IR 05000341/2006302: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:September 6, 2006Mr. Donald K. CobbAssistant Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166SUBJECT:FERMI POWER PLANTNRC INITIAL LICENSE EXAMINATION REPORT 050000341/2006302(DRS)
{{#Wiki_filter:ber 6, 2006
 
==SUBJECT:==
FERMI POWER PLANT NRC INITIAL LICENSE EXAMINATION REPORT 050000341/2006302(DRS)


==Dear Mr. Cobb:==
==Dear Mr. Cobb:==
On August 8, 2006, members of the Fermi Power Plant Training staff administered the writtenretake examination to two Reactor Operator (RO) applicants who had previously failed the written examination administered on March 10, 2006. The results of the examination werefinalized on August 16, 2006, showing the applicants passed the written examination. Theapplicants previously passed the operating test administered the week of March 6, 2006, andtherefore, have now passed all sections of the license examination. The enclosed report documents the results of the examination which were discussed on August 16, 2006, withMr. Edwin Kokosky, and with other members of your staff.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC Public DocumentRoom, or from the Publicly Available Records (PARS) component of NRC's document system(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
On August 8, 2006, members of the Fermi Power Plant Training staff administered the written retake examination to two Reactor Operator (RO) applicants who had previously failed the written examination administered on March 10, 2006. The results of the examination were finalized on August 16, 2006, showing the applicants passed the written examination. The applicants previously passed the operating test administered the week of March 6, 2006, and therefore, have now passed all sections of the license examination. The enclosed report documents the results of the examination which were discussed on August 16, 2006, with Mr. Edwin Kokosky, and with other members of your staff.


D. Cobb-2-We will gladly discuss any questions you have concerning this examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this examination.


Sincerely,
Sincerely,
/RA/Hironori Peterson, ChiefOperations Branch Division of Reactor SafetyDocket No. 50-341License No. NPF-43
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43


===Enclosures:===
===Enclosures:===
1.Operator Licensing Examination Report 050000341/2006302(DRS)
1. Operator Licensing Examination Report 050000341/2006302(DRS)
w/Attachment: Supplemental Information2.Written Examination and Answer Key (RO Retake)
w/Attachment: Supplemental Information 2. Written Examination and Answer Key (RO Retake)


REGION IIIDocket No:50-341License No:NPF-43Report No:050000341/2006302(DRS)
REGION III==
Licensee:Detroit Edison Company Facility:Fermi Power Plant Location:6400 North Dixie HighwayNewport, MI 48166Dates:August 16, 2006 Examiners:R. K. Walton, Chief Examiner Approved by:H. Peterson, ChiefOperations Branch Division of Reactor SafetyEnclosure 1 Enclosure 1 2
Docket No: 50-341 License No: NPF-43 Report No: 050000341/2006302(DRS)
Licensee: Detroit Edison Company Facility: Fermi Power Plant Location: 6400 North Dixie Highway Newport, MI 48166 Dates: August 16, 2006 Examiners: R. K. Walton, Chief Examiner Approved by: H. Peterson, Chief Operations Branch Division of Reactor Safety Enclosure 1


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
ER 05000341/2006302(DRS); 08/16/2006; Fermi Power Plant; Initial License Written RetakeExamination Report.The operator licensing written retake examination was administered by the licensee inaccordance with the guidance of NUREG-1021, "Operator Licensing Examination Standards forPower Reactors," Revision 9.Examination Summary
ER 05000341/2006302(DRS); 08/16/2006; Fermi Power Plant; Initial License Written Retake
:*A written retake examination was administered to two Reactor Operator (RO) applicantson August 8, 2006.*The two applicants passed the written examination. The applicants passed theoperating test administered the week of March 6, 2006, and therefore, have now passedall sections of their examination. The applicants were issued the applicable operatorlicenses on August 22, 2006.


3
Examination Report.
 
The operator licensing written retake examination was administered by the licensee in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9.
 
Examination Summary:
* A written retake examination was administered to two Reactor Operator (RO) applicants on August 8, 2006.
* The two applicants passed the written examination. The applicants passed the operating test administered the week of March 6, 2006, and therefore, have now passed all sections of their examination. The applicants were issued the applicable operator licenses on August 22, 2006.


