| issue date = 11/28/2017 | | issue date = 11/28/2017 | ||
| title = | | title = Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2018002 | ||
| author name = Domke M | | author name = Domke M | ||
| author affiliation = NRC/RGN-III/DRS/EB1 | | author affiliation = NRC/RGN-III/DRS/EB1 | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, ILLINOIS | {{#Wiki_filter:UNITED STATES | ||
B. Hanson -2- | NUCLEAR REGULATORY COMMISSION | ||
B. Hanson -3- | REGION III | ||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | 2443 WARRENVILLE RD. SUITE 210 | ||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | LISLE, ILLINOIS 60532-4352 | ||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | November 28, 2017 | ||
Mr. Bryan C. Hanson | |||
Senior VP, Exelon Generation Company, LLC | |||
President and CNO, Exelon Nuclear | |||
4300 Winfield Road | |||
Warrenville, IL 60555 | |||
SUBJECT: CLINTON NUCLEAR PLANT, UNIT 1NOTIFICATION OF NRC | |||
BASELINE INSPECTION AND REQUEST FOR INFORMATION; | |||
INSPECTION REPORT 05000461/2018002 | |||
Dear Mr. Hanson: | |||
On May 7, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline | |||
Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed | |||
May 7, 2018, through May 11, 2018. | |||
Experience has shown that this inspection is resource intensive both for the NRC inspector and | |||
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive | |||
inspection for both sides, we have enclosed a request for documents needed for this inspection. | |||
These documents have been divided into two groups. | |||
The first group identifies information necessary to ensure that the inspector is adequately | |||
prepared. The second group identifies the information the inspector will need upon arrival at | |||
the site. It is important that all of these documents are up-to-date, and complete, in order to | |||
minimize the number of additional documents requested during the preparation and/or the | |||
onsite portions of the inspection. | |||
We have discussed the schedule for inspection activities with your staff and understand that our | |||
regulatory contact for this inspection will be Mr. Kenneth Pointer, of your organization. If there | |||
are any questions about this inspection or the material requested, please contact the lead | |||
inspector Mr. Matt Domke at 630-829-9562, or via e-mail at Matthew.Domke@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject | |||
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information | |||
collection requirements were approved by the Office of Management and Budget, Control | |||
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to | |||
respond to, a request for information or an information collection requirement unless the | |||
requesting document displays a currently valid Office of Management and Budget Control | |||
Number. | |||
B. Hanson -2- | |||
This letter and its enclosure will be made available for public inspection and copying at | |||
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in | |||
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, | |||
/RA/ | |||
Matt Domke, Reactor Inspector | |||
Engineering Branch 1 | |||
Division of Reactor Safety | |||
Docket No. 50-461 | |||
License No. NPF-62 | |||
Enclosure: | |||
Baseline Inservice Inspection Document Request | |||
cc: Distribution via LISTSERV | |||
B. Hanson -3- | |||
Letter to Bryan C. Hanson from Matt Domke dated November 28, 2017 | |||
SUBJECT: CLINTON NUCLEAR PLANT, UNIT 1NOTIFICATION OF NRC | |||
BASELINE INSPECTION AND REQUEST FOR INFORMATION; | |||
INSPECTION REPORT 05000461/2018002 | |||
DISTRIBUTION: | |||
Jeremy Bowen | |||
RidsNrrDorlLpl3 | |||
RidsNrrPMClinton Resource | |||
RidsNrrDirsIrib Resource | |||
Cynthia Pederson | |||
Kenneth OBrien | |||
Richard Skokowski | |||
Allan Barker | |||
Carole Ariano | |||
Linda Linn | |||
DRSIII | |||
DRPIII | |||
ADAMS Accession Number ML17333A078 | |||
OFFICE RIII RIII RIII RIII | |||
NAME MDomke:cl | |||
DATE 11/28/17 | |||
OFFICIAL RECORD COPY | |||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | |||
Inspection Dates: May 7-11, 2018 | |||
Inspection Procedures: Inspection Procedure 71111-08, Inservice Inspection | |||
Lead Inspector: Matt Domke, DRS | |||
630-829-9562 | |||
Matthew.Domke@nrc.gov | |||
A. Information for the In-Office Preparation Week | |||
The following information (electronic copy CD ROM if possible) is requested by | |||
April 16, 2018, to facilitate the selection of specific items that will be reviewed during the | |||
onsite inspection week. The inspector will select specific items from the information | |||
requested below and request a list of additional documents needed onsite to your staff. | |||
We request that the specific items selected from the lists be available and ready for | |||
review on the first day of inspection. If you have any questions regarding this | |||
information, please call the inspector as soon as possible. | |||
1. For the upcoming outage, a detailed schedule and description of: | |||
