status(?\N uC78-Z anchorage Partial view of anchorage, view is typical of all anchors Sheet 77 of379 Paul C, Rizzo Associates, Inc.ENGINE.ERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. CCl469 Equip.

Class 7. Pneumatic-Operated Valves StatusON U Equipment Description Location:

Bldg. AUXB AOV CC 1469Floor El.545 Room ll3Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50oh of SWEL items requiring such verification)?Mounted on

-16" diam ltne installed right before containment penetration.2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/ofotwhich an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N Y N Y N Y N Y N Y N Y X X X X X X poeSeismic Walkdown Checklist (SWC)Equipment ID No. CCl469 Equip.

Class 7. Pneumatic-Operated Valves Equipment Description AOV CC 1469 Interaction Effects 7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?

Attached lines showed adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X X Sheet of 379 Status(f)N uOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated bv: Eddie M. Guerra Date: Date:Adam L. Helffrich Sheet 79 of 379 Paul C. Ri zzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. CCl469 Equip. ClassEquipment Description AOV CC 1469 Status(flN U 7. Pneumatic-Operated Valves Other supporting or relevant documents and photos (if any): cc I 469General view of component pc\te Paul c. Rizzo Associates, Inc.ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. cs1530 Equip. Class 8A. Motor-operated valves Sheet 80 of379 Statu0 N UEquipment Description CONTAINMENT SPRAY TRAIN I INJECTION VALVE AT PUMP I-I DISCHARGELocation: Bldg.

AUXBFloor El.585 Room 303 Manufacturer, Model. Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50Yo of SWEL items requiring such verification)?2. Is the anchorage free of bent, broken, missing or loose hardware?

Limitorgue has a nut on the lower part of the actuator that holds thecover on that is notfully torgued down. Judged not to alfect operabilityof component.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Main line anchor support shows not enough grout below anchor plate.Main line presents sfficient lateral bracing. Not considered as adverse condition.
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X X X x X X Sheet Paul C. Rizzo Associates, Inc.ENGINEERS 6. CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. CS1530 Equip.

Class 8A. Motor-operated valves Equipment Description CONTAINMENT SPRAY TRAIN I INJECTION VALVE AT PUMP Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Seismic anchor motion confirmed acceptable per calc 1B NI2.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X X Other Adverse ConditionsI 1. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

of379Status(?)N u l-l DISCHARGE NiA 7/25/2012 X Comments (Additional pages may be added as necessary)

Evaluated bv:Eddie M. Guerra Date: Date:Adam L. Helffrich Paul C. Rizzo Associates, Inc.ENGTNEERS 6.' CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. CSl530 Equipment Description StatusG\N UEquip. Class 8A. Motor-Operated Valves CONTAINMENT SPRAY TRAIN I INJECTION VALVE AT PUMP I-I DISCHARGE CS 1530 plate ID Plate of component CS 1530 general General view of component Sheet 82 of 379 Other supportingor relevant documents and if any):

Pau[ C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50Yofor which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Valve located to the side of main line right before wall penetration.

YN X YN U N/A YNUN/A X YNUN/A X YNUN/A X YNU XStatus@N UEquipment ID No. CV-5005 Equip. Class 0d.

Other - check/manual valveEquipment Description PURGE VALVE ISOLATION Location:

Bldg. AUXB Floor El.

643 Room 600 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Sheet 83 of379 X pcte Paul c' Rizzo Associates, Inc.ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No.

CV-5005Equip. Class 0d. Other - checVmanual valveEquipment DescriptionPURGE VALVE ISOLATION Sheet 84 of 379 status/?)N UInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?Attached lines found with adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?U N Y U N Y N Y U N Y N/A NiA U N/A X X X XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

U N Y X Comments (Additional pages may be added as necessary)

Evaluated by:;m,(t4 Eddie M. Guerra Date: 7/2st20r2 Date: 712512012 Adam L. Helffrich Sheet 85 of 379 Paul C. Rizzo Associates, Inc.

ENGINEERS c*' CONSUTiTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. CV-5005 Equip. Class 0d. Other - check/manual valve Status(?)N u Equipment Description PURGE VALVE ISOLATION Other supporting or relevant documents and photos (if any): CV-5005 general General view of valve connected to main lines Paul C. Rizzo Associates, lnc.En*GINEERS & CONSUXTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. Dl Equipment Description BUS Dl Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?Cabinet composed of I3 sections.2. Is the anchorage free of bent, broken, missing or loose hardware?

Verified plugwelds at thefront of one section that was openedfor inspection.Verffication of anchorage of other sections deferred to previous SEWS in Calc 3. Is the anchorage free of corrosion that is more than mild surface oxidation?None observed during inspection.4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed during inspection.

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

forwhich an anchorage configuration verification is required.)Panel door was closed and anchorage inside cabinet could not be verified.

However,SQUG C-CSS-DI calculation was used and it was verffied that anchorage capacityis adequatefor the configuration shown. Verified the three 7/8" to I.25" plugwelds atfront ofone opened panel section.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

C-CSS-DI.YstatuQv uEquip. Class

3. Medium Voltage Switchgear Location:

Bldg. AUXBFloor El.s85 Room 323Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Sheet 86 of379 X X X x X X pc.eSeismic Walkdown Checklist (SWC)Equipment ID No. Dl Equip. Class 3. Medium Voltage Switchgear Equipment DescriptionBUS DI Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?

No maintenance equipment identified in the area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Relative movement not a concern since attached lines are rigidly connected with component.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Fire extinguisher in area judged not to be operability issue.X X X X Sheetof 379 status(f)N u Other Adverse ConditionsI 1. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: Date:+/fr,/,Adam L. Helffrich Sheet 88 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS 6{. CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. Dl Equip. ClassEquipment DescriptionBUS DI Dl Plate ID ID Plate of component3. Medium Voltage Switchgear Status'O*

UOther supporting or relevant documents and photos (if any):Dl General General view of component Sheet 89 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS {& CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DlEquipment Description BUS DlEquip. Class 3. Medium Voltage Switchgear Status'O*

UDl Inside Cabinet View of floor detail inside Dl cabinet PCte Paul c. Rizzo Associates, Inc.ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. Dl ED Equip. Class l. Motor Control CentersSheet 90 of 379 statofr\N uEquipment DescriptionMCC ILocation: Bldg.

AUXB Floor El.Room 429Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50o/o of SWEL items requiring such verification)?MCC composed of 14 sections welded to embedded channels with an averageof 5.5" long 3/16" welds atfront and back of the unit.2. Is the anchorage free of bent, broken, missing or loose hardware?603of corrosion that is more than mild surface N/A N/A N/A 3. Is the anchorage free oxidation?

None observed during walkdown.4. Is the anchorage free of visible cracks in the concrete near the anchors?None observed during walkdown.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)

Top bracingverified against drawing C-0233 and SQUG calculation CSS-CS-D CMCC I verified existing anchorage.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

x X X X X X Paul C. Rizzo Associates, Inc.ENCINEERS &

CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. Dl EDEquip.

Class l. Motor Control Centers Equipment Description MCC I Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, dishibution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?

Cabinets are interconnected and braced to wall ot top.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X XSheet 9lof 379 status(?)N u Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerrat / ,Y.?:

,/"of&"t//Date: Date:Adam L. Helffrich Sheet 92 of 379 Paul C. Ri zzo Associates, Inc.

ENGINEERS

& CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. DI_ED Equip. ClassEquipment Description MCC IStatus@N Ul. Motor Control Centers Other supporting or relevant documents and photos (if any): DI_ED plate ID Plate of component DI_ED generalGeneral view of component Dl ED stitch weld Partial view of welded base detail.

Sheet 93 of379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DIN Equip. Class 14.

Distribution Panels statuCN u Equipment Description PNL DIN Location:

Bldg. AUXBFloor El.Room 4291'Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50Yo af SWEL items requiring such verification)?

Similar anchorage configuration as for D2N (Drawing E-20-4-7).

2. Is the anchorage free of bent, broken, missing or loose hardware?Mounting inspected and no missing parts identified.
3. Is the anchorage free of corrosion that is more than mild surface oxidation?No signs of excesive corrosion identified during inspection.4. Is the anchorage free of visible cracks in the concrete near the anchors?No craclrs identified at based anchorage grout.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 5OYoforwhich an anchorage configuration verification is required.)

