{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2007 Mr. Christopher M. Crane President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348 | ||
==SUBJECT:== | ==SUBJECT:== | ||
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - LIMERICK GENERATING STATION | MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - | ||
LIMERICK GENERATING STATION | |||
==Dear Mr. Crane:== | ==Dear Mr. Crane:== | ||
On August 15, 2007, the NRC staff completed its performance review of Limerick | On August 15, 2007, the NRC staff completed its performance review of Limerick Generating Station for the first half of the calender year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. | ||
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan. | |||
Plant performance for the most recent quarter of 2007 at Limerick Generating Station Units 1 and 2 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting an Independent Spent Fuel Storage Installation dry run inspection during June 2008. | |||
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
C. Crane 2 The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan. | |||
Sincerely, | |||
/RA/ | |||
Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85 | |||
==Enclosure:== | ==Enclosure:== | ||
Limerick Inspection/ Activity Plan cc w/encl:Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager - Limerick Senior Vice President - Nuclear Services Vice President - Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company Correspondence Control Desk Director, Bureau of Radiation Protection, PA Department of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear Institute of Nuclear Power Operations (INPO) | Limerick Inspection/ Activity Plan cc w/encl: | ||
Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager - Limerick Senior Vice President - Nuclear Services Vice President - Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company Correspondence Control Desk Director, Bureau of Radiation Protection, PA Department of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear Institute of Nuclear Power Operations (INPO) | |||
C. Crane 2 The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan. | |||
Sincerely, | |||
/ra/ | |||
Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85 | |||
==Enclosure:== | ==Enclosure:== | ||
Limerick Inspection/ Activity Plan Distribution w/encl:(via E-mail)S. Collins, | Limerick Inspection/ Activity Plan Distribution w/encl: (via E-mail) L. Pinkham - Resident OA S. Collins, RA D. Screnci, PAO M. Dapas, DRA N. Sheehan, PAO D. Lew, DRP DRS Director J. Clifford, DRP DRS Deputy Director P. Krohn, DRP DRS Branch Chiefs(6) | ||
R. Fuhrmeister, DRP RidsNrrDirslpab@nrc.gov R. Laufer, RI OEDO ROPreports@nrc.gov H. Chernoff, NRR JWT1@NRC.GOV P. Bamford, PM, NRR Region I Docket Room (with concurrences) | |||
" C" = Copy without attachment/enclosure | S. Hansell, DRP - Sr Resident Inspector C. Bickett, DRP - Resident Inspector SUNSI Review Complete: __PGK__ (Reviewers Initials) | ||
-12/31/2008 | DOCUMENT NAME: S:\ROP 8 Mid Cycle Review\Letters for Mid Cycle\Branch 4 Mid-cycle letters\LIM 2007 Mid-cycle Letter-R1.wpd After declaring this document An Official Agency Record it will be released to the Public. | ||
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N RI/DRP NAME TSetzer PKrohn DATE 08/27/07 08/ 27 /07 OFFICIAL RECORD COPY | |||
Page 1 of 2 Limerick 08/27/2007 13:52:40 Inspection / Activity Plan Report 22 07/01/2007 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type ISFSI - ISFSI CONSTRUCTION INSPECTION 1 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 04/01/2007 09/30/2007 Other Routine TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP 7111105T Fire Protection [Triennial] 07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 07/30/2007 08/03/2007 Baseline Inspections 7111401 - EP EXERCISE & PI VERIFICATION 8 1, 2 IP 7111401 Exercise Evaluation 08/06/2007 08/10/2007 Baseline Inspections 7111111B - LOR INSP + P/F REVIEW 3 1, 2 IP 7111111B Licensed Operator Requalification Program 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 7111111B Licensed Operator Requalification Program 10/29/2007 11/02/2007 Baseline Inspections 7111111B - LSRO REQUAL AN OPTEST @PB + P/F REVIEW 2 1, 2 IP 7111111B Licensed Operator Requalification Program 11/01/2007 11/01/2007 Baseline Inspections 01/07EXM - INITIAL LSRO OPERATOR EXAM 3 1 U01632 LIMERICK LSRO EXAM (FY08) 11/19/2007 11/23/2007 Not Applicable 1 U01632 LIMERICK LSRO EXAM (FY08) 01/07/2008 01/08/2008 Not Applicable 7111121 - CDBI (COMPONENT