a. Non-Destructive Examinations (NDE) planned for Class 1 and 2 systems | |||
and containment, performed as part of your American Society of Mechanical | |||
Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition | |||
and addenda of Code committed to), and NDE planned for other systems | |||
performed as part of a Risk-Informed ISI Program, or other augmented | |||
inspection programs commitments, as part of an industry initiative. For each | |||
weld examination, include the weld identification number, description of weld | |||
(component name), category, class, type of exam and procedure number, | |||
and date of examination; and | |||
b. Welding on Code Class 1, 2, or 3 components. | |||
2. A copy of the NDE procedures and welding procedures used to perform the | |||
activities identified in A.1 (including NDE calibration and flaw characterization/ | |||
sizing procedures and Welding Procedure Qualification Records). For ultrasonic | |||
examination procedures qualified in accordance with Appendix VIII, of Section XI | |||
of the ASME Code, provide documentation supporting the procedure qualification | |||
(e.g., the Electric Power Research Institute performance demonstration | |||
qualification summary sheets). | |||
3. A copy of ASME Section XI, Code Relief Requests applicable to the | |||
examinations identified in A.1. | |||
4. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye | |||
penetrant), which have identified relevant indications on Code Class 1 and 2 | |||
systems since the beginning of the last refueling outage. | |||
Enclosure | |||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | |||
5. List with short description of the welds in Code Class 1 and 2 systems, which | |||
have been fabricated due to component repair/replacement activities since the | |||
beginning of the last refueling outage and identify the system, weld number, and | |||
reference applicable documentation (e.g., NIS-2 forms with definitions of system | |||
and component acronyms). | |||
6. If reactor vessel weld examinations required by the ASME Code are scheduled to | |||
occur during the inspection period, provide a detailed description of the welds to | |||
be examined, and the extent of the planned examination. | |||
7. List with description of ISI-related issues such as piping degradation or damage | |||
(e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors | |||
identified in piping examinations that have been entered into your corrective | |||
action system since the beginning of the last refueling outage. Also, include a list | |||
of corrective action records associated with foreign material introduced/identified | |||
in the reactor vessel or reactor coolant system since the beginning of the last | |||
refueling outage. | |||
8. Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports | |||
applicable to your structures, systems, or components within the scope of | |||
Section XI of the ASME Code that have been identified since the beginning of the | |||
last refueling outage. | |||
9. A copy of the 10-year ISI Program showing those required exams scheduled to | |||
be performed this outage, and those which have been completed. | |||
10. Point of contact information (name and site number) for the ISI Program and | |||
Reactor Internals Inspection Programs-Site and vendor leads. | |||
B. Onsite information to be provided to the inspector on the first day of the | |||
inspection (e.g., following the entrance meeting). Please provide hard copies | |||
(e.g., paper records) of the following documents. | |||
1. For welds selected by the inspector from A.1.b and A.5 above, provide copies of | |||
the following documents: | |||
a. Document of the weld number and location (e.g., system, train, branch); | |||
b. Document with a detail of the weld construction (e.g., drawing); | |||
c. Applicable portions of the Design Specification and applicable Code of | |||
construction for the weldment (e.g., B31.1 or ASME Section III); | |||
d. Applicable Code Edition and Addenda for weld procedure qualification; | |||
e. Applicable weld procedure specifications and completed weld data sheets | |||
used to fabricate the welds; | |||
f. Copies of procedure qualification records supporting the weld procedure | |||
specifications; | |||
g. Copies of welders performance qualification records; | |||
2 | |||
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST | |||
h. Copies of mechanical test reports identified in the procedure qualification | |||
records above; | |||
i. Copies of the non-conformance reports for the selected welds; | |||
j. Access to radiographs and equipment to view radiographs of the selected | |||
welds; | |||
k. ASME Code Section XI repair replacement plan and reconciliation for | |||
replacement components/materials; | |||
l. Certified Material Test Reports for replacement pressure boundary materials; | |||
and | |||
m. Copies of the NDE required by the construction Code and the pre-service | |||
examination records required by the ASME Code Section XI for the selected | |||
