EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature /Title Date Signature I Title Date Signature /Title Date EFFECTIVE DATE: / J I

NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

Training Review for Completeness: PIMS CODE:

I PIMS ENTRY:

- S ig natu re/Date I I 2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 1 of 7

TEMPORARY CHANGE FORM LOG e

CODE NO.: PLOR-301CA REV. NO.: 008 TITLE: lniect Boron into RPV (Alternate Path - RWCU Fails to Isolate) 9.

10.

11.

12.

13.

14.

15.

2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 2 of 7

PECO NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2001100501 / PLOR-301CA WA: 295037EA1.04 URO: 4.5 SRO: 4.5 TASK DESCRIPTI0N: Inject Boron into RPV (Alternate Path - RWCU Fails to Isolate)

A. NOTES TO EVALUATOR:

I. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.

2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.

I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.

2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 3 of 7

B. TOOLS AND EQUIPMENT

1. Key for SBLC System keylock switch on Control Room panel C005A.

d C. REFERENCES

1. RRC 11.1-2, Rev. 0, Standby Liquid System Initiation During a Plant Event
2. SO II. I .B-2, Rev. 3, Standby Liquid Control System Initiation D. TASK STANDARD
1. Satisfactory task completion is indicated when a SBLC pump is running, boron is injecting into the Reactor vessel and RWCU system flow is secured.
2. Estimated time to complete: 4 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to inject boron into the Reactor vessel using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

~,

1. SBLC injection is required by T-I 01, RPV Control.

G INITIATING CUE The Control Room Supervisor directs you to inject boron into the Reactor vessel from the Control Room using Rapid Response Card RRCI 1.I-2, Standby Liquid System Initiation During a Plant Event.

  • /

2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 4 of 7

H. PERFORMANCE CHECKLIST STEP

. NO STEP ACT STANDARD 1 Verify AO-2-02-039, Recirc Sample P AO-2-02-039 green light verified ON at Inboard Is01 valve, is closed. panel 20C004A.

(Cue: AO-2-02-039 green light is on, red light is off.)

2 Verify AO-2-02-040, Recirc Sample P AO-2-02-040 green light verified ON at Inboard lsol valve, is closed. panel 20C004A.

(Cue: AO-2-02-040 green light is on, red light is off.)

3 Verify key is inserted into 2(A)BP040 P Key verified inserted into 2(A)BP040 keylock switch. keylock switch at panel 20C005A.

(Cue: Key is in keylock switch.)

  • 4 Turn keylock switch to start "Sys A(B)". P Keylock switch turned to the "START SYS A(B)" position at panel 20C005A.

(Cue: Acknowledge keylock switch operation.)

i-5 Verify RWCU System isolated. P RWCU failure to isolate is recognized (Cue: MO-15, MO-18, and MO-68 red lights are on, green lights are off.)

~~

6 Trip all running RWCU pumps. P All running RWCU Pump control switches are momentarily placed in the STOP (Cue: Acknowledge control switch position at panel 20C004A.

operations.)

7 Verify all RWCU pumps are secured. A, B, and C RWCU pump green lights verified ON and flow decreases to 0 on (Cue: A and B RWCU Pumps green lights FI-2-12-141A and FI-2-12-141B at panel are on, red lights are off.) 20C004A.

/ Performing either step 8 (close MO-15) step 9 (close MO-18) satisfies the critical step.

p8 Close MO-2-12-15, RWCU Inboard Isolation valve.

P MO-2-12-15 control switch momentarily placed in the CLOSE position at panel 20C004A.

L (Cue: Acknowledge control switch operation.)

Page 5 of 7

~

STEP ACT STANDARD

~- ~

'--/

  • 9 Close MO-2-12-18, RWCU Outboard P MO-2-12-18 control switch momentarily Isolation valve. placed in the CLOSE position at panel 2OC004A.

(Cue: Acknowledge control switch operation.)

  • I0 Close MO-2-12-68, RWCU Outlet valve. P MO-2-12-68 control switch momentarily placed in the CLOSE position at panel (Cue: Acknowledge control switch 20C004A.

operation.)

11 Verify MO-2-12-15, MO-2-12-18 and P MO-2-12-15, AND/OR MO-2-12-18, MO-2-12-68 are closed. AND/OR MO-2-12-68 green light(s) verified ON at panel 20C004A.

(Cue: MO-I 5, MO-18, and MO-68 green lights are on, red lights are off.)

12 Ac knowIedge the "CLEAN- UP P The annunciator "ACKNOWLEDGE" FILTERIDEMIN SYSTEM TROUBLE" pushbutton is depressed on panel annunciator. 20c012.

(Cue: Annunciators 215 C-3 is lit solid.)

-- . 13 Verify SBLC Pump A(B) starts and injects. P SBLC Pump A(B) red light is verified ON.

(Cue: SBLC Pump A(B) red light is on, SBLC Pump discharge pressure verified green light is off; PI-065 reads approximately 100 psi > reactor pressure approximately 100 psi greater than on PI-2-11-065.

Reactor pressure; LI-66 indication is slowly lowering; Reactor power is slowly Lowering Reactor power verified.

lowering.)

All at panel 20C005A.

14 Inform Control Room Supervisor of task P Task completion reported.

cornpietion.

(Cue: Control Room Supervisor acknowledges report.)

15 As an evaluator ensure that you have P Positive control established.

positive control of all exam material provide to the examinee (Task Conditions/Prerequisites) AND procedures.

P 2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 6 of 7

Under ACT P - must perform S - must simulate U

I. TERMINATING CUE When a SBLC pump is running and boron is injecting into the Reactor vessel with RWCU flow secured, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.


I 2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 7 of 7

TASK CONDITIONS/PREREQUISlTES

1. SBLC injection is required by T-101, RPV Control.

INITIATING CUE The Control Room Supervisor directs you to inject boron into the Reactor vessel from the Control v

Room using Rapid Response Card RRCI I.I-2, Standby Liquid System Initiation During a Plant Event.

EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET APPROVALS:

Signature /Title Date Signature I Title Date Signature /Title Date Signature I Title Date APPROVED FOR USE:

Signature I Title Date I EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

Training Review for Completeness: I PIMS CODE:

Signature/Date 1

I PlMS ENTRY:

I C'

2007 NRC JPM CR-b(2) (PLOR300CA Rev012) Page 1 of 6

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-300CA REV. NO.: 012

  • .d TITLE: Manually Initiate HPCl (Alternate Path - Manual Initiation Pushbutton Fails to Operate)

\ '

IO.

11.

12.

13.

14.

15.

2007 NRC JPM CR-b(2) (PLOR300CA RevOl2) Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2060050101 / PLOR-300CA WA: 295031EA1.02 URO: 4.5 SRO: 4.5 TASK DESCRIPTI0N: Manuallv Initiate HPCl (Alternate Path - Manual Initiation Pushbutton Fails to Operate)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM CR-b(2) (PLORSOOCA RevOl2) Page 3 of 6

B. TOOLS AND EQUIPMENT

1. None

-- c. REFERENCES

1. RRC 23.1-2, Rev. 4, HPCI System Operation During a Plant Event D. TASK STANDARD
1. Satisfactory task completion is indicated when HPCl is injecting to the RPV at 5000 gpm.
2. Estimated time to complete: 5 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to manually initiate the HPCl system and inject to the Reactor vessel at a flow rate of 5000 gpm using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES I. RPV Level is -25 inches and lowering.

cl- G. INITIATING CUE The Control Room Supervisor directs you to initiate the HPCl system using the HPCl Manual Initiation pushbutton and inject to the Reactor vessel at 5000 gpm using RRC 23.1-2, HPCI System Operation During a Plant Event.

2007 NRC JPM CR-b(2) (PLOR300CA RevOl2) Page 4 of 6

H. PERFORMANCE CHECKLIST STEP NO STEP ACT STANDARD

'-4 2

Obtain copy of RRC 23.1-2 "HPCI Operation During a Plant Event".

Arm and depress the HPCl Manual Ip References Section A of RRC "HPCI Injection Using Manual Initiation PB".

HPCl Manual Initiation Pushbutton collar Initiat io n Pushbutton. is rotated clockwise to the ARMED position and then the pushbutton is (Cue: Acknowledge pushbutton momentarily DEPRESSED at panel operation.) 20C004B.

"3 Recognize that the Manual Initiation Manual Initiation pushbutton failure to pushbutton did not function. function is recognized. Examinee should now refer to Section B of RRC, "HPCI (Cue: HPCl discharge pressure, flow and Injection by Manual Component speed indicate zero. Aux oil pump green Operation".

light is on, red light is off.)

        • NOTE ****

li If notified as the Control Room Supervisor that the HPCl Manual Initiation Pushbutton did not unction, cue the examinee to initiate HPCl and inject to the reactor vessel at 5000 gpm.

  • 4 Simultaneously start the Auxiliary Oil P Auxiliary oil pump control switch is placed Pump, 20P026 and open M0-2-23-014 in the START position while "Supply" va Ive. simultaneously placing MO-2-23-014

'Supply" control switch momentarily in the (Cue: Acknowledge control switch "OPEN" position at panel 20C004B.

operation.)

5 Verify the Auxiliary Oil Pump started. P Verify the Auxiliary Oil pump red light is ON at panel 20C004B or annunciator 222 (Cue: Auxiliary Oil pump red light is on D-5 is alarming at panel 20C204C.

green light is off and annunciator 222 D-5 is alarming, "HPCI AUXILIARY OIL PUMP RUNNING", Turbine Stop and Control valve red lights are on.)

6 Verify MO-2-23-014, "Supply" valve is P MO-2-23-14 red light verified ON,HPCl open. discharge pressure (Pl-2-23-109) and HPCl speed (SPI-4505) rising at panel (Cue: MO-14 red light is on, green light is 20C004B.

off, HPCl discharge pressure and speed rise.)

2007 NRC JPM CR-b(2) (PLOR300CA RevOl2) Page 5 of 6

STEP ACT STANDARD Open MO-2-23-019, "To Feed Line" valve. P VlO-2-23-019 control switch is nomentarily placed in the OPEN position (Cue: Acknowledge control switch at panel 20C004B.

operation.)

~~ ~

8 Verify MO-2-23-019, "To Feed Line" valve P M0-2-23-019 red light is verified ON and is open. flow (Fl-2-23-108) rising at panel 20C004B.

(Cue: MO-19 red light is on, green light is off, HPCl flow rise.)