Configurationfor D2N is used as reference.

Drawing C-0220Didentifies the configuration as four 7/8"diam anchor bolts and it wasconfirmed in thefield during walkdown inspection.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

603 N/A X X X X X X PCe Paul C. Rizzo Associates, rnc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)

Equipment ID No. DIN Equip. ClassEquipment Description PNL DIN Sheet 94 of 379 14. Distribution Panels Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?No maintenance equipment identified in the area.
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

X X X Xstatus(f\N u Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

x Comments (Additional pages may be added as necessary)

Components YRF3 and YV3 associated wilh DlN.Evaluated by:

Eddie M. Guerra Adam L. Helffrich Sheet 95 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS 6{. CONSUUTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DIN Equip. Class Equipment Description PNL DINStatus(?)N u I 4. Distribution PanelsOther supporting or relevant documents and photos (if any): DIN plate ID Plate of componentDIN General General view of component Sheet 96 of 379 Paul C. Ri zzo Associates, lnc.ENGINEERS Sr- CTONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No.

DIN Equip. Class Equipment Description PNL DINI 4. Distribution PanelsD I N anchorage Partial view of anchorage, view is typical of all anchorsstatusG)N u pcte Paul c. Rizzo Associates, Inc.

ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No.D2 EDEquip. Class 1. Motor Control Centers Equipment Description MCC 2Location: Bldg.

AUXBFloor El.Room 428Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50Yo of SWEL items requiring such verification)?MCC composed of 14 sections welded to embedded channels with an averageof 5.5" long 3/l6" welds atfront and back of the unit.2. Is the anchorage free of bent, broken, missing or loose hardware?No access to inside of componentfor anchorage inspection.

Missing bolt mentioned in C-CSS-DCMCC-002. Resolved by work request 95-i,368.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?No excesive corrosion identified around base detail.4. Is the anchorage free of visible cracks in the concrete near the anchors?No craclcs identified at cabinet base.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

forwhich an anchorage configuration verification is required.)Top bracing provided by numerous top entry conduit. SQUG calculstionCSS-C.S-DCMCCI and CS-DCMCC2 verffied existing anchorage.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?Sheet 97 of379Status$N U 603 X N/A N/A N/A NiA N Y N Y N Y N Y N Y N Y X X X X X Pau[ C. Rizzo Associates, Inc.

ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. D2_EDEquip.

Class l. Motor Control CentersEquipment Description MCC 2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?

MCC supported at the top by large conduits providing lateral restraint.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X X Other Adverse Conditions I l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

Mantainance cartfound near the area, Judged not to be a signiJicant intersction.Sheet 98 of379status(?)N u 712512012 x Comrnents (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: Date: ,er/, Adam L. Helffrich Sheet 99 of 379 Paul C. Ri zzo Associates, Inc.ENGINEERS 6.. CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. D2_ED Equip. Class l. Motor Control Centers Equipment Description MCC 2Other supporting or relevant documents and photos (if any):D2 ED plateID Plate of component status@N uD2 ED generalGeneral view of component Sheet 100 of 379 Paul C, Rizzo Associates, Inc.ENGINEERS

& CONSULTANTSSeismic Walkdown Checklist (SWC)

Equipment ID No. D2 ED Equip. Class l. Motor Control Centers Equipment Description MCC 2 Status(?)N u D2 ED stitch weld Partial view of anchorage, view is typical of all anchorsD2 ED carts int Unsecured carts near unit can cause relay chaffer on impact pcte Paul c. Rizzo Associates, lnc.ENCINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. D2N Equip. Class 14. Distribution PanelsEquipment DescriptionPNL D2N Location:

Bldg. AUXBFloor El.603 Room 4288Manufacturer. Model.

Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?

This panel is part of a line-up that includes YRF4 and YV4. Each panel is qnchored to the concrete withfour 3/4" diameter anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?No missing parts or degraded condition identified during the inspection.3. Is the anchorage free of corrosion that is more than mild surface oxidation?No significant corrosion identified in cabinet and mounting base.4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50ohforwhich an anchorage configuration verification is required.)SQUG calculation C-CSS-YV4 includes seismic qualification of the anchoragefor this panel.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Sheet l0l of379 StatusQn U X X X N/A N/A Y X X X pcte Paul c. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. D2NEquip. ClassPNL D2N Equipment Description Sheet I 4. Distribution Panels Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?Seismic capacity of block walls in the area verified.Blockwall 4016 verified to be to be seismically adequatebased on ref. VBW20-8001-100, Rev 14 (12/6/88).
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X X t02of 379 Statu*) N u N/A N/A Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)Evaluated by:Eddie M. GuerraAdam L. Helffrich Sheet 103 of 379Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. D2N Equip. ClassPNL D2N Statuff) N U 14. Distribution Panels Equipment Description Other supporting or relevant documents and photos (if any): D2N plateID Plate of component D2N general General view of component Sheet 104 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS 6. C-ONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. D2N Equip. ClassI 4. Distribution Panels Statuft N U Equipment DescriptionPNL D2N D2N 4 anchor boltsview of anchorage, view is typical of allD2N masonry wallsPotential interaction hazard from masonry wall near unit Sheet 105 of379 Paul C. Rizzo Associates, Inc.

ENCINEERS 6. CONSULTANTS Status(T)N u Seismic Walkdown Checklist (SWC)Equipment ID No. DZP Equip. Class 14. Distribution Panels Equipment DescriptionPNL D2P Location:

Bldg. AUXBManufacturer, Model, Etc.Floor El.

603 Room 428Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?No si gnificant corros ion identifeid4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)

Drawing C-02208 identifies the configuration as four 3/4" anchor bolts and it wasconfirmed in the fiel d during walkdown inspec tion.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A N/A N/A X X X X X X Sheet Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DzP Equip. ClassPNL D2P Equipment Description14. Distribution PanelsInteraction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, dishibution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Fire extinguisher in area judged not to be an operability issue,9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y X Y X Y X Y X 106 of379Status(f)N u N/A N/A N/A Other Adverse ConditionsI l. Have you looked for andadversely affect the safety found no other seismic conditions that could functions of the equipment?

Y X Comments (Additional pages may be added as necessary)

Evaluated by:Eddie M. Guerra/l"/,'t"t/Prfut'ioDate:7125/20t2 Date: 7/25/20t2 Adam L. Helffrich Sheet 107 of 379 Paul C. Rizzo Associates, Inc.

ENGINEERS GC CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DzP Equip. Class PNL D2PEquipment Description Status@N UI 4. Distribution Panels Other supporting or relevant documents and photos (if any): DzP plate ID Plate of component DzP general General view of component DZP anchor bolts Partial view of anchorage, view is typical of all anchors Sheet 108 of379 Paul C. Rizzo Associates, Inc.

ENGINE.ERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DA-3783 Equip. Class 88. Solenoid Valves Status:QN U Equipment DescriptionLocation: Bldg.

AUXBFloor El.585 Room 318SOLENOID VALVE FROM AIR START RECEIVER I-I-I. T86-I Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.

Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50Y, of SWEL items requiring such verification)?

Mounted on l/4" pipe line.2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

for which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

NiA X X X x X X Sheet 109 of379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSUXTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DA-3783Equip. Class 88.

Solenoid Valves Equipment DescriptionSOLENOID VALVE FROM AIR START RECEIVER I-I-I T86-lstatus(f)N u Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?

Components is surrounded by air compressor tanks.No significant potenttal interaction was founded.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/A N/A X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)Evaluated by:

7t25t20r2 Eddie M. Guerra 7/2s/2012Adam L. Helffrich Sheet I 10 of 379 Pau[ C. Rizzo Associates, Inc.ENGINEERS 6.. CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DA-3783Equip. Class 8B. Solenoid Valves Equipment DescriptionSOLENOID VALVE FROM AIR START RECEIVER 1-I-I, T86-IOther supporting or relevant documents and photos (if any): Status(?\N u DA3783 plate ID Plate of component DA3783 general General view of component Sheet lll of379 Paul C. Rizzo Associates, Inc.

ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DBCIPN Equip. Class 16. Battery Chargers and InvertersstatuQN uEquipment Description Location:

Bldg. AUXB CHARGER (Newly installed equipment)Floor El.

603 Room 429Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?Four I" diameter anchors at corners and six l" diameter anchors on sides.

