MONTHYEARRA-20-0263, Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-09-16016 September 2020 Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv) ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports HNP-15-043, Response to Request for Additional Information 4 Regarding License Amendment Request to Revise Technical Specification Table 3.3-4 Loss of Offsite Power 6.9 Kv Emergency Undervoltage Primary Setpoints2015-05-13013 May 2015 Response to Request for Additional Information #4 Regarding License Amendment Request to Revise Technical Specification Table 3.3-4 Loss of Offsite Power 6.9 Kv Emergency Undervoltage Primary Setpoints RA-13-012, Capability to Perform Multi-Unit Dose Assessment2013-06-26026 June 2013 Capability to Perform Multi-Unit Dose Assessment ML1020401472010-07-22022 July 2010 NFPA 805 Pilot License Amendment Request Review Schedule Update, July 2010 ML1020301682010-07-0707 July 2010 North Carolina Split Sample Results ML1020301692010-07-0707 July 2010 Photos ML0932400582009-11-19019 November 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, November, 2009 ML0917603592009-06-25025 June 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, June 2009 ML0914201292009-05-21021 May 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, May 2009 ML0909905232009-04-29029 April 2009 Enclosure 2: Shearon Harris Regulatory Audit - Documents Reviewed ML0908403602009-03-25025 March 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, March, 2009, Revised ML0834001812008-12-0404 December 2008 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update ML0812003342008-04-17017 April 2008 NFPA 805 Transition Pilot Plant FAQ Log - April 2008 ML0729200822007-10-19019 October 2007 Index of References - Shearon Harris SEIS License Renewal ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0727801202007-08-0606 August 2007 August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Fire Pra/Fire Protection Program Interface - Progress Energy - Briefing Materials/Meeting Handouts ML0727801242007-07-17017 July 2007 August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Post Transition Documentation - Progress Energy - Briefing Materials/Meeting Handouts ML0727803252007-07-16016 July 2007 August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Change Evaluation/Deficiency Resolution - 8/9/07 Slides - Progress Energy - Briefing Materials/Meeting Handouts ML0727801182007-07-16016 July 2007 August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Change Evaluations/Deficiency Resolution - 8/6/07 Slides - Briefing Materials/Meeting Handouts ML0727801162007-06-0505 June 2007 August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Harris Nuclear Plant Change Evaluation Development - Briefing Materials/Meeting Handouts ML0623500952006-07-21021 July 2006 NFPA-805 Transition Pilot Plant FAQ 06-0005 ML18230A4841979-06-12012 June 1979 Transmitting Affidavit of J. A. Jones, Marked for Identification as Applicant Exhibit Pp, & Revisions to Applicant'S Proposed Findings of Fact & Conclusion of Law in Form of Supplemental Initial Decision (Construction Permits) ML18230A5241979-01-23023 January 1979 Applicant'S Response to Conservation Council of North Carolina and Wake Environment, Inc.'S Motion to Remand to Licensing Board for Further Hearings ML18230A2141977-09-28028 September 1977 Transmitting Cost Estimates for Revised Cooling Tower Blowdown System, Letter Advising Cost Will Be Increased by Approximately $6.500,000 as a Result of Modifications to System ML18230B0281977-09-23023 September 1977 List of Carolina Power & Light Company (Cp&L) Equipment on Line as of 1977, and for the Period 1978-1990, a List of Equipment to Be Added and Subtracted from the CP&L System for Each Year ML18230A0881976-09-20020 September 1976 as Discussed, Letter Transmitting Information Regarding Containment Structure Load Combination, Containment Internal Structure, Seismic Category I Structure, Index to Positions & Regulatory Guides ML18230A9381975-01-28028 January 1975 Figure P1-1, Geologic Time in Perspective 2020-09-16
[Table view] |
Text
North Carolina Split Sample Resu*,ts K
I.
Cooling Tower Blowdown Wells H-3 Concentration (pCi/L)
BD-MWI BD-MW2 BD-MW3 BD-MW5 BD-MW6 BD-MW7 BD-MW8 BD-MW9 1/23/2009- <243 787 533 dry dry ____:___-_:..._.__...___,_.
2/6/2009 _-____* .. . _-. -_ 1500 2450 .. .. _... . . .._ ..
3/4/2009 372 373 1060 1260 1450 <234 <232 <232 3/30/2009 371 4/8/2009 456 1010 1430 1220 -294 275 <232 5/14/2009 <232 513 +/- 146 994 + 151 1100 +/- 151 1580 +/- 156 Unable to sample <233 Unable to sample 6/9/2009 _ I
Cooling Tower Blowdown Wells Gamma Note: Analyzed to Environmental Lower Limit of Detection BD-MW1 BD-MW2 BD-MW3 BD-MW5 BD-MW6 BD-MW7 BD-MW8 1/23/2009 dry dry 2/6/2009 .:
3/4/2009.
4/8/2009 <LLD <LLD <LLD <LLD <LLD <LLD
<LLD <LLD <LLD <LLD O<LLD 5/14/2009 <LLD
Ss.
TABLE 1 MONITORING WELL LOCATION/RATIONALE GROUNDWATER ASSESSMENT SHEARON HARRIS NUCLEAR POWERPLANT NEW HILL. NORTH CAROLINA MONITORING LOCATION/RATIONALE WELL ID Approximately 100 feet south (downstream) from ARS# 1. This is a location where the TW-1 pipeline is above the normal water table.and will be used.to evaluate potential leaks upstream. The pipeline was not visually inspected in this area.
TW-2 Approximately 200 feet north (upstream) of APM#I. This is 'a location where thepipeline is above the normal water table and is the location where the WEKO SEAL repair was performed. This point will be used to determine water quality at the location of the identified leak.
TW-3 Approximately 50 feet south (downstream) from ARS#4. This is a location where the pipeline is above the normal water table and will be used to evaluate potential leaks upstream. The pipeline was not visually inspected in this area.
TW-4 Approximately 50 feet north (upstream) from ARS#5. This is a location where the pipeline is above the normal water table and will be used to evaluate potential leaks upstream. The pipeline was not visually inspected in this area.
.TW-5 Approximately 1800 feet south (downstream) of Drop Structure A. This is a location where the pipeline is abovethe nonnal watertable and will be used to determine water quality at the location of the identified leak.
TW-6 Approximately 50 feet north (upstream) from Drop Structure B. This is a location where the pipeline is above the normal water table and will be used to determine water quality at the location of the identified leak.
BDL-MWlO Adjacent to ARS# 1 to monitor groundwater quality at this portion of the pipeline. Note:
This monitoring well location may be moved farther north to better evaluate the portion of the pipeline north of ARS#l that was not.visually inspected.