ML072780120
From kanterella
Jump to navigation
Jump to search
ML072780120 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 08/06/2007 |
From: | Progress Energy Co |
To: | Office of Nuclear Reactor Regulation |
Oudinot D | |
Shared Package | |
ML072830337 | List:
|
References | |
Download: ML072780120 (1) | |
Similar Documents at Harris | |
---|---|
Category:Graphics incl Charts and Tables
MONTHYEARRA-20-0263, Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-09-16016 September 2020
[Table view]Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv) ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports HNP-15-043, Response to Request for Additional Information 4 Regarding License Amendment Request to Revise Technical Specification Table 3.3-4 Loss of Offsite Power 6.9 Kv Emergency Undervoltage Primary Setpoints2015-05-13013 May 2015 Response to Request for Additional Information #4 Regarding License Amendment Request to Revise Technical Specification Table 3.3-4 Loss of Offsite Power 6.9 Kv Emergency Undervoltage Primary Setpoints RA-13-012, Capability to Perform Multi-Unit Dose Assessment2013-06-26026 June 2013 Capability to Perform Multi-Unit Dose Assessment ML1020401472010-07-22022 July 2010 NFPA 805 Pilot License Amendment Request Review Schedule Update, July 2010 ML1020301682010-07-0707 July 2010 North Carolina Split Sample Results ML1020301692010-07-0707 July 2010 Photos ML0932400582009-11-19019 November 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, November, 2009 ML0917603592009-06-25025 June 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, June 2009 ML0914201292009-05-21021 May 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, May 2009 ML0909905232009-04-29029 April 2009 Enclosure 2: Shearon Harris Regulatory Audit - Documents Reviewed ML0908403602009-03-25025 March 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, March, 2009, Revised ML0834001812008-12-0404 December 2008 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update ML0812003342008-04-17017 April 2008 NFPA 805 Transition Pilot Plant FAQ Log - April 2008 ML0729200822007-10-19019 October 2007 Index of References - Shearon Harris SEIS License Renewal ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0727801202007-08-0606 August 2007 August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Fire Pra/Fire Protection Program Interface - Progress Energy - Briefing Materials/Meeting Handouts ML0727801242007-07-17017 July 2007 August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Post Transition Documentation - Progress Energy - Briefing Materials/Meeting Handouts ML0727803252007-07-16016 July 2007 August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Change Evaluation/Deficiency Resolution - 8/9/07 Slides - Progress Energy - Briefing Materials/Meeting Handouts ML0727801182007-07-16016 July 2007 August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Change Evaluations/Deficiency Resolution - 8/6/07 Slides - Briefing Materials/Meeting Handouts ML0727801162007-06-0505 June 2007 August 2007 - Transition to National Fire Protection Association (NFPA) 805 - Harris Nuclear Plant Change Evaluation Development - Briefing Materials/Meeting Handouts ML0623500952006-07-21021 July 2006 NFPA-805 Transition Pilot Plant FAQ 06-0005 ML18230A4841979-06-12012 June 1979 Transmitting Affidavit of J. A. Jones, Marked for Identification as Applicant Exhibit Pp, & Revisions to Applicant'S Proposed Findings of Fact & Conclusion of Law in Form of Supplemental Initial Decision (Construction Permits) ML18230A5241979-01-23023 January 1979 Applicant'S Response to Conservation Council of North Carolina and Wake Environment, Inc.'S Motion to Remand to Licensing Board for Further Hearings ML18230A2141977-09-28028 September 1977 Transmitting Cost Estimates for Revised Cooling Tower Blowdown System, Letter Advising Cost Will Be Increased by Approximately $6.500,000 as a Result of Modifications to System ML18230B0281977-09-23023 September 1977 List of Carolina Power & Light Company (Cp&L) Equipment on Line as of 1977, and for the Period 1978-1990, a List of Equipment to Be Added and Subtracted from the CP&L System for Each Year ML18230A0881976-09-20020 September 1976 as Discussed, Letter Transmitting Information Regarding Containment Structure Load Combination, Containment Internal Structure, Seismic Category I Structure, Index to Positions & Regulatory Guides ML18230A9381975-01-28028 January 1975 Figure P1-1, Geologic Time in Perspective 2020-09-16 Category:Meeting Briefing Package/Handouts MONTHYEARML24100A8062024-04-0909 April 2024
