EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

Signature /Title Date Signature / Title Date Signature I Title Date Signature / Title Date

.-I

'APPROVED FOR USE:

Signature /Title Date 1I EFFECTIVE DATE: i I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

I I Training Review for Completeness: PlMS CODE:

PlMS ENTRY:

SignaturdDate 2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 1 of 7

TEMPORARY CHANGE FORM LOG

'".'CODE NO.: PLOR-301CA REV. NO.: 008 TITLE:

1.

2.

3.

4.

5.

6.

7.

1 9.

10.

11.

12.

13.

14.

15.

2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 2 of 7

PECO NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE 2

POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2001100501 / PLOR-301CA WA: 295037EA1.04 URO: 4.5 SRO: 4.5 TASK DESCRIPTI0N: Inject Boron into RPV (Alternate Path - RWCU Fails to Isolate)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM CR-a(?) (PLOR301CA Rev008) Page 3 of 7

B. TOOLS AND EQUIPMENT

1. Key for SBLC System keylock switch on Control Room panel C005A.

.\- C REFERENCES

1. RRC 11.I-2, Rev. 0, Standby Liquid System Initiation During a Plant Event
2. SO 11. I .B-2, Rev. 3, Standby Liquid Control System Initiation D. TASK STANDARD
1. Satisfactory task completion is indicated when a SBLC pump is running, boron is injecting into the Reactor vessel and RWCU system flow is secured.
2. Estimated time to complete: 4 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to inject boron into the Reactor vessel using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

- G.

1. SBLC injection is required by T-101, RPV Control.

INITIATING CUE The Control Room Supervisor directs you to inject boron into the Reactor vessel from the Control Room using Rapid Response Card RRCI 1.1-2, Standby Liquid System Initiation During a Plant Event.

2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 4 of 7

H. PERFORMANCE CHECKLIST P

STEP ACT STANDARD

~~

Verify AO-2-02-039, Recirc Sample P AO-2-02-039 green light verified ON at Inboard lsol valve, is closed. panel 20C004A.

[Cue: AO-2-02-039 green light is on, red light is off.)

~~ ~

Verify AO-2-02-040, Recirc Sample P AO-2-02-040 green light verified ON at Inboard lsol valve, is closed. panel 20C004A.

(Cue: AO-2-02-040 green light is on, red light is off.)

Verify key is inserted into 2(A)BP040 P Key verified inserted into 2(A)BP040 keylock switch. keylock switch at panel 20C005A.

(Cue: Key is in keylock switch.)

Turn keylock switch to start "Sys A(B)". P Keylock switch turned to the "START SYS A(B)" position at panel 20C005A.

(Cue: Acknowledge keylock switch operation.)

~~ ~

\ r' 5 Verify RWCU System isolated. P RWCU failure to isolate is recognized.

(Cue: MO-15, MO-18, and MO-68 red lights are on, green lights are off.)

6 Trip all running RWCU pumps. All running RWCU Pump control switches are momentarily placed in the STOP (Cue: Acknowledge control switch position at panel 20C004A.

operations.)

~

7 Verify all RWCU pumps are secured. A, B, and C RWCU pump green lights verified ON and flow decreases to 0 on (Cue: A and B RWCU Pumps green lights Fl-2-12-141A and FI-2-12-141B at panel are on, red lights are off.) 20C004A.

  • 8 Close MO-2-12-15 RWCU Inboard P MO-2-12-15 control switch momentarily Isolation valve. placed in the CLOSE position at panel 20C004A.

(Cue: Acknowledge control switch operation.)

2007 NRC JPM CR-a(1) (PLORSOICA Rev008) Page 5 of 7

~~

STEP NO STEP ACT STANDARD

  • 9 Close MO-2-12-18, RWCU Outboard P MO-2-12-18 control switch momentarily Isolation valve. placed in the CLOSE position at panel 20C004A.

(Cue: Acknowledge control switch operation.)

  • I0 Close MO-2-12-68, RWCU Outlet valve. P MO-2-12-68 control switch momentarily placed in the CLOSE position at panel (Cue: Acknowledge control switch 20C004A.

operation.)

~~ ~

11 Verify MO-2-12-15, MO-2-12-18 and P MO-2-12-15, AND/OR MO-2-12-18, MO-2-12-68 are closed. AND/OR MO-2-12-68 green light(s) verified ON at panel 20C004A.

(Cue: MO-15, MO-18, and MO-68 green lights are on, red lights are off.)

~~ ~

12 Acknowledge the "CLEAN-UP P The annunciator "ACKNOWLEDGE" FI LTER/DEMIN SYSTEM TROUBLE" pushbutton is depressed on panel annunciator. 20co 12.

(Cue: Annunciators 215 C-3 is lit solid.)

13 Verify SBLC Pump A(B) starts and injects. P SBLC Pump A(B) red light is verified ON.

(Cue: SBLC Pump A(B) red light is on, SBLC Pump discharge pressure verified green light is off; PI-065 reads approximately I 0 0 psi > reactor pressure approximately 100 psi greater than on PI-2-11-065.

Reactor pressure; LI-66 indication is slowly lowering; Reactor power is slowly Lowering Reactor power verified.

lowering.)

All at panel 20C005A.

14 Inform Control Room Supervisor of task P Task completion reported.

completion.

(Cue: Control Room Supervisor acknowledges report.)

15 As an evaluator ensure that you have P Positive control established.

positive control of all exam material provide to the examinee (Task Conditions/Prerequisites) AND procedures.

2007 NRC JPM CR-a(1) (PLORBOICA Rev008) Page 6 of 7

Under ACT P - must perform S - must simulate u

I. TERMINATING CUE When a SBLC pump is running and boron is injecting into the Reactor vessel with RWCU flow secured, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

2007 NRC JPM CR-a(1) (PLOR301CA Rev008) Page 7 of 7

TASK CONDITIONS/PREREQUISlTES

-d I. SBLC injection is required by T-101, RPV Cont roI.

INITIATING CUE The Control Room Supervisor directs you to inject boron into the Reactor vessel from the Control Room using Rapid Response Card RRCl I.I -2, Standby Liquid System Initiation During a Plant Event.

EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature I Title Date Signature I Title Date Signature I Title Date

/

.Ld*'

APPROVED FOR USE:

Signature /Title Date l EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

Training Review for Completeness: I PlMS CODE:

Signature/Date 1 PlMS ENTRY:

2007 NRC JPM CR-b(2) (PLOR300CA RevOl2) Page 1 of 6

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-300CA REV. NO.:

d TITLE: Manualiv initiate HPCl (Alternate Path - Manual Initiation Pushbutton Fails to ODerate)

I.

2.

3.

4.

5.

6.

7.

8.

9.

c/

IO.

11.

12.

13.

14.

15.

W

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE

.j POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2060050101 / PLOR-300CA K/A: 295031EA1.02 URO: 4.5 SRO: 4.5 TASK DESCRIPTI 0N: Manuallv Initiate HPCl (Alternate Path - Manual Initiation Pushbutton Fails to Operate)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.

I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.

2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

B. TOOLS AND EQUIPMENT

1. None

-.=//c. REFERENCES

1. RRC 23.1-2, Rev. 4, HPCI System Operation During a Plant Event D. TASK STANDARD
1. Satisfactory task completion is indicated when HPCl is injecting to the RPV at 5000 9pm.
2. Estimated time to complete: 5 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to manually initiate the HPCl system and inject to the Reactor vessel at a flow rate of 5000 gpm using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. RPV Level is -25 inches and lowering.

-+- G. INITIATING CUE The Control Room Supervisor directs you to initiate the HPCl system using the HPCl Manual Initiation pushbutton and inject to the Reactor vessel at 5000 gpm using RRC 23.1-2, HPCI System Operation During a Plant Event.

H. PERFORMANCE CHECKLIST

,llSTEP NO STEP ACT STANDARD 1 Obtain copy of RRC 23.1-2 "HPCI P References Section A of RRC "HPCI Operation During a Plant Event". Injection Using Manual Initiation PB".

2 Arm and depress the HPCl Manual P HPCl Manual Initiation Pushbutton collar Initiation Pushbutton. is rotated clockwise to the ARMED position and then the pushbutton is momentarily DEPRESSED at panel 20C004B.

  • 3 Recognize that the Manual Initiation P Manual Initiation pushbutton failure to pushbutton did not function. function is recognized. Examinee should now refer to Section B of RRC, "HPCI Injection by Manual Component Operation".

~

        • NOTE ****

If notified as the Control Room Supervisor that the HPCl Manual Initiation Pushbutton did not function, cue the examinee to initiate HPCl and inject to the reactor vessel at 5000 gpm.

\../ "4 Simultaneously start the Auxiliary Oil P Auxiliary oil pump control switch is placed Pump, 20P026 and open MO-2-23-014 in the START position while "Supply" valve. simultaneously placing MO-2-23-014 "Supply" control switch momentarily in the (Cue: Acknowledge control switch "OPEN" position at panel 20C004B.

operation.)

5 Verify the Auxiliary Oil Pump started. P Verify the Auxiliary Oil pump red light is ON at panel 20C004B or annunciator 222 (Cue: Auxiliary Oil pump red light is on D-5 is alarming at panel 20C204C.

green light is off and annunciator 222 D-5 is alarming, "HPCI AUXILIARY OIL PUMP RUNNING", Turbine Stop and Control valve red lights are on.)

(1 6 Verify MO-2-23-014, "Supply" valve is open.

P MO-2-23-14 red light verified ON, HPCl discharge pressure (PI-2-23-109) and HPCl speed (SPI-4505) rising at panel 2OC0046.

STEP NO STEP ACT STANDARD

  • 7 Open MO-2-23-019, "To Feed Line" valve. P MO-2-23-019 control switch is momentarily placed in the OPEN position (Cue: Acknowledge control switch at panel 20C004B.

operation.)