9 Start the HPCl Gland Seal Condenser P HPCl Gland Seal Condenser Vacuum Vacuum pump, 20K002. Pump control switch is placed in the START position at panel 20C004B.

(Cue: Vac pump red light is on, green light is off.)

10 Verify pump flowrate of 5000 gpm. P A HPCl flowrate of approximately 5000 gpm is verified on Fl-2-23-108 at panel (Cue: Fl-2-23-108 indicates 5000 gpm.) 20C004B.

11 Inform Control Room Supervisor that P Task completion reported.

HPCl was manually started and is injecting into the RPV.

(Cue: Control Room Supervisor acknowledges report.)

12 As an evaluator ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)AND procedures.

Under "ACT" P - must perform S - must simulate I. TERMINATING CUE When HPCl is injecting into the Reactor vessel at a flow rate of 5000 gpm, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

L,'

2007 NRC JPM CR-b(2) (PLOR300CA RevOl2) Page 6 of 6

TASK CONDlTlONSlPREREQUlSlTES

-L/,

I. RPV Level is -25 inches and lowering.

INITIATING CUE The Control Room Supervisor directs you to initiate the HPCI system using the HPCI Manual v

Initiation pushbutton and inject to the Reactor vessel at 5000 gpm using RRC 23.1-2, HPCI System Operation During a Plant Event.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date

-i/APPROVED FOR USE: Date Signature I Title EFFECTIVE DATE: / I 1

NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

Training Review for Completeness: PlMS CODE:

PlMS ENTRY:

-- II SignaturelDate I

2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 1 of 7

TEMPORARY CHANGE FORM LOG e

CODE NO.: PLOR-023C REV. NO.: 007 TITLE: ADS RESET FOLLOWING BLOWDOWN 1.

2.

3.

4.

5.

6.

7.

a.

11.

12.

13.

14.

15.

2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 2 of 7

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2180040101 / PLOR-023C WA: 218000A4.03 RO: 4.2 SRO: 4.2 TASK DESCRIPTION: ADS RESET FOLLOWING BLOWDOWN A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.

I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.

2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 3 of 7

B. TOOLS AND EQUIPMENT None L/

C. REFERENCES Procedure SO 1G.7.C-2, Rev. 9, Automatic Depressurization System Reset Following Blowdown (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when ADS logic reset, Vacuum breaker position indication reset, and ADS relief valve position indication reset.
2. Estimated time to complete: 7 minutes (A.5) Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to reset the ADS system using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. An automatic ADS initiation has occurred.

.--J

2. RPV water level is now greater than -160 and the capability exists to maintain level above -160.
3. The following annunciators have been reset:
a. System I ECCS REAC VESSEL LO-LO-LO LEVEL, panel 227 D-2.
b. System II ECCS REAC VESSEL LO-LO-LO LEVEL, panel 228 C-2.
4. Blowdown of the RPV is complete by evidence of SRVs closed due to lack of pressure to keep them open.
5. Reactor pressure is 0 psig.
6. Drywell pressure is 0.25 psig.

G. INITIATING CUE The Control Room Supervisor directs you to reset the ADS logic in accordance with SO 1G.7.C-2. Automatic Demessurization Svstem Reset Followina Blowdown. Section 4. I.

v 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 4 of 7

H. PERFORMANCE CHECKLIST I I STEP NO STEP ACT STANDARD

~ ~~ ~ ~~

  • I Depress the "A" ADS LOGIC RESET- P The "A" ADS LOGIC TIMER RESET TIMER pushbutton, 2E-S2A. pushbutton, 2E-S2AI is momentarily depressed at panel 2OCOO3-01.

(Cue: Acknowledge pushbutton operation .)

  • 2 Depress the "B" ADS LOGIC RESET- P The "B" ADS LOGIC TIMER RESET TIMER pushbutton, 2E-S2B. pushbutton, 2E-S2B, is momentarily depressed at panel 2OCOO3-01.

(Cue: Acknowledge pushbutton operation.)

        • NOTE ****

The "BLOWDOWN RELIEF VALVES HIGH TEMP" annunciator will not reset unless all of the temperatures are below the alarm setpoint. If necessary, as the Control Room Supervisor direct examinee to continue with resetting ADS.

I 3 Reset the following annunciators:

a. "BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS".

The alarm "RESET" pushbutton is momentarily depressed on panel 20C003.

b. "BLOWDOWN RELIEF VALVES HIGH TEMP".

(Cue: Acknowledge pushbutton operation.)

~

Verify "BLOWDOWN AUX RELAYS "BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS" and ENERGIZED RHR OR CS" and "BLOWDOWN RELIEF VALVES HIGH "BLOWDOWN RELIEF VALVES HIGH TEMP" annunciators are clear. TEMP" annunciators are verified clear on alarm panels 227 E-4 and 227 B-4.

(Cue: Annunciators 227 E-4 and 227 B-4 are not lit.)

Verify "BLOWDOWN TIMERS INITIATED" P "BLOWDOWN TIMERS INITIATED" annunciator reset. annunciator is verified clear on alarm panel 227 D-4.

(Cue: Annunciator 227 D-4 is not lit.)

2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 5 of 7

E STEP ACT STANDARD 6 Verify "SAFETY RELIEF VALVE OPEN" P "SAFETY RELIEF VALVE OPEN" annunciator reset. annunciator is verified clear on alarm panel 210 D-2.

(Cue: Annunciator 210 D-2 is not lit.)

7 Verify the ADS valves indicate closed RV-2-02-71A, B, C, G, & K green lights verified ON at panel 2OCOO3-01.

(Cue: RV-2-02-71A1B, C, G, & K green lights are on, red lights are off.)

~

8 Monitor temperature recorder TR-2 TR-2-02-103 monitored at panel 20C003-103 to ensure each valve has reseated. 01 to ensure each ADS valve has reseated, as indicated by each point (Cue: TR-2-02-103 points TE-2-2-113Al trending downward from -320-340°F.

B, C, G, & K read -32OOF and are decreasing slowly.)

  • 9 Depress the "A" ADS LOGIC RESET - The "A1ADS DRYWELL HIGH DRYWELL HIGH PRESS pushbutton, 2E- PRESSURE LOGIC RESET pushbutton, S3A. 2A-S3A, is momentarily depressed at panel 2OCOO3-01.

(Cue: Acknowledge pushbutton operation.)

  • I0 Depress the "B" ADS LOGIC RESET The "B" ADS DRYWELL HIGH PRESS DRYWELL HIGH PRESS pushbutton 2E- LOGIC RESET pushbutton, 2E-S3B, is S3B. momentarily depressed at panel 20C003-01.

(Cue: Acknowledge pushbutton operation.)

~ _ _ _ _ ~ ~~

11 Reset the following annunciators: The alarm "RESET" pushbutton is momentarily depressed on panel 20C003.

a. "DRYWELL HI PRESS SIGNAL SEALED IN".
b. "HIGH DRYWELL PRESSURE BYPASS TIMERS INITIATED".

(Cue: Acknowledge pushbutton operation.)

2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 6 of 7

~~

STEP ACT STANDARD I

12 Verify "DRYWELL HI PRESS SIGNAL P "DRYWELL HI PRESS SIGNAL SEALED SEALED IN" and "HIGH DRYWELL IN" and "HIGH DRYWELL PRESSURE PRESSURE BYPASS TIMERS BYPASS TI MERS INITIAT ED" INITIATED" annunciators are clear. annunciators are verified clear on alarm panels 227 A-4 and 227 A-3.

(Cue: Annunciators 227 A-4 and 227 A-3 are not lit.)

~ ~~ ~

13 Inform the Control Room Supervisor of P Task completion reported.

task completion.

(Cue: Control Room Supervisor acknowledges report.)

14 As an evaluator, ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)AND procedures.

Under "ACT" P - must perform S - must simulate i j I. TERMINATING CUE When the ADS logic has been reset, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 7 of 7

.e TASK CONDITIONS/PREREQUISlTES I. An automatic ADS initiation has occurred.

2. RPV water level is now greater than -160 inches and the capability exists to maintain level above -160 inches.
3. The fo IIowing annunciators have been reset:
a. System I ECCS REAC VESSEL LO-LO-LO LEVEL, panel 227 D-2.
b. System II ECCS REAC VESSEL LO-LO-LO LEVEL, panel 228 C-2.

~-

4. Blowdown of the RPV is complete by evidence of SRVs closed due to lack of pressure to keep them open.
5. Reactor pressure is 0 psig.
6. Drywell pressure is 0.25 psig.

INITIATING CUE The Control Room Supervisor directs you to reset the ADS logic in accordance with SO lG.7.C-2, Automatic Depressurization System Reset Following Blowdown, Section 4.1.

EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET APPROVALS:

Signature /Title Date Signature /Title Date Signature I Title Date

- If Signature /Title Date 1 APPROVED FOR USE:

Signature / Title Date I EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

1 Training Review for Completeness: I PlMS CODE: I I

Signature/Date I I

ENTRY:

I 2007 NRC JPM CR-d(4) (NEW) Page 1 of 8

TEMPORARY CHANGE FORM LOG v

CODE NO.: PLOR-NEWICA REV. NO.:

TITLE: PERFORM CORE SPRAY B PUMP CAPACITY TEST FOR IST i i I 8.

L.

9.

IO.

11.

12.

13.

14.

2007 NRC JPM CR-d(4) (NEW) Page 2 of 8

EXELON NUCLEAR PEACH BO-TTOMATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2090140101 / PLOR-NEWICA WA: 209001A4.04 URO: 2.9 SRO: 2.9 TASK DESCRIPTION: Perform Core Spray B Pump Capacity Test For IST A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.

I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.

2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM CR-d(4) (NEW) Page 3 of 8

6. TOOLS AND EQUIPMENT
1. None id C. REFERENCES
1. ST-0-014-212-2, Rev. 1, Core Spray B Pump Capacity Test For IST D. TASK STANDARD I. Satisfactory task completion is indicated when Core Spray 6 Pump Capacity Test For IST is complete and Core Spray 6 is returned to a normal standby lineup, as specified in the performance steps of ST-0-014-212-2, Section 6.0.
2. Estimated time to complete: 15 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to perform Core Spray 2 6 pump capacity test for IST using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. The plant is operating at 100% power.

L---,

2. An Equipment Operator is standing by in the 26 Core Spray Pump Room.
3. Communications are available between the Control Room, 26 Core Spray Pump Room, 6 and D Core Spray Pump Triangle Room, and Cable Spreading Room.
4. Core Spray pump 2B oil level is between the minimum and maximum lines on the sightglass.
5. Core Spray pump 26 static pump suction pressure is 6 psig.
6. A second operator will record all data (simulated).

