Oconee NFPA-805 Technical Update August 9, 2007 1

Overall

 Reconstitution

 B-1 Table

 B-2 Table

 B-3 Table

 Radioactive Release

 Non-power Ops

 PRA

 Configuration Control

 Documentation

 LAR and UFSAR 2

Reconstitution

 ONS-1 cable selection and routing in progress. Completion in early 2008. Results fed into B-3 table and PRA as completed.

 Modification review from 2002 to present in progress. Completion by end of year.

 Currently adding PRA components.

3

B-1 Table

 Rev 0 completed and in process to send to NRC

 Duke and NEXUS to incorporate comments for revision 1.

 Chapter 4 inputs added to B-1 table

 Expecting to complete B-1 Table by end of September 2007.

4

B-2 Table

 Rev 0 complete and being routed to send to NRC

 Expecting to complete B-2 Table by end of September 2007 5

B-3 Table

 Completing new post fire safe shutdown analysis

 Performance goals populated

 Open items loaded

 Areas requiring suppression identified (deterministic requirements) 6

Radioactive Release

 Work to start in Aug 2007

 Expect work to complete by end of Oct 2007 7

Non-power Operations

 Non-power equipment identified

 Cables for non-power equipment identified and routed

 Awaiting completion of details associated with performing the non-power analysis 8

PRA

 Unit 3 completed

 Unit 2 to be completed in early fall 2007

 Unit 1 will be completed in early 2008

 PRA calculations submitted to NRC for review

 Change Evaluations examples are being used to refine the change evaluation process 9

Configuration Control

 Developing controlling documents

 LAR development to start this Fall

 Joint utility team assembled to define UFSAR details



10