8 Verify MO-2-23-019, "To Feed Line" valve P MO-2-23-019 red light is verified ON and is open. flow (Fl-2-23-108) rising at panel 20C004B.

(Cue: MO-19 red light is on, green light is off, HPCl flow rise.)

9 Start the HPCl Gland Seal Condenser P HPCl Gland Seal Condenser Vacuum Vacuum pump, 20K002. Pump control switch is placed in the START position at panel 20C004B.

(Cue: Vac pump red light is on, green light is off.)

10 Verify pump flowrate of 5000 gpm. P A HPCl flowrate of approximately 5000 gpm is verified on Fl-2-23-108 at panel (Cue: Fl-2-23-108 indicates 5000 gpm.) 20C004B.

11 Inform Control Room Supervisor that P Task completion reported.

HPCl was manually started and is injectinc into the RPV.

(Cue: Control Room Supervisor acknowledges report.)

As an evaluator ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.

Under "ACT" P - must perform S - must simulate I. TERMINATING CUE When HPCl is injecting into the Reactor vessel at a flow rate of 5000 gpm, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

TASK CONDlTlONS/PREREQUlSlTES

1. RPV Level is -25 inches and lowering.

INITIATING CUE The Control Room Supervisor directs you to initiate the HPCl system using the HPCl Manual Initiation pushbutton and inject to the Reactor vessel at 5000 gpm using RRC 23.1-2, HPCI System Operation During a Plant Event.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature /Title Date Signature I Title Date Signature I Title Date

/ APPROVED FOR USE:

Signature /Title Date EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

Training Review for Completeness: PlMS CODE:

PlMS ENTRY:

SignatureIDate 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 1 of 7

TEMPORARY CHANGE FORM LOG

. I e

CODE NO.: PLOR-023C REV. NO.: 007 TITLE: ADS RESET FOLLOWING BLOWDOWN 1.

2.

3.

4.

5.

6.

7.

- 8.

9.

IO.

11.

12.

13.

14.

15.

2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 2 of 7

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2180040101 / PLOR-023C WA: 218000A4.03 RO: 4.2 SRO: 4.2 TASK DESCRIPTION: ADS RESET FOLLOWING BLOWDOWN A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 3 of 7

6. TOOLS AND EQUIPMENT None

,d C. REFERENCES Procedure SO 1G.7.C-2, Rev. 9, Automatic Depressurization System Reset Following Blowdown (R)

D. TASK STANDARD I. Satisfactory task completion is indicated when ADS logic reset, Vacuum breaker position indication reset, and ADS relief valve position indication reset.

2. Estimated time to complete: 7 minutes (A.5) Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to reset the ADS system using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. RPV water level is greater than -160 and the capability exists to maintain level above

-160.

2. The following annunciators have been reset:
a. System I ECCS REAC VESSEL LO-LO-LO LEVEL, panel 227 D-2.
b. System II ECCS REAC VESSEL LO-LO-LO LEVEL, panel 228 C-2.
3. Blowdown of the RPV is complete by evidence of SRVs closed due to lack of pressure to keep them open.
4. Reactor pressure is 0 psig.
5. Drywell pressure is 0.25 psig.

G. INITIATING CUE The Control Room Supervisor directs you to reset the ADS logic in accordance with SO I G.7.C-2, Automatic Depressurization System Reset Following Blowdown, Section 4.1.

u 2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 4 of 7

H. PERFORMANCE CHECKLIST

) )

STEP NO STEP ACT STANDARD

  • I Depress the "A' ADS LOGIC RESET- P The "A1ADS LOGIC TIMER RESET TIMER pushbutton, 2E-S2A. pushbutton, 2E-S2A, is momentarily depressed at panel 2OCOO3-01.

(Cue: Acknowledge pushbutton operation .)

  • 2 Depress the "B" ADS LOGIC RESET- P The "B" ADS LOGIC TIMER RESET TIMER pushbutton, 2E-S2B. pushbutton, 2E-S2B, is momentarily depressed at panel 2OCOO3-01.

(Cue: Acknowledge pushbutton operation .)

The "BLOWDOWN RELIEF VALVES HIGH TEMP" annunciator will not reset unless all of the temperatures are below the alarm setpoint.

3 Reset the following annunciators: P The alarm "RESET" Pushbutton is nomentarily depressed on panel 20C003.

a. "BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS".
b. "BLOWDOWN RELIEF VALVES HIGH TEMP".

(Cue: Acknowledge pushbutton operation.)

Verify "BLOWDOWN AUX RELAYS 'BLOWDOWN AUX RELAYS ENERGIZED RHR OR CS" and INERGIZED RHR OR CS" and "BLOWDOWN RELIEF VALVES HIGH 'BLOWDOWN RELIEF VALVES HIGH TEMP" annunciators are clear. TEMP" annunciators are verified clear on alarm panels 227 E-4 and 227 B-4.

(Cue: Annunciators 227 E-4 and 227 B-4 are not lit.)

~~ ~

Verify "BLOWDOWN TIMERS INITIATED" 'BLOWDOWN TIMERS INITIATED" annunciator reset. annunciator is verified clear on alarm pane 227 D-4.

(Cue: Annunciator 227 D-4 is not lit.)

6 Verify "SAFETY RELIEF VALVE OPEN" P 'SAFETY RELIEF VALVE OPEN" annunciator reset. annunciator is verified clear on alarm pane 210 D-2.

(Cue: Annunciator 210 D-2 is not lit.)

2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 5 of 7

STEP ACT STANDARD 7 Verify the ADS valves indicate closed. P RV-2-02-71A, B, C, G, & K green lights ilerified ON at panel 2OCOO3-01.

(Cue: RV-2-02-71A, B, C, G, & K green lights are on, red lights are off.)

~

8 Monitor temperature recorder TR-2 P TR-2-02-103 monitored at panel 20C003-103 to ensure each valve has reseated. 31 to ensure each ADS valve has reseated, as indicated by each point (Cue: TR-2-02-103 points TE-2-2-113A, reading less than 200°F and decreasing.

B, C, G, & K read 200°F and decreasing SIowly .)

~ ~

  • 9 Depress the "A" ADS LOGIC RESET - P The "A" ADS DRYWELL HIGH DRYWELL HIGH PRESS pushbutton, 2E- PRESSURE LOGIC RESET pushbutton, S3A. 2A-S3A, is momentarily depressed at panel 2OCOO3-01.

(Cue: Acknowledge pushbutton operation.)

  • I0 Depress the "B" ADS LOGIC RESET P The "B" ADS DRYWELL HIGH PRESS DRYWELL HIGH PRESS pushbutton 2E- LOGIC RESET pushbutton, 2E-S3B, is S3B. momentarily depressed at panel 20C003-01.

(Cue: Acknowledge pushbutton operation.)

I1 Reset the following annunciators: The alarm "RESET" pushbutton is momentarily depressed on panel 20C003.

a. "DRYWELL HI PRESS SIGNAL SEALED IN".
b. "HIGH DRYWELL PRESSURE BYPASS TIMERS INITIATED".

(Cue: Acknowledge pushbutton operation.)

~

12 Verify "DRYWELL HI PRESS SIGNAL "DRYWELL HI PRESS SIGNAL SEALED SEALED IN" and "HIGH DRYWELL IN" and "HIGH DRYWELL PRESSURE PRESSURE BYPASS TIMERS BYPASS TIMERS INITIATED" INITIATED" annunciators are clear. annunciators are verified clear on alarm panels 227 A-4 and 227 A-3.

(Cue: Annunciators 227 A-4 and 227 A-3 are not lit.)

2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 6 of 7

STEP ACT STANDARD

--.. 13 Inform the Control Room Supervisor of P rask completion reported.

task completion.

(Cue: Control Room Supervisor acknowledges report.)

14 As an evaluator, ensure that you have P ositive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.

Under ACT P - must perform S - must simulate I. TERMINATING CUE When the ADS logic has been reset, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

2007 NRC JPM CR-c(3) (PLOR023C RevOO6) Page 7 of 7

TASK CONDITIONS/PREREQUISlTES u

I. RPV water level is greater than -160inches and the capability exists to maintain level above -160 inches.

2. The following annunciators have been reset:
a. System I ECCS REAC VESSEL LO-LO-LO LEVEL, panel 227 D-2.
b. System II ECCS REAC VESSEL LO-LO-LO LEVEL, panel 228 C-2.
3. Blowdown of the RPV is complete by v

evidence of SRVs closed due to lack of pressure to keep them open.

4. Reactor pressure is 0 psig.
5. Drywell pressure is 0.25 psig.

INITIATING CUE The Control Room Supervisor directs you to reset the ADS logic in accordance with SO lG.7.C-2, Automatic Depressurization System Reset Following Blowdown, Section 4.1

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET PERFORM CORE SPRAY B PUMP CAPACITY TEST FOR IST (ALTERNATE PATH APPROVALS:

Signature I Title Date Signature / Title Date Signature /Title Date Signature / Title Date 1 APPROVED FOR USE:

Signature / Title Date EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. 1 COMPLETION DATE:

COMMENTS:

Training Review for Completeness: I PlMS CODE: I Signature/Date I

I PlMS ENTRY:

I 2007 NRC JPM CR-d(4) (NEW) Page 1 of 6

TEMPORARY CHANGE FORM LOG

-u' CODE NO.: PLOR-NEWICA REV. NO.:J(O Q

TITLE: PERFORM CORE SPRAY B PUMP CAPACITY TEST FOR IST (ALTERNATE PATH -

PUMP MINIMUM FLOW VALVE FAILS TO OPEN) 1.

2.

3.

4.

5.

1 I I

6. I I 7.

9.

IO.

11.

