Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 7 August 2023 | Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | Cyber Security Safeguards Contingency Plan Fire Protection Program |
IR 05000346/2021090 | 16 December 2021 | Reissue Davis-Besse NRC Inspection Report (05000346/2021090) Preliminary White Finding | Significance Determination Process Preliminary White Finding |
L-18-108, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.... | 12 April 2018 | Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.... | Safe Shutdown Unanalyzed Condition Boric Acid High winds Tornado Missile Enforcement Discretion Probabilistic Risk Assessment FLEX Tornado Generated Missile Tornado Missile Protection |
L-17-088, Independent Spent Fuel Storage Installation Changes, Tests and Experiments | 27 March 2017 | Independent Spent Fuel Storage Installation Changes, Tests and Experiments | |
L-16-148, Fatigue Monitoring Program Evaluation of Reactor Coolant Pressure Boundary Components for Effects of the Reactor Coolant Environment on Fatigue Usage (I.E., Environmentally-Assisted Fatigue) | 21 April 2016 | Fatigue Monitoring Program Evaluation of Reactor Coolant Pressure Boundary Components for Effects of the Reactor Coolant Environment on Fatigue Usage (I.E., Environmentally-Assisted Fatigue) | |
ML15230A289 | 25 August 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review | Safe Shutdown Earthquake Operating Basis Earthquake Fukushima Dai-Ichi Earthquake |
L-14-401, First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In | 19 December 2014 | First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In | |
ML14353A060 | 3 November 2014 | 2734296-R-010, Rev. 0, Expedited Seismic Evaluation Process (ESEP) Report Davis-Besse Nuclear Power Station | |
L-14-259, Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 August 2014 | Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | FLEX Spent Fuel Pool Instrumentation |
ML14141A525 | 30 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident | Unanalyzed Condition High winds Operator Manual Action Fukushima Dai-Ichi Earthquake |
L-14-167, Report of Facility Changes, Tests and Experiments for the Period Ending May 26, 2014 | 18 June 2014 | Report of Facility Changes, Tests and Experiments for the Period Ending May 26, 2014 | Incorporated by reference Turbine Missile |
L-14-104, Firstenergy Nuclear Operating Co. Response to NRC Request for Information Pursuant to 10 CFR 50.54 (F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 11 March 2014 | Firstenergy Nuclear Operating Co. Response to NRC Request for Information Pursuant to 10 CFR 50.54 (F) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Fukushima Dai-Ichi Earthquake |
ML13340A147 | 26 November 2013 | Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant - Response to RAI Associated with Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (TAC Nos. MF0116 & MF0 | Condition Adverse to Quality Fukushima Dai-Ichi |
ML13340A159 | 26 November 2013 | Davis-Besse Nuclear Power Station Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix a | |
ML13340A160 | 9 October 2013 | Davis-Besse Nuclear Power Station Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (1 of 2) | |
ML13340A158 | 9 October 2013 | Davis-Besse Nuclear Power Station Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1 | |
ML13340A162 | 9 October 2013 | Davis-Besse Nuclear Power Station Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix B (2 of 2) | |
ML13340A163 | 9 October 2013 | Davis-Besse Nuclear Power Station Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report Revision 1, Appendix C to Appendix G | Scaffolding |
L-13-157, Generic Safety Issue 191 Resolution Plan | 15 May 2013 | Generic Safety Issue 191 Resolution Plan | Coatings Severe Accident Management Guideline |
L-12-347, FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | 27 November 2012 | FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | Safe Shutdown Unanalyzed Condition Boric Acid High winds Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Locked High Radiation Area Fukushima Dai-Ichi Earthquake |
ML13008A031 | 10 August 2012 | Davis-Besse Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Cover Through Appendix a, Resumes and Qualifications, Page A-39 | Safe Shutdown Shutdown Margin High Radiation Area Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Finite Element Analysis Large early release frequency Earthquake Maintenance Rule Program Fire Protection Program Scaffolding Weak link |
ML13135A246 | 10 August 2012 | Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix C - Area Walk-by Checklists (Awcs) Through End | Scaffolding |