G. INITIATING CUE The Control Room Supervisor directs you to perform Core Spray 26 Pump Capacity Test For IST in accordance with ST-0-014-212-2 (provided).

Provide examinee a copy of ST-0-014-212-2 with the following items completed:

Section 1 of the cover page Procedure section 2.0, Test Equipment Procedure section 3.0, Prerequisites L-2007 NRC JPM CR-d(4) (NEW) Page 4 of 8

H. PERFORMANCE CHECKLIST STEP NO STEP ACT STANDARD I CLOSE MO-2-14-011B Core Spray P MO-2-14-011B control switch is Outboard Disch. momentarily placed in CLOSE at Panel 20C003.

(Cue: Acknowledge control switch operation. MO-2-14-011B green light is MO-2-14-011B green light is verified ON; ON; red light is OFF.) red light is verified OFF at Panel 20C003.

If this JPM is being performed in parallel with another JPM, direct candidate NOT to make the plant page announcement prior to starting 2 8 Core Spray pump.

  • 2 START 2BP037 Core Spray B Pump. P Starting 28 Core Spray pump is announced on plant page prior to starting (Cue: Acknowledge control switch Core Spray pump 2B.

operation.)

2B Core Spray pump control switch is momentarily placed in the START position at Panel 20C003.

3 VERIFY Core Spray 2B Pump STARTS P 2B Core Spray pump green light is and is RUNNING by observing motor verified OFF, red light is verified ON.

current on 14A-MI 6 and discharge Pump motor amps on ammeter 14A-MI B pressure on PI-2-14-048B Core Spray and discharge pressure on PI-2-14-048B Disch P. are verified rising at Panel 20C003.

(Cue: Ammeter 14A-MIB indicates 40 amps, PI-2-14-048B indicates 350 psig.)

VERIFY MO-2-14-005B Core Spray B P MO-2-14-005B green light is verified Min Flow automatically OPENS. OFF; red light is verified ON at Panel 20C003.

(Cue: MO-2-14-005B green light is OFF; red light is ON.)

VERIFY 2DP037 Core Spray D Pump is P Directs Equipment Operator to verify NOT rotating. Core Spray D Pump is NOT rotating.

(Cue: Core Spray D Pump is NOT rotating.)

2007 NRC JPM CR-d(4) (NEW) Page 5 of 8

STEP ACT STANDARD OPEN MO-2-14-026B Core Spray Full P MO-2-14-026B control switch is Flow Test. momentarily placed in OPEN at Panel 20C003.

(Cue: Acknowledge control switch operation. MO-2-14-026B green light is MO-2-14-026B green light is verified OFF; red light is ON.) OFF; red light is verified ON at Panel 20C003.

~~ ~~ ~~

VERIFY MO-2-14-005B Core Spray B P MO-2-14-005B green light is verified ON; Min Flow automatically CLOSES. red light is verified OFF at Panel 20C003.

(Cue: MO-2-14-005B green light is ON; red light is OFF.)

/ Time-compress by telling the examinee Core Spray B Pump has been running for 5 r

minutes. If necessary, remind examinee a second operator will record all test data.

THROTTLE MO-2-14-0268 Core Spray MO-2-14-026B control switch is Full Flow Test to obtain Rated Flow of momentarily placed in CLOSE at Panel 3125 to 3175 gpm as read on computer 20C003. Red pushbutton is depressed to point H056. stop valve stroke. Valve control switch and red pushbutton are operated as (Cue: Acknowledge control switch and necessary to achieve 3125 to 3175 gpm red pushbutton operation. MO-2-14-026B as read on PMS computer point H056.

green light is ON; red light is ON.

Computer point H056 indicates 3150 MO-2-14-026B green and red lights are gPmJ verified ON at Panel 20C003.

9 VERIFY discharge pressure is greater Directs Equipment Operator to report than or equal to 240 psig as read on Core Spray B Pump discharge pressure PI-2-14-080B. as read on PI-2-14-080B.

(Cue: PI-2-14-080B indicates 255 psig.)

  • I0 THROTTLE MO-2-14-026B Core Spray P MO-2-14-026B control switch is Full Flow Test to obtain Rated Flow of momentarily placed in CLOSE at Panel 2000 to 2050 gpm as read on computer 20C003. Red pushbutton is depressed to point H056. stop valve stroke. Valve control switch and red pushbutton are operated as (Cue: Acknowledge control switch and necessary to achieve 2000 to 2050 gpm red pushbutton operation. MO-2-14-026B as read on PMS computer point H056.

green light is ON; red light is ON.

Computer point H056 indicates 2025 MO-2-14-026B green and red lights are gpm.1 verified ON at Panel 20C003.

2007 NRC JPM CR-d(4) (NEW) Page 6 of 8

ACT STANDARD

  • I1 CLOSE MO-2-14-026B Core Spray Full P MO-2-14-026B control switch is Flow Test. momentarily placed in CLOSE at Panel 20C003.

(Cue: Acknowledge control switch operation. MO-2-14-026B green light is MO-2-14-026B green light is verified ON; ON; red light is OFF.) red light is verified OFF at Panel 20C003.

12 VERIFY MO-2-14-005B Core Spray B MO-2-14-005B green light is verified Min Flow automatically OPENS. OFF; red light is verified ON at Panel 20C003.

(Cue: MO-2-14-005B green light is OFF; red light is ON.)

  • I3 SHUTDOWN 2BP037 Core Spray B 2B Core Spray pump control switch is Pump. momentarily placed in the STOP position at Panel 20C003.

(Cue: Acknowledge control switch operation. Core Spray B Pump green 2B Core Spray pump green light is light is ON; red light is OFF. Pump motor verified ON, red light is verified OFF.

amps and pump discharge pressure are Pump motor amps on ammeter 14A-MIB zero.) and discharge pressure on PI-2-14-048B are verified at zero at Panel 20C003.

14 VERIFY MO-2-14-005B Core Spray B P MO-2-14-005B green light is verified ON; Min Flow automatically CLOSES. red light is verified OFF at Panel 20C003.

(Cue: MO-2-14-005B green light is ON; red light is OFF.)

  • I5 Open MO-2-14-011B Core Spray MO-2-14-011B control switch is Outboard Disch. momentarily placed in OPEN at Panel 20C003.

(Cue: Acknowledge control switch operation. MO-2-14-011B green light is MO-2-14-011B green light is verified OFF; red light is ON.) OFF; red light is verified ON at Panel 20C003.

~~~ ~

16 As an evaluator, ensure that you have Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AN D procedures.

2007 NRC JPM CR-d(4) (NEW) Page 7 of 8

Under ACT P - must perform S - must simulate

J I. TERMINATING CUE When the Core Spray 2B pump capacity test for IST is complete and Core Spray 2B is returned to a normal standby lineup, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

-\---

2007 NRC JPM CR-d(4) (NEW) Page 8 of 8

TASK CONDlTlONSlPREREQUlSlTES L/

I= The plant is operating at 100% power.

2. An Equipment Operator is standing by in the 2B Core Spray Pump Room.
3. Communications are available between the Control Room, 2B Core Spray Pump Room, B and D Core Spray Pump Triangle Room, and Cable Spreading Room.
4. Core Spray pump 2B oil level is between the minimum and maximum lines on the sightglass.
5. Core Spray pump 2B static pump suction pressure is 6 psig.
6. A second operator will record all data (simulated)=

INITIATING CUE The Control Roam Supervisor directs you to perform Core Spray 2B pump capacity test for IST L-in accordance with ST-0-014-212-2 (provided).

EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET 1 APPROVALS: e Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date

.L..r l APPROVED FOR USE:

Signature I Title Date EFFECTIVE DATE: I i ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

Training Review for Completeness: PlMS CODE:

~~ ~ ~

PlMS ENTRY:

I Signatu re/Date

'v 2007 NRC JPM CR-e(1) (PLOR081C RevOOS) Page 1 of 7

TEMPORARY CHANGE FORM LOG

- 4 CODE NO.: PLOR-081C REV. NO.: 005 TITLE: HPSW Iniection Into the Torus 1.

2.

3.

4.

5.

6.

7.

' 8.

i 9.

IO.

11.

12.

13.

14.

15.

2007 NRC JPM CR-e(1) (PLOR081C RevOO5) Page 2 of 7

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2004800501 / PLOR-081C KIA: 219000A4.13 URO: 3.9 SRO: 3.8 TASK DESCRIPTION: HPSW lniection Into the Torus A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.

I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.

2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM CR-e(1) (PLOR081C Rev005) Page 3 of 7

B. TOOLS AND EQUIPMENT

1. Keys for MO-2-10-174 and MO-2-10-176

.-.---. I C. REFERENCES

1. T-231-2, Rev. 3, HPSW Injection Into the Torus D. TASK STANDARD I. Satisfactory task completion is indicated when the 2B HPSW Pump is injecting water into the Torus.
2. Estimated time to complete: 10 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to inject water into the Torus using the 2B HPSW pump using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TAS K CONDITI0NS/PREREQUISITES

1. Use of this procedure has been directed by the T-100 procedures.
2. High Pressure Service Water Pumps are available.
3. A LOCA initiation signal has NOT occurred.
4. 4 KV Buses are receiving power from their respective startup feeds.

G. INITIATING CUE The Control Room Supervisor directs you to perform T-231-2, HPSW Injection into the Torus in order to inject water into the Torus with the 2B HPSW pump.

\--

2007 NRC JPM CR-e(1) (PLOR081C Rev005) Page 4 of 7

H. PERFORMANCE CHECKLIST STEP NO STEP ACT STANDARD 1 Verify RHR pump 2BP035 shutdown. P B RHR pump green light verified ON at panel 2OCOO3-02.

(Cue: B RHR pump green light ON, red light OFF.)

~ ~~~ ~~

2 Verify RHR pump 2DP035 shutdown. D RHR pump green light verified ON at panel 206003-02.

(Cue: D RHR pump green light ON, red light OFF.)

3 Close MO-2-10-154B, Outboard Disch MO-2-10-1548 control switch is momentarily placed in the CLOSE (Cue: Acknowledge switch operation.) position at panel 2OCOO3-02.

Verify closed MO-2-10-154B, Outboard P MO-154B green light verified ON, red Disch I. light verified OFF on panel 2OCOO3-02.

(Cue: MO-154B green light ON, red light OFF.)

Verify HPSW 2BP042 pump shutdown. P B HPSW pump green light verified ON at panel 2OCOO3-02.

(Cue: BHPSW pump green light ON, red light OFF.)

Verify HPSW 2DP042 pump shutdown. D HPSW pump green light verified ON at panel 2OCOO3-02.

(Cue: D HPSW pump green light ON, red light OFF.)

Verify closed MO-2-10-089B, B HPSW MO-089B green light verified ON, red Hx Out. light verified OFF at panel 2OCOO3-02.

(Cue: MO-089B green light ON, red light OFF.)