2007 NRC JPM CR-d(4) (NEW) Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2090140101 / PLOR-NEWICA WA: 209001A4.04 URO: 2.9 SRO: 2.9 TASK DESCRlPTION: Perform Core Spray B Pump Capacitv Test For IST (Alternate Path -

Pump Minimum Flow Valve Fails To Open)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance L
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

u 2007 NRC JPM CR-d(4) (NEW) Page 3 of 6

~~

B. TOOLS AND EQUIPMENT I

k d C. REFERENCES

1. ST-0-014-212-2, Rev. 1, Core Spray B Pump Capacity Test For IST.

D. TASK STANDARD

1. Satisfactory task completion is indicated when Core Spray pump 2B minimum flow valve is determined to have failed to open and 29 Core Spray pump is shutdown.
2. Estimated time to complete: 10 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to perform Core Spray 2B pump capacity test for IST using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. The plant is operating at 100% power L/ 2. An Equipment Operator is standing by in the 26 Core Spray Pump Room.
3. Communications are available between the Control Room, 2B Core Spray Pump Room, B and D Core Spray Pump Triangle Room, and Cable Spreading Room.
4. Core Spray pump 2B oil level is between the minimum and maximum lines on the sightglass.
5. Core Spray pump 29 static pump suction pressure is 6 psig.

G. INITIATING CUE The Control Room Supervisor directs you to perform Core Spray 2B pump capacity test for IST in accordance with ST-0-014-212-2 (provided).

Provide examinee a copy of ST-0-014-212-2 with the following items completed:

0 Section 1 of the cover page 0 Procedure section 2.0, Test Equipment 0 Procedure section 3.0, Prerequisites 2007 NRC JPM CR-d(4) (NEW) Page 4 of 6

H. PERFORMANCE CHECKLIST

~~ ~

I (

STEP

\ NO STEP ACT STANDARD I CLOSE MO-2-14-011B Core Spray P MO-2-14-011B control switch is Outboard Disch. momentarily placed in CLOSE at Panel 20C003.

(Cue: Acknowledge control switch operation. MO-2-14-011B green light is MO-2-14-011B green light is verified ON; ON; red light is OFF.) red light is verified OFF at Panel 20C003.

  • 2 START 2BP037 Core Spray B Pump. Starting 28 Core Spray pump is announced on plant page prior to starting (Cue: Acknowledge control switch Core Spray pump 2B.

operation.)

2B Core Spray pump control switch is momentarily placed in the START position at Panel 20C003.

~

3 VERIFY Core Spray 28 Pump STARTS 2B Core Spray pump green light is and is RUNNING by observing motor verified OFF, red light verified ON, pump current on 14A-MI B and discharge motor amps on ammeter 14A-MI B and pressure on PI-2-14-048B Core Spray discharge pressure on PI-2-14-048B are Disch P. verified rising at Panel 20C003.

... (Cue: Ammeter 14A-MI B indicates 40 amps, PI-2-14-048B indicates 350 psig.)

~

  • 4 VERIFY MO-2-14-005B Core Spray B P Recognized Min Flow Valve MO-2 Min Flow automatically OPENS. 005B did NOT open as indicated by green light ON, red light OFF, and FI (Cue: MO-2-14-005B green light is ON; 14-050B indicating 0 gpm at Panel red light is OFF.) 20C003.

~~

  • 5 Report to CRS 2B Core Spray pump P 2B Core Spray pump minimum flow valve minimum flow valve failed to open. MO-2-014-005B failed to open reported to CRS.

(Cue: Acknowledge report that 2B Core Spray pump minimum flow valve failed to open.)

  • 6 Stop 2BP037 Core Spray B Pump. P 2B Core Spray pump control switch is momentarily placed in the STOP (Cue: Acknowledge control switch position at Panel 20C003.

operation.)

2007 NRC JPM CR-d(4) (NEW) Page 5 of 6

STEP 1 ACT

~~ ~

STANDARD

.-. 7 Verify Core Spray 2B Pump stops. P 2B Core Spray pump green light is verified ON, red light verified OFF, pump (Cue: Ammeter 14A-MI B indicates 0 motor amps on ammeter 14A-MI B and amps, PI-2-14-048B indicates 0 psig.) discharge pressure on PI-2-14-048B are verified at 0 at Panel 20C003.

8 Open MO-2-14-01IB Core Spray P MO-2-14-011B control switch is Outboard Disch. momentarily placed in OPEN at Panel 20C003.

(Cue: Acknowledge control switch operation. MO-2-14-011B green light is MO-2-14-011B green light is verified OFF; red light is ON.) OFF; red light is verified ON at Panel 20C003.

9 As an evaluator, ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.

Under ACT P - must perform S - must simulate

- 4 I. TERMINATING CUE When Core Spray pump 2B minimum flow valve is determined to have failed to open, and Core Spray pump 2B is shutdown, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

d 2007 NRC JPM CR-d(4) (NEW) Page 6 of 6

TASK CONDITIONS/PREREQUISlTES v i 1 The plant is operating at 100% power.

2. An Equipment Operator is standing by in the 2B Core Spray Pump Room.
3. Communications are available between the Control Room, 2B Core Spray Pump Room, B and D Core Spray Pump Triangle Room, and Cable Spreading Room.
4. Core Spray pump 2B oil level is between the minimum and maximum lines on the sightglass.
5. Core Spray pump 2B static pump suction pressure is 6 psig.

INITIATING CUE The Control Room Supervisor directs you to perform Core Spray 2B pump capacity test for IST in accordance with ST-0-0114-212-2 (provided).

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

Signature /Title Date Signature / Title Date Signature I Title Date Signature /Title Date I/ EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

Training Review for Completeness: I PlMS CODE:

Signature/Date 1 ENTRY:

2007 NRC JPM CR-e(1) (PLOR081C RevOOS) Page 1 of 7

TEMPORARY CHANGE FORM LOG W

CODE NO.: PLOR-081C REV. NO.: 005 TITLE: HPSW lniection Into the Torus 9.

IO.

11.

12.

13.

14.

15.

2007 NRC JPM CR-e(1) (PLOR081C Rev005) Page 2 of 7

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2004800501 / PLOR-081C WA: 219000A4.13 URO: 3.9 SRO: 3.8 TASK DESCRIPTI0N: HPSW lniection Into the Torus A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

4 2007 NRC JPM CR-e(1) (PLOR081C Rev005) Page 3 of 7

B. TOOLS AND EQUIPMENT I. Keys for MO-2-10-174 and MO-2-10-176 iJ C. REFERENCES

1. T-231-2, Rev. 3, HPSW Injection Into the Torus D. TASK STANDARD
1. Satisfactory task completion is indicated when the 2B HPSW Pump is injecting water into the Torus.
2. Estimated time to complete: 10 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to inject water into the Torus using the 2B HPSW pump using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. Use of this procedure has been directed by the T-I00 procedures.

?

. 2. High Pressure Service Water Pumps are available.

3. A LOCA initiation signal has NOT occurred.
4. 4 KV Buses are receiving power from their respective startup feeds.

G. INITIATING CUE The Control Room Supervisor directs you to perform T-231-2, HPSW Injection into the Torus in order to inject water into the Torus with the 2B HPSW pump.

, - %~

2007 NRC JPM CR-e(1) (PLOR081C Rev005) Page 4 of 7

H. PERFORMANCE CHECKLIST 7

STEP i NO STEP ACT STANDARD

~ ~~ ~ ~

1 Verify RHR pump 2BP035 shutdown. P B RHR pump green light verified ON at panel 2OCOO3-02.

(Cue: B RHR pump green light ON, red light OFF.)

2 Verify RHR pump 2DP035 shutdown. P D RHR pump green light verified ON at panel 2OCOO3-02.

(Cue: D RHR pump green light ON, red light OFF.)

3 Close MO-2-10-154B, Outboard Disch. P MO-2-10-154B control switch is momentarily placed in the CLOSE (Cue: Acknowledge switch operation.) position at panel 206003-02.

4 Verify closed MO-2-10-154B, Outboard MO-154B green light verified ON, red Disch I. light verified OFF on panel 206003-02.

(Cue: MO-1548 green light ON, red light OFF.)

Verify HPSW 2BP042 pump shutdown. B HPSW pump green light verified ON i

at panel 2OCOO3-02.

(Cue: B HPSW pump green light ON, red light OFF.)

Verify HPSW 2DP042 pump shutdown. P D HPSW pump green light verified ON at panel 2OCOO3-02.

(Cue: ID HPSW pump green light ON, red light OFF.)

7 Verify closed MO-2-10-089B, B HPSW MO-089B green light verified ON, red Hx Out. light verified OFF at panel 2OCOO3-02.

(Cue: MO-089B green light ON, red light OFF.)

~~ ~

8 Verify closed MO-2-10-089D D HPSW MO-089D green light verified ON, red Hx Out. light verified OFF at panel 2OCOO3-02.

(Cue: MO-089D green light ON red light OFF.)

2007 NRC JPM CR-e(1) (PLOR081C RevOOS) Page 5 of 7

E STEP ACT STANDARD 9 Verify closed MO-2-32-2344 (10-186), P MO-2344 (10-186) green light verified HPSW Loop Cross Tie. ON, red light verified OFF at panel 2OCOO-03.

(Cue: MO-2344 (10-186) green light ON, red light OFF.)

  • I 0 Open MO-2-10-174, HPSWIRHR Em P Key is obtained from the SSV keybox, Inner Cross Tie. inserted into MO-174 keylock switch and placed in the OPEN position at panel (Cue: Acknowledge keylock switch 206003-03.

operation.)

NOTE: MO-174 may be opened in parallel with MO-176.

11 Verify MO-2-10-174, HPSWIRHR Em MO-174 red light verified on at panel Inner Cross Tie valve is opened. 2OCOO3-03.

(Cue: MO-174 red light is ON, green light is OFF.)

  • I2 Open MO-2-10-176, HPSWIRHR Em Key is obtained from the SSV keybox, Outer Cross Tie. inserted into MO-176 keylock switch and placed in the OPEN position at panel (Cue: Acknowledge keylock switch 2OCOO3-03.

operation.)