DESIGN BASES INSPECTION) 7 1, 2 IP 7111121 Component Design Bases Inspection 10/01/2007 10/05/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 10/15/2007 10/19/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 10/29/2007 11/02/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 11/05/2007 11/09/2007 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 11/12/2007 11/16/2007 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 11/26/2007 11/30/2007 Baseline Inspections 7112101 - OCC RAD SAFETY - ACCESS 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 01/07/2008 01/11/2008 Baseline Inspections 7111108G - U1 INSERVICE INSPECTION 1 1 IP 7111108G Inservice Inspection Activities - BWR 03/10/2008 03/14/2008 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 1, 2 IP 7112102 ALARA Planning and Controls 03/10/2008 03/14/2008 Baseline Inspections 7111111B - LSRO REQUAL INSPECTION 3 1, 2 IP 7111111B Licensed Operator Requalification Program 06/05/2008 06/09/2008 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 06/02/2008 06/06/2008 Baseline Inspections This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | This report shows only on-site and announced inspection procedures. | ||
Limerick Inspection / Activity Plan 07/01/2007 | |||
-12/31/2008 | Page 2 of 2 Limerick 08/27/2007 13:52:40 Inspection / Activity Plan Report 22 07/01/2007 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type ISFSI - ISFSI DRY RUN INSPECTIONS 4 1, 2 IP 60854 Preoperational Testing Of An ISFSI 06/09/2008 06/27/2008 Other Routine 1, 2 IP 60856 Review of 10 CFR 72.212(b) Evaluations 06/09/2008 06/27/2008 Other Routine 10/20EXM - INITIAL OPERATOR LICENSING EXAMS 4 1 U01745 FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM 09/22/2008 09/26/2008 Not Applicable 1 U01745 FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM 10/20/2008 10/31/2008 Not Applicable 7112103 - OCC RAD SAFETY - INSTRUMENTS 1 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/04/2008 08/08/2008 Baseline Inspections 7111107B - HEAT SINK INSP 1 1, 2 IP 7111107B Heat Sink Performance 08/18/2008 08/22/2008 Baseline Inspections EP - EP PROGRAM INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 71151-EP01 Drill/Exercise Performance 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 08/25/2008 08/29/2008 Baseline Inspections 71152B - PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 09/08/2008 09/12/2008 Baseline Inspections MODS - MODS AND 50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 09/22/2008 09/26/2008 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 09/22/2008 09/26/2008 Baseline Inspections This report does not include INPO and OUTAGE activities. | ||
This report shows only on-site and announced inspection procedures.}} | This report shows only on-site and announced inspection procedures.}} |
Revision as of 03:02, 23 November 2019
ML072430579 | |
Person / Time | |
---|---|
Site: | Limerick |
Issue date: | 08/31/2007 |
From: | Paul Krohn Reactor Projects Region 1 Branch 4 |
To: | Crane C Exelon Generation Co, Exelon Nuclear |
KROHN, PG | |
References | |
Download: ML072430579 (5) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2007 Mr. Christopher M. Crane President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
LIMERICK GENERATING STATION
Dear Mr. Crane:
On August 15, 2007, the NRC staff completed its performance review of Limerick Generating Station for the first half of the calender year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter of 2007 at Limerick Generating Station Units 1 and 2 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting an Independent Spent Fuel Storage Installation dry run inspection during June 2008.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
C. Crane 2 The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85
Enclosure:
Limerick Inspection/ Activity Plan cc w/encl:
Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager - Limerick Senior Vice President - Nuclear Services Vice President - Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company Correspondence Control Desk Director, Bureau of Radiation Protection, PA Department of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear Institute of Nuclear Power Operations (INPO)
C. Crane 2 The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/ra/
Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85
Enclosure:
Limerick Inspection/ Activity Plan Distribution w/encl: (via E-mail) L. Pinkham - Resident OA S. Collins, RA D. Screnci, PAO M. Dapas, DRA N. Sheehan, PAO D. Lew, DRP DRS Director J. Clifford, DRP DRS Deputy Director P. Krohn, DRP DRS Branch Chiefs(6)