OKStffined base on -I l/2' grout pad.2. Is the anchorage free of bent, broken, missing or loose hardware?

No access to mounting anchorage and/or documentation.3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

forwhich an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?Based on previously inspected similar mounting and skid details, it is judged that no potential adverse condition is presented by this newly installed charger. Outside condition looles in good state and noadverse condition were identifiedfor previous similar cases.Y Y Y Y Y Y X X X X X X Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. DBCIPN Equip. Class 16.

Battery Chargers and InvertersEquipment Description CHARGER (Newly installed equipment)

Sheet Il2 of 379 StatusSN UInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Seismic capacity of blockwalls in the area verified.Blockwall 4016 verified to be to be seismically adequatebased on ref. VBW20-8001-100, Rev 14 (12/6/58).Nearbyfire extinguisher judged not to be an operability issue.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y X Y X Y X Y xOther Adverse Conditions11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y X Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra.#.,/P&'/'

Date: 7125/2012Date: 712512012 Adam L. Helffrich Sheet 113 of379 Paul C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. DBCIPN Equip. Class 16. Battery Chargers and Inverters Equipment Description CHARGER (Newly installed equipment)

Other supporting or relevant documents and photos (if any): DBCIPN plateID Plate of component Status(?)N u DBCIPN general General view of component Sheet ll4 of379 Paul C. Rizzo Associates, Inc.ENGINEERS & OONSULTANTSSeismlc Welkdown Checklist (SWC)Equipment ID No. DBCIPN Equip. class 16. Battery chargers and Inverters Equipment Description CHARGER(Newly installed equipment)

DBC I PN anchorage inaccessible Anchorage is not visible Status(?)N u

Sheet lI5 of379 Pau[ C. Rizzo Associates, Inc.

ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)AnchorageL Is the anchorage configuration verification required (i.e., is the item oneof the 50%o of SWEL items requiring such verification)?Skid mounting identified with 4-1" anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?No missing parts or degraded condition identified during the inspection.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?No significant corrosion identified in cabinet and mounting base.4. Is the anchorage free of visible cracks in the concrete near the anchors?No crqcl{s identified at base grout.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50oh for which an anchorage configuration verification is required.)

SQUG C-CSS-DBC2P calculation was used and it was verified that anchorage capacity is adequatefor the configuration shown.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YN X YN U N/A YNUN/A X YNUN/A X YNUN/A X YNU XstatusQv uEquipment ID No. DBC2P Equip. Class 16. Battery Chargers and InvertersEquipment Description CHARGER 2PLocation: Bldg. AUXB Floor El.

603Room 428Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.

X PCte Paul c. Rizzo Associares, [nc, ENGINEERS & CONSULIANTSSeismic Walkdown Checklist (SWC)Equipment ID No. DBC2P Equip. Class 16. Battery Chargers and Inverters Equipment Description CHARGER 2PSheet 116 of379Status(f)N u Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?

Seismic capacity of blockwalls in the area verified.

Block wall 4026 no references found for seismic analysis.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YNUNiA x YNUN/A X YNUN/A X YNU X Other Adverse ConditionsI 1. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

YNU x Comments (Additional pages may be added as necessary)Evaluated by:Date: 7/2512012 Eddie M. Guerra ,,#"r/ //t&rl Date: ,/zstzotzAdam L. Helffrich Sheet ll7 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DBC2P Equip. Class Equipment Description CHARGER 2P

16. Battery Chargers and InvertersStatus(ilN U Other supporting or relevant documents and photos (if any): DBC2P plate ID Plate of component DBC2P masonry wallsPotential interaction hazard from masonry wall near unit pc\t? Paul c. Rizzo Associares, Inc.ENCINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. DBC2PN Equip. Class 16. Battery Chargers and InvertersEquipment Description CHARGER (Newly installed equipment)

Location:

Bldg. AUXB Floor El.603Room 428 Manufacturer. Model. Etc.

Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50Yo of SWEL items requiring such verification)?No access to inside af cabinets.2. Is the anchorage free of bent, broken, missing or loose hardware?No sccess to mounting anchoroge and/or documentation.3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50Yofor which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Based on previously inspected similar mounttng and skid details, it is judged that no potential adverse condition is presented by this nauly installed charger. Outside condition looks in good state and no adverse condition were identifiedfor previous similar cases.Sheet I l8 of379Status:Q,{ U X N/A N/A Y Y Y Y Y Y X X X X X pct? Paul c. Rizzo Associates, Inc.ENGINEERS 6( CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DBC2PN Equipment Description ll9 of379StatusQN UEquip. Class 16. Battery Chargers and Inverters CHARGER (Newly installed equipment)Interaction Effects 7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Seismic capacity of block walls in the area verified.Block wall 4016 verified to be to be seismically adequatebased on ref. VBW20-8001-100, Rev 14 (12/6/88).Nearbyfire extinguisher and barrier judged not to be significant interactions.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Y X Y X Y X Y X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

Y X Comments (Additional pages may be added as necessary)Evaluated by:

Eddie M. Guerra Date: 7/2st20r2 Date: 7/2512012Adam L. Helffrich Paul C. Rizzo Associates, Inc.ENGTNEERS 6.. CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DBC2PN Equipment Description Equip. Class 16. Battery Chargers and Inverters CHARGER (Newly installed equipment)Other supporting or relevant documents and photos (if any): Sheet 120 of 379 Status'O U DBC2PN plate ID Plate of component DBC2PN anchorage inaccessible Anchorage is not visible DBC2PN general General view of component Sheet l2l of379 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSUITANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DHlOlEquip. Class 0d. Other - check valve or manual valveStatusfr)N U Equipment Description Location:

Bldg. AUXBSFP Inlet Line Vent from DHRFloor El.597', Room 3r2 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?Small check valve located on -10" diameter pipe line.No degraded condition identffied.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A X X X X X X SheetPaul C. Rizzo Associates, Inc.

ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DHlOl Equip. Class 0d. Other - check valve or manual valveEquipment DescriptionSFP Inlet Line Vent from DHR122 of 379 Status@N UInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?Seismic capacity of blockwalls in the area verified.Blockwalls 3257 and 3267 verffied to be to be seismically adequatebased on ref. VBWI6-8001-083, Rev 2 (4/27/88) and VBWI6-8001-084, Rev 5 (4/27/88).

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

x X X X Other Adverse ConditionsI L Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by:Eddie M. Guerra Adam L. Helffrich Date: Date:

Paul C. Rizzo Associates, Inc.ENGINEERS &. CONSUTTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. DHlOl Equip. Class 0d.

Other - check valve or manual valveEquipment Description SFP Inlet Line Vent from DHR Other supporting or relevant documents and photos (if any): Sheet 123 of 379 StatusG\N UDH l0l general General view of component PCte Paul c. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DH9BEquip. Class 8A. Motor-Operated ValvesEquipment Description MOV DH 98 Location:

Bldg. AUXBFloor El.545 Room 225 Manufacfurer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50To of SWEL items requiring such verification)?Valve located on line attached to containment wall.2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 5oo/ofor which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Sheet 124of379status{)N u X X X X N/A X X Sheet 125 of 379 Paul C. Rizzo Associates, Inc.

ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. DH9B Equipment Description MOV DH 98Equip. Class 8A. Motor-Operated ValvesStatus:$.{ UInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Anached lines found with adequate flexibility.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N Y N Y U N Y U N Y U N/AUN/A N/A X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

U N Y X Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. GuerraDate: 7125/2012 Date: 712512012 ,e*/p&'t Adam L. Helffrich Sheet 126of379 Paul C. Rizzo Associates, fnc.

ENGINEERS 6. CONSULIANTS status@N uSeismic Walkdown Checklist (SWC)Equipment ID No.

El Equip. Class 2. Low Voltage SwitchgearEquipment DescriptionLocation: Bldg.

AUXBBUS El, Low Voltage Switchgear Floor El.603 Room 429 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?Component composed of 7 sections. End panels were opened qnd verified plugwelds atfront (2-1/4"diam at 18"oc).2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/oforwhich an anchorage configuration verification is required.)Anchorage not vissible thus verification based on adequacy per SQUG calc C-CSS-EI.SQUG calculations show anchorage to be adequatefrom previous outlier resolution.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A X X X X X X Sheet Paul C. Rizzo Associates, Inc.

ENCINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No.

