1 Oconee NFPA-805 Technical Update August 9, 2007

2 Overall

 Reconstitution

 B-1 Table

 B-2 Table

 B-3 Table

 Radioactive Release

 Non-power Ops

 PRA

 Configuration Control

 Documentation

 LAR and UFSAR

3 Reconstitution

 ONS-1 cable selection and routing in progress. Completion in early 2008. Results fed into B-3 table and PRA as completed.

 Modification review from 2002 to present in progress. Completion by end of year.

 Currently adding PRA components.

4 B-1 Table

 Rev 0 completed and in process to send to NRC

 Duke and NEXUS to incorporate comments for revision 1.

 Chapter 4 inputs added to B-1 table

 Expecting to complete B-1 Table by end of September 2007.

5 B-2 Table

 Rev 0 complete and being routed to send to NRC

 Expecting to complete B-2 Table by end of September 2007

6 B-3 Table

 Completing new post fire safe shutdown analysis

 Performance goals populated

 Open items loaded

 Areas requiring suppression identified (deterministic requirements)

7 Radioactive Release

 Work to start in Aug 2007

 Expect work to complete by end of Oct 2007

8 Non-power Operations

 Non-power equipment identified

 Cables for non-power equipment identified and routed

 Awaiting completion of details associated with performing the non-power analysis

9 PRA

 Unit 3 completed

 Unit 2 to be completed in early fall 2007

 Unit 1 will be completed in early 2008

 PRA calculations submitted to NRC for review

 Change Evaluations examples are being used to refine the change evaluation process

10 Configuration Control

 Developing controlling documents

 LAR development to start this Fall

 Joint utility team assembled to define UFSAR details