~~~ ~~

Verify closed MO-2-10-089D D HPSW MO-089D green light verified ON, red Hx Out. light verified OFF at panel 206003-02.

(Cue: MO-089D green light ON red light OFF.)

2007 NRC JPM CR-e(1) (PLOR081C RevOOS) Page 5 of 7

STEP ACT STANDARD 9 Verify closed MO-2-32-2344 (10-186), P M0-2344 (10-186) green light verified HPSW Loop Cross Tie. ON, red light verified OFF at panel 2OCOO3-03.

(Cue: MO-2344 ( I 0-186) green light ON, red light OFF.)

  • I0 Open MO-2-10-174, HPSW/RHR Em P Key is obtained from the SSV keybox, Inner Cross Tie. inserted into MO-174 keylock switch and placed in the OPEN position at panel (Cue: Acknowledge keylock switch 2OCOO3-03.

operation.)

NOTE: MO-174 may be opened in parallel with MO-176.

11 Verify open MO-2-10-174, HPSWIRHR P MO-I74 red light verified on at panel Em Inner Cross Tie. 2OCOO3-03.

(Cue: MO-174 red light is ON, green light is OFF.)

  • I2 Open MO-2-10-176, HPSW/RHR Em P Key is obtained from the SSV keybox, Outer Cross Tie. inserted into MO-176 keylock switch and placed in the OPEN position at panel (Cue: Acknowledge keylock switch 2OCOO3-03.

operation.)

NOTE: MO-176 may be opened in parallel with MO-174.

13 Verify open MO-2-10-176, HPSW/RHR P MO-176 red light verified on at panel Em Outer Cross Tie. 2OCOO3-03.

(Cue: MO-176 red light is ON, green light is OFF.)

  • I4 Open MO-2-10-039B, Torus Hdr. MO-2-10-039B control switch is momentarily placed in the OPEN position (Cue: Acknowledge switch operation.) at panel 2OCOO3-02.

~

15 Verify open MO-2-10-039B, Torus Hdr. MO-2-10-039B red light verified ON at panel 2OCOO3-02.

(Cue: MO-39B red light is on, green light is off.)

2007 NRC JPM CR-e(1) (PLOR081C RevOO5) Page 6 of 7

STEP ACT STANDARD

  • I6 Start the "B" HPSW pump. P "B" HPSW pump control switch is momentarily placed in the START (Cue: "B" HPSW pump red light is on, position at panel 2OCOO3-02.

green light is off and annunciator 225 B-5 is alarming.)

17 Verify proper start of the "B" HPSW P Pump amps and discharge pressure are pump. verified stable after starting current decays.

(Cue: 10A-A2B indicates 62 amps and PI-2330B indicates 395 psig.)

~~ ~

18 Acknowledge the "RHR DISCH HDRS HI P The annunciator "ACKNOWLEDGE" PRESS & SHUTDOWN SUCTION HDRS pushbutton is depressed on panel HI PRESS" annunciator. 2OCOO3-04.

(Cue: Annunciator 225 B-5 is lit solid.)

  • I9 Throttle open MO-2-10-034B1Full Flow P MO-2-10-034B control switch is Test valve to maintain HPSW flow less momentarily placed in the OPEN position than 5300 gpm on FI-2-10-139B. until 4500-5300 gpm is obtained on FI 10-139B1THEN the red stop travel (Cue: FI-l39B reads 5300 gpm.) pushbutton is depressed at panel 2OCOO3-02.

20 Inform Shift Supervisor of task P Task completion reported.

completion.

(Cue: Shift Supervisor acknowledges report.)

21 As an evaluator, ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.

Under "ACT" P - must perform S - must simulate I. TERMINATING CUE When the "B" HPSW pump is injecting into the Torus, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

2007 NRC JPM CR-e(1) (PLOR081C Rev005) Page 7 of 7

TASK CONDITIONS/PREREQUISlTES

1. Use of this procedure has been directed by the T-100 procedures.
2. High Pressure Service Water Pumps are available.
3. A LOCA initiation signal has - NOT occurred.
4. 4 KV Buses are receiving power from their respective startup feeds.

INITIATING CUE The Control Room Supervisor directs you to perform T-231-2, HPSW Injection into the Torus in order to inject water into the Torus with the Y2B HPSW pump.

EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date APPROVED FOR USE:

Signature /Title Date I EFFECTIVE DATE: 1 1 NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

I I Training Review for Completeness: PlMS CODE:

t I I

PlMS ENTRY:

SignaturelDate I I L

2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 1 of 8

TEMPORARY CHANGE FORM LOG

.-d CODE NO.: PLOR-Ol7C REV. NO.: 009 TITLE: SYNCHRONIZE TURBINE GENERATOR OUTPUT WITH GRID AT MINIMUM LOAD

' 11.

12.

13.

14.

15.

2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 2 of 8

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor 0perator/Senior Reactor Operat0r TASK-JPM DESIGNATOR: 2370110101 / PLOR-O17C WA: 262001A4.04 RO: 3.6 SRO: 3.7 TASK DESCRIPTION: SYNCHRONIZE TURBINE GENERATOR OUTPUT WITH GRID AT MINIMUM LOAD A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.

I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.

2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

L-2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 3 of 8

6. TOOLS AND EQUIPMENT
1. Synchroscope key for breaker operation (R)

J

2. Key for synchro-check relay bypass key switch (R)

C. REFERENCES Procedure SO 50.1.A-2 Rev. 11, Main Generator Synchronizing and Loading (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when the Main Generator is synchronized to the grid and initial load is placed on the generator.
2. Estimated time to complete: 12 minutes (A.5) Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to synchronize the Lain Generator to the grid and pickup load using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK C0NDITI0NS/PREREQUISITES i, 1. Plant startup in progress with reactor power approximately 16%.

2. All SO 50.1A-2, Main Generator Synchronizing and Loading prerequisites are met.
3. Generator terminal voltage is 22 Kv with the voltage regulator in automatic mode.
4. Generator ready to be synchronized to grid.
5. Power System Director has been notified.

G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the Main Generator to the grid and pick up load in accordance with steps 4.1 1 through 4.24 of SO 50.1 .A-2, Main Generator Synchronizing and Loading.

Provide examinee with a copy of SO 50.1.A-2, completed up to, but not including, step 4.1 1.

L-2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 4 of 8

H. PERFORMANCE CHECKLIST STEP i NO STEP ACT STANDARD 1 Obtain copy of SO 50.1.A-2. P Copy of SO 50.1.A-2 obtained.

  • 2 Turn on synchroscope for breaker 215 or Synchroscope key obtained from Panel 225. 30C009 inserted into selected breaker sync switch and placed in the "ON" (Cue: Synchroscope meter rotating and position at Panel 20C209.

incoming voltmeters and sensing lights are activated .)

  • 3 Use turbine load selector pushbuttons to Load selector pushbuttons are momentaril!

adjust generator speed. depressed to get synchroscope rotating slowly in the "FAST" direction at Panel (Cue: Synchroscope is rotating slowly in 20C209.

clockwise direction.)

4 Check both synchronizing lights for proper P Sync lights verified ON at "6 o'clock operations. position" OFF at "12 o'clock position" at Panel 20C209.

(Cue: Both lights lit brightly at the "6 o'clock position", both lights out at the "12 o'clock position".)

  • 5 Use the auto voltage regulator rheostat to P Auto voltage regulator rheostat adjusted to adjust generator voltage so that incoming set incoming voltage slightly higher than voltage is slightly higher than running running voltage while maintaining voltage. generator voltage between 20.9 and 23.1 KV at Panel 20C209.

(Cue: Incoming voltage meter is reading slightly higher than running voltage.)

6 Verify the sync scope is rotating slowly in Synchroscope verified for rotation - slowly the "FAST" direction. in the "FAST" direction at Panel 20C209.

(Cue: Sync scope is rotating slowly in the clockwise direction.)

~~ ~ ~~~~~~ ~

  • 7 When the synchroscope is within five 215 (225) breaker control switch is taken tc degrees (green lines) of the "12 o'clock" CLOSE when the synchroscope is within position then close the selected breaker. approximately 5 degrees of "12 o'clock

position at Panel 20C209.

(Cue: Acknowledge control switch operation.)

2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 5 of 8

~

STEP ACT STANDARD k---.. 8 Verify selected breaker is closed. P Selected breakers red indicating light is verified ON at Panel 20C209.

(Cue: Breaker closed - red light onlgreen light off, synchroscope stops rotating at the "I 2 o'clock position.)

9 Verify synchroscope pointer at "12 o'clock P Synchroscope pointer verified at "12 position. o'clock position at Panel 20C209.

(Cue: Synchroscope at "12 o'clock

position and lights off.)

10 Turn off synchroscope for breaker 215 or P Synchroscope placed in the "OFF" position 225. for breaker 215 or 225 at Panel 20C209.

(Cue: Acknowledge sync switch operation.)

~

  • I1 Pick up load on the generator until all nine P The "RAISE" load selector pushbutton is bypass valves are closed. depressed on Panel 20C209 until all nine bypass valve red lights are OFF at Panel (Cue: All nine bypass valves red lights are 20C008B.

off, green lights are on.)

--r 12

        • NOTE: ***e At the examiner's discretion, this JPM may be terminated at this point.

Place the remaining breaker's (225 or 215) sync switch to ON.

P Synchroscope key obtained from Panel 20C209 inserted into selected breaker (225 or 215) sync switch and placed in the "ON" (Cue: Synchroscope is at the 12 o'clock position at Panel 20C209.

position. Incoming and running voltages are equal.)

~

13 Place the SYNC CHK RELAY BYPASS P Key is obtained from CRS keybox, inserted KEY switch in BYPASS. into the SYNC CHK RELAY BYPASS switch and placed in the "BYPASS" I (Cue: Acknowledge key switch operation.) position at Panel 20C209.

