1 Oconee NFPA-805 Technical Update August 9, 2007
2 Overall
Reconstitution
B-1 Table
B-2 Table
B-3 Table
Radioactive Release
Non-power Ops
Configuration Control
Documentation
3 Reconstitution
ONS-1 cable selection and routing in progress. Completion in early 2008. Results fed into B-3 table and PRA as completed.
Modification review from 2002 to present in progress. Completion by end of year.
Currently adding PRA components.
4 B-1 Table
Rev 0 completed and in process to send to NRC
Duke and NEXUS to incorporate comments for revision 1.
Chapter 4 inputs added to B-1 table
Expecting to complete B-1 Table by end of September 2007.
5 B-2 Table
Rev 0 complete and being routed to send to NRC
Expecting to complete B-2 Table by end of September 2007
6 B-3 Table
Completing new post fire safe shutdown analysis
Performance goals populated
Open items loaded
Areas requiring suppression identified (deterministic requirements)
7 Radioactive Release
Work to start in Aug 2007
Expect work to complete by end of Oct 2007
8 Non-power Operations
Non-power equipment identified
Cables for non-power equipment identified and routed
Awaiting completion of details associated with performing the non-power analysis
9 PRA
Unit 3 completed
Unit 2 to be completed in early fall 2007
Unit 1 will be completed in early 2008
PRA calculations submitted to NRC for review
Change Evaluations examples are being used to refine the change evaluation process
10 Configuration Control
Developing controlling documents
LAR development to start this Fall