|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:January 30, 2007Mr. R. C. BraunSite Vice President Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 | | {{#Wiki_filter:January 30, 2007 Mr. R. C. Braun Site Vice President Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| OPERATOR LICENSING EXAMINATION APPROVAL(PEACH BOTTOM ATOMIC POWER STATION) | | OPERATOR LICENSING EXAMINATION APPROVAL (PEACH BOTTOM ATOMIC POWER STATION) |
|
| |
|
| ==Dear Mr. Braun:== | | ==Dear Mr. Braun:== |
|
| |
|
| The purpose of this letter is to confirm the final arrangements for the upcoming operatorlicensing examinations at Peach Bottom Atomic Power Station.The NRC has completed its review of the operator license applications submitted in connectionwith this examination and separately provided a list of approved applicants to Mr. A. Wasong, Director of Training. Note that any examination waivers have been addressed in separate correspondence.The NRC has approved the subject examinations and hereby authorizes you to administer thewritten examinations in accordance with Revision 9 of NUREG-1021, "Operator Licensing Examinations Standards for Power Reactors," on February 16, 2007. The NRC staff will administer the operating tests during the weeks of February 5 and 12, 2007.Please contact your Chief Examiner, Mr. T. Fish, at 610-337-5369, if you have any questions oridentify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.Sincerely,/RA/Marvin D. Sykes, ChiefOperations Branch Division of Reactor SafetyDocket Nos. 50-277; 50-278License Nos.:DPR-44, DPR-56 R. C. Braun-2-cc w/encl:President and CNO, Exelon Nuclear Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Associate General Counsel, Exelon Generation Company Manager, Financial Control & Co-Owner Affairs Manager Licensing, PBAPS Director, Training T. Vanwyen, Manager, Operations Training Correspondence Control Desk Director, Bureau of Radiation Protection (PA) | | The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Peach Bottom Atomic Power Station. |
| | The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. A. Wasong, Director of Training. Note that any examination waivers have been addressed in separate correspondence. |
| | The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, on February 16, 2007. The NRC staff will administer the operating tests during the weeks of February 5 and 12, 2007. |
| | Please contact your Chief Examiner, Mr. T. Fish, at 610-337-5369, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant. |
| | Sincerely, |
| | /RA/ |
| | Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-277; 50-278 License Nos.: DPR-44, DPR-56 |
| | |
| | R. C. Braun cc w/encl: |
| | President and CNO, Exelon Nuclear Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Associate General Counsel, Exelon Generation Company Manager, Financial Control & Co-Owner Affairs Manager Licensing, PBAPS Director, Training T. Vanwyen, Manager, Operations Training Correspondence Control Desk Director, Bureau of Radiation Protection (PA) |
| R. McLean, Power Plant and Environmental Review Division (MD) | | R. McLean, Power Plant and Environmental Review Division (MD) |
| G. Aburn, Maryland Department of Environment T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO, MD) | | G. Aburn, Maryland Department of Environment T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO, MD) |
| Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance TMI - Alert (TMIA) | | Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance TMI - Alert (TMIA) |
| J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams Vice President, Licensing and Regulatory Affairs Vice President, Operations Mid-Atlantic Senior Vice President, Nuclear Services Director, Licensing and Regulatory Affairs J. Fewell, Assistant General Counsel E. Epstein, TMI Alert R. C. Braun-3-Distribution:A. R. Blough, DRSDRS Master Exam File (C. Bixler) (w/concurrences) | | J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams Vice President, Licensing and Regulatory Affairs Vice President, Operations Mid-Atlantic Senior Vice President, Nuclear Services Director, Licensing and Regulatory Affairs J. Fewell, Assistant General Counsel E. Epstein, TMI Alert |
| T. Fish, DRS, Chief Examiner M. Sykes, DRSE-Mail Distribution:S. Collins, RAM. Dapas, DRA M. Gray, DRP C. Khan, DRP F. Bower, DRP - NRC Senior Resident Inspector M. Brown - NRC Resident Inspector
| |
|
| |
|
| S. Schmitt, DRP - NRC Resident OA J. Lamb, RI OEDO J. Shea, PM, NRR J. Kim, PM, NRR (Back up) | | R. C. Braun Distribution: |