ML13135A245 | 10 August 2012 | Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B - Seismic Walkdown Checklists (Swcs), Sheet 202 of 379 Through Sheet 379 of 379 | |
ML13135A244 | 10 August 2012 | Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B - Seismic Walkdown Checklists (Swcs), Sheet 1 of 379 Through Sheet 201 of 379 | |
ML13135A243 | 10 August 2012 | Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix a - Resumes and Qualifications | |
ML13135A242 | 10 August 2012 | Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Cover Through Page 176 | |
L-12-283, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B, Seismic Walk-Down Checklists, Sheet 364 of 461 Through Appendix C, Area Walk-By Checklists, Sheet 20 of 139 | 10 August 2012 | Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B, Seismic Walk-Down Checklists, Sheet 364 of 461 Through Appendix C, Area Walk-By Checklists, Sheet 20 of 139 | Scaffolding |
ML13008A064 | 10 August 2012 | Davis-Besse Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B, Seismic Walk-Down Checklists, Sheet 244 of 461 Through Sheet 363 of 461 | Scaffolding |
ML13008A063 | 10 August 2012 | Davis-Besse Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B, Seismic Walk-Down Checklists, Sheet 121 of 461 Through Sheet 243 of 461 | High Radiation Area Scaffolding |
ML13008A062 | 10 August 2012 | Davis-Besse Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B, Seismic Walk-Down Checklists, Page B-1 Through Sheet 120 of 416 | Scaffolding |
ML12213A337 | 27 July 2012 | SB-00-20: CR-2011-03346 Evaluation | |
ML12213A335 | 27 July 2012 | Review of Technical Assessment Report No. 25539-200 COR-0000-00001 | |
L-12-196, FENOC-Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346, License No. NPF-3 Submittal of Contractor Root Cause Assessment Report-Section 7 | 14 May 2012 | FENOC-Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346, License No. NPF-3 Submittal of Contractor Root Cause Assessment Report-Section 7 | High winds Finite Element Analysis |
ML12138A058 | 14 May 2012 | FENOC-Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346, License No. NPF-3 Submittal of Contractor Root Cause Assessment Report-Section 3 | High winds Coatings |
ML12138A081 | 14 May 2012 | FENOC-Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346, License No. NPF-3 Submittal of Contractor Root Cause Assessment Report-Section 6 | Finite Element Analysis |
ML12138A049 | 14 May 2012 | FENOC-Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346, License No. NPF-3 Submittal of Contractor Root Cause Assessment Report-Section 2 | Past operability Coatings Scaffolding Operability Assessment |
ML12138A067 | 14 May 2012 | FENOC-Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346, License No. NPF-3 Submittal of Contractor Root Cause Assessment Report-Section 4 | |
ML12138A073 | 14 May 2012 | FENOC-Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346, License No. NPF-3 Submittal of Contractor Root Cause Assessment Report-Section 5 | |
L-12-071, 10 CFR 50.46 Report of Significant Changes or Errors in the Loss of Coolant Accident Evaluation Model | 16 March 2012 | 10 CFR 50.46 Report of Significant Changes or Errors in the Loss of Coolant Accident Evaluation Model | Fuel cladding |
ML12200A212 | 21 November 2011 | Containment Shield Building Issue | Tornado Missile Protection |
ML12200A210 | 17 November 2011 | Containment System Primary Steel Containment an Shield Building | |
ML12213A348 | 28 October 2011 | Table of Contents to Isolated Crack Indication Identified by Impulse Response Testing of the Shield Building | Past operability |
L-11-319, Pressure and Temperature Limits Report | 27 October 2011 | Pressure and Temperature Limits Report | Hydrostatic Pressure and Temperature Limits Report |
ML11301A230 | 1 June 2011 | Reference: State Energy Consumption Estimates 1960 Through 2009 | |
ML110100758 | 10 January 2011 | Pressure Temperature Limits Report Attachment | Hydrostatic Pressure and Temperature Limits Report Exemption Request |
ML11301A223 | 31 July 2010 | Chp Regional Application Centers: Activities and Selected Results for Fiscal Year 2009 | |
ML101520116 | 26 May 2010 | Field Report Control Rod Drive Mechanism Number 4 Ultrasonic Results | |
ML101270439 | 5 May 2010 | Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants | |
ML100539623 | 22 February 2010 | Lessons Learned Task Force Action Plan Regarding Stress Corrosion Cracking Dec 2009 (Final Update) | Boric Acid Hydrostatic VT-2 Pressure Boundary Leakage |
L-09-068, Independent Spent Fuel Storage Installation - 10 CFR 72.48 Report of Dry Fuel Storage Facility Changes, Tests, and Experiments | 27 February 2009 | Independent Spent Fuel Storage Installation - 10 CFR 72.48 Report of Dry Fuel Storage Facility Changes, Tests, and Experiments |