El Equip. Class 2. Low Voltage SwitchgearEquipment DescriptionBUS El, Low Voltage Switchgear Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Top entry conduit rigidly supported.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X x Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

r27of 379 Status(f)N u 7/2512012 x Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra ,r#,t"r{/p.

Date: Date: Adam L. Helffrich Sheet 128 of 379 Pau[ C. Rizzo Associates, Inc.ENGINEERS G.. C*NSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. El Equip. Class 2. Low Voltage Switchgear Equipment DescriptionBUS El, Low Voltage Switchgear Other supporting or relevant documents and photos (if any): El plateID Plate of componentE I general General view of component Status(ilN U

Sheet129 of 379 Paul C. Ri zzo Associates, Inc.ENGTNEERS 6( CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. ElEquipment DescriptionBUS El, Low Voltage Switchgear StatusG\N U Equip. Class 2. Low Voltage SwitchgearE I anchorage inaccessibleAnchorage is not visible Sheet 130 of379Paul C, Rizzo Associates, Inc.

ENGINEERS *. CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. El lB Equip. ClassEquipment Description MCC El lBStatus9 N UL Motor Control Centers Location:

Bldg. AUXBFloor El.585 Room 304 Manufacturer, Model. Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?This is a l0 sections MCC.

Each section is welded to embedded channel withan average of 6" long, 3/I6" welds. Top bracing provided per drawing C-0233.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage configuration verification is required.)

Top bracing of this MCC verified against Drawing C-0233.

SQUG calculationC-CSS-EI IB provides qualification calculations for the base welds and the top bracing.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A N/A N/A X X X X X X pcte Pau[ c. Rizzo Associates, Inc.

EI*GINEER S & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. El lB Equip. Class Equipment Description MCC El lB Sheetstatus(?\N u1. Motor Control Centers Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y X Y X Y X Y X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y X Comments (Additional pages may be added as necessary)

Evaluated bv: 7t25/2012 7/2s/2012 Eddie M. Guerra'#o'u/Adam L. Helffrich Sheet 132 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS 6*. CONSULTANTS Seismic Walkdown Checklist (SWC)status(?)N u Equipment ID No. El lB Equipment DescriptionEquip. ClassMCC EIIB l. Motor Control CentersOther supporting or relevant documents and photos (if any): El lB plateID Plate of component El I B general General view of component Sheet 133 of379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. El lB Equip. Class Equipment Description MCC El lBStatus@N U

l. Motor Control CentersEl lB stitch weld Partial view of anchorage, view is typical of all anchorsEl lB is bolted between El lCUnits are bolted together to prevent pounding Sheet 134of379Paul C. Rizzo Associates, Inc.

ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No.

El2B Equip. Class l. Motor Control CentersStatus:ON U Equipment Description MCC El2BLocation: Bldg.

AUXB Floor El.

585 Room 318 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?

This is a 4 section MCC (including panel YEI), welded to embed channels withan average of 6' long 3/l6" fillet welds per section.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

for which an anchorage configuration verification is required.)Top bracing provided by several top entry conduit. SQUG calculation C-CSS-E I 28 provides qualification calculations for the base welds.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YN X YNU N/A YNUN/A X YNUN/A X YNUN/A X YNU X X Sheet 135 of379 Paul C. Rizzo Associates, Inc.

ENCINEERS & CONSUTTANTS Seismic Walkdown Checklist (SWC)Equipment ID No.

El2B Equip. ClassEquipment Description MCC El2BStatusr?)N Ul. Motor Control CentersInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Scafoldingfound near equipment properly braced. No interaction concern.9. Do attached lines have adequate flexibility to avoid damage?Attached lines rigidly connected to cabinet.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?-l/2" gapfound between back of cabinet and water line, Interactioniudged not to be a problem due to rigidity of cabinet and provided top bracing.

N Y U N Y N Y U N Y U N/A N/A U NiA X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

U N Y x Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra rll t t '"/,n,,//+#/'://Date: 712512012Date: 712512012 Adam L. Helffrich POe Paul C. Rizzo Associates, Inc.

ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. El2C Equip. Class l. Motor Control CentersSheet 136of379 Statusff)N UEquipment Description MCC EIZCLocation: Bldg.

INTKFloor El.s76 Room 5tManufacturer, Model.

Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?This is a 4 section MCC, welded to embed channels with an average of atleast 5" long, 3/l6" fillet welds per section (front and back).2. Is the anchorage free of bent, broken, missing or loose hardware?

No degraded conditions foundfor base stitch welds.

N/A N Y N Y N Y N Y N Y NiA3. Is the anchorage free of corrosion oxidation?

that is more than mild surface N/A 4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracl<s identified in grout at mounting base.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o forwhich an anchorage configuration verification is required.)

Top bracing of this MCC verified against Drawing C-0233. SQUG calculation C-CSS-E128 provides qualffication calculationsfor the basewelds and the top bracing.

Base welds verified against drawing C-04128, section L.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?No signtficant degraded condition identified during inspection.

Anchorage is provided in C-CSS-EI2C and VFI2/800-008 shown to be adequate.configuration capacity N/A N Y X X X X X X Sheet 137 of379 Paul C. Rizzo Associates, Inc.

ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. ElzC Equip. Class l. Motor Control CentersEquipment Description MCC ElzC Status$N u Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Scafolding found near component adequately brac ed.No interaction concern.9. Do attached lines have adequate flexibility to avoid damage?Anached lines rigidly connected to cabinet.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?I/2 gapfound between back of cabinet and water line.No interaction concern due to overall rigidity of cabinet and provided top bracing.

YNUN/A X YNUN/A X YNUN/A X YNU XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

YNU X Comments (Additional pages may be added as necessary)

Missing grout at lower right of component is cosmetic and judged not to bean adverse seismic condition.

Evaluated bv:Date: 712512012Eddie M. Guerra ,fd*/Ft/Aio Date: Ttzslzotz Adam L. Helffrich Sheet 138 of 379 Pau[ C. Rizzo Associates, Inc.ENGINEBRS 6( C0NSUUTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. ElzC Equip. Class MCC EIaC Status@N Ul. Motor Control Centers Equipment Description Other supporting or relevant documents and photos (if any): El2C plateID Plate of component ElzC general General view of component Sheet 139 of 379Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checktist (SWC)Equipment ID No. ElzC Equip. Class MCC EIZC statusG)N ul. Motor Control Centers Equipment Description ElzC grout missing View of mounting base showing stitch weld detail and groutClose up view of gap identified between back of cabinet and conduit.

ElzC gap conduit and cabinet Sheet 140 sf 379 Paul C. Rizzo Associates, Inc.ENGINEERS &. CONSUITANTS Seismlc \ilalkdown Checkllst (SWC)Equipment ID No. ElzC Equip. Class Equipment Description MCC El2C l. Motor Contnol Centers ElzC Scaffold View of scafolding near component Sheet l4l of379 Paul C. Rizzo Associates, Inc, ENGINEERS & CONSULTAhTTSSeismic Walkdown Checklist (SWC)Equipment ID No.

822-l Equip. Class 21. Tanks and Heat ExchangersStatusG)N UEquipment DescriptionLocation: Bldg.

AUXBCCW HEAT EXCHANGER I-I AT DISCHARGE OF CCW PUMP 43-1 Floor El. 585 Room 328Manufacfurer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50% of SWEL items requiring such verification)?2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o for which an anchorage configuration verification is required.)

Nozzle load issue identified and documented in PCAQ98-1945, and subsequently resolved by MOD 98-0058. SQUG calculation C-CSS-E22-L shows seismic adequacyof the as-installed design.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A N/A N/A N/A X X X X X X pcte Pau[ c. Rizzo Associates, Inc.

ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. 822-l Equip. Class 2l. Tanks and Heat Exchangers Sheet 142of379 Status(?)N u Equipment DescriptionCCW HEAT EXCHANGER I-I AT DISCHARGE OF CCW PUMP 43-1 Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Seismic capacity of blockwalls in the area verified.