NOTE: MO-176 may be opened in parallel with MO-174.

13 Verify MO-2-10-176, HPSWIRHR Em P MO-176 red light verified on at panel Outer Cross Tie valve is opened. 2OCOO3-03.

(Cue: MO-176 red light is ON, green light is OFF.)

  • I4 Open MO-2-1O-O39B, Torus Hdr valve. P MO-2-10-039B control switch is momentarily placed in the OPEN position (Cue: Acknowledge switch operation.) at panel 2OCOO3-02.

15 Verify MO-2-10-039B, Torus Hdr. valve is P MO-2-10-039B red light verified ON at opened. panel 2OCOO3-02.

(Cue: MO-396 red light is on, green light is off.)

2007 NRC JPM CR-e(1) (PLOR081C Rev005) Page 6 of 7

STEP ACT STANDARD i *I 6 Start the "B" HPSW pump. "B" HPSW pump control switch is momentarily placed in the START (Cue: "B" HPSW pump red light is on, position at panel 2OCOO3-02.

green light is off and annunciator 225 8-5 is alarming.)

~~

17 Verify proper start of the "B" HPSW Pump amps and discharge pressure are pump. verified stable after starting current decays.

(Cue: 10A-A2B indicates 62 amps and PI-2330B indicates 430 psig.)

18 Acknowledge the "RHR DISCH HDRS HI The annunciator "ACKNOWLEDGE" PRESS & SHUTDOWN SUCTION HDRS pushbutton is depressed on panel HI PRESS" annunciator. 2OCOO3-04.

(Cue: Annunciator 225 B-5 is lit solid.)

  • I 9 Throttle open MO-2-10-034BI Full Flow MO-2-10-034B control switch is Test valve to maintain HPSW flow less momentarily placed in the OPEN position than 5300 gpm on FI-2-10-139B. until 5000-5300 gpm is obtained on FI 10-139B, THEN the red stop travel (Cue: FI-l39B reads 5300 gpm.) pushbutton is depressed at panel i

2OCOO3-02.

20 Inform Shift Supervisor of task Task completion reported.

cornpletion.

(Cue: Shift Supervisor acknowledges report.)

~

21 As an evaluator, ensure that you have Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.

Under "ACT" P - must perform S - must simulate I. TERMINATING CUE When the "B" HPSW pump is injecting into the Torus, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

L-'

2007 NRC JPM CR-e(1) (PLOR081C RevOOS) Page 7 of 7

TASK CONDITIONS/PREREQUISlTES w;

I. Use of this procedure has been directed by the T-I 00 procedures.

2. High Pressure Service Water Pumps are available.
3. A LOCA initiation signal has -NOT occurred.
4. 4 KV Buses are receiving power from their respective startup feeds.

INITIATING CUE The Control Room Supervisor directs you to perform T-231-2, HPSW Injection into the Torus in order to inject water into the Torus with the 2B HPSWpump.

EXELON NUCLEAR Nuclear Generation Group OJTlTPE MATERIAL COVERSHEET APPROVALS:

Signature /Title Date Signature / Title Date Signature J Title Date Signature I Title Date

-[APPROVED FOR USE: Date Signature / Title

/I EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. I COMPLETION DATE:

COMMENTS:

Training Review for Completeness: PlMS CODE:

~

PlMS ENTRY:

SignatureIDate I

2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page Iof 8

~

TEMPORARY CHANGE FORM LOG L-1.

CODE NO.: PLOR-O17C REV. NO.: 009 TITLE: SYNCHRONIZE TURBINE GENERATOR OUTPUT WITH GRID AT MINIMUM LOAD 2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 2 of 8

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor OperatorEenior Reactor Operator TASK-JPM DESIGNATOR: 23701I0101 / PLOR-O17C WA: 262001A4.04 RO: 3.6 SRO: 3.7 TASK DESCRIPTION: SYNCHRONIZE TURBINE GENERATOR OUTPUT WITH GRID AT MINIMUM LOAD A. NOTES TO EVALUATOR:

I. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.

2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance L,
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.

I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.

2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

L-.--

2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 3 of 8

B. TOOLS AND EQUIPMENT

1. Synchroscope key for breaker operation (R)

-v

2. Key for synchro-check relay bypass key switch (R)

C. REFERENCES Procedure SO 50.1 .A-2 Rev. 1 1 , Main Generator Synchronizing and Loading (R)

D. TASK STANDARD

1. Satisfactory task completion is indicated when the Main Generator is synchronized to the grid and initial load is placed on the generator.
2. Estimated time to complete: 12 minutes (A.5) Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to synchronize the Main Generator to the grid and pickup load using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK C0NDITI0NS/PREREQUISITES L

1. Plant startup in progress with reactor power approximately 16%.
2. All SO 50.1A-2, Main Generator Synchronizing and Loading prerequisites are met.
3. Generator terminal voltage is 22 KV with the voltage regulator in automatic mode.
4. Generator ready to be synchronized to grid.
5. Power System Director has been notified.

G. INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the Main Generator to the grid and pick up load in accordance with steps 4.11 through 4.24of SO 50.1.A-2, Main Generator Synchronizing and Loading.

Provide examinee with a copy of SO 50.1.A-2, completed up to, but not including, step 4.I I.

2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 4 of 8

H. PERFORMANCE CHECKLIST STEP ACT STANDARD Obtain copy of SO 50.1.A-2. P Copy of SO 50.1.A-2 obtained.

~~

Turn on synchroscope for breaker 215 or P Synchroscope key obtained from Panel 225. OOC024 inserted into selected breaker sync switch and placed in the "ON" (Cue: Synchroscope meter rotating and position at Panel OOC024.

incoming voltmeters and sensing lights are activated.)

Use turbine load selector pushbuttons to P Load selector pushbuttons are momentarily adjust generator speed. depressed to get synchroscope rotating slowly in the "FAST" direction at Panel (Cue: Synchroscope is rotating slowly in OOC024.

clockwise direction.)

Check both synchronizing lights for proper P Sync lights verified ON at "6 o'clock operations. position" OFF at "12 o'clock position" at Panel OOC024.

(Cue: Both lights lit brightly at the "6 o'clock position", both lights out at the "12 o'clock position".)

i-'

"5 Use the auto voltage regulator rheostat to P Auto voltage regulator rheostat adjusted to adjust generator voltage so that incoming set incoming voltage slightly higher than voltage is slightly higher than running running voltage while maintaining voltage. generator voltage between 20.9 and 23.1 KV at Panel OOC024.

(Cue: Incoming voltage meter is reading slightly higher than running voltage.)

6 Verify the sync scope is rotating slowly in P Synchroscope verified for rotation - slowly the "FAST" direction. in the "FAST" direction at Panel OOC024.

(Cue: Sync scope is rotating slowly in the clockwise direction.)

"7 When the synchroscope is within five P 215 (225) breaker control switch is taken tc degrees (green lines) of the "12 o'clock" CLOSE when the synchroscope is within position then close the selected breaker approximately 5 degrees of "I 2 o'clock~

position at Panel OOC024.

(Cue: Acknowledge control switch operation.)

2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 5 of 8

l=% STEP ACT STANDARD 8 Verify selected breaker is closed. Selected breakers red indicating light is verified ON at Panel OOC024.

(Cue: Breaker closed - red light onlgreen light off, synchroscope stops rotating at the "12 o'clock position.)

9 Verify synchroscope pointer at "12 o'clock Synchroscope pointer verified at "12 position. o'clock position at Panel OOC024.

(Cue: Synchroscope at "12 o'clock

position and lights off.)

10 Turn off synchroscope for breaker 215 or Synchroscope placed in the "OFF" position 225. for breaker 215 or 225 at Panel OOC024.

(Cue: Acknowledge sync switch operation.)

  • I1 Pick up load on the generator until all nine The "RAISE" load selector pushbutton is bypass valves are closed. depressed on Panel OOC024 until all nine bypass valve red lights are OFF at Panel (Cue: All nine bypass valves red lights are 20C008B.

off, green lights are on.)

12 Place the remaining breaker's (225 or 215) Synchroscope key obtained from Panel sync switch to ON. OOC024 inserted into selected breaker (225 or 215) sync switch and placed in the "ON" (Cue: Synchroscope is at the 12 o'clock position at Panel OOC024.

position. Incoming and running voltages are equal.)

13 Place the SYNC CHK RELAY BYPASS Key is obtained from CRS keybox, inserted KEY switch in BYPASS. into the SYNC CHK RELAY BYPASS switch and placed in the "BYPASS" (Cue: Acknowledge key switch operation.) position at Panel OOC024.

14 Verify incoming and running voltage are P Incoming and running voltage are verified matched. to be matched on the INCOMING and RUNNING voltage meters at Panel (Cue: Incoming and running voltages are OOC024.

equal.)

2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 6 of 8

STEP ACT STANDARD

~ ~~

Verify the synchroscope within five P The synchroscope is verified to be within 5 degrees (green lines) of the 12 oclock degrees of the 12 oclock position, inside position. the green lines on the meter face at Panel OOC024.

(Cue: Synchroscope at I2 oclock position.)

Close the selected breaker (225 or 215). P The selected breaker (225 or 215) control switch is placed in the CLOSED position.

(Cue: Acknowledge breaker control switch operation.)

~ ~

Verify breaker 225 or 215 is closed. P Breaker 225 or 215 red light on, sync scopes stopped at 12 oclock position and (Cue: Breaker 225 or 215 red light on, sync lights OFF verified at Panel OOC024 green light off, the synchroscope needle is stopped at the 12 oclock position and sync lights out.)

~~ ~ ~ ~~ ~

Place the 225 or 215 breaker sync switch P Breaker 225 or 215 sync switch is placed to OFF. in the OFF position at Panel OOC024.