R. Fuhrmeister, DRP RidsNrrDirslpab@nrc.gov R. Laufer, RI OEDO ROPreports@nrc.gov H. Chernoff, NRR JWT1@NRC.GOV P. Bamford, PM, NRR Region I Docket Room (with concurrences)
S. Hansell, DRP - Sr Resident Inspector C. Bickett, DRP - Resident Inspector SUNSI Review Complete: __PGK__ (Reviewers Initials)
DOCUMENT NAME: S:\ROP 8 Mid Cycle Review\Letters for Mid Cycle\Branch 4 Mid-cycle letters\LIM 2007 Mid-cycle Letter-R1.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N RI/DRP NAME TSetzer PKrohn DATE 08/27/07 08/ 27 /07 OFFICIAL RECORD COPY
Page 1 of 2 Limerick 08/27/2007 13:52:40 Inspection / Activity Plan Report 22 07/01/2007 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type ISFSI - ISFSI CONSTRUCTION INSPECTION 1 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 04/01/2007 09/30/2007 Other Routine TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP 7111105T Fire Protection [Triennial] 07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 07/30/2007 08/03/2007 Baseline Inspections 7111401 - EP EXERCISE & PI VERIFICATION 8 1, 2 IP 7111401 Exercise Evaluation 08/06/2007 08/10/2007 Baseline Inspections 7111111B - LOR INSP + P/F REVIEW 3 1, 2 IP 7111111B Licensed Operator Requalification Program 10/22/2007 10/26/2007 Baseline Inspections 1, 2 IP 7111111B Licensed Operator Requalification Program 10/29/2007 11/02/2007 Baseline Inspections 7111111B - LSRO REQUAL AN OPTEST @PB + P/F REVIEW 2 1, 2 IP 7111111B Licensed Operator Requalification Program 11/01/2007 11/01/2007 Baseline Inspections 01/07EXM - INITIAL LSRO OPERATOR EXAM 3 1 U01632 LIMERICK LSRO EXAM (FY08) 11/19/2007 11/23/2007 Not Applicable 1 U01632 LIMERICK LSRO EXAM (FY08) 01/07/2008 01/08/2008 Not Applicable 7111121 - CDBI (COMPONENT DESIGN BASES INSPECTION) 7 1, 2 IP 7111121 Component Design Bases Inspection 10/01/2007 10/05/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 10/15/2007 10/19/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 10/29/2007 11/02/2007 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 11/05/2007 11/09/2007 Baseline Inspections 7112203 - PUB RAD SAFETY - REMP 1 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 11/12/2007 11/16/2007 Baseline Inspections 7112201 - PUB RAD SAFETY - RETS 1 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 11/26/2007 11/30/2007 Baseline Inspections 7112101 - OCC RAD SAFETY - ACCESS 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 01/07/2008 01/11/2008 Baseline Inspections 7111108G - U1 INSERVICE INSPECTION 1 1 IP 7111108G Inservice Inspection Activities - BWR 03/10/2008 03/14/2008 Baseline Inspections 7112102 - OCC RAD SAFETY - ALARA 1 1, 2 IP 7112102 ALARA Planning and Controls 03/10/2008 03/14/2008 Baseline Inspections 7111111B - LSRO REQUAL INSPECTION 3 1, 2 IP 7111111B Licensed Operator Requalification Program 06/05/2008 06/09/2008 Baseline Inspections 7112202 - PUB RAD SAFETY - RADWASTE 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 06/02/2008 06/06/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Limerick 08/27/2007 13:52:40 Inspection / Activity Plan Report 22 07/01/2007 - 12/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type ISFSI - ISFSI DRY RUN INSPECTIONS 4 1, 2 IP 60854 Preoperational Testing Of An ISFSI 06/09/2008 06/27/2008 Other Routine 1, 2 IP 60856 Review of 10 CFR 72.212(b) Evaluations 06/09/2008 06/27/2008 Other Routine 10/20EXM - INITIAL OPERATOR LICENSING EXAMS 4 1 U01745 FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM 09/22/2008 09/26/2008 Not Applicable 1 U01745 FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM 10/20/2008 10/31/2008 Not Applicable 7112103 - OCC RAD SAFETY - INSTRUMENTS 1 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/04/2008 08/08/2008 Baseline Inspections 7111107B - HEAT SINK INSP 1 1, 2 IP 7111107B Heat Sink Performance 08/18/2008 08/22/2008 Baseline Inspections EP - EP PROGRAM INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 71151-EP01 Drill/Exercise Performance 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 08/25/2008 08/29/2008 Baseline Inspections 71152B - PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 08/25/2008 08/29/2008 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 09/08/2008 09/12/2008 Baseline Inspections MODS - MODS AND 50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 09/22/2008 09/26/2008 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 09/22/2008 09/26/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.