Blockwalls 3307, 3397 and 3407 verified to be to be seismically adequatebased on ref. VBWl7-8001-088, Rev 6 (6/21/89), VBWI9-8001-094, Rev 5 (6/3/06) and VBWI9-8001-095, Rev 10 (7/5/06).9. Do attached lines have adequate flexibility to avoid damage?Flexibility of drain piping judged acceptable to accommodate thermol growth ofthe heat exchanger.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N Y N Y N Y U N Y U N/A U N/A U N/A X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

U N X Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra//,e/,Date:7t25t20t2 Date: 7/25/2012 Adam L. Helffrich Sheet 143 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS & C:IONSULIANTSSeismic Walkdown Checklist (SWC)Equipment ID No. E22-l Equip. Class 21. Tanks and Heat Exchangers Status(?'\N uEquipment DescriptionCCW HEAT EXCHANGER I-I AT DISCHARGE OF CCW PUMP 43-IOther supporting or relevant documents and photos (if any): 822-l plateID Plate of component 822-l general General view of component Sheet ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. 822-l Paul C. Rizzo Associates, Inc.

Equip. Class 21. Tanks and Heat Exchangers CCW HEAT EXCHANGER I-I AT DISCHARGE OF CCW PUMP 43-I 822-l anchorage left Partial view of anchorage, view is typical of all anchors Equipment Description 144 of 379 StatusG\N U 822-l Welded Anchor Configuration of the Welded Anchor Plate Sheet 145 of379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o forwhich an anchorage configuration verification is required.)Nozzle load issue identffied and documented in PCAQ98-1945, and subsequently resolvedby MOD 98-0058.

SQUG calculation C-CSS-E22-L shows seismic adequacyof the as-installed design.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YN X YN U N/A YNUN/A X YNUN/A X YNUNiA X YNU XStatus:(f)N UEquipment ID No. 822-2 Equip. Class 21. Tanks and Heat ExchangersEquipment Description CCW HEAT EXCHANGER l-2 AT DISCHARGE OF CCW PUMP 43-2Location: Bldg. AUXB Floor El.

585 Room 328 Manufacturer, Model, Etc.

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.X Sheet 146 of379 Paul C, Rizzo Associates, Inc.ENCINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)statusff)N u Equipment ID No. E22-2Equip. Class 21. Tanks and Heat ExchangersEquipment DescriptionCCW HEAT EXCHANGER I.2 AT DISCHARGE OF CCW PUMP 43-2Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?

Flexibility of drain piping judged acceptable to accommodate thermal growth of the heat exchanger.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N Y N Y N Y U N Y U N/A U N/A U N/A X X X XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

U N Y X Comments (Additional pages may be added as necessary)Evaluated by:

Eddie M. Guerra Date: 7lzs/2012Date:7/25t70t2 Adam L. Helffrich Sheet 147 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)StatusON UEquipment ID No. E22-2 Equip. Class 21. Tanks and Heat ExchangersEquipment Description CCW HEAT EXCHANGER I-2 AT DISCHARGE OF CCW PUMP 43-2 Other supporting or relevant documents and photos (if any): 822-2 plateID Plate of component 822-2 general General view of component Pau[ C. Rizzo Associates, Inc.ENGINEERS 6" CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No.

822-2Equip. Class 21. Tanks and Heat ExchangersEquipment DescriptionCCW HEAT EXCHANGER I-2 AT DISCHARGE OF CCW PUMP 43-2 Sheet 148 of 379 statusG\N U 822-2 anchorage right side Partial view of anchorage, view is typical of all anchors E22-2 anchorage left sideAnchorage at left side of the saddle at fixed end Sheet 149 of379 Paul C. Rizzo Associates, Inc.ENCINEERS & CONSULTANTS Statusf')N U Seismic Walkdown Checklist (SWC)Equipment ID No.

827-l Equip. Class 21. Tanks and Heat Exchangers Equipment DescriptionLocation: Bldg.

AUXB DECAY HEAT REMOVAL COOLER I-I. 827-I Floor El.545Room I 13Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage l. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?Tank mounted on two saddles.

each anchored with 4-1" bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

forwhich an anchorage configuration verification is required.)

Nozzle load identified and documented in PCAQ97-0068, subsequently resolvedby MOD97-0068.

SQUG Calculation C-CSS-827-001 shows seismic adequacy of the as - ins t al I ed c onfi guration.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N Y N Y N Y N Y N Y N/A NiA N/A N/A N Y X X X X X X P(}e Paul C. Rizzo Associates, Inc.ENGINEERS *. CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. 827-lEquipment Description Sheet 150 of379StatusON U Equip. Class 21. Tanks and Heat ExchangersDECAY HEAT REMOVAL COOLER I-I .E27-IInteraction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment freie of potentially adverse seismic interaction effects?

N Y N Y U N Y U N/A U N/A N/A U N Y X X X XOther Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra U N YDate: 712512012 X Adam L. Helffrich Date: 7125/2012 Sheet 15l of379 Paul C. Rizzo Associates, Inc.ENCINEERS 6. CONSUTTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. F;27 -l Equip. Class 2 I . Tanks and Heat ExchangersEquipment DescriptionDECAY HEAT REMOVAL COOLER I -1,E27-IOther supporting or relevant documents and photos (if any): F,27 -l plate ID Plate of component Status$ U E27 -l generalZGeneral view of component Sheet 152 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSUETANTSSeismic Walkdown Checklist (SWC)Equipment ID No.

827-l Equip. Class 21. Tanks and Heat ExchangersEquipment Description DECAY HEAT REMOVAL COOLER I -1,827-I F,27 -l anchorage Partial view of anchorage, view is typical of all anchors E27 -l Slotted hole to allow for expansion Slotted hole between saddle and componentStatusSr{ U Sheet 153 of379 Pau[ C. Rizzo Associates, Inc.Seismic Walkdown Checklist (SWC)EquipmentIDNo.

E27-l Equip.Class 2l.TanksandHeatExchangers Equipment DescriptionDECAY HEAT REMOVAL COOLER I -1,827-I StatusQN U827-l weldedjointJoint welded as specified in MOD 97-0068 Sheet 154 of379 Paul C. Rizzo Associates, Inc.

ENCINEERS *. CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. E27-2 Equip. Class 21. Tanks and Heat ExchangersStatus@N U Equipment DescriptionLocation: Bldg.

AUXBDECAY HEAT REMOVAL COOLER I-2" 827-2Floor El.545 Room ll3 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?

Tqnkmounted on two saddles, each anchoredwith 4-I" bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50Yo for which an anchorage configuration verification is required.)Nozzle load identffied and documented in PCAQ97-0068, subsequently resolvedby MOD97-0068.

SQUG Calculation C-CSS-E27-001 shows seismic adequacy of the as - ins tal I ed c onfi gurat ion.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A N/A N/A N/A X X x X X X Sheet Paul C. Rizzo Associates, Inc.ENCINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. 827-2Equip. Class 2l. Tanks and Heat ExchangersEquipment DescriptionDECAY HEAT REMOVAL COOLER 1-2. 827-2 Status:$'{

U155 of379 Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N Y N Y N Y N Y X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

N YEddie M. Guerrat ./ ,r', - ./,{a"rr/Date: 712512012 X Evaluated by:Adam L. Helffrich Date: 7/2512012 Sheet 156 of 379 Paul C. Rizzo Associates, Inc.ENCINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. 827-2 Equip. Class 2l . Tanks and Heat Exchangers Equipment Description DECAY HEAT REMOVAL COOLER I -2,827.2Other supporting or relevant documents and photos (if any): F,27-2 plate ID Plate of component Status$ u 827-2 generalGeneral view of component Sheet 157 of 379 Paul C. Rizzo Associates, Inc.

ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. E27-2 Equip. Class 21. Tanks and Heat Exchangers Equipment Description DECAY HEAT REMOVAL COOLER I -2,827-2Status$ U F,27 -2 anchorage Partial view of anchorage, view is typical of all anchors E27-2 weldJoint welded as specified in MOD 97-0068 Sheet 158 of379 Paul C. Rizzo Associates, Inc.

ENGINEERS &. CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. EFlzc Equip. class

l. Motor control Centers StatusO N U Equipment Description Location:

Bldg. INTK Floor El.576MCC EFI2C Room 52 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50Yo of SWEL items requiring such verification)?2. Is the anchorage free of bent, broken, missing or loose hardware?

3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?
5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50To for which an anchorage configuration verification is required.)