(Cue: Breaker sync switch is placed in 1-OFF and incoming and running voltage meters drop to 0 volts.)

19 Place the SYNC CHK RELAY BYPASS P SYNC CHK RELAY BYPASS KEYSWITCH in NORM. KEYSWITCH is placed in the NORMAL position at Panel OOC024 and the key is (Cue: Sync chk relay bypass keyswitch is returned to the SSV keybox.

in NORM.)

20 Inform the Control Room Supervisor of P Task completion reported.

task completion.

(Cue: Control Room Supervisor acknowledges report.)

21 As an evaluator, ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)AND procedures.

2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 7 of 8

Under ACT P - must perform S - must simulate

,--.* I. TERMINATING CUE When the Main Generator is synchronized to the grid and load is picked up in accordance with steps 4.1 Ithrough 4.24 of procedure SO 50.1.A-2, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

2007 NRC JPM CR-f(4) (PLOR017C RevOO9) Page 8 of 8

TASK CONDITIONS/PREREQUlSlTES I. Plant startup in progress with reactor power approximately 16%.

2. All SO 50.1A-2, Main Generator Synchronizing and Loading prerequisites are met.
3. Generator terminal voltage is 22 KV with the voltage regulator in automatic mode.

Generator ready to be synchronized to grid.

Power System Director has been notified.

INITIATING CUE The Control Room Supervisor directs you, the Plant Reactor Operator, to synchronize the Main Generator to the grid and pick up load in accordance with steps 4-11 through 4.24 of SO 50.1 .ADZ,Main Generator Synchronizing and Loading.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature I Title Date Signature I Title Date I APPROVED FOR USE:

EFFECTIVE DATE:

Signature I Title Signature I Title I f Date Date NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

Training Review for Completeness: PlMS CODE:

Signature/Date I PIMS ENTRY: I r

2007 NRC JPM CR-g(3) (PLOR068C Rev008) Page 1 of 6

TEMPORARY CHANGE FORM LOG CODE NO.: PLOR-068C REV. NO.: 009 L'

TITLE: Restore TBCCW Following a Loss of Both Pumps 1.

2.

3.

4.

5.

6.

7.

8.

9.

\ -1 IO.

11.

12.

13.

14.

15.

I I

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE td POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2740020101 / PLOR-068C WA: 2.1.23 URO: 3.9 SRO: 4.0 TASK DESCRIPTION: Restore TBCCW Following a Loss of Both Pumps A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing In-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

B. TOOLS AND EQUIPMENT

1. None
c. REFERENCES k d
1. SO 34.7.B-2, Rev. 2, TBCCW System Restoration Following Loss of Both Pumps D. TASK STANDARD
1. Satisfactory task completion is indicated when the ATBCCW Pump is in RUN, the B TBCCW Pump is in AUTO, and the RBCCWnBCCW auto transfer valves reset.
2. Estimated time to complete: 14 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to restore the TBCCW System following a loss of both pumps using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISITES

1. Service Water System in operation supplying cooling water to the ATBCCW Heat Exchanger.
2. Both TBCCW pumps have tripped due to a loss of power. 480 VAC power has been restored to both pumps.
3. RBCCWfiBCCW automatic transfer occurred.
4. Sufficient tygon hoses are available to vent TBCCW pumps.

G. INITIATING CUE The Control Room Supervisor directs you to start the A TBCCW pump, place the B pump in standby, and reset the system automatic swapover valves using SO 34.7.B-2, TBCCW System Restoration Following Loss of Both Pumps.

H. PERFORMANCE CHECKLIST i

e 1 STEP Dbtain a copy of procedure SO 34.7.9-2, ACT STANDARD 4 copy of procedure SO 34.7.9-2

'TBCCW System Restoration Following 'TBCCW System Restoration Following Loss of Both Pumps". Loss of Both Pumps" is obtained.

~~ ~

2 Direct an equipment operator to vent both Floor operator directed to vent both TBCCW pump casings. TBCCW pump casings.

(Cue: Report that both TBCCW pumps have been vented.)

  • 3 Start the "A' TBCCW Pump. P "A" TBCCW Pump control switch is placed in the RUN position at panel (Cue: Acknowledge control switch 20c012.

operation.)

4 Verify proper start of the "A1TBCCW P "AI TBCCW pump red light is verified ON pump. and discharge press is verified stable on PI-2229 at panel 20C012.

(Cue: "A" TBCCW pump red light is on, green light is off, discharge pressure is

= 85 psig on PI-2229.)

c 5 Direct an equipment operator to verify P Equipment operator is contacted to verify 60-90 psig discharge pressure. "A" TBCCW Pump discharge pressure is 60-90 psig on local PI-2220A.

(Cue: Report that discharge pressure is 88 psig on PI-222OA.)

Place The "9" TBCCW pump in AUTO. "9" TBCCW pump control switch is placed in the "AUTO" position at panel (Cue: Acknowledge control switch 20c012.

operation.)

~~ ~

? Direct Chemistry to sample RBCCW Chemistry is contacted to sample system for activity. RBCCW system for activity.

(Cue: Report that activity in RBCCW is 1 x OI'- pci/mI.)

  • 8 Reset transfer valves using the TBCCW P After verifying RBCCW system activity is RESET pushbutton. I 1 x 10-7pci/ml,"TBCCW RESET" pushbutton is momentarily DEPRESSED (Cue: Acknowledge reset pushbutton at panel 20C012.

operation.)

~

P STEP ACT STANDARD Direct an equipment operator to verify AO- S Equipment operator is contacted to verify 2-34-2352, TBCW Return to RBCW 3-Way 40-2352 and AO-2354 transferred to the Air Operated valve and AO-2-34-2354, TBCCW position.

Emergency Supply To TBCW Essential Loads valve transferred to the TBCCW position.

(Cue: Report that AO-2352 and AO-2354 have transferred to the TBCCW position on local panel N2117.)

IO Inform Control Room Supervisor that A P Task completion reported.

TBCCW pump is in service, B pump is in auto and transfer valves are reset.

(Cue: Control Room Supervisor acknowledges report.)

11 As an evaluator ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.

P Under ACT P - must perform S - must simulate I. TERMINATING CUE When the ATBCCW Pump is in RUN, the B TBCCW Pump is in AUTO and the TBCCWIRBCCW transfer valves are reset, the Control Room Supervisor should be informed.

The evaluator will then terminate the exercise.

TASK CONDITIONS/PREREQUlSlTES

  • d I. Service Water System in operation supplying cooling water to the A TBCCW Heat Exchanger.
2. Both TBCCW pumps have tripped due to a loss of power. 480 VAC power has been restored to both pumps.
3. RBCCW/TBCCW automatic transfer occurred.
4. Sufficient tygon hoses are available to vent TBCCW pumps.

INITIATING CUE The Control Room Supervisor directs you to start the A TBCCW pump, place the B pump in standby, and reset the system automatic swapover valves using SO 34.7.B-2, TBCCW System Restoration Following Loss of Both Pumps .

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature /Title Date Signature I Title Date Signature I Title Date APPROVED FOR USE:

Signature I Title Date I EFFECTIVE DATE: I I NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

Training Review for Completeness: 1 PlMS CODE:

Signature/Date I

I PlMS ENTRY:

I LA 2007 NRC JPM CR-h(2) (NEW) Page 1 of 9

TEMPORARY CHANGE FORM LOG

'"/CODE NO.: PLOR-NEW2CA REV. NO.:

TITLE: Plant Reactor Operator Response To Reactor Scram (Alternate Path - SBGT Fails To Automaticallv Initiate) i l '

9.

10.

11.

12.

13.

14.

15.

2007 NRC JPM CR-h(2) (NEW) Page 2 of 9

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE v

POSITION TITLE: Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2610050101 / PLOR-NEW2CA WA: 261000 A2.10 RO: 3.1 RO: 3.2 TASK DESCRIPTION: Plant Reactor Operator Response to Reactor Scram (Alternate Path -

SBGT Fails To Automaticallv Initiate)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a u-Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory Performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.

I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.

2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM CR-h(2) (NEW) Page 3 of 9

B. TOOLS AND EQUIPMENT None C. REFERENCES

1. RRC 94.2-2, Rev. 0, Plant Reactor Operator Scram Actions
2. RRC 94.2-2:1 Rev. 0, PRO Scram Reports
3. GP-4, Rev. 4, Manual Reactor Scram
4. GP-8B, Rev. 17, PCIS Isolation - Groups ll and 111
5. COL GP-8BI Rev. 17, Groups II and Ill Isolation
6. SO 9A.1.C, Rev. 9, Response To Standby Gas Treatment System Automatic Start D. TASK STANDARD
1. Satisfactory task completion is indicated when the trainee has performed all steps required by RRC 94.2-2, Plant Reactor Operator Scram Actions, and RRC 94.2-2:1, PRO Scram Reports.
2. Estimated time to complete: 10 minutes Non-Time Critical

- E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform Plant Reactor Operator scram actions in accordance with the Operations Manual. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. The plant was initially operating at full power when a plant transient occurred.
2. A GP-4 Manual Reactor Scram was performed.
3. 13KV House Loads were transferred to the Startup Feed Buses in accordance with RRC 53.1-2.

G. INITIATING CUE The Control Room Supervisor directs you to perform the Plant Reactor Operator scram actions in accordance with the Rapid Response Procedures.

2007 NRC JPM CR-h(2) (NEW) Page 4 of 9

H. PERFORMANCE CHECKLIST 7

STEP NO ACT STANDARD 1 Verify Main Turbine is tripped. P Main Turbine Tripped light is verified ON and Reset light is verified OFF at Panel (Cue: Tripped light is ON, Reset light is 20C80A; Master Trip Solenoid Test OFF; Master Trip Solenoid Test Lights A Lights A and B are verified OFF at Panel and B are OFF.) 20C08B.