| H. Chernoff, NRRRegion I Docket Room (with concurrences)ROPreports@nrc.gov (All Irs)SUNSI Review Complete: MDS (Reviewer's Initials | | A. R. Blough, DRS DRS Master Exam File (C. Bixler) (w/concurrences) |
| )ADAMS PKG: ML060800089DOCUMENT NAME:C:\FileNet\ML070310224.wpdAfter declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box:
| | T. Fish, DRS, Chief Examiner M. Sykes, DRS E-Mail Distribution: |
| " C" = Copy without attachment/enclosure " E" = Copy withattachment/enclosure " N" = No copyOFFICERI/DRS/OBRI/DRS/OBRI/DRS/OBNAMECJBixler/CJBTHFish/THFMDSykes/MDSDATE01/29/0701/29/0701/30/07OFFICIAL RECORD COPY}} | | S. Collins, RA M. Dapas, DRA M. Gray, DRP C. Khan, DRP F. Bower, DRP - NRC Senior Resident Inspector M. Brown - NRC Resident Inspector S. Schmitt, DRP - NRC Resident OA J. Lamb, RI OEDO J. Shea, PM, NRR J. Kim, PM, NRR (Back up) |
| | H. Chernoff, NRR Region I Docket Room (with concurrences) |
| | ROPreports@nrc.gov (All Irs) |
| | SUNSI Review Complete: MDS (Reviewers Initials) |
| | ADAMS PKG: ML060800089 DOCUMENT NAME: |
| | C:\FileNet\ML070310224.wpd After declaring this document An Official Agency Record it will be released to the Public. |
| | To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB THFish/THF MDSykes/MDS DATE 01/29/07 01/29/07 01/30/07 OFFICIAL RECORD COPY}} |
|
---|
Category:Letter
MONTHYEARIR 05000277/20244012024-10-17017 October 2024 Security Baseline Inspection Report 05000277/2024401 and 05000278/2024401 (Cover Letter Only) RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval ML24099A0012024-04-0808 April 2024 (PBAPS) Units 2 and 3, Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. 05000277/LER-2024-001, Submittal of LER 2024-001-00 for Peach Bottom Atomic Power Station (PBAPS) Unit 2, Automatic Reactor Scram Due to an Invalid Generator Lockout2024-03-21021 March 2024 Submittal of LER 2024-001-00 for Peach Bottom Atomic Power Station (PBAPS) Unit 2, Automatic Reactor Scram Due to an Invalid Generator Lockout IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) 2024-09-06
[Table view] |
Text
January 30, 2007 Mr. R. C. Braun Site Vice President Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314
SUBJECT:
OPERATOR LICENSING EXAMINATION APPROVAL (PEACH BOTTOM ATOMIC POWER STATION)
Dear Mr. Braun:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Peach Bottom Atomic Power Station.
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. A. Wasong, Director of Training. Note that any examination waivers have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, on February 16, 2007. The NRC staff will administer the operating tests during the weeks of February 5 and 12, 2007.
Please contact your Chief Examiner, Mr. T. Fish, at 610-337-5369, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely,
/RA/
Marvin D. Sykes, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-277; 50-278 License Nos.: DPR-44, DPR-56
R. C. Braun cc w/encl:
President and CNO, Exelon Nuclear Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Associate General Counsel, Exelon Generation Company Manager, Financial Control & Co-Owner Affairs Manager Licensing, PBAPS Director, Training T. Vanwyen, Manager, Operations Training Correspondence Control Desk Director, Bureau of Radiation Protection (PA)
R. McLean, Power Plant and Environmental Review Division (MD)
G. Aburn, Maryland Department of Environment T. Snyder, Director, Air and Radiation Management Administration, Maryland Department of the Environment (SLO, MD)
Public Service Commission of Maryland, Engineering Division Board of Supervisors, Peach Bottom Township B. Ruth, Council Administrator of Harford County Council Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance TMI - Alert (TMIA)
J. Johnsrud, National Energy Committee, Sierra Club Mr. & Mrs. Kip Adams Vice President, Licensing and Regulatory Affairs Vice President, Operations Mid-Atlantic Senior Vice President, Nuclear Services Director, Licensing and Regulatory Affairs J. Fewell, Assistant General Counsel E. Epstein, TMI Alert
R. C. Braun Distribution:
A. R. Blough, DRS DRS Master Exam File (C. Bixler) (w/concurrences)
T. Fish, DRS, Chief Examiner M. Sykes, DRS E-Mail Distribution:
S. Collins, RA M. Dapas, DRA M. Gray, DRP C. Khan, DRP F. Bower, DRP - NRC Senior Resident Inspector M. Brown - NRC Resident Inspector S. Schmitt, DRP - NRC Resident OA J. Lamb, RI OEDO J. Shea, PM, NRR J. Kim, PM, NRR (Back up)
H. Chernoff, NRR Region I Docket Room (with concurrences)
ROPreports@nrc.gov (All Irs)
SUNSI Review Complete: MDS (Reviewers Initials)
ADAMS PKG: ML060800089 DOCUMENT NAME:
C:\FileNet\ML070310224.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB THFish/THF MDSykes/MDS DATE 01/29/07 01/29/07 01/30/07 OFFICIAL RECORD COPY