This is a 4 section MCC, welded to embed channels with an average of at least5" long, 3/16" fillet welds per section (front and back). Top bracing provided per drawing C-0233.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N/A N/A X X X X X X PCte Paul C. Rizzo Associates, Inc.ENGINEERS 6. CONSUITANTS Seismic Walkdown Checklist (SWC)Equipment ID No. EF12C Equip. Class Equipment Description MCC EFl2Cl. Motor Control Centers Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?Seismic capacity of block walls in the area verified Block wall 2371 verified to be to be seismically adequatebased on ref. VBWl0-8001-055, Rev 14 (2/10/57).9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X X Sheet 159 of 379Status(?')N u N/A Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra ,#r,/Prfu'/, Date: Date: Adam L. Helffrich R Pau[ c. Rizzo Associates, Inc.Seismic \ilalkdown Checklist (SWC)Equipment ID No. EFI}C Equip. Class Equipment Description MCC EFI2C EFI2C plate ID Plate of component Sheet 160 of379 status(?\N u l. Motor Control Centers other supporting or relevant documents and photos (if any): EFIZC general General view of component Sheet 161 of379Paul C. Rizza Associates, Inc.ENGINEERS & CONSUTJTANTS Seismic Walkdown Checktist (SWC)Equipment ID No. EFI2CEquip. Class MCC EFI2C Equipment Description statusSN ul. Motor Control CentersEFI2C anchorage hiddenView of mounting base showing stitch weld detailEFI2C bnce leftView of channel section used to restrain front-to-back motion. Same detail at opposite side' Sheet 162of379Paul C. Rizzo Associates, Inc.

ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. Fl Equip. Class 2. Low Voltage SwitchgearstatusG)N u Equipment Description Location:

Bldg. AUXBBUS Fl, Low Voltage SwitchgearFloor El.

603 Room 428 Manufacturer, Model, Etc.

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50o/o of SWEL items requiring such verification)?Component composed of 7 sections. Inspected two end sections atfrontand verified two plug welds -3/4' diameter.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?Base groutfound in good condition.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%

for which an anchorage configuration verification is required.)

Verification based on adequacy per SQUG calc C-CSS-FI.SQUG calculations show anchorage to be adequatefrom previous outlier resolution, page 9 of28.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X X X X X X Paul C. Rizzo Associates, Inc.ENGINEERS & CONSUTTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. Fl Equip. class 2.Low voltage switchgear Equipment DescriptionBUS Fl, Low Voltage Switchgear Interaction Effects7 . Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X X Sheet 163 of 379 StatusON U N/AOther Adverse ConditionsI 1. Have you looked for and adversely affect the safetyfound no other seismic conditions that could functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: Date:

Sheet Paul C. Rizz(r Associates, Inc.ENGTNEERS A{ CONSL,'LTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. F I Equip. Class Equipment Description BUS F I , Low Voltage Status@N U 2. Low Voltage Switchgear SwitchgearOther supporting or relevant documents and photos (if any):F I general (plate inaccessible)

General view of component of 379F I anchorage inaccessible PCe Paul c. Rizzo Associates, Inc.

ENCINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. Fl08-l Equip. Class 0c. Other - sub-component Sheet 165 of379Status$N UEquipment DescriptionEDG I-1 INTAKE FILTER Location:

Bldg. AUXB Floor El.585 Room 318 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?

Anchorage could not be verified since it wasfully covered by roof cover.SQUG Calc C-CSS-F108 taken as referencefor anchorage condition.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?

No detail provtded in calc. Unable to view during inspection.

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies ifthe item is one of the 50Yofor which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Outlier specified in calculation C-CSS-F108 with respect to anchorage capacity Calculation provides an outliner close out note specifying a modification

(#MOD 95-0029) for additional anchors.N/A N/A X X X X X X pc.\e Paul c. Rizzo Associates, Inc.ENCINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)

Equipment ID No. Fl08-l Equipment Description Equip. Class 0c. Other - sub-component EDG I-I INTAKE FILTER Interaction Effects 7 . Are soft targets free from impact by nearby equipment or structures?Filter cover deemed to be capable of resisting external hazards.8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?x X X X Sheet 166 of 379statusQN u Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by: Date: Date: Eddie M. Guerra ,#r,,/Ptfu-/o Adam L. Helffrich RPaul c. Rizzo Associates, Inc" Seismic Walkdown Checklist (SWC)

Equipment ID No. Fl08-l Equip. Class 0c. Other - sub-component Equipment Description EDG I-I INTAKE FILTER other supporting or relevant documents and photos (if any): Fl08-l plate ID ID Plate of component F 108- I Encasing Anchroage View of Intake encasing anchroage condition.

Sheet 167 of 379 Status(f)N U F 108- I general General view of component Sheet 168 of379 Paul C. Rizzo Associates, Inc.

ENGINEERS & CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. Fl lA Equip. Class l. Motor Control centers Status(B N U Equipment DescriptionMCC FI IALocation: Bldg.

AUXBFloor El.603 Room 427 Manufacfurer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments andfindings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?

This is an I I section MCC, welded to embed channels with an average of at least 5" long, 3/l6" fillet welds per section (front and back).2. Is the anchorage free of bent, broken, missing or loose hardware?No degraded conditions foundfor base stitch welds.3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

Separationfound on base grout at end of cabinet.

Identified as an aestetic concern, therefore no significant adverse effect.

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50%o for which an anchorage configuration verification is required.)Stitch weld detail verified in detail I5 of drawing C-0233 and confirmed to be consistent with walkdown inspection (drawtng 1/4' weld 3-6oc). SQUG CalculationC-CSS-FI IA provides qualification of as-installed welded anchorage.
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X X X X X X pcte Paul c. Rizzo Associates, [nc.

ENGINEERS S. CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. Fl lA Equip. ClassEquipment Description MCC Fl lA Sheetl. Motor Control Centers Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Nearby ladderfound with poor tie-ffi but judged not a potential hazard to this MCC.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?Auached top conduits provide adequate top bracing to MCC.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Adjacent panels CDFI lA-I and CDFI IA-2 have a gap of -I/4" to this MCC, butthe top connection of these panels to the MCC negotes any interaction potential.

X X X X 169 of379 star(}N u N/A Other Adverse Conditions11. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra tr ' / /"t ;:;t

/',#"r/ //l{k'A Date: Date:Adam L. Helffrich Sheet 170 of 379 Paul C. Rizzo Associates, Inc.

ENGINEERS 6.. CONSULTANTSSeismic Walkdown Checklist (SWC)Equipment ID No. Fl lA Equipment Description MCC FIIA Equip. Class l. Motor Control CentersStatusG'\N UOther supporting or relevant documents and photos (if any):Fl lA plate ID Plate of componentFl lA general General view of component Sheet L7I of379 Paul C. Ri zzo Associates, Inc.ENGINEERS 6{- C]ONSULTANTS Seismic Walkdown Checklist (SWC)StatusG\N u Equipment ID No. Fl lA Equipment DescriptionEquip. Class MCC FI IA l. Motor Control Centers

'f t 4' t" Fl lA stitch weldPartial view of anchorage, view is typical of allF I I A rigid connection to adjoining conduit and MCC A rigid connection is used to fasten the unit to adjoining conduit Paul C. Ri zzo Associates, Inc.ENGINEERS 6. CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. Fl lA Equipment Description Equip. Class MCC FIIA l. Motor Control CentersSheet 172 of 379 Status(?\N uF I I A crack in base of grout on corner Separation in base grout. Appears to be aestetic grout only.Fl lA poorly secured ladder in area of MCC Ladder loosely tied off.

Seismic Walkdown Checklist (SWC)Equipment ID No. Fl-2 Equip. Class 0. OrherSheet 173 of379statuf)N u Equipment Description Location:

Bldg. INTK Traveling water screen Fl-2 Floor El.585 Room 50 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on theSWEL. The space below each of the following questions may be used to record the results ofjudgments and hndings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50Yo of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?Slight corrosion identified in bolts due to humid environment.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50Tofor which an anchorage configuration verification is required.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Although slight corrosionfound on screen mounting base, no signfficant degraded conditionwas identified during inspection.

Y Y Y Y Y NiA N/A N/A Y X X X X X X PC'".eSeismic Walkdown Checktist (SWC)Equipment ID No. Fl-z Equip. Class 0. Other Equipment Description Traveling water screen F1-2 Sheet Interaction Effects7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting,and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?Rigidly attached lines, no concern of dffirential displacement.
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X X X x 174 of379 Statusl?)N U Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Inside of screen housing was accessible and no degraded condition was identified.