welds. | |||
2. For the ISI-related corrective action issues selected by the inspector from | |||
Item A.7 above, provide a copy of the corrective actions and supporting | |||
documentation. | |||
3. For the NDE reports with relevant indications on Code Class 1 and 2 systems | |||
selected by the inspector from Item A.4 above, provide a copy of the examination | |||
records and associated corrective action documents. | |||
4. Updated schedules for Item A.1 (including schedule showing contingency repair | |||
plans if available). | |||
5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be | |||
examined during the outage. Also provide any drawings used by NDE vendors | |||
to locate these welds. | |||
6. Provide copies of the following standards at the onsite U.S. Nuclear Regulatory | |||
Commission inspection location for the duration of the inspection: | |||
a. Sections V, IX, and XI of the ASME Code with Editions applicable to the | |||
ISI Program and the Repair/Replacement Program; and | |||
b. Copy of the performance demonstration initiative (PDI) generic procedures | |||
with the latest applicable Revisions that support site qualified ultrasonic | |||
examination of piping welds and components (e.g., PDI-UT-1, PDI-UT-2, | |||
PDI-UT-3, PDI-UT-10 etc.). | |||
7. Provide training (e.g., Scaffolding, Fall Protection, Foreign Material Exclusion) if | |||
required to access the NDE selected by the inspector for observation. | |||
If you have questions regarding the information requested, please contact the lead inspector. | |||
3 | |||
}} | }} |
Latest revision as of 04:08, 16 November 2019
ML17333A078 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 11/28/2017 |
From: | Matthew Domke NRC/RGN-III/DRS/EB1 |
To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
References | |
IR 2018002 | |
Download: ML17333A078 (6) | |
See also: IR 05000461/2018002
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE RD. SUITE 210
LISLE, ILLINOIS 60532-4352
November 28, 2017
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: CLINTON NUCLEAR PLANT, UNIT 1NOTIFICATION OF NRC
BASELINE INSPECTION AND REQUEST FOR INFORMATION;
INSPECTION REPORT 05000461/2018002
Dear Mr. Hanson:
On May 7, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline
Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed
May 7, 2018, through May 11, 2018.
Experience has shown that this inspection is resource intensive both for the NRC inspector and
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive
inspection for both sides, we have enclosed a request for documents needed for this inspection.
These documents have been divided into two groups.
The first group identifies information necessary to ensure that the inspector is adequately
prepared. The second group identifies the information the inspector will need upon arrival at
the site. It is important that all of these documents are up-to-date, and complete, in order to
minimize the number of additional documents requested during the preparation and/or the
onsite portions of the inspection.
We have discussed the schedule for inspection activities with your staff and understand that our
regulatory contact for this inspection will be Mr. Kenneth Pointer, of your organization. If there
are any questions about this inspection or the material requested, please contact the lead
inspector Mr. Matt Domke at 630-829-9562, or via e-mail at Matthew.Domke@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
B. Hanson -2-
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Matt Domke, Reactor Inspector
Engineering Branch 1
Division of Reactor Safety
Docket No. 50-461
License No. NPF-62
Enclosure:
Baseline Inservice Inspection Document Request
cc: Distribution via LISTSERV
B. Hanson -3-
Letter to Bryan C. Hanson from Matt Domke dated November 28, 2017
SUBJECT: CLINTON NUCLEAR PLANT, UNIT 1NOTIFICATION OF NRC
BASELINE INSPECTION AND REQUEST FOR INFORMATION;
INSPECTION REPORT 05000461/2018002
DISTRIBUTION:
RidsNrrDorlLpl3
RidsNrrPMClinton Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Kenneth OBrien
DRSIII
DRPIII
ADAMS Accession Number ML17333A078
OFFICE RIII RIII RIII RIII
NAME MDomke:cl
DATE 11/28/17
OFFICIAL RECORD COPY
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates: May 7-11, 2018
Inspection Procedures: Inspection Procedure 71111-08, Inservice Inspection
Lead Inspector: Matt Domke, DRS
630-829-9562
Matthew.Domke@nrc.gov
A. Information for the In-Office Preparation Week
The following information (electronic copy CD ROM if possible) is requested by
April 16, 2018, to facilitate the selection of specific items that will be reviewed during the
onsite inspection week. The inspector will select specific items from the information
requested below and request a list of additional documents needed onsite to your staff.
We request that the specific items selected from the lists be available and ready for
review on the first day of inspection. If you have any questions regarding this
information, please call the inspector as soon as possible.