=REPORT DETAILS=
=REPORT DETAILS=
4.OTHER ACTIVITIES (OA)4OA5Other.1Initial Licensing Examinations
 
==OTHER ACTIVITIES (OA)==
{{a|4OA5}}
==4OA5 Other==
 
===.1 Initial Licensing Examinations===


====a. Examination Scope====
====a. Examination Scope====
The licensee wrote and administered an NRC approved written retake examination onAugust 8, 2006. The NRC outline and written examination was written and reviewedusing the guidance established in NUREG-1021, "Operator Licensing ExaminationStandards for Power Reactors," Revision 9.
The licensee wrote and administered an NRC approved written retake examination on August 8, 2006. The NRC outline and written examination was written and reviewed using the guidance established in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9.


====b. Findings====
====b. Findings====
There were no post-examination comments from the written examination. The applicants previously passed the operating exam that was administered during the week of March 6, 2006. The applicants were granted a waiver for the operating test.
There were no post-examination comments from the written examination.
 
The applicants previously passed the operating exam that was administered during the week of March 6, 2006. The applicants were granted a waiver for the operating test.


Each applicant successfully passed the written examination..2Examination Security
Each applicant successfully passed the written examination.
 
===.2 Examination Security===


====a. Inspection Scope====
====a. Inspection Scope====
The NRC examiners briefed the facility contact on the NRC's requirements andguidelines related to examination physical security (e.g., access restrictions). The licensee implemented examination security and integrity measures (e.g., security agreements) in accordance with licensee procedures.
The NRC examiners briefed the facility contact on the NRCs requirements and guidelines related to examination physical security (e.g., access restrictions). The licensee implemented examination security and integrity measures (e.g., security agreements) in accordance with licensee procedures.


====b. Findings====
====b. Findings====
No findings were noted in this area. 4OA6MeetingsExit MeetingThe chief examiner conducted a telephone exit meeting on August 16, 2006, withMr. E. Kokosky and other members of the Training Department staff. ATTACHMENT:
No findings were noted in this area.
 
{{a|4OA6}}
==4OA6 Meetings==
 
Exit Meeting The chief examiner conducted a telephone exit meeting on August 16, 2006, with Mr. E. Kokosky and other members of the Training Department staff.
 
ATTACHMENT:  


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


1Attachment
Enclosure 1
1SUPPLEMENTAL INFORMATIONKEY POINTS OF CONTACTLicensee
SUPPLEMENTAL INFORMATION
: [[contact::E. Kokosky]], Manager, Nuclear Training  
KEY POINTS OF CONTACT
Licensee
: [[contact::E. Kokosky]], Manager, Nuclear Training
: [[contact::T. Horan]], Operations Training Supervisor
: [[contact::T. Horan]], Operations Training Supervisor
: [[contact::D. Coseo]], Shift Engineer, Operations
: [[contact::D. Coseo]], Shift Engineer, Operations
NRC
NRC
: [[contact::R. Walton]], Chief ExaminerITEMS OPENED, CLOSED, AND DISCUSSEDOpened, Closed, and DiscussedNone
: [[contact::R. Walton]], Chief Examiner
2Attachment
ITEMS OPENED, CLOSED, AND DISCUSSED
2LIST OF ACRONYMS
Opened, Closed, and Discussed
USEDADAMSAgency-Wide Document Access and Management SystemDRSDivision of Reactor Safety
None
NRCNuclear Regulatory Commission
Attachment
PARSPublicly Available Records
LIST OF ACRONYMS USED
ROReactor Operator
ADAMS Agency-Wide Document Access and Management System
SROSenior Reactor Operator
DRS  Division of Reactor Safety
WRITTEN EXAMINATION AND ANSWER KEY (RO Retake)RO Retake Written Examination ADAMS Accession # ML062420268.Enclosure 2
NRC  Nuclear Regulatory Commission
PARS  Publicly Available Records
RO    Reactor Operator
SRO  Senior Reactor Operator
Attachment
WRITTEN EXAMINATION AND ANSWER KEY (RO Retake)
RO Retake Written Examination ADAMS Accession # ML062420268.
2
}}
}}