[Table view]Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML23341A1522023-12-0707 December 2023 December 11, 2023 Public Meeting - RIPE Exemption Request - Licensee Slides ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22153A3842022-06-0606 June 2022 Duke Energy Presentation Material for June 6, 2022 Public Meeting on GSI-191 Closeout ML22091A1332022-04-0101 April 2022 Bru Har Combined 2021 Assessment Meeting Slides ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML19077A3672019-03-14014 March 2019 March 14, 2019 Pre-submittal Meeting TS DNBR Safety Limit Change LAR Meeting Slides ML18351A1342018-12-20020 December 2018 December 20, 2018 Pre-submittal Meeting Slides for Escw Risk-Informed LAR ML18333A1822018-11-0808 November 2018 Pre-Submittal Meeting - November 8, 2018 - License Amendment Request for Shearon Harris Nuclear Power Plant Emergency Plan Revision ML17331A6272017-11-29029 November 2017 Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 ML17250B2382017-08-30030 August 2017 TMRE Presubmittal NRC ML17044A0892017-03-0202 March 2017 EDG SR Presubmittal Meeting March 2, 2017 ML16267A0292016-09-29029 September 2016 SFP Pre-Submittal Meeting Slides - BWR Storage Rack Inserts, Updated NCS Analysis at Harris Nuclear Plant ML16112A2932016-05-0202 May 2016 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted)2015-09-18018 September 2015 Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) ML14129A3352014-05-0909 May 2014 Summary of Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13212A3372013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting2013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-012013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13218B3372013-07-30030 July 2013 Handout for 7/30/13 Conference Call Re. Harris Emergency Response Facility Activation Timeliness and Criteria ML13211A3782013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13204A2562013-07-0909 July 2013 Handout - LOOP Voltage Setpoint Change Presubmittal Conference Call - July 9, 2013 ML13170A3352013-06-13013 June 2013 Presentation - NRC Special Inspection Meeting - Harris Reactor Pressure Vessel ML12277A0272012-10-0202 October 2012 Slides - Summary of Meeting with Duke Energy Carolinas to Discuss Noncenservative Technical Specifications License Amendment Requests ML12242A4322012-08-28028 August 2012 Summary of Category 1 Public Meeting - Regulatory Conference and Predecisional Enforcement Conference ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12107A0012012-04-16016 April 2012 Meeting Summary - Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant ML11354A3782012-02-0808 February 2012 Meeting Handout - Meeting with Carolina Power and Light Suggested Discussion Items Regarding Realistic Large Break Loss-of-Coolant Accident HNP-12-028, Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-0282012-01-11011 January 2012 Realistic LBLOCA Question Response Meeting Handout, Enclosure 3 to HNP-12-028 ML12076A1652012-01-11011 January 2012 Meeting Slides - Harris Realistic LBLOCA Question Response Meeting ML1118011132011-06-29029 June 2011 NRC Staff Response to NFPA 805 Transition FAQ 10-0059, Revision 1 ML1113704082011-05-0909 May 2011 Meeting Slides Regarding Human Performance Improvement ML1107301382011-04-21021 April 2011 February 22, 2011, Summary of Pre-application Meeting with Carolina Power & Light and Representatives Regarding Upcoming BWR Boraflew License Amendment Request W/ Public Meeting Slides ML1111000242011-04-20020 April 2011 Meeting Summary - Shearon Harris - List of Attendees ML1014102712010-05-18018 May 2010 Shearon Harris Nuclear Plant Annual Assessment Meeting Slides ML0922900342009-08-17017 August 2009 08/19/09-Meeting Slides for 11th International Seminar on Fire Safety in Nuclear Power Plants and Installations, Risk-Informed, Performance-Based Fire Protection: a U.S. Regulatory Perspective ML0916605042009-06-24024 June 2009 04/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805 ML0904906122009-02-18018 February 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, February, 2009 ML0829601532008-11-17017 November 2008 Summary of Meeting with Progress Energy Carolinas, Inc., to Discuss Shearon Harris Unit 1 National Fire Protection Association Standard 805 License Amendment Request ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0820703912008-07-17017 July 2008 Meeting Handouts from 7/17/08 Public Meeting on the Harris and Oconee LARs to Transition to NFPA-805 M080717, M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection2008-07-17017 July 2008 M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection ML0818407352008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris Fire PRA Lessons Learned ML0818407312008-06-20020 June 2008 NFPA-805 Workshop Handouts - Harris NFPA-805 Results and Lessons Learned ML0812003342008-04-17017 April 2008 NFPA 805 Transition Pilot Plant FAQ Log - April 2008 2024-04-09 |
Text
PRA Risk/Scoping Relationships FP Program (evaluate for impacts)
Mitigation Systems Models Ign-Source/Impact Info Database Fires Internal Events Change HRA Timing Info FP Program Plant Changes Impacted?
Implemented Delta CDF for change PRA Plant Changes Impacted?
NFPA-805 change process PRA Eval Request (includes non-power risk considerations)
Change Log Non-Safety-Related Augmented Quality (technical adequacy (technical adequacy based on Industry controlled by Corp. QA Standards with Manual and Site Peer Reviews)
Committments)
Fire PRA / Fire Protection Program Interface
Retrieved from "https://kanterella.com/w/index.php?title=ML072780120&oldid=2172660"