ML072780118: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Initial and Follow-upresolution coordinationmeetingsKnownOMAs / MSOsSSA Non-compliances / HitsPRA Fire Modeling-Fixed and TransientlocationsB-3 Table ResultsMaster ActionInformation List(MAIL)Revised CLBResolutionStrategiesFire PRAQuantification - fullarea / risk rankingInitial Fire PRAIgnition sourcescenario resultsMSO Final CheckFinal PRAQuantificationFire SafetyAnalysis (FSA)DraftInitial ProposedModificationIdentificationPRA  Model and/orSSA ModelUpdatesIdentify ChangeEvaluationScenariosFinal FSAFinal MSO Dispositions Final OMA DispositionsFinal SSA strategiesLAR InputTemplates /Sketches /Drawings LocatedDeficienciesNote: Attendance is as needed,but typically SSA, PRA, CLFP,and Fire Modeling personnelas a minimum.General Note: Allsteps are subject toiterationRevised 7/16/2007Change Evaluations / Deficiency ResolutionProcess OverviewFollow-up ActionsRoughing inPhaseFinishingPhaseTrue-up PRAQuantificationAdditional DataCollection / InputRevisions}}
{{#Wiki_filter:Change Evaluations / Deficiency Resolution Process Overview PRA Fire Modeling-                       Fire PRA SSA Non-                         Known B-3 Table Results                    Fixed and Transient                Quantification - full compliances / Hits              OMAs / MSOs locations                    area / risk ranking Templates /
Master Action                            Sketches /                            Initial Fire PRA Information List                    Drawings Located                            Ignition source (MAIL)                             Deficiencies                            scenario results Initial and Follow-up Follow-up Actions                  resolution coordination        Note: Attendance is as needed, meetings              but typically SSA, PRA, CLFP, and Fire Modeling personnel as a minimum.
Revised CLB              Identify Change                PRA Model and/or                  Initial Proposed Resolution                Evaluation                      SSA Model                        Modification Strategies                Scenarios                        Updates                        Identification Roughing in                          Fire Safety Phase                          Analysis (FSA)
Draft Additional Data Finishing                        True-up PRA Collection / Input Phase                          Quantification Revisions Final PRA MSO Final Check Quantification General Note: All steps are subject to iteration Final FSA Final MSO Dispositions Final OMA Dispositions Final SSA strategies LAR Input                                              Revised 7/16/2007}}

Latest revision as of 03:08, 23 November 2019

August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Change Evaluations/Deficiency Resolution - 8/6/07 Slides - Briefing Materials/Meeting Handouts
ML072780118
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/16/2007
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML072830337 List:
References
Download: ML072780118 (1)


Text

Change Evaluations / Deficiency Resolution Process Overview PRA Fire Modeling- Fire PRA SSA Non- Known B-3 Table Results Fixed and Transient Quantification - full compliances / Hits OMAs / MSOs locations area / risk ranking Templates /

Master Action Sketches / Initial Fire PRA Information List Drawings Located Ignition source (MAIL) Deficiencies scenario results Initial and Follow-up Follow-up Actions resolution coordination Note: Attendance is as needed, meetings but typically SSA, PRA, CLFP, and Fire Modeling personnel as a minimum.

Revised CLB Identify Change PRA Model and/or Initial Proposed Resolution Evaluation SSA Model Modification Strategies Scenarios Updates Identification Roughing in Fire Safety Phase Analysis (FSA)

Draft Additional Data Finishing True-up PRA Collection / Input Phase Quantification Revisions Final PRA MSO Final Check Quantification General Note: All steps are subject to iteration Final FSA Final MSO Dispositions Final OMA Dispositions Final SSA strategies LAR Input Revised 7/16/2007