2 Verify Main Generator lockout. P Main Generator output breakers and Alt Exc Fld Bkr green lights are verified ON, (Cue: Main Generator output breakers red lights are verified OFF at Panel and Alt Exc Fld Bkr green lights are ON, oocoo9.

red lights are OFF. Annunciators 220 B-I and 220 B-2 are lit.)

  • 3 Verify Group I, II, and Ill isolations and P Determine Group II and Ill isolations SBGT initiation, as applicable. should have occurred due to low RPV water level.

(Cue: All Group I1and Ill isolation valves green lights are ON, red lights are OFF at PClS Group II and Ill isolation status is Panel 20C003. The following - conditions verified at panel 2OCOO3-01, SBGT exist at Panel 20C012:) system status is verified at panel 20C012.

Damper / Fan Green Red Recognize SBGT Fan A failed to start PO-20465 ON OFF and the following Reactor Building PO-20466 OFF ON Ventilation dampers failed to reposition:

AO-20469-1 ON OFF AO-20469-2 OFF ON Damper / Fan Required Actual AO-20470-1 ON OFF PO-20465 OPEN CLOSED AO-20470-2 OFF ON AO-20469-1 OPEN CLOSED AO-20453 OFF ON AO-20470- 1 OPEN CLOSED AO-2046 1 OFF ON AO-20453 CLOSED OPEN AO-20462 ON OFF AO-2046 1 CLOSED OPEN AO-20452 ON OFF AO-20458 CLOSED OPEN AO-20458 OFF ON AO-20463 CLOSED OPEN AO-20463 OFF ON AO-20467 CLOSED OPEN AO-20464 ON OFF AO-20475-1 OPEN CLOSED AO-20457 ON OFF AO-20475-2 OPEN CLOSED AO-20467 OFF ON AO-2 0468 ON OFF AO-20475-1 ON OFF AO-20475-2 ON OFF AO-20476-1 OFF ON AO-20476-2 OFF ON SBGT Fan A ON OFF SBGT Fan B OFF ON C

2007 NRC JPM CR-h(2) (NEW) Page 5 of 9

STEP NO STEP ACT STANDARD I I I

  • e** NOTE****

Examinee may obtain a copy of SO 9A.1 .C to isolate Reactor Building Ventilation and place Standby Gas Treatment in service.

~

4 Open PO-20465, Exh to Stby Gas Treat P At Panel 20C012, PO-20465 control Equip Cell. switch placed in OPEN, green light verified OFF and red light verified ON.

(Cue: PO-20465 green light is OFF, red light is ON.)

5 Open AO-20469-1, DNV Rx Bldg Equip P At Panel 20C012, AO-20469-1 control Exh. switch placed in OPEN, green light verified OFF and red light verified ON.

(Cue: AO-20469-1 green light is OFF, red light is ON.)

6 Open AO-20470-1, Refuel Flr. Exh. P At Panel 20C012, AO-20470-1 control switch placed in OPEN, green light (Cue: AO-20470-1 green light is OFF, verified OFF and red light verified ON.

red light is ON.)

  • 7 Close AO-20453, Ventilation Supply At Panel 20C012, AO-20453 control Refuel. switch placed in CLOSE, green light verified ON and red light verified OFF.

(Cue: AO-20453 green light is ON, red light is OFF.)

  • 8 Close AO-20461, Ventilation Exhaust At Panel 20C012, AO-20461 control Refuel. switch placed in CLOSE, green light verified ON and red light verified OFF.

(Cue: AO-20461 green light is ON, red light is OFF.)

  • 9 Close AO-20458, Ventilation Supply Rx P At Panel 20C012, AO-20458 control BIdg . switch placed in CLOSE, green light verified ON and red light verified OFF.

(Cue: AO-20458 green light is ON, red light is OFF.)

  • I0 Close AO-20463, Ventilation Exhaust Rx P At Panel 20C012, AO-20463 control Bldg . switch placed in CLOSE, green light verified ON and red light verified OFF.

(Cue: AO-20463 green light is ON, red light is OFF.)

2007 NRC JPM CR-h(2) (NEW) Page 6 of 9

STEP ACT STANDARD

~

  • II Close AO-20467, Ventilation Exhaust P At Panel 20C012, AO-20467 control Equip Cell. switch placed in CLOSE, green light verified ON and red light verified OFF.

(Cue: AO-20467 green light is ON, red light is OFF.)

12 Open AO-00475-1, Standby Gas P At Panel 20C012, AO-00475-1 control Treatment A Filter Inlet. switch placed in OPEN, green light verified OFF and red light verified ON.

(Cue: AO-00475-1 green light is OFF, red light is ON.)

13 Open AO-00475-2, Standby Gas P At Panel 20C012, AO-00475-2 control Treatment A Filter Outlet. switch placed in OPEN, green light verified OFF and red light verified ON.

(Cue: AO-00475-2 green light is OFF, red light is ON.)

14 Start SBGT Fan A P At Panel 20C012, SBGT Fan Acontrol switch placed in RUN, green light verified (Cue: SBGT Fan Agreen light is OFF, OFF and red light verified ON.

red light is ON.)

15 Verify scram discharge volume vents and P SDV vents and drains are verified closed drains are closed. as indicated at panel 20C005A or 2OCOO3-01.

(Cue: SDV vent and drain green valve position lights are ON, red valve position lights are OFF.)

16 Verify Hydrogen Water Chemistry is P Hydrogen flow is verified to be at 0 scfm isolated. on FR-8629 at panel 20C006A.

(Cue: FR-8629 flow is 0 scfm.)

~~~ ~~ ~

17 Verify both Recirc Pumps speed have P Due to the GP-4 Manual Scram, A and B runback to 30%. Recirc MG set generator speed is verified to be 20% on SPI-2-02-184-016A and B (Cue: A and B Recirc MG set generator at panel 20C004A.

speed is 20% on SPI-2-02-184-016A and BJ 2007 NRC JPM CR-h(2) (NEW) Page 7 of 9

STEP NO STEP ACT STANDARD 18 Monitor Instrument Air header pressure P Instrument Air header pressure on PI-

. 2425A(B) at panel 20C012 is verified to and Drywell pressure.

be greater than Drywell pressure on PR-(Cue: Drywell pressure is .3 psig, 2508 at Panel 2OCOO3-03, or computer instrument air header pressure is 105 point M026.

PSig-)

        • NOTE ****

IF the examinee does NOT report scram actions, THEN inform the examinee that you (the CRS)are ready for hidher scram action report.

19 Report the following to the CRS: P CRS informed that:

e House loads transferred House loads transferred e Main Turbine is tripped Main Turbine is tripped e Main Generator is locked out Main Generator is locked out e Group II and Ill isolations complete Group II and Ill isolations complete and SGTS is initiated; some with SGTS in service; some Reactor Building ventilation Reactor Building ventilation dampers were manually aligned dampers were manually aligned and SBGT Fan Awas manually and SBGT Fan A was manually started started

- e SDV Vents and Drains are closed SDV Vents and Drains are closed e Hydrogen Water Chemistry is Hydrogen Water Chemistry is isolated isolated e Recirc pump speeds are 20% Recirc pump speeds are 20%

e Instrument Air header pressure is Instrument Air header pressure is greater than Drywell pressure greater than Drywell pressure (Cue CRS is informed.)

20 Inform Control Room Supervisor of task P Task completion reported.

cornpletion.

(Cue: Control Room Supervisor acknowledges report.)

21 As an evaluator ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)AND procedures.

2007 NRC JPM CR-h(2) (NEW) Page 8 of 9

Under ACT P - must perform S - must simulate

-I. TERMINATING CUE When all steps required by RRC 94.2-2, Plant Reactor Operator Scram Actions, and RRC 94.2-2: I,PRO Scram Reports, are complete, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

4 2007 NRC JPM CR-h(2) (NEW) Page 9 of 9

TASK CONDlTlONSlPREREQUlSlTES L//

I. The plant was initially operating at full power when a plant transient occurred.

2. A GP-4 Manual Reactor Scram was performed.
3. 13KV House Loads were transferred to the Startup Feed Buses in accordance with RRC 53.112.

INITIATING CUE The Control Room Supervisor directs you to perform the Plant Reactor Operator scram actions in accordance with the Rapid Response Procedures.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET U

APPROVALS:

Signature I Title Date Signature /Title Date Signature /Title Date Signature / Title Date

/ APPROVED FOR USE:

Signature / Title Date I EFFECTIVE DATE: I I I

NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

Training Review for Completeness: PlMS CODE:

II I I Signature/Date I ENTRY:

2007 NRC JPM IP-i (PLOR316PA Rev003) Page 1 of 9

TEMPORARY CHANGE FORM LOG

-CODE NO.: PLOR-316PA REV. NO.: 003 TITLE: Low CRD Scram Air Header Pressure - Unit 3 (Alternate Path - Standby Requlator Must be Placed In Service) 9.

IO.

11.

12.

13.

14.

15.

2007 NRC JPM IP-i (PLOR316PA Rev003) Page 2 of 9

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2001500401/ PLOR-316PA WA: 201001A2.09 URO: 3.2 SRO: 3.1 TASK DESCRIPTION: Low CRD Scram Air Header Pressure - Unit 3 (Alternate Path -

Standby Requlator Must be Placed In Service)

A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance b a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.

I) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.

2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM IP-i (PLOR316PAkev003) Page 3 of 9

B. TOOLS AND EQUIPMENT None

-C. REFERENCES Procedure ON-I 08, Rev. 6, Low CRD Scram Air Header Pressure D. TASK STANDARD

1. Satisfactory task completion is indicated when Unit 3 scram air header PCV-5239A is in service and PCV-5239B has been removed from service.
2. Estimated time to complete: 14 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps of ON-108, Low CRD Scram Air Header Pressure procedure. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITI0NS/PR EREQUISI TES

1. Unit 3 is operating at full power steady state conditions.
2. SCRAM VALVE PILOT AIR HEADER PRESS HI-LO annunciator is up on alarm panel 311 D-2.
3. The cause of low scram air header pressure condition is NOT caused by a loss of the Instrument Air system.
4. Scram air header PCV-5239B is presently in service.

G. INITIATING CUE The Control Room Supervisor directs you to restore the Unit 3 CRD scram air header pressure to approximately 73 psig per procedure ON-I 08, Low CRD Scram Air Header Pressure.

x 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 4 of 9

H. PERFORMANCE CHECKLIST I STEP NO STEP ACT STANDARD

~~ ~~

I Obtain a copy of procedure ON-108 SIP 4 copy of procedure ON-I 08 is obtained.