1. For the upcoming outage, a detailed schedule and description of:
a. Non-Destructive Examinations (NDE) planned for Class 1 and 2 systems
and containment, performed as part of your American Society of Mechanical
Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition
and addenda of Code committed to), and NDE planned for other systems
performed as part of a Risk-Informed ISI Program, or other augmented
inspection programs commitments, as part of an industry initiative. For each
weld examination, include the weld identification number, description of weld
(component name), category, class, type of exam and procedure number,
and date of examination; and
b. Welding on Code Class 1, 2, or 3 components.
2. A copy of the NDE procedures and welding procedures used to perform the
activities identified in A.1 (including NDE calibration and flaw characterization/
sizing procedures and Welding Procedure Qualification Records). For ultrasonic
examination procedures qualified in accordance with Appendix VIII, of Section XI
of the ASME Code, provide documentation supporting the procedure qualification
(e.g., the Electric Power Research Institute performance demonstration
qualification summary sheets).
3. A copy of ASME Section XI, Code Relief Requests applicable to the
examinations identified in A.1.
4. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye
penetrant), which have identified relevant indications on Code Class 1 and 2
systems since the beginning of the last refueling outage.
Enclosure
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
5. List with short description of the welds in Code Class 1 and 2 systems, which
have been fabricated due to component repair/replacement activities since the
beginning of the last refueling outage and identify the system, weld number, and
reference applicable documentation (e.g., NIS-2 forms with definitions of system
and component acronyms).
6. If reactor vessel weld examinations required by the ASME Code are scheduled to
occur during the inspection period, provide a detailed description of the welds to
be examined, and the extent of the planned examination.
7. List with description of ISI-related issues such as piping degradation or damage
(e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors
identified in piping examinations that have been entered into your corrective
action system since the beginning of the last refueling outage. Also, include a list
of corrective action records associated with foreign material introduced/identified
in the reactor vessel or reactor coolant system since the beginning of the last
refueling outage.
8. Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports
applicable to your structures, systems, or components within the scope of
Section XI of the ASME Code that have been identified since the beginning of the
last refueling outage.
9. A copy of the 10-year ISI Program showing those required exams scheduled to
be performed this outage, and those which have been completed.
10. Point of contact information (name and site number) for the ISI Program and
Reactor Internals Inspection Programs-Site and vendor leads.
B. Onsite information to be provided to the inspector on the first day of the
inspection (e.g., following the entrance meeting). Please provide hard copies
(e.g., paper records) of the following documents.
1. For welds selected by the inspector from A.1.b and A.5 above, provide copies of
the following documents:
a. Document of the weld number and location (e.g., system, train, branch);
b. Document with a detail of the weld construction (e.g., drawing);
c. Applicable portions of the Design Specification and applicable Code of
construction for the weldment (e.g., B31.1 or ASME Section III);
d. Applicable Code Edition and Addenda for weld procedure qualification;
e. Applicable weld procedure specifications and completed weld data sheets
used to fabricate the welds;
f. Copies of procedure qualification records supporting the weld procedure
specifications;
g. Copies of welders performance qualification records;
2
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
h. Copies of mechanical test reports identified in the procedure qualification
records above;
i. Copies of the non-conformance reports for the selected welds;
j. Access to radiographs and equipment to view radiographs of the selected
k. ASME Code Section XI repair replacement plan and reconciliation for
replacement components/materials;
l. Certified Material Test Reports for replacement pressure boundary materials;
and
m. Copies of the NDE required by the construction Code and the pre-service
examination records required by the ASME Code Section XI for the selected
2. For the ISI-related corrective action issues selected by the inspector from
Item A.7 above, provide a copy of the corrective actions and supporting
documentation.
3. For the NDE reports with relevant indications on Code Class 1 and 2 systems
selected by the inspector from Item A.4 above, provide a copy of the examination
records and associated corrective action documents.
4. Updated schedules for Item A.1 (including schedule showing contingency repair
plans if available).
5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be
examined during the outage. Also provide any drawings used by NDE vendors
to locate these welds.
6. Provide copies of the following standards at the onsite U.S. Nuclear Regulatory
Commission inspection location for the duration of the inspection:
a. Sections V, IX, and XI of the ASME Code with Editions applicable to the
ISI Program and the Repair/Replacement Program; and
b. Copy of the performance demonstration initiative (PDI) generic procedures
with the latest applicable Revisions that support site qualified ultrasonic
examination of piping welds and components (e.g., PDI-UT-1, PDI-UT-2,
PDI-UT-3, PDI-UT-10 etc.).
7. Provide training (e.g., Scaffolding, Fall Protection, Foreign Material Exclusion) if
required to access the NDE selected by the inspector for observation.