~- ~

14 Verify incoming and running voltage are P Incoming and running voltage are verified matched. to be matched on the INCOMING and RUNNING voltage meters at Panel 1 (Cue: Incoming and running voltages are (equal.)

20C209.

2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 6 of 8

STEP ACT STANDARD 15 Verify the synchroscope within five P The synchroscope is verified to be within 5 degrees (green lines) of the " I 2 o'clock degrees of the "12 o'clock" position, inside position". the green lines on the meter face at Panel 206209.

(Cue: Synchroscope at "12 o'clock

position.)

16 Close the selected breaker (225 or 215). The selected breaker (225 or 215) control switch is placed in the "CLOSED position.

(Cue: Acknowledge breaker control switch operation.)

~~ ~ ~

17 Verify breaker 225 or 215 is closed. Breaker 225 or 215 red light on, sync scopes stopped at 12 o'clock position and (Cue: Breaker 225 or 215 red light on, sync lights "OFF" verified at Panel 20C209.

green light off, the synchroscope needle is stopped at the 12 o'clock position and sync lights out.)

18 Place the 225 or 215 breaker sync switch P Breaker 225 or 215 sync switch is placed to OFF. in the OFF position at Panel 20C209.

(Cue: Breaker sync switch is placed in OFF and incoming and running voltage meters drop to 0 volts.)

19 Place the SYNC CHK RELAY BYPASS P SYNC CHK RELAY BYPASS KEYSWITCH in NORM. KEYSWITCH is placed in the NORMAL position at Panel 20C209 and the key is (Cue: Sync chk relay bypass keyswitch is returned to the SSV keybox.

in NORM.)

~ ~

20 Inform the Control Room Supervisor of P Task completion reported.

task completion.

(Cue: Control Room Supervisor acknowledges report.)

21 As an evaluator, ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.

~ 7 2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 7 of 8

Under ACT P - must perform S - must simulate J

I. TERMINATING CUE When the Main Generator is synchronized to the grid and load is picked up in accordance with steps 4.1 1 through 4.24 of procedure SO 50.1.A-2, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

-4 2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 8 of 8

TASK CONDlTlONSlPREREQUlSlTES d

1. Plant startup in progress with reactor power approximately 16%.
2. All SO 50.1A-2, Main Generator Synchronizing and Loading prerequisites are met.
3. Generator terminal voltage is 22 KV with the voltage regulator in automatic mode.
4. Generator ready to be synchronized to grid.
5. Power System Director has been notified.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the Main Generator to the grid and pick up load in accordance with steps 4.11 through 4.24 of SO 50.1 .A-2, Main Generator Synchronizing and Loading.

EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature I Title Date Signature I Title Date Signature /Title Date APPROVED FOR USE:

Signature I Title Date l EFFECTIVE DATE: I /

NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. 1 COMPLETION DATE:

COMMENTS:

Training Review for Completeness: 1 PlMS CODE:

PlMS ENTRY:

Signature/Date I

d 2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 1 of 9

TEMPORARY CHANGE FORM LOG

-L.l CODE NO.: PLOR-028C REV. NO.: 006 TITLE: Emergency Coolina Water System Startup i i I I 2.

3.

4.

10.

11.

12.

~

13.

14.

15.

2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 2 of 9

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: PLOR-028C / 2770020401 WA: 295018.AA1.01 URO: 3.3 SRO: 3.4 TASK DESCRIPTION: Emerqencv Coolinq Water System Startup A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a

-v-Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).

b. When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.

I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.

2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 3 of 9

B. TOOLS AND EQUIPMENT

1. None c.

.--..--- REFERENCES

1. SO 48.1 .B, Rev.11 Emergency Cooling Water System Startup I

D. TASK STANDARD

1. Satisfactory task completion is indicated when the Emergency Cooling Water System is in closed loop operation with the C ECT in service.
2. Estimated time to complete: 20 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to startup the ECW System using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. The ECW System is setup per SO 48.1.A, Emergency Cooling Water Setup for Normal Operation.

w

2. Damage has occurred to the Conowingo Dam due to an earthquake.
3. Conowingo Pond level is 107 and slowly lowering. The Main Control Room has been officially notified of an uncontrolled loss of river.
4. SE-3, Loss of Conowingo Pond has been entered and directs the ECW System placed in service using SO 48.1 .B, Emergency Cooling Water Startup.
5. Steps 4.1 through 4.4 of SO 48.1.B have been successfully completed, including:

Placing the A ESW pump (OAP057) in service and installing a momentary jumper to open MO-0841 Shutdown of all Service Water pumps on both units, Shutdown of all HPSW pumps on both units (a required for operation at this time),

Shutdown of all Service Water Screen Wash pumps on both units.

G. INITIATING CUE The Control Room Supervisor directs you to perform steps 4.5 through 4.14 of SO 48.1 .B, v

Emergency Cooling Water Startup in order to startup the Emergency Cooling Water System using the Aand B Emergency Cooling Tower Cells.

2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 4 of 9

H. PERFORMANCE CHECKLIST

" STEP 2-' NO STEP ACT STANDARD 1 Obtain a copy of procedure SO 48.1.B P A copy of procedure SO 48.1 .B is obtained

  • 2 Close MO-2233A Unit 2A Sluice Gate. P MO-2233A control switch is momentarily placed in the LOWER position at panel (Cue: Acknowledge control switch OOC123.

operation.)

3 Verify MO-2233A Unit 2A Sluice Gate is P MO-2233A green light is verified ON at going closed. panel OOC123.

(Cue: MO-2233A red and green lights are on.)

  • 4 Close MO-2233B Unit 2B Sluice Gate. P MO-2233B control switch is momentarily placed in the LOWER position at panel (Cue: Acknowledge control switch OOC123.

operation.)

1 5 Verify MO-22338 Unit 2B Sluice Gate is going closed.

P MO-2233B green light is verified ON at panel OOC123.

\\

(Cue: MO-22338 red and green lights are on.)

1 *6 1 Close MO-3233A Unit 3A Sluice Gate.

l p MO-3233A control switch is momentarily placed in the LOWER position at panel (Cue: Acknowledge control switch OOC123.

operation.)

7 Verify MO-3233A Unit 3A Sluice Gate is P MO-3233A green light is verified ON at going closed. panel OOC123.

(Cue: MO-3233A red and green lights are on.)

"8 Close MO-3233B Unit 3B Sluice Gate. P MO-32338 control switch is momentarily placed in the LOWER position at panel (Cue: Acknowledge control switch OOC123.

operation.)

9 Verify MO-3233B Unit 3B Sluice Gate is P MO-3233B green light is verified ON at going closed. panel OOC123.

(Cue: MO-3233B red and green lights

_1 are on.)

2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 5 of 9

STEP NO STEP ACT STANDARD 11 I I I When all sluice gates are going closed cue the examinee that the stroke time of the sluice gates has been compressed from the original 12 minutes.

10 Check "ESW WASH TO POND VALVE P ESW WASH TO POND VALVE MO-0498 MO-0498 OPEN" annunciator is lit. )PEN" annunciator is verified lit on alarm

)anel 001 D-5.

(Cue: Annunciator 001 D-5 is lit.)

~

  • II As the Sluice Gates are closing: P 4s the Sluice Gates are closing, "Permit to
lose" pushbutton 69-5643 is momentarily 0 . Depress "Permit to Close" lepressed and MO-0498 control switch is pushbutton 69-5643. nomentarily placed in the CLOSE position within 200 seconds of depressing the 0 . Close MO-0498, ESW Disch to 'Permit to Close" pushbutton at panel Pond Valve. lOC123.

(Cue: Acknowledge pushbutton and control switch operation.)

12 Verify MO-0498 ESW Disch to Pond P vl0-0498 green light is verified ON at valve is closed. >anelOOC123.

(Cue: MO-0498 green light is on, and red light is off.)

13 When MO-0498 is closed: P 'AIESW Booster Pump red light is verified 3N. Discharge pressure is verified Verify "A" ESW Booster Pump starts and letween 40 and 65 psig on PI-0550, motor discharge pressure increases to 60 psig xrrent is verified between 25 and 35 (40-65 psig) and motor current increases 3mps on the "AgESW Booster pump to 29 amps (25-35 amps). 3mmeter at panel OOCl23.

(Cue: "A"ESW Booster Pump red light is on, and green light is off; PI-0550 indicates 60 psig; " A I ESW Booster Pump ammeter indicates 29 amps.)

4 2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 6 of 9

STEP ACT STANDARD 14 When MO-0498 is closed: P Equipment Operator is directed to verify xoper "A1ESW Booster Pump suction Dispatch Equipment Operator to verify xessu re.

suction pressure is between 0" and 8" Hg vacuum as read on PI-0821A located in the EDG Cardox Room.

(Cue: Equipment Operator reports that "A" ESW Booster Pump suction pressure is 4" Hg vacuum.)

15 When MO-0498 is closed: 'ESW DISCH TO POND MO-0498 OPEN" annunciator is verified clear on alarm Verify "ESW DISCH TO POND MO-0498 oanel001 D-5.

OPEN" annunciator is clear.

(Cue: Annunciator 001 D-5 is not lit.)

16 When MO-2233A, MO-2233B, MO- When MO-2233A, MO-2233B, MO-3233A1 3233A, and MO-3233B are fully closed, and MO-3233B are fully closed, Service verify MO-2804A1MO-2804B, MO-3804A1 Water Bay level setpoint is verified to be at and MO-3804B HPSW Bay Inlet Valves 106.0 ft. and controllers in "AUTO" on LIC-automatically open to maintain Service 2804A, 2804B, 3804A, and 3804B at Water Bay level at 106.0 ft. panel OOC123.

(Cue: LI-2804A, 2804B, 3804A4,and 3804B setpoint is 106.0 ft.)

(Evaluator Note: It takes approximately 20 minutes for HPSW bay inlet valves to begin controlling.)

  • I7 Close MO-2486 Unit 2 HPSW Disch to P MO-2486 control switch is momentarily Pond valve. placed in the CLOSE position at panel OOC123.

(Cue: Acknowledge control switch operation.)

18 Verify MO-2486 Unit 2 HPSW Disch to P MO-2486 green light is verified ON at Pond valve is closed. panel OOC123.

(Cue: MO-2486 green light is on, and red light is off.)

2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 7 of 9

STEP ACT STANDARD

~~

"19 Close M0-3486 Unit 3 HPSW Discharge P MO-3486 control switch is momentarily to Pond Valve. placed in the CLOSE position at panel DOC123.

