ML072780325
| ML072780325 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 07/16/2007 |
| From: | - No Known Affiliation |
| To: | Office of Nuclear Reactor Regulation |
| Oudinot D | |
| Shared Package | |
| ML072830337 | List:
|
| References | |
| Download: ML072780325 (1) | |
Text
Initial and Follow-up resolution coordination meetings Known OMAs / MSOs SSA Deterministic Non-compliances /
Hits PRA Fire Modeling-Fixed and Transient locations B-3 Table Results Master Action Information List (MAIL)
Revised CLB Resolution Strategies Fire PRA Quantification - full area / risk ranking Initial Fire PRA Ignition source scenario results MSO Final Check Final PRA Quantification Fire Safety Analysis (FSA)
Draft Initial Proposed Modification Identification PRA Model and/or SSA Model Updates Identify Change Evaluation Scenarios Final FSA Final MSO Dispositions Final OMA Dispositions Final SSA strategies LAR Input Templates /
Sketches /
Drawings Located Deficiencies Note: Attendance is as needed, but typically SSA, PRA, CLFP, and Fire Modeling personnel as a minimum.
General Note: All steps are subject to iteration Revised 7/16/2007 Change Evaluations / Deficiency Resolution Process Overview Follow-up Actions Roughing in Phase Finishing Phase True-up PRA Quantification Additional Data Collection / Input Revisions