{{#Wiki_filter:FENOC Perry Nuclear Power Station*10 Center Road FirstEnergy Nuclear Operating Company Perry, Ohio 44081 Barry S. Allen 440-280-5382 Vice President Fax: 440-280-8029 Marchl 11,'2008 PY-CEI/OEPA-0483L Ohio Environmental Protection Agency Division ofWater.(PolilUtlion Control EnforCement Section, ES/DMR P.O.,-Box 1049 Columbus, Ohio 43216-1049
{{#Wiki_filter:FENOC*10                                                                          Perry Nuclear Power Station Center Road FirstEnergy NuclearOperating Company                                                         Perry,Ohio 44081 Barry S. Allen                                                                                   440-280-5382 Vice President                                                                             Fax: 440-280-8029 Marchl11,'2008 PY-CEI/OEPA-0483L Ohio Environmental Protection Agency Division ofWater.(PolilUtlion Control EnforCement Section, ES/DMR P.O.,-Box 1049 Columbus, Ohio 43216-1049


==SUBJECT:==
==SUBJECT:==
Perry Nuclear Power Plant, February NPDES Discharge Monitoring Report Enclosed are the Perry Nuclear Power Plant, NPDES monthly report forms for the month of February 2008. No violations occurred during this period.If you have questions or require additional information, please contact Mrs. Liz Ryan at (440) 280-5536.Sincerely, Enclosures,., A-Station Code o004Report-BStation Code, 094 Report C Station Code 601 Report D Station Code "602 Report-E Station Code 800 Report cc: NRC Region IlI NRC Resident Inspector NRR Project Manager NRC Document Control Desk (Docket No. 50-440)
Perry Nuclear Power Plant, February NPDES Discharge Monitoring Report Enclosed are the Perry Nuclear Power Plant, NPDES monthly report forms for the month of February 2008. No violations occurred during this period.
Page 1 of8 Ohio EPA -Daily Discharge Monitoring Report -Form 4500 FACILITY: LOCATION: COUNTY: DISTRICT: FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER: STATION CODE: MONITORING PERIOD: REPORTING LAB: ANALYST: NO DISCHARGE INDICATOR:
If you have questions or require additional information, please contact Mrs. Liz Ryan at (440) 280-5536.
3IB00016*ID 004 2008-02-01 To: 2008-02-29 CCB125 -Liz Ryan Water Zinc, Total Copper, Total Oxidants, Total Chlorine, Total PARAMETER Temperature Flow Rate pH Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 4107 4107 4106 4106 FREQUENCY I/Day ]/Day 2/Week I/Month I/Month When Disch. When Disch.SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2008-02-01 45 69.4 8.57 AH AA 0.05 2008-02-02 44 60.5 AH AA 0.05 2008-02-03 43 64.8 AH AA 0.05 2008-02-04 43 66.2 AA 8.0 6 AH AA 0.05 2008-02-05 45 72.2 8.68 AH AA 0.05 2008-02-06 44 76.4 AH AA 0.05 2008-02-07 46 85.3 AH .AA 0.05 2008-02-08 45 83.0 8.65 AH AA 0.05 2008-02-09 46 86.4 AH AA 0.05 2008-02-10 47 90.9 AH AA 0.05 2008-02-11 44 98.9 AH AA 0.05 2008-02-12 43 85.5 8.5 AH AA 0.05 2008-02-13 45 91.4 AH AA 0.05 2008-02-14 52 91.7 AH AA 0.05 2008-02-15 47 71.7 8.63 AH AA 0.05 2008-02-16 44 92.7 AH AA 0.05 2008-02-17 47 88.1 AH AA 0.05 2008-02-18 49 90.5 AH AA 0.05 2008-02-19 45 102.3 8.42 AH AA 0.05 2008-02-20 43 104.0 AH AA 0.05 2008-02-21 43 103.3 'AH AA 0.05 2008-02-22 43 100.3 8.54 AH AA 0.05 2008-02-23 43 95.5 AH AA 0.05 2008-02-24 43 90.3 AH AA 0.05 2008-02-25 44 76.1 AH AA 0.05 2008-02-26 43 79.2 8.44 AH AA 0.05 2008-02-27 43 841 AH AA 0.05 2008-02-28 42 102.1 AH AA 0.05* 2008-02-29 43 100.5 8.52 AH AA 0.05 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DDIYY)
Sincerely, Enclosures,.,
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete.
A-Station Code o004Report-BStation     Code, 094 Report C Station   Code 601 Report D Station   Code "602 Report-E Station   Code 800 Report cc: NRC     Region IlI NRC   Resident Inspector NRR   Project Manager NRC   Document Control Desk (Docket No. 50-440)
I am aware that there are Representative significant penalties for submitting false information, including the possibility of /g,[j/VP, opeeda fine and imprisonment.
 
EDMI ?-When completed mail this report to: EDMR Administrator, EDMR Administrator,...
Page 1 of8 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:                     FirstEnergy Perry Nuclear Power Pit               PERMIT NUMBER:                          3IB00016*ID LOCATION:                      10 Center Rd                                     STATION CODE:                            004 North Perry, 44081                               MONITORING PERIOD:                       2008-02-01 To: 2008-02-29 COUNTY:                      Lake                                              REPORTING LAB:                           CCB125 -
OH,
DISTRICT:                    NEDO                                              ANALYST:                                Liz Ryan NO DISCHARGE INDICATOR:
* Page I https ://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.
Water                                                     Zinc, Total         Copper, Total     Oxidants, Total     Chlorine, Total PARAMETER             Temperature           Flow Rate                 pH           Recoverable           Recoverable         Residual           Residual PARAMETER CODE               00011               50050                 00400             01094               01119               34044             50060 UNITS                 4103                 4108                 6653               4107                 4107               4106               4106 FREQUENCY                 I/Day                 ]/Day             2/Week             I/Month             I/Month         When Disch.       When Disch.
do?actType=viewWithXslt&f...
SAMPLING TYPE             Continuous           Continuous               Grab               Grab                 Grab               Grab             Grab 2008-02-01                 45                   69.4                 8.57                                                       AH             AA 0.05 2008-02-02                 44                   60.5                                                                             AH             AA 0.05 2008-02-03                 43                   64.8                                                                             AH             AA 0.05 2008-02-04                 43                   66.2                                   AA 8.0                 6                 AH             AA 0.05 2008-02-05                 45                   72.2                 8.68                                                       AH             AA 0.05 2008-02-06                 44                   76.4                                                                             AH             AA 0.05 2008-02-07                 46                   85.3                                                                             AH   .         AA 0.05 2008-02-08                 45                   83.0                 8.65                                                       AH             AA 0.05 2008-02-09                 46                   86.4                                                                             AH             AA 0.05 2008-02-10                 47                   90.9                                                                             AH             AA 0.05 2008-02-11                 44                   98.9                                                                             AH             AA 0.05 2008-02-12                 43                   85.5                 8.5                                                       AH             AA 0.05 2008-02-13                 45                   91.4                                                                             AH             AA 0.05 2008-02-14                 52                   91.7                                                                             AH             AA 0.05 2008-02-15                 47                   71.7                 8.63                                                       AH             AA 0.05 2008-02-16                 44                   92.7                                                                             AH             AA 0.05 2008-02-17                 47                   88.1                                                                             AH             AA 0.05 2008-02-18                