Motor located on top of screen housingfound in adequate condition.

Evaluated bv: Eddie M. Guerra'#*//?'#'/*

Adam L. Helffrich Sheet 175 of 379 Pau[ C. Rizzo Associates, Inc.ENGTNEERS 6t CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. Fl-zEquip. Class 0. Other Equipment DescriptionTraveling water screen F I -2 Other supporting or relevant documents and photos (if any): Fl-2 plate ID Plate of component StatusON U Fl-2 general General view of component Sheet 176 of 379Paul C. Rizzo Associates, Inc.ENGINEERS er- CONSULTAN]TS Seismic Walkdown Checklist (SWC)Equipment ID No. Fl-zEquip. Class 0. Other Equipment DescriptionTraveling water screen F l -2Fl-2 anchoragePartial view of anchorage, view is typical of all anchors Fl-l insideFl-l is opened for inspection because it is more visible than Fl-z StatusG\N u

Sheet 177 of379Paul C. Rizzo Associates, Inc.ENGINEERS & CONSUTTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. F12A Equip. Class l. Motor Control Centers statusQv u Equipment Description MCC FI2A Location: Bldg. AUXBFloor El.603 Room 428 Manufacturer. Model. Etc.

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50Yo of SWEL items requiring such verification)?This is an 8 section MCC, but it is in-line with two other MCC sections (MCC FI4 and MCC FI5).It was verified that all adjacent sections are bolted together. Each section of MCC is welded to embed channels at front and back with an average of at least 5" long, 3/16" fillet welds.Y 2. Is the anchorage free of bent, broken, missing or loose hardware?

No degraded conditions foundfor base stitch welds.3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?No craclrs identffied in sloped grout at mounting base.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the SOYo forwhich an anchorage configuration verification is required.)

SQUG Calculation C-CSS-Fl24 provides qualification of as-installed welded anchorage.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y Y Y Y N/A Y X X X X X X Sheet 178 of379Paul C. Rizzo Associates, Inc.ENGINEERS & CONSUXTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. Fl2A Equip. ClassMCC FI2A StatusFN Ul. Motor Control Centers Equipment Description Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Top entry conduit rigidly supported to backwall.
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/A X X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that couldadversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

This 8 section MCC is adjacent to MCC FI4 and MCC F15. These MCCs were opened and inspected. It was verified that these MCCs are bolted together. At the south end of this MCC, there is a I .5" gap to panel CDF I 2A- I , which is iudged acceptable to preclude pounding.Evaluated bv:

Date: 712512012Eddie M. Guerra

'#"/// /'Adam L. Helffrich Date: 7125/2012 Sheet 179 of379 Paul C. Rizzo Associates, Inc.ENGINEERS & CTONSUTTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. Fl2A Status(?)N u Equipment DescriPtion Equip. Class MCC FIZAl. Motor Control Centers Other supporting or relevant documents and photos (if any): ID Plate of component Fl2A general General view of comPonent Paul C. Rizza Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. FlzA Equip. ClassMCC FI2A l. Motor Control Centers Equipment Description Sheet 180 of379 StatusON UF l2A stitch weld Partial view of anchorage, view is typical of all anchors Sheet 181 of379Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. Fl2D Equip. Class l. Motor Control Centers statuf)N u Equipment DescriptionMCC FI2D Location: Bldg. INTKFloor El.576 Room Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments'Anchorage l. Is the anchorage configuration verification required (i.e., is the item oneof the 5OYo of SWEL items requiring such verification)?This a single section MCC welded to embed with an average of 9' of 3/ 16" fillet welds at front and back.No degraded conditionfound around cabinet base.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?No significant craclrs identffied around cabinet mounting base.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)

Since cabinet could not be opened, configuration is verified basedon SQUG calculation C-CSS-FL2D. This calculation evaluates anchorage based on calculation C-CSS-E12C which conlcudes anchorage configuration is adequate.

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Outlier close out note (C-CSS-F I2D, page 7 of 7) indicates comparison w/ E I2Chas shown anchorage is adequate.

Anchorage is also checked with 52 N Y NiA X X X X X X section L of drawing C-04128 and confirmed to be consistent with walkdown 182 of 379Paul C. Rizzo Associates, Inc.Es-GINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. Fl2DEquip. Class MCC FIZD L Motor Control Centers Equipment Description Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Potential interaction hazard due to near byfire extinguishers without adequate wallfixity.

It was agreed that no significant ffict expected during seismic event.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y X Y X Y X X Sheet StatusG)N u Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by:Eddie M. GuerraAdam L. Helffrich Date: 7t25/2012 Date: 712512012 Sheet I 83 of 379 Paul C. Ri zzo Associates, Inc.ENGINEERS dl CONSULTANTS Seismic Walkdown Checklist (SWC)Status/?)N u Equipment ID No. Fl2D Equipment Description Equip. Class MCC FI2Dl. Motor Control Centers Other supporting or relevant documents and photos (if any):F l2D plateID Plate of componentF l2D anchorage Mounting base detail with embedded channel Potential interaction hazard from fire extinguisher in the vicinitY of comPonent.

F l2D general General view of componentF l2D fire ext to right Sheet 184 of379 Paul C. Rizzo Associates, Inc.ENCINEERS & CONSULTANTS Statufr)N u Seismic Walkdown Checklist (SWC)Equipment ID No. FDl062 Equip. Class 0. Other Equipment DescriptionFIRE DAMPER FD t062 Location:

Bldg. AUXB Floor El.603 Room 428 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage l. Is the anchorage configuration verification required (i.e., is the item oneof the 50Yo of SWEL items requiring such verification)?

Component attached to ceiling and braced to wall with HSS sections'2. Is the anchorage free of bent, broken, missing or loose hardware?Damper vertical supports connected to upperfloor decking between ribs.3. Is the anchorage free of corrosion that is more than mild surface oxidation?4. Is the anchorage free of visible cracks in the concrete near the anchors?

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/oforwhich an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?Damperfound adequately supported against lateral movement 11SS sections found in adequate condition. No signs of corrosion observed on support members.N Y N Y N Y N Y U N Y U NiA U NiA U N/A N/A U N Y X X X X X X Sheet 185 of379Paul C" Rizzo Associates, Inc.ENGINEERS 6. CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. FDl062Equip. Class FIRE DAMPER FD Status/?)N U0. Other Equipment Description 1062 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?9. Do attached lines have adequate flexibility to avoid damage?

Electric line connected with adequate flexibility.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N Y N Y N Y U N Y U N/A U N/A U N/A X X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

N Y X Comments (Additional pages may be added as necessary)

Evaluated by:Eddie M. Guerra Date: '712512012 Date: 7125/2012 ,,i$rr'//1 Adam L. Helffrich Sheet 186 of379 Paul C. Rizzo Associates, Inc.ENGINEERS {ir CONSULTANTS Seismic Walkdown Checklist (SWC)StatusG)N u Equipment ID No. FDl062 Equipment Description Equip. Class 0. OtherFIRE DAMPER FD 1062 Other supporting or relevant documents and photos (if any): FDl062General view of componentFD I 062 anchorage View of anchorage Sheet 187 of379 Paul C. Rizzo Associates, Inc.ENCINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. FIS l6l2 Equip. Class 20.

Instrument and Control Panels Equipment Description SFP HX I FIS-1612 Cool Water Outlet Flow Indicating Switch Status*)N u Location:

Bldg. AUXB Manufacturer, Model, Etc.Floor El.590'6" Room 312 Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchorage l. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?

