To: T. Fish Fm: M. Kelly, PBAPS Exam Author Subj.: Handouts provided to applicants for the written exam We provided the following materials to the applicants for administration of the written exam:

RO Exam

1. Full set of TRIPSwith entry conditions blanked out:

0 T-1 00 "Scram" (1 sheet) 0 T-101 "RPV Control" (1 sheet) 0 T-102 "Primary Containment Control" (3 sheets) 0 T-103 "Secondary Containment Control" (1 sheet)

T-104 "Radioactivity Release" (1 sheet) 0 T-1 11 "Level Restoration" (1 sheet)

T-112 "Emergency Blowdown" (1 sheet) 0 T-116 "RPV Flooding" (2 sheets)

T-117 "LeveVPower Control" (1 sheet)

2. Steam Tables 3, Print E-1 (sheet 1 of 4) Single Line Diagram - Station
4. Table 2 "Cause & Corrective Action Trouble Shooting" of SO 62.1.A "Withdrawing/lnsertinga Control Rod" SRO Exam
1. Full set of Technical Specifications (without bases), with S.R. 3.6.4.1.4 (SBGT flow rate c 10,500 cfm) sanitized.
2. Full set of Technical Requirements (without bases)
3. SE-11 "Loss of Off-Site Power", Attachment C "Instrument List"
4. Table PBAPS 3-1 : Emergency Action Level (EAL) Matrix of EP-AA-1007 "Radiological Emergency Plan Annex for Peach Bottom Atomic Power Station",

Rev. 13

5. OT-1 10, "Reactor High Level' Figure 1