~~~ ~

2 Verify low scram air header pressure P Scram air header pressure is monitored locally on Pl-3-03-229 at CRD flow nest m Pl-3-3-229 or Pl-3-03-312.

OR on Pl-3-03-312 on Panel 30C124.

(Cue: Pl-3-3-229 indicates 63 psig. If the control room is called, report that PI-3 312 indicates 63 psig.)

3 Check normal operation of the in-service P Loading Pressure and control pressure is scram air header pressure control monitored on PCR-3-03-31688B.

regulator by observing loading pressure of approximately 80 psig and control pressure of approximately 75 psig on PCR-3-03-31688B pressure control regulator for PCV-52396.

(Cue: Loading pressure is approximately 80 psig, control pressure is 63 psig.)

  • 4 Adjust PCR knob (red knob) clockwise to S PCR-3-03-31688B red knob is turned raise scram air header pressure to 67 to clockwise while observing Pl-3-3-229 until 75 psig on Pl-3-03-229. the knob will not turn further.

(Cue: Red knob on PCR-3-03-31688B is turned (clockwise) until it will not turn further, Pl-3-3-229 {Pl-3-03-312) indicates 65 psig. If asked, Loading pressure is 80 psig and Control Pressure is 65 psig.)

        • NOTE****

f requested the evaluator will serve as the second equipment operator to monitor pressure.

  • 5 Open HV-3-3-31681A, lnstr Air Inlet Block S HV-3-3-31681A handwheel is turned VV to PCV-3-03-5239A. COUNTERCLOCKWISE until resistance of valve backseat is felt.

(Cue: Valve handwheel is turned

[COUNTERCLOCKWISE] until stem length above valve yoke rises 1 inch, then will not turn.)

2007 NRC JPM IP-i (PLOR316PA Rev003) Page 5 of 9

STEP ACT STANDARD

~~~ ~

  • 6 3pen HV-3-3-31682A, lnstr Air Outlet S HV-3-3-31682A handwheel is turned 3lock Vv from PCV-3-03-5239A. COUNTERCLOCKWISE until resistance of valve backseat is felt.
Cue: Valve handwheel is turned
COUNTERCLOCKWISE]until stem ength above valve yoke rises Iinch, then Mill not turn.)
  • 7 3pen HV-3-3-31686A, lnstr Air Back S HV-3-3-31686A handwheel is turned pressure to PCV-5239A. COUNTERCLOCKWISE until resistance of valve backseat is felt.
C0UNTERCLOCKWIS E] unt iI stem
  • 8 Open HV-3-3-31685A, Instrument Air S HV-3-3-31685A handwheel is turned Block Valve to PCV-5239A. COUNTERCLOCKWISE until resistance of valve backseat is felt.

(Cue: Valve handwheel is turned

[C0UNTERCLOCKWISE] untiI stem length above valve yoke rises 1 inch, then d l not turn.)

(Cue: If asked for any of the following pressures, then give the respective FoI Iowing indication(s) :

Pl-3-3-229 / Pl-3-03-312 (Scram Air Header Pressure) indicates 65 psig Loading pressure indicates - 80 psig Control pressure indicates - 63 psig)

.L' 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 6 of 9

STEP ACT STANDARD

  • 9 4djust scram air header pressure to S 'CR-3-03-31688A is manipulated [turned 3etween 67 and 75 psig using the red 2lockwiseI to adjust scram air header tnob [turned Clockwise] on PCR-3 iressure monitored on Pl-3-03-229.

31688A.

(Cue: Red knob on PCR-3-03-31688A is adjusted. If asked for any of the following pressures, then give the respective Following indication:

Pl-3-3-229 / Pl-3-03-312 {Scram Air Header Pressure} indicates (rising pressure as red knob is turned in the clockwise direction until} 73 psig Loading pressure indicates - 80 psig Control pressure indicates {rising pressure as red knob is turned in the clockwise direction until} 75 psig) 10 Close HV-3-3-31685B, Instrument Air S HV-3-3-31685B handwheel is turned Block Valve to PCV-5239B. CLOCKWISE until resistance of valve seal is felt.

(Cue: Valve handwheel is turned

[CLOCKWISE] until stem length above valve yoke lowers 1 inch, then handwheel will not turn.)

11 Close HV-3-3-31686B, lnstr Air Back S HV-3-3-31686B handwheel is turned Pressure to PCV-5239B. CLOCKWISE until resistance of valve seal is felt.

(Cue: Valve handwheel is turned

[CLOCKWISE] until stem length above valve yoke lowers 1 inch, then handwheel will not turn.)

12 Close HV-3-3-31681B, lnstr Air Inlet Block S HV-3-3-31681B handwheel is turned VV to PCV-5239B. CLOCKWISE until resistance of valve sea.

is felt.

(Cue: Valve handwheel is turned

[CLOCKWISE] until stem length above valve yoke lowers 1 inch, then handwheel will not turn further.)

2007 NRC JPM IP-i (PLOR316PA Rev003) Page 7 of 9

STEP ACT STANDARD

~

13 Close HV-3-3-31682BI lnstr Air Outlet S HV-3-3-31682B handwheel is turned Block Vv from PCV-5239B. CLOCKWISE until resistance of valve seat is felt.

(Cue: Valve handwheel is turned

[CLOCKWISE] until stem length above valve yoke lowers 1 inch, then handwheel will not turn.)

14 Verify proper operation of the standby P Loading Pressure and Control Pressure is scram air header PCR, PCR-3-03-31688A monitored on PCR-3-03-31688A.

Pressure Control Regulator for PCV-5239A by observing Loading Pressure of approximately 80 psig and Control Pressure of 75 psig.

(Cue: Loading pressure is approximately 80 psig, Control Pressure is 75 psig.)

15 Verify scam air header pressure on PI P Scram air header pressure is monitored 03-229 at the CRD flow nest OR on PI on Pl-3-03-229 / Pl-3-03-312.03-312 on Panel 30C124 is satisfactory (67 to 75 psig).

(Cue: Scram air header pressure is 73 psig on Pl-3-03-229 / Pl-3-03-312.)

16 Inform Control Room of task completion. S Task completion reported using telephone hand held radio or GAI-TRONICS page (Cue: Control Room acknowledges system.

report.)

17 As an evaluator ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites)AND procedures.

L-,,

. 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 8 of 9

Under ACT P - must perform S - must simulate v

I. TERMINATING CUE When Unit 3 scram air header PCV-5239A is in service and PCV-52396 has been removed from service, the Control Room Supervisor should be informed. The evaluator may then terminate the exercise.

u 2007 NRC JPM IP-i (PLOR316PA Rev003) Page 9 of 9

TASK CONDlTlONSlPREREQUlSlTES

1. Unit 3 is operating at full power steady state conditions.
2. SCRAM VALVE PILOT AIR HEADER PRESS HI-LO annunciator is up on alarm panel 311 D-2.
3. The cause of low scram air header pressure condition is -NOT caused by a loss of the Instrument Air system.
4. Scram air header PCV-5239B is presently in

.W service.

INITIATING CUE The Control Room Supervisor directs you to restore the Unit 3 CRD scram air header pressure to approximately 73 psig per procedure ON-108, LOWCRD Scram Air Header Pressure.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature I Title Date Signature I Title Date Signature /Title Date APPROVED FOR USE:

Signature / Title Date EFFECTIVE DATE: I I NAME: SOC. SEC. NO.

Last First M.I.

ISSUE DATE: COMPLETION DATE:

COMMENTS:

PlMS CODE:

PlMS ENTRY:

2007 NRC JPM IP-j (PLOR086P Rev01I) Page Iof 6

TEMPORARY CHANGE FORM LOG

'-CODE NO.: PLOR-086P REV. NO.: 011 TITLE: Defeating RClC Low Pressure Isolations - Unit 3 I.

2.

6.

7.

i I 8-

  • --...- 9.

IO.

11.

12.

13.

14.

15.

2007 NRC JPM IP-j (PLOR086P Rev011) Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE L/

POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 2004510599 / PLOR-086P WA: 295031EA1.05 URO: 4.3 SRO: 4.3 TASK DESCRIPTION: Defeatina RClC Low Pressure Isolation - Unit 3 A. NOTES TO EVALUATOR:

I. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.

2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control Room JPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM IP-j (PLOR086P RevOll) Page 3 of 6

8. TOOLS AND EQUIPMENT
1. T-225 Tool Package d
2. EOP Tool Locker Key C. REFERENCES
1. T-225-3, Rev. 3, Defeating RClC Low Pressure Isolation D. TASK STANDARD I. Satisfactory task completion is indicated when the RClC low pressure isolation is defeated.
2. Estimated time to complete: 10 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to defeat the RClC low pressure isolation, using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. A transient has occurred on Unit 3.

\-

2. Use of this procedure has been directed by the T-100 procedures.

G. INITIATING CUE The Control Room Supervisor directs you to perform steps 4.1 and 4.2 of T-225-3, Defeating RClC Low Pressure Isolation.

\J 2007 NRC JPM IP-j (PLOR086P RevOll) Page 4 of 6

H. PERFORMANCE CHECKLIST E F

~~~ ~

i NO STEP ACT STANDARD

~

"1 Obtain the key for the Emergency S Emergency Operating Procedure Tool Operating Procedure Tool Locker. Locker Key requested from WECS examinee identifies the location of the (Cue: When examinee requests EOP Tool WECS key box and its associated key.