Floor mounted rackfound in adequate condition anchoredwith 4-l/2" diam bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?No signs of corrosionfound on anchor bolts and bottom-I/2" plate.4. Is the anchorage free of visible cracks in the concrete near the anchors?No visible cracks on groutfor bottom plate anchorage.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50oh for which an anchorage conf,tguration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Anchor spacing to adjacentfloor mounted rack is iudged adequate.X X X X X X Sheet 188 of379Paul C. Rizzo Associates, Inc'ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. FIS 1612 Equip. Class 20. Instrument and Control Panels Equipment Description SFP HX I FIS-1612 Cool Water Outlet Flow Indicating Switch StatusON U Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry btock walls not likely to collapse onto the equipment?Seismic capacity of blockwalls in the area verified.Blockwalls 3257 and 3267 verified to be to be seismically adequate based on ref. VBWI6-8001-083, Rev 2 (4/27/88) and VBWL6-8001-084, Rev 5 (4/27/88).
9. Do attached lines have adequate flexibility to avoid damage?Flexible line and small pipingwere identified with adequateflexibility.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N/A X X X X Other Adverse Conditions11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

X Comments (Additional pages may be added as necessary)

Evaluated by:Eddie M. GuerraAdam L. Helffrich Date: 7/2512012 Date: 712512012 Sheet I 89 of 379Paul C. Rizza Associates, Inc.Seismic Walkdown Checklist (SWC)Equipment ID No. FIS 1612 Equip. Class 20. Instrument and Control Panels Status(?\N u Equipment Description SFP HX I FIS- 1612 Cool Water Outlet Flow Indicating SwitchOther supporting or relevant documents and photos (if any): FIS 1612 plateID Plate of component FIS 1612 general General view of component Sheet 190 of379Paul C. Rizzo Associates, Inc.ENGINEERS & CONSUTTANTS Seismic \Yalkdown Checklist (SWC)Equipment ID No. FIS 1612 Equip. class 20.

Instrument and control Panels Equipment Description SFP HX I FIS- 1612 Cool Water Outlet Flow Indttuting S*itth FIS 1612 anchorageView of anchorage status(?)N u FIS 1612 adjacent masonry wall Potential interaction hazard from masonry wall near unit Sheet l9l of379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Status(f) N U Equipment ID No.FTHP3C Equip. Class 18. Instrument (on) Racks Equipment Description FLOW TRANSMITTER FT HP3C Location:

Bldg. AUXB Floor El.565 Room 208 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e', is the item one of the 50o/o of SWEL items requiring such verification)?

Mounted on tube section 6x6 which is attached to concrete wall withfour l/2" diameter anchors. The lightweight transmitter

(<-20lbs) is attsched to the rackwithfour 3/8" diameter machine bolts. OK.2. Is the anchorage free of bent, broken, missing or loose hardware?Supporting wall tubes found in good condition.

3. Is the anchorage free of corrosion that is more than mild surlace oxidation?

No signs of corrosionfound on mounting support and piping4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracks identified on wall nearflow transmitter.

5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free ofpotentially adverse seismic conditions?

X X Y Y Y Y N/A N/A Y X X X X Sheet 192of379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. FTHP3CEquip. Class

18. Instrument (on) Racks Equipment Description FLOW TRANSMITTER FT HP3C StatusfDN u Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Small piping connected to transmitter found with adequate flexibility'
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?No potential interaction identified on the vicinity of component.

Y X X X X Other Adverse ConditionsI L Have you looked for and adversely affect the safety found no other seismic conditions that could functions of the equipment?

Comments (Additional pages may be added as necessary)Pipe lines rigidly attached to containment wall. No adverse efects due to dffirential motion are expected'Evaluated by:

Date: 7tzsl?ol2Eddie M. Guerra

, ,,i. / /.t i;;",/

.{td,n// b*t/hwr Date: 712512012 Adam L. Helffrich X

Sheet 193 of 379 Paul C. Ri zzo Associates, Inc.ENCI INEERS

6. C-ONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. FTHP3CEquip. Class 18. Instrument (on) Racks Equipment Description FLOW TRANSMITTER FT HP3COther supporting or relevant documents and photos (if any): statusG)N u\*l FTHP3CID Plate of component FTHP3C General General view of component Sheet 194 of379 Paul C. Rizzo Associates, Inc.ENGINEERS & CONSUXTANTS Seismic Walkdown Checklist (SWC)status:oN U Equipment ID No. FV645l Equipment Description Equip. Class SOLENOID VALVE8B. Solenoid Valves AF645l Location:

Bldg.AUXB Floor El.Room 238 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments'Anchorage1. Is the anchorage configuration verification required (i.e., is the item oneof the 50To of SWEL items requiring such verification)?

Installed on a 4" diameter pipe line.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Valve and main pipe linefound with no signs of corrosion'

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/o forwhich an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Main pipe line adequatelly supported.

No excessive unsupported lengths identified.

565 X X X X X X 195 of379 Paul C. Rizzo Associates, Inc.ENG1NEERS 6.

CONSULJTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. FV645lEquip. Class 88. Solenoid Valves Equipment Description SOLENOID VALVE AF645I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?No blockwalls or potential interaction hazard identilied in the srea.9. Do attached lines have adequate flexibility to avoid damage?Lines connected with adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y X Y X Y X Y X Sheet status(f)N u Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y X Comments (Additional pages may be added as necessary)

Evaluated by: ,t#,/p,fur/, 712512012 Eddie M. GuerraAdam L. Helffrich Date: 7lzsl20l2 Sheet 196 of 379Paul C. Rizzo Associates, Inc.ENGTNEERS 6.' CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. FV645l Equip. Class 88. Solenoid Valves Equipment Description SOLENOID VALVE AF645I Other supporting or relevant documents and photos (if any): FV-6451 Plate ID Plate of component FV-6451 General2 General view of comPonent statusG)N u

Sheet 197 of379 Paul C, Rizzo Associates, Inc.ENGINEERS & CONSUXTANTS Seismic Walkdown Checklist (SWC)Status@N U Equipment ID No.FV6452 Equip. Class 88. Solenoid Valves Equipment Description SOLENOID VALVE AF6452 Location:

Bldg. AUXB Floor El. 565 Room 237 Manufacturer, Model, Etc.Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the foltowing questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments'Anchoragel. Is the anchorage configuration verification required (i.e., is the item one of the 50o/o of SWEL items requiring such verification)?Mounted on pipe line spannig around l0ft.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Valve and pipe linefound with good surface condition and no signs of cotosion.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% forwhich an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

X X N/A N/A X X x X of379Paul C. Rizzo Associates, lnc.ENGINEERS & CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. FV6452Equip. Class 88. Solenoid Valves Equipment DescriptionSOLENOID VALVE AF6452 Status(f)N u Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?

Attached lines found with adequate flexibiliy.

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N Y N Y N Y N Y X X X X Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

N Y X Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra"'tf-'t'{/

P'Date: 712512012 Date: 712512012 Adam L. Helffrich 199 of 379 Paul C. Ri zzo Associates, Inc.ENGTNEERS 6*. CONSULTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. FV6452 Equip. Class 88. Solenoid Valves Equipment Description SOLENOID VALVE 4F6452Other supporting or relevant documents and photos (if any): FV6452 general General view of component Sheet StatusG)N u

200Paul C. Rizzo Associates, Inc.ENGINEERS & C,ONSULTAN}TS Seismic Walkdown Checklist (SWC)Equipment ID No. HIS 58894 Equip. Class 20. Instrument and Control Panels Equipment DescriptionAFP TURB l-l STEAM INLET VALVE inside PNL C5709 Status:f)N U Location: Bldg. AUXB Manufacturer, Model, Etc.

Floor El.623 Room 505 Instructions for Completing ChecklistThis checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.Anchoragel. Is the anchorage configuration verification required (i.e., is the item oneof the 50o/o of SWEL items requiring such verification)?

Inside Panel C5709, which has similar anchorage to Panel C5702.

Back panel doors are adequately attached to panel structure with4-l/2" screws.2. Is the anchorage free of bent, broken, missing or loose hardware?

None observed.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

None observed.4. Is the anchorage free of visible cracks in the concrete near the anchors?

None observed.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50o/ofor which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

N Y N Y N Y U N Y U N Y U N/A U NiA N/A U N Y X X X X X X Sheet 201 of 379Paul C. Rizzo Associates, Inc.ENGINEERS &

CONSUUTANTS Seismic Walkdown Checklist (SWC)Equipment ID No. HIS 5889A Equip. Class 20.

Instrument and Control Panels Equipment DescriptionAFP TURB l-l STEAM INLET VALVE inside PNL C5709 Status:(?)N U Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?N Y N Y N Y U N Y U N/A U N/A U N/A x X X X Other Adverse ConditionsI l. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

U N Y X Comments (Additional pages may be added as necessary)

Evaluated by:Eddie M. Guerra I ,.J I f ' ')' "/ifrC Date: 712512012 Date: 712512012Adam L. Helffrich