(Cue: Acknowledge control switch operation.)

20 Verify MO-3486 Unit 3 HPSW Discharge P MO-3486 green light is verified ON at to Pond Valve is closed. panel OOC123.

(Cue: MO-3486 green light is on, and red light is off.)

21 When MO-2486 and MO-3486 are fully P When MO-2486 and MO-3486 are fully closed, verify MO-2803 and MO-3803, closed, MO-2803 and MO-3803 red lights HPSW Disch to Cooling Tower valves are verified ON at panel OOC123.

automatically open.

(Cue: MO-2803 and MO-3803 red lights are on, and green lights are off.)

  • 22 Start the "A" ECT Fan. P "AI ECT Fan control switch is momentarily placed in the START position at panel (Cue: Acknowledge control switch OOC123.

operation.)

23 Verify the'"A" ECT Fan has started. P " A f ECT Fan red light ON is verified at panel OOC123.

(Cue: "A" ECT Fan red light is on, and green light is off.)

  • 24 Start the "Bl' ECT Fan. P "B" ECT Fan control switch is momentarily placed in the START position at panel (Cue: Acknowledge control switch OOC123.

operation.)

25 Verify the "B" ECT Fan has started. P "B"ECT Fan red light ON is verified at panel OOC123.

(Cue: "B" ECT Fan red light is on, and green light is off.)

26 Inform Control Room Supervisor of task P Task completion reported.

completion.

(Cue: Control Room Supervisor acknowledges report.)

2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 8 of 9

STEP ACT STANDARD As an evaluator, ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.

Under ACT P - must perform S - must simulate

1. TERMINATING CUE When the Emergency Cooling Water System is in closed loop operation with the A and B ECT Cells in service, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

2007 NRC JPM CR-g(3) (PLOR-028C Rev 006) Page 9 of 9

TASK CONDITIONS/PREREQUISlTES

--%l I. The ECW System is setup per SO 48.1.A, Emergency Cooling Water Setup for Normal Operation.

2. Damage has occurred to the Conowingo Dam due to an earthquake.
3. Conowingo Pond level is 107 and slowly lowering. The Main Control Room has been officially notified of an uncontrolled loss of river.
4. SE-3, Loss of Conowingo Pond has been entered and directs the ECW System placed in service using SO 48.1 .B, Emergency Cooling Water Startup.
5. Steps 4.1 through 4.4 of SO 48.1.6 have been successfully completed, including:

a Placing the A ESW pump (OAP057) in service and installing a momentary jumper to open MO-0841, Shutdown of all Service Water pumps on both units, a Shutdown of all HPSW pumps on both units (a required for operation at this time),

a Shutdown of all Service Water Screen Wash pumps on both units.

INITIATING CUE The Control Room Supervisor directs you to perform steps 4.5 through 4.14 of SO 48.1 .B, Emergency Cooling Water Startup in order to startup the Emergency Cooling Water L,. System using the A and B Emergency Cooling Tower Cells.

EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET

'4' APPROVALS:

Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date APPROVED FOR USE:

Signature I Title Date EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

I I Training Review for Completeness: PlMS CODE:

-. SignatureIDate I I

ENTRY: I 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 1 of 7

TEMPORARY CHANGE FORM LOG

'-'CODE NO.: PLOR-NEW2CA REV. NO.:

TITLE: Plant Reactor Operator Response To Reactor Scram (Alternate Path - SBGT Fails To Automatically Initiate) 1.

2.

3.

I 4.

5.

6.

7.

8.

9.

IO.

11.

12.

13.

14.

15.

2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 2 of 7

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2610050101 / PLOR-NEW2CA WA: 261000 A2.10 RO: 3.1 RO: 3.2 TASK D ESCRI PTI0N: Plant Reactor Operator Response to Reactor Scram (Alternate Path -

SBGT Fails To Automatically Initiate)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance

-.-- a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).

b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

.U 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 3 of 7

B. TOOLS AND EQUIPMENT None C. REFERENCES

1. RRC 94.2-2, Rev. 0, Plant Reactor Operator Scram Actions
2. RRC 94.2-2:1, Rev. 0, PRO Scram Reports
3. GP-4, Rev. 4, Manual Reactor Scram
4. GP-8B1Rev. 17, PCIS Isolation - Groups II and 111
5. COL GP-8B, Rev. 17, Groups II and I l l Isolation
6. SO 9A.1 .C, Rev. 9, Response To Standby Gas Treatment System Automatic Start D. TASK STANDARD
1. Satisfactory task completion is indicated when the examinee has isolated Reactor Building Ventilation and placed Standby Gas Treatment in service.
2. Estimated time to complete: I O minutes Non-Time Critical

-w-E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform Plant Reactor Operator scram actions in accordance with the Operations Manual. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TAS K C0ND I TI0NS/PREREQUISITES

1. The plant was initially operating at full power when a plant transient occurred.
2. A GP-4 Manual Reactor Scram was performed.
3. 13KV House Loads were transferred to the Startup Feed Buses in accordance with RRC 53.1-2.

G. INITIATING CUE The Control Room Supervisor directs you to perform the Plant Reactor Operator scram actions.

NOTE to Examiner: Rapid Response Cards are Level 2 Procedures - not required to be in-hand.

2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 4 of 7

H. PERFORMANCE CHECKLIST GE i NO STEP ACT STANDARD

~~ ~

Verify Main Turbine is tripped. P Main Turbine Tripped light is verified ON and Reset light is verified OFF at Panel (Cue: Tripped light is ON, Reset light is 20C008A; Master Trip Solenoid Test OFF; Master Trip Solenoid Test Lights A Lights A and B are verified OFF at Panel and B are OFF.) 20C008B.

Verify Main Generator lockout. Main Generator output breakers and Alt Exc Fld Bkr green lights are verified ON, (Cue: Main Generator output breakers red lights are verified OFF at Panel and Alt Exc Fld Bkr green lights are ON, 20C009.

red lights are OFF. Annunciators 220 B-I and 220 B-2 are lit.)

3 Verify Group I, II, and Ill isolations and Determine Group II and Ill isolations SBGT initiation, as applicable. should have occurred due to low RPV water level.

(Cue: All Group II and Ill isolation valves green lights are ON, red lights are OFF at PClS Group II and Ill isolation status is Panel 20C003. The following conditions verified at panel 2OCOO3-01, SBGT exist at Panel 20C012:) system status is verified at panel 20C012.

1 Damper / Fan -

Green- Red Recognize SBGT Fans A and B failed PO-20465 ON OFF to start and the following Reactor Building PO-20466 OFF ON Ventilation dampers failed to reposition:

AO-20469-1 ON OFF AO-20469-2 OFF ON Damper / Fan Required Actual AO-20470-1 ON OFF PO-20465 OPEN CLOSED AO-20470-2 OFF ON AO-20469- I OPEN CLOSED AO-20453 OFF ON AO-20470-1 OPEN CLOSED AO-2046 1 OFF ON AO-20453 CLOSED OPEN AO-20462 ON OFF AO-2046 1 CLOSED OPEN AO-20452 ON OFF AO-20458 CLOSED OPEN AO-20458 OFF ON AO-20463 CLOSED OPEN AO-20463 OFF ON AO-20467 CLOSED OPEN AO-20464 ON OFF AO-20475-1 OPEN CLOSED AO-20457 ON OFF AO-2 0475-2 OPEN CLOSED AO-20467 OFF ON AO-20468 ON OFF AO-20475-1 ON OFF May attempt to start B SBGT Fan since AO-20475-2 ON OFF it is already aligned for operation (fan will b

AO-20476- 1 OFF ON not start).

AO-20476-2 OFF ON SBGT Fan A ON OFF SBGT Fan B OFF ON 2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 5 of 7

STEP NO STEP ACT STANDARD

        • NOTE: e***

Examinee may obtain a copy of SO 9A.l.C to isolate Reactor Building Ventilation and place Standby Gas Treatment in service.

~~ ~

  • 4 Open PO-20465, Exh to Stby Gas Treat P At Panel 20C012, PO-20465 control Equip Cell. switch placed in OPEN, green light verified OFF and red light verified ON.

(Cue: PO-20465 green light is OFF, red light is ON.)

~ ~

  • 5 Open AO-20469-1, D M Rx Bldg Equip P At Panel 20C012, AO-20469-1 control Exh. switch placed in OPEN, green light verified OFF and red light verified ON.

(Cue: AO-20469-1 green light is OFF, red light is ON.)

I

  • 6 Open AO-20470-1, Refuel Flr. Exh.

(Cue: AO-20470-1 green light is OFF, Ip At Panel 20C012, AO-20470-1 control switch placed in OPEN, green light verified OFF and red light verified ON.

red light is ON.)

- *7 Close AO-20453, Ventilation Supply RefueI.

P At Panel 20C012, AO-20453 control switch placed in CLOSE, green light verified ON and red light verified OFF.

(Cue: AO-20453 green light is ON, red light is OFF.)

8 Close AO-20461, Ventilation Exhaust P At Panel 20C012, AO-20461 control Refuel. switch placed in CLOSE, green light verified ON and red light verified OFF.

(Cue: AO-20461 green light is ON, red light is OFF.)

9 Close AO-20458, Ventilation Supply Rx P At Panel 20C012, AO-20458 control Bldg. switch placed in CLOSE, green light verified ON and red light verified OFF.

(Cue: AO-20458 green light is ON, red light is OFF.)

  • I0 Close AO-20463, Ventilation Exhaust Rx P At Panel 20C012, AO-20463 control Bldg. switch placed in CLOSE, green light verified ON and red light verified OFF.

(Cue: AO-20463 green light is ON, red light is OFF.)

2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 6 of 7

pE STEP I ACT STANDARD

  • II Close AO-20467, Ventilation Exhaust P At Panel 20C012, AO-20467 control Equip Cell. switch placed in CLOSE, green light verified ON and red light verified OFF.

(Cue: AO-20467 green light is ON, red light is OFF.)

  • I2 Open AO-00475-1, Standby Gas P At Panel 20C012, AO-00475-1 control Treatment A Filter Inlet. switch placed in OPEN, green light verified OFF and red light verified ON.

(Cue: AO-00475-1 green light is OFF, red light is ON.) Acknowledges annunciator 216 A-5 Standby Gas Treatment Filters Not in Aut 0.

  • I3 Open AO-00475-2, Standby Gas P At Panel 20C012, AO-00475-2 control Treatment A Filter Outlet. switch placed in OPEN, green light verified OFF and red light verified ON.