Locker key from WECS examinee identifies the location of the WECS key box and its associated key then evaluator should provide the EOP Tool Locker key.)

"2 Open Emergency Operating Procedure P Tool Locker located on Radwaste Building Tool Locker and obtain T-225 Tool Kit. El. 165' is unlocked, opened and T-225 Tool Kit is located.

(Cue: Equipment obtained.)

        • NOTE****

When examinee locates tool kit, inform him that he now has the tools to perform the procedure.

Provide the examinee with a copy of the T-200 procedure which corresponds to the tool kit that has been chosen. DO NOT allow equipment to be removed from the locker. Relock the locker before leaving the area.

~

L "3 Open panel 30633 back panel doors. Door handle turned, doors pulled outward to gain access to terminal strip BB at back (Cue: Panel 30C33 doors are open.) of panel 30C33 in the Cable Spreading Room. '

"4 Lift leads BG-13 and UV-C from terminal Terminal screw is turned 66-45. COUNTERCLOCKWISE until loose. The terminal screw is removed with a "CAPTURE" screwdriver, then the leads are removed.

5 Tape leads BG-13 and UV-C. S Tape is wrapped around end of each lead ensuring no metal is exposed.

(Cue: Leads are taped.)

6 Close panel 30C33 back panel doors. P Door closed and relatched using handle.

  • 7 Open panel 30C34 back panel doors. P Door handle turned, doors pulled outward to gain access to terminal strip BB at back (Cue: Panel 30C34 doors are open.) of panel 30C34 in the Cable Spreading Room.

2007 NRC JPM IP-j (PLOR086P RevOll) Page 5 of 6

STEP I ACT

~~

STANDARD

  • a Lift leads AA-59 and ACA-13 from terminal S Terminal screw is turned BB-69. COUNTERCLOCKWISE until loose. The terminal screw is removed with a (Cue: Leads are lifted.) CAPTURE screwdriver, then the leads are removed.

9 Tape leads AA-59 and ACA-I 3. S Tape is wrapped around end of each lead ensuring no metal is exposed.

(Cue: Leads are taped.)

10 Close panel 30C34 back panel doors. P Doors are closed and relatched using handle.

(Cue: Panel 30C34 doors are closed and latched.)

~

I1 Inform Control Room of task completion. S Task completion reported using telephone or GAI-TRONICS page system.

NOTE: Hand held radios are NOT to be used in the Cable Spreading Room.

I2 As an evaluator ensure that you have P Positive control established.

positive control of all exam material provided to the examinee (Task Conditions/Prerequisites) AND procedures.

I Under ACT P - must perform S - must simulate I. TERMINATING CUE When the low pressure isolation for RClC is defeated, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

..4 2007 NRC JPM IP-j (PLOR086P Rev011) Page 6 of 6

.-.e-, TASK CONDITIONS/PREREQUlSlTES I. A transient has occurred on Unit 3.

2. Use of this procedure has been directed by the T-I00 procedures.

INITIATING CUE The Control Room Supervisor directs you to perform steps 4.1 and 4.2 of T-225-3, Defeating RCIC Low Pressure Isolation.

EXELON NUCLEAR Nuclear Generation Group OJT/TPE MATERIAL COVERSHEET APPROVALS:

Signature I Title Date Signature I Title Date Signature /Title Date Signature I Title Date

.-<--(APPROVED FOR USE:

Signature I Title Date

/I EFFECTIVE DATE: f /

NAME: ISSUE DATE:

Last First M.I.

SOC. SEC. NO. COMPLETION DATE:

COMMENTS:

Training Review for Completeness: PlMS CODE:

PlMS ENTRY:

SignatureIDate 2007 NRC JPM IP-k (PLOR049P RevOlS) Page Iof 6

TEMPORARY CHANGE FORM LOG

'-"CODE NO.: PLOR-049P REV. NO.: 015 TITLE: Diesel Generator Air Start Solenoid Override

'.-z. 9.

IO.

11.

12.

13.

14.

15.

2007 NRC JPM IP-k (PLOR049P RevOl5) Page 2 of 6

EXELON NUCLEAR PEACH BOTTOM ATOMIC POWER STATION JOB PERFORMANCE MEASURE

~W POSITION TITLE: Unit Reactor Operator/Senior Reactor Operator TASK-JPM DESIGNATOR: 26400I040I/ PLOR-049P WA: 264000A2.10 URO: 3.9 SRO: 4.2 TASK DESCRIPTION: Diesel Generator Air Start Solenoid Override A. NOTES TO EVALUATOR:

1. An asterisk (*) before the step number denotes a CRITICAL STEP. CRITICAL STEPS are those steps which when not performed correctly will prevent the system from functioning properly or prevent successful task completion.
2. System cues included in the performance checklist are to be provided to the examinee when no system response is available.
3. JPM Performance
a. Control Room JPMs are designed to be performed in the simulator. If a Control RoomJPM is to be performed in the Control Room all perform steps (P) shall be simulated (S).
b. When performing ln-Plant JPMs, no equipment will be operated without Shift Management approval.
4. Satisfactory performance of this JPM is accomplished if:
a. The task standard is met.
b. JPM completion time requirement is met.
1) For non-time critical JPMs, completion within double the estimated time (listed in paragraph D.2) is acceptable provided the evaluator determines that the progress to completion is acceptable.
2) For time critical JPMs, completion within the estimated time (listed in paragraph D.2) is required.
5. The estimated time to complete this JPM, though listed in the task standard, is not to be given to the examinee.

2007 NRC JPM IP-k (PLOR049P RevOl5) Page 3 of 6

B. TOOLS AND EQUIPMENT None w.c. REFERENCES Procedure A 0 52A.2 Rev. 4, Diesel Generator Air Start Solenoid Override D. TASK STANDARD

1. Satisfactory task completion is indicated when E-2 Diesel Generator has been started by overriding one of the air start solenoid valves.
2. Estimated time to complete: 15 minutes Non-Time Critical E. DIRECTIONS TO EXAMINEE When given the initiating cue, perform necessary steps to start the E-2 Diesel Generator by overriding one of the air start solenoid valves using appropriate procedures. I will describe initial plant conditions and provide you access to the materials required to complete this task.

F. TASK CONDITIONS/PREREQUISlTES

1. A loss of coolant accident has occurred.
2. E-2 Diesel Generator failed to start.

L---,

3. Investigation reveals that both E-2 Diesel Generator air start solenoid valve coils have failed.
4. The prerequisites of procedure A 0 52A.2 Diesel Generator Air Start Solenoid Override have been met.

G. INITIATING CUE The Control Room Supervisor directs you to perform A 0 52A.2 Diesel Generator Air Start Solenoid Override up to and including step 4.4 for the E-2 Diesel Generator.

2007 NRC JPM IP-k (PLOR049P RevOl5) Page 4 of 6

H. PERFORMANCE CHECKLIST 1 STEP NO STEP ACT STANDARD 1 Obtain a copy of procedure A 0 52A.2. P A copy of procedure A 0 52A.2 is obtained.

  • 2 Reset the E-2 diesel generator control S "RESET" pushbutton is momentarily circuitry. DEPRESSED at the E-2 diesel gauge panel.

(Cue: RESET pushbutton has been depressed.)

3 Verify the E-2 D/G start failure lockout P Annunciator C-2, "START FAILURE" is relay is reset. verified clear at panel OBC097.

(Cue: Annunciator C-2, "START FAILURE" on panel OBC097 is not lit.)

  • 4 Override SV-0-52C-7233B S SV-0-52C-7233B Manual Override handle SV-0-52C-7234B. -

OR SV-0-52C-7234B Manual Override handle is turned clockwise to mechanical (Cue: Air flow is heard, EDG engine stop.

speed increases rapidly to a steady RPM, heat is felt coming from exhaust manifold.)

  • 5 Turn SV-0-52C-7233B S SV-0-52C-7233B SV-0-52C-7234B SV-0-52C-7234B fully counter clockwise tc handle is turned counterclockwise to the mechanical stop. mechanical stop.

(Cue: Air flow heard in previous step stops.)

6 Request Control Room operator verify S Control Room operator is requested to cooling water flow is started to E-2 Diesel verify cooling water flow is started to E-2 Generator. Diesel Generator using radio or GAI-TRONICS page system.

(Cue: "A'ESW pump is running with discharge pressure indication of 52 psig.)

7 Inform the Control Room of task S Task completion reported using hand held completion. radio or GAI-TRONICS page system.

(Cue: Control Room acknowledges report.)

2007 NRC JPM IP-k (PLOR049P RevOl5) Page 5 of 6

STEP ACT STANDARD As an evaluator ensure you have positive P Positive control established control of all exam material provided to the examinee (Task Conditions/Prerequisites)

AND procedures.

Under ACT P - must perform S - must simulate I. TERMINATING CUE When A 0 52A.2 has been completed up to and including Step 4.4, the Control Room Supervisor should be informed. The evaluator will then terminate the exercise.

c 2007 NRC JPM IP-k (PLOR049P Rev015) Page 6 of 6

TASK CONDITIONS/PREREQUlSlTES

1. A loss of coolant accident has occurred.
2. E-2 Diesel Generator failed to start.
3. Investigation reveals that both E-2 Diesel Generator air start solenoid valve coils have failed.
4. The prerequisites of procedure A 0 52A.2 Diesel Generator Air Start Solenoid Override have been met.

INITIATING CUE The Control Room Supervisor directs you to perform A 0 52A.2 Diesel Generator Air Start Solenoid Override up to and including step 4.4 for the E 2 Diesel Generator.