Revision as of 14:08, 23 November 2019

Er 05000341/2006302(DRS); 08/16/2006; Fermi Power Plant; Initial License Written Retake Examination Report
ML062560477
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/06/2006
From: Hironori Peterson
Division of Reactor Safety III
To: Cobb D
Detroit Edison
References
50-341/06302 50-341/06302
Download: ML062560477 (10)


Text

ber 6, 2006

SUBJECT:

FERMI POWER PLANT NRC INITIAL LICENSE EXAMINATION REPORT 050000341/2006302(DRS)

Dear Mr. Cobb:

On August 8, 2006, members of the Fermi Power Plant Training staff administered the written retake examination to two Reactor Operator (RO) applicants who had previously failed the written examination administered on March 10, 2006. The results of the examination were finalized on August 16, 2006, showing the applicants passed the written examination. The applicants previously passed the operating test administered the week of March 6, 2006, and therefore, have now passed all sections of the license examination. The enclosed report documents the results of the examination which were discussed on August 16, 2006, with Mr. Edwin Kokosky, and with other members of your staff.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this examination.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43

Enclosures:

1. Operator Licensing Examination Report 050000341/2006302(DRS)

w/Attachment: Supplemental Information 2. Written Examination and Answer Key (RO Retake)

REGION III==

Docket No: 50-341 License No: NPF-43 Report No: 050000341/2006302(DRS)

Licensee: Detroit Edison Company Facility: Fermi Power Plant Location: 6400 North Dixie Highway Newport, MI 48166 Dates: August 16, 2006 Examiners: R. K. Walton, Chief Examiner Approved by: H. Peterson, Chief Operations Branch Division of Reactor Safety Enclosure 1

SUMMARY OF FINDINGS

ER 05000341/2006302(DRS); 08/16/2006; Fermi Power Plant; Initial License Written Retake

Examination Report.

The operator licensing written retake examination was administered by the licensee in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9.

Examination Summary:

  • A written retake examination was administered to two Reactor Operator (RO) applicants on August 8, 2006.
  • The two applicants passed the written examination. The applicants passed the operating test administered the week of March 6, 2006, and therefore, have now passed all sections of their examination. The applicants were issued the applicable operator licenses on August 22, 2006.

REPORT DETAILS

OTHER ACTIVITIES (OA)

4OA5 Other

.1 Initial Licensing Examinations

a. Examination Scope

The licensee wrote and administered an NRC approved written retake examination on August 8, 2006. The NRC outline and written examination was written and reviewed using the guidance established in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9.

b. Findings

There were no post-examination comments from the written examination.

The applicants previously passed the operating exam that was administered during the week of March 6, 2006. The applicants were granted a waiver for the operating test.

Each applicant successfully passed the written examination.

.2 Examination Security

a. Inspection Scope

The NRC examiners briefed the facility contact on the NRCs requirements and guidelines related to examination physical security (e.g., access restrictions). The licensee implemented examination security and integrity measures (e.g., security agreements) in accordance with licensee procedures.

b. Findings

No findings were noted in this area.

4OA6 Meetings

Exit Meeting The chief examiner conducted a telephone exit meeting on August 16, 2006, with Mr. E. Kokosky and other members of the Training Department staff.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

Enclosure 1

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

E. Kokosky, Manager, Nuclear Training
T. Horan, Operations Training Supervisor
D. Coseo, Shift Engineer, Operations

NRC

R. Walton, Chief Examiner

ITEMS OPENED, CLOSED, AND DISCUSSED

Opened, Closed, and Discussed

None

Attachment

LIST OF ACRONYMS USED

ADAMS Agency-Wide Document Access and Management System

DRS Division of Reactor Safety

NRC Nuclear Regulatory Commission

PARS Publicly Available Records

RO Reactor Operator

SRO Senior Reactor Operator

Attachment

WRITTEN EXAMINATION AND ANSWER KEY (RO Retake)

RO Retake Written Examination ADAMS Accession # ML062420268.

2