(Cue: AO-00475-2 green light is OFF, red light is ON.)

14 Start SBGT Fan A. P At Panel 20C012, SBGT Fan A control switch placed in RUN, green light verified (Cue: SBGT Fan A green light is OFF, OFF and red light verified ON.

red light is ON.)

-L Observes SBGT flow increase and r

Reactor Building vacuum increase.

EXAMINER CUE: Inform the examinee that this JPM is now complete.

As an evaluator ensure that you have P Positive control established positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.

Under ACT P - must perform S - must simulate I. TERMINATING CUE When all steps required to isolate Reactor Building Ventilation and place Standby Gas Treatment in service are complete, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

2007 NRC JPM CR-h(2) (NEW) -VERSION 2 Page 7 of 7

TASK CONDITIONS/PREREQUISlTES I. The plant was initially operating at full power when a plant transient occurred.

2. A GP-4 Manual Reactor Scram was performed.
3. 13KV House Loads were transferred to the Startup Feed Buses in accordance with RRC 53.1-2.

INITIATING CUE The Control Room Supervisor directs you to perform the Plant Reactor Operator scram actions.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature I Title Date

'i-'

APPROVED FOR USE:

Signature I Title Date 1I EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

1) Training Review for Completeness:

II I PlMS CODE:

I I

I I Signature/Date I ENTRY:

2007 NRC JPM IP-i (PLOR316PA Rev003) Page 1 of 9

TEMPORARY CHANGE FORM LOG

x. .

-'CODE NO.: PLOR-316PA REV. NO.: 003 TITLE: Low CRD Scram Air Header Pressure - Unit 3 (Alternate Path - Standby Requlator Must be Placed In Service) i I 1 2.

3.

4.

5.

6.

\ L 9.

IO.

11.

12.

13.

14.

15.

2007 NRC JPM IP-i (PLOR316PA RevOO3) Page 2 of 9

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2001500401/ PLOR-316PA WA: 201001A2.09 URO: 3.2 SRO: 3.1 TASK DESCRIPTION: Low CRD Scram Air Header Pressure - Unit 3 (Alternate Path -

Standbv Renulator Must be Placed In Service)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance

--.-J a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).

b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

c 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 3 of 9

B. TOOLS AND EQUIPMENT None LC. REFERENCES Procedure ON-108, Rev. 6, Low CRD Scram Air Header Pressure D. TASK STANDARD

1. Satisfactory task completion is indicated when Unit 3 scram air header PCV-5239A is in service and PCV-5239B has been removed from service.
2. Estimated time to complete: 14 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps of ON-108, Low CRD Scram Air Header Pressure procedure. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. Unit 3 is operating at full power steady state conditions.
2. SCRAM VALVE PILOT AIR HEADER PRESS HI-LO annunciator is up on alarm panel J

311 D-2.

3. The cause of low scram air header pressure condition is NOT caused by a loss of the Instrument Air system.
4. Scram air header PCV-5239B is presently in service.

G. INITIATING CUE The Control Room Supervisor directs you to restore the Unit 3 CRD scram air header pressure to approximately 73 psig per procedure ON-I 08, Low CRD Scram Air Header Pressure.

\ - ,

2007 NRC JPM IP-i (PLOR316PA Rev003) Page 4 of 9

H. PERFORMANCE CHECKLIST 7

STEP 4 NO STEP ACT STANDARD 1 3btain a copy of procedure ON-108. SIP 9 copy of procedure ON-I08 is obtained.

~~

2 Verify low scram air header pressure P Scram air header pressure is monitored locally on Pl-3-03-229 at CRD flow nest ,n Pl-3-03-229 or Pl-3-03-312.

OR on Pl-3-03-312 on Panel 30C124.

(Cue: Pl-3-03-229 indicates 63 psig. If the control room is called, report that PI 03-312 indicates 63 psig.)

3 Check normal operation of the in-service P -oading Pressure and control pressure is scram air header pressure control monitored on PCR-3-03-31688B.

regulator by observing loading pressure of approximately 80 psig and control pressure of approximately 75 psig on PCR-3-03-31688B pressure control regulator for PCV-5239B.

(Cue: Loading pressure is approximately 80 psig, control pressure is 63 psig.)

. *4

~ ~

Adjust PCR knob (red knob) clockwise to S PCR-3-03-31688B red knob is turned raise scram air header pressure to 67 to clockwise while observing Pl-3-03-229 75 psig on Pl-3-03-229. until the knob will not turn further.

(Cue: Red knob on PCR-3-03-31688B is turned (clockwise) until it will not turn further, Pl-3-03-229 {Pl-3-03-312) indicates 65 psig. If asked, Loading Pressure is 80 psig and Control Pressure is 65 psig.)

        • NOTE****

If requested the evaluator will serve as the second equipment operator to monitor pressure.

  • 5 Open HV-3-03-31681AI lnstr Air Inlet S HV-3-03-31681A handwheel is turned Block VV to PCV-3-03-5239A. COUNTERCLOCKWISE until resistance of valve backseat is felt.

(Cue: Valve handwheel is turned

[COUNTERCLOCKWISE] until stem length above valve yoke rises Iinch, then will not turn.)

2007 NRC JPM IP-i (PLOR316PA Rev003) Page 5 of 9

STEP ACT STANDARD

  • 6 Open HV-3-03-31682A, lnstr Air Outlet S iV-3-03-31682A handwheel is turned Block Vv from PCV-3-03-5239A. ;OUNTERCLOCKWlSE until resistance f, valve backseat is felt.

(Cue: Valve handwheel is turned

[COUNTERCLOCKWISE] until stem length above valve yoke rises 1 inch, then will not turn.)

~~

"7 Open HV-3-03-31686A, lnstr Air Back S iV-3-03-31686A handwheel is turned Pressure to PCV-5239A. 2OUNTERCLOCKWlSE until resistance 3f valve backseat is felt.

(Cue: Valve handwheel is turned

[COUNTERCLOCKWISE] until stem length above valve yoke rises 1 inch, then will not turn.)

~ ~

  • 8 Open HV-3-03-31685A, Instrument Air S HV-3-03-31685A handwheel is turned Block Valve to PCV-5239A. SOUNTERCLOCKWISE until resistance Df valve backseat is felt.

(Cue: Valve handwheel is turned

[COUNTERCLOCKWISE] until stem length above valve yoke rises 1 inch, then will not turn.)

(Cue: If asked for any of the following pressures, then give the respective following indication(s):

Pl-3-03-229 / Pl-3-03-312 (Scram Air Header Pressure) indicates 65 psig Loading pressure indicates - 80 psig Control pressure indicates - 63 psig) b-2007 NRC JPM IP-i (PLOR316PA Rev003) Page 6 of 9

pF STEP ACT STANDARD

  • 9 Adjust scram air header pressure to S XR-3-03-31688A is manipulated [turned between 67 and 75 psig using the red >lockwise]to adjust scram air header knob [turned Clockwise] on PCR-3 iressure monitored on Pl-3-03-229.

3 1688A.

(Cue: Red knob on PCR-3-03-31688A is adjusted. If asked for any of the following pressures, then give the respective following indication:

Pl-3-03-229 / Pl-3-03-312 {Scram Air Header Pressure} indicates {rising pressure as red knob is turned in the clockwise direction until} 73 psig Loading pressure indicates - 80 psig Control pressure indicates {rising pressure as red knob is turned in the clockwise direction until} 75 psig) 10 Close HV-3-03-31685B, Instrument Air S iV-3-03-31685B handwheel is turned Block Valve to PCV-5239B. :LOCKWISE until resistance of valve seai s felt.

(Cue: Valve handwheel is turned

[CLOCKWISE] until stem length above valve yoke lowers 1 inch, then handwheel will not turn.)

11 Close HV-3-03-31686BI lnstr Air Back S iV-3-03-31686B handwheel is turned Pressure to PCV-5239B. :LOCKWISE until resistance of valve seai s felt.

(Cue: Valve handwheel is turned

[CLOCKWISE] until stem length above valve yoke lowers 1 inch, then handwheel will not turn.)

12 Close HV-3-03-31681B, lnstr Air Inlet S iV-3-03-31681B handwheel is turned Block VV to PCV-5239B. :LOCKWISE until resistance of valve sea s felt.

(Cue: Valve handwheel is turned

[CLOCKWISE] until stem length above valve yoke lowers 1 inch, then handwheel will not turn further.)

2007 NRC JPM IP-i (PLOR316PA Rev003) Page 7 of 9

STEP ACT STANDARD

- I3 Close HV-3-03-316826, lnstr Air Outlet Block Vv from PCV-52396.

S HV-3-03-31682B handwheel is turned CLOCKWISE until resistance of valve seat is felt.

(Cue: Valve handwheel is turned

[CLOCKWISE] until stem length above valve yoke lowers 1 inch, then handwheel will not turn.)

~

14 Verify proper operation of the standby P Loading Pressure and Control Pressure is scram air header PCR, PCR-3-03-31688A monitored on PCR-3-03-31688A.

Pressure Control Regulator for PCV-5239A by observing Loading Pressure of approximately 80 psig and Control Pressure of 75 psig.

(Cue: Loading pressure is approximately 80 psig, Control Pressure is 75 psig.)

15 Verify scam air header pressure on PI P Scram air header pressure is monitored 03-229 at the CRD flow nest OR on PI on Pl-3-03-229 / Pl-3-03-312.03-312 on Panel 30C124 is satisfactory (67 to 75 psig).

(Cue: Scram air header pressure is 73 psig on Pl-3-03-229 / Pl-3-03-312.)

16 Inform Control Room of task completion. S Task completion reported using telephone, hand held radio or GAI-TRONICS page (Cue: Control Room acknowledges system.

report.)

17 As an evaluator ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)AND procedures.

L 2007 NRC JPM IP-i (PLOR316PA RevOO3) Page 8 of 9

Under ACT P - must perform S - must simulate

.-..J I. TERMINATING CUE When Unit 3 scram air header PCV-5239A is in service and PCV-5239B has been removed from service, the Control Room Supervisor should be informed. The evaluator may then terminate the exercise.

2007 NRC JPM IP-i (PLORSIGPA Rev003) Page 9 of 9

TASK CONDlTlONSlPREREQUlSlTES

,-Ll

1. Unit 3 is operating at full power steady state conditions.
2. SCRAM VALVE PILOT AIR HEADER PRESS HI-LO annunciator is up on alarm panel 311 D-2.
3. The cause of low scram air header pressure condition is -NOT caused by a loss of the Instrument Air system.
4. Scram air header PCV-5239B is presently in

. , service.

INITIATING CUE The Control Room Supervisor directs you to restore the Unit 3 CRD scram air header pressure to approximately 73 psig per procedure ON-108, Low CRD Scram Air Header Pressure.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature I Title Date Signature I Title Date Ii APPROVED FOR USE: Signature I Title Date I EFFECTIVE DATE:

Signature I Title I I Date NAME: SOC. SEC. NO.

Last First M.I.

ISSUE DATE: COMPLETION DATE:

COMMENTS:

PlMS CODE:

...- PIMS ENTRY:

2007 NRC JPM IP-j (PLOR197P Rev000) Page 1 of 6

TEMPORARY CHANGE FORM LOG 4

CODE NO.: PLOR-197P REV. NO.: 001 TITLE: Defeating RClC Low Pressure Isolations - Unit 2 2.

3.

4.

5.

6.

7.

8.

.,.. 9.

IO.

11.

12.

13.

14.

15.

2007 NRC JPM IP-j (PLOR197P Rev000) Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2004510599 / PLOR-197P WA: 295031EA1.05 URO: 4.3 SRO: 4.3 TASK DESCRIPTION: Defeatina RClC Low Pressure Isolation - Unit 2 A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM IP-j (PLOR197P Rev000) Page 3 of 6

B. TOOLS AND EQUIPMENT

1. T-225 Tool Package

-d

2. EOP Tool Locker Key
3. Yellow copy of T-225-2, Defeating RClC Low Pressure Isolation
4. Green copy of T-225-3, Defeating RClC Low Pressure Isolation (in case examinee picks the wrong unit)

C. REFERENCES

1. T-225-2, Rev. 3, Defeating RClC Low Pressure Isolation D. TASK STANDARD
1. Satisfactory task completion is indicated when the RClC low pressure isolation is defeated.
2. Estimated time to complete: 10 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to defeat the RClC low pressure isolation, using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUBITES I. A transient has occurred on Unit 2.

2. Use of this procedure has been directed by the 1-100procedures.

G. INITIATING CUE The Control Room Supervisor directs you to perform steps 4.1 and 4.2 of T-225-2, Defeating RClC Low Pressure Isolation.

d 2007 NRC JPM IP-j (PLOR197P Rev000) Page 4 of 6

H. PERFORMANCE CHECKLIST NO STEP ACT STANDARD

  • I Obtain the key for the Emergency S Emergency Operating Procedure Tool Operating Procedure Tool Locker. Locker Key requested from WECS examinee identifies the location of the (Cue: When examinee requests EOP Tool WECS key box and its associated key.

Locker key from WECS examinee identifies the location of the WECS key box and its associated key then evaluator should provide the EOP Tool Locker key.)

  • 2 Open Emergency Operating Procedure P Tool Locker located on Radwaste Building Tool Locker and obtain T-225-2 Tool Kit. El. 165' is unlocked, opened and 1-225-2 Tool Kit is located.

(Cue: Equipment obtained.)

When examinee locates tool kit, inform him/her that helshe now has the tools to perform the procedure. Provide the examinee with a copy of T-225-2 (or T-225-3, depending on which tool kit has been chosen). DO NOT allow equipment to be removed from the locker. Relock the locker before leaving the area.

  • 3 Open panel 20633 back panel doors. P Door handle turned, doors pulled outward to gain access to terminal strip BB at back (Cue: Panel 20C33 doors are open.) of panel 20C33 in the Cable Spreading Room.
  • 4 Lift leads BG-13 and UV-C from terminal S Terminal screw is turned BB-45. COUNTERCLOCKWISE until loose. The terminal screw is removed with a (Cue: Leads are lifted.) "CAPTURE" screwdriver, then the leads are removed.

Tape leads BG-13 and UV-C. S Tape is wrapped around end of each lead ensuring no metal is exposed.

(Cue: Leads are taped.)

Close panel 20633 back panel doors. P Door closed and relatched using handle.

(Cue: Panel 20C33 doors are closed and latched.)

  • 7 Open panel 20C34 back panel doors. P Door handle turned, doors pulled outward to gain access to terminal strip BB at back (Cue: Panel 20C34 doors are open.) of panel 20C34 in the Cable Spreading Room.

--- I 2007 NRC JPM IP-j (PLOR197P Rev000) Page 5 of 6

STANDARD

~~

  • 8 Lift leads AA-59 and ACA-13 from terminal S Terminal screw is turned BB-69. COUNTERCLOCKWISE until loose. The terminal screw is removed with a (Cue: Leads are lifted.) CAPTURE screwdriver, then the leads are removed.

9 Tape leads AA-59 and ACA-13. Tape is wrapped around end of each lead ensuring no metal is exposed.

(Cue: Leads are taped.)

~

10 Close panel 20C34 back panel doors. P Doors are closed and relatched using handle.

(Cue: Panel 20634 doors are closed and latched.)

11 Inform Control Room of task completion. S Task completion reported using telephone or GAI-TRONICS page system.

(Cue: Control Room acknowledges report.) NOTE: Hand held radios are NOT to be used in the Cable Spreading Room.

12 As an evaluator ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.

Under ACT P - must perform S - must simulate I. TERMINATING CUE When the low pressure isolation for RClC is defeated, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

d 2007 NRC JPM IP-j (PLOR197P Rev000) Page 6 of 6

TASK CONDITIONS/PREREQUlSlTES I. A transient has occurred on Unit 2.

2. Use of this procedure has been directed by the T-I00 procedures.

INITIATING CUE The Control Room Supervisor directs you to perform steps 4.1 and 4.2 of T-225-2, Defeating RClC Low Pressure Isolation.

EXELON NUCLEAR Nuclear Generation Group OJTITPE MATERIAL COVERSHEET APPROVALS:

Signature /Title Date Signature I Title Date Signature I Title Date Signature I Title Date I EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

1 PlMS CODE:

~~ ~

Training Review for Completeness: I Signature/Date I I

ENTRY: I

\ J/

2007 NRC JPM IP-k (PLOR049P Rev015) Page 1 of 6

TEMPORARY CHANGE FORM LOG eCODE NO.: PLOR-049P REV. NO.: 015 TITLE: Diesel Generator Air Start Solenoid Override J

2.

3.

4.

5.

6.

7.

8.

/' 9.

IO.

11.

12.

13.

14.

15.

2007 NRC JPM IP-k (PLOR049P RevOl5) Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE

/ - ,%

POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2640010401/ PLOR-049P WA: 264000A2.10 URO: 3.9 SRO: 4.2 TASK DESCRIPTION: Diesel Generator Air Start Solenoid Override A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM IP-k (PLOR049P RevOl5) Page 3 of 6

B. TOOLS AND EQUIPMENT None r /

-- c. REFERENCES Procedure A 0 52A.2 Rev. 4, Diesel Generator Air Start Solenoid Override D. TASK STANDARD

1. Satisfactory task completion is indicated when E-2 Diesel Generator has been started by overriding one of the air start solenoid valves.
2. Estimated time to complete: 15 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to start the E-2 Diesel Generator by overriding one of the air start solenoid valves using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDIT10NS/PREREQUISITES

1. A loss of coolant accident has occurred.
2. E-2 Diesel Generator failed to start.
3. Investigation reveals that both E-2 Diesel Generator air start solenoid valve coils have failed.
4. The prerequisites of procedure A 0 52A.2 Diesel Generator Air Start Solenoid Override have been met.

G. INITIATING CUE The Control Room Supervisor directs you to perform A 0 52A.2 Diesel Generator Air Start Solenoid Override up to and including step 4.4 for the E-2 Diesel Generator.

4 2007 NRC JPM IP-k (PLOR049P RevOlS) Page 4 of 6

H. PERFORMANCE CHECKLIST

-1 NO STEP ACT STANDARD 1 Obtain a copy of procedure A 0 52A.2. P A copy of procedure A 0 52A.2 is obtained.

  • 2 Reset the E-2 diesel generator control S "RESET" pushbutton is momentarily circuitry. DEPRESSED at the E-2 diesel gauge panel.

(Cue: RESET pushbutton has been depressed.)

3 Verify the E-2 D/G start failure lockout P Annunciator C-2, "START FA1LURE" is relay is reset. verified clear at panel OBC097.

(Cue: Annunciator C-2, "START FAILURE" on panel OBC097 is not lit.)

~~

  • 4 Override SV-0-52C-7233B S SV-0-52C-7233B Manual Override handle SV-0-52C-7234B. -

OR SV-0-52C-7234B Manual Override handle is turned clockwise to mechanical (Cue: Air flow is heard, EDG engine stop.

speed increases rapidly to a steady RPM, heat is felt coming from exhaust manifold.)

Turn SV-0-52C-7233B S SV-0-52C-7233B SV-0-52C-7234B SV-0-52C-72346 fully counter clockwise to handle is turned counterclockwise to the mechanical stop. mechanical stop.

(Cue: Air flow heard in previous step stops.)

Request Control Room operator verify S Control Room operator is requested to cooling water flow is started to E-2 Diesel verify cooling water flow is started to E-2 Generator. Diesel Generator using radio or GAI-TRONICS page system.

(Cue: "A1ESW pump is running with discharge pressure indication of 52 psig.)

Inform the Control Room of task S Task completion reported using hand held completion. radio or GAI-TRONICS page system.

(Cue: Control Room acknowledges report.)

2007 NRC JPM IP-k (PLOR049P RevOl5) Page 5 of 6

STEP ACT STANDARD As an evaluator ensure you have positive P Positive control established control of all exam material provided to the examinee (Task Conditions/Prerequisites)

AND procedures.

Under ACT P - must perform S - must simulate I. TERMINATING CUE When A 0 52A.2 has been completed up to and including Step 4.4, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

2007 NRC JPM IP-k (PLOR049P RevOl5) Page 6 of 6

TASK CONDlTlONSlPREREQUlSlTES

.d I. A loss of coolant accident has occurred.

2. E-2 Diesel Generator failed to start.
3. Investigation reveals that both E-2 Diesel Generator air start solenoid valve coils have failed.
4. The prerequisites of procedure A 0 52A.2 Diesel Generator Air Start Solenoid Override have been met.

INITIATING CUE The Control Room Supervisor directs you to perform A 0 52A.2 Diesel Generator Air Start Solenoid Override up to and including step 4.4 for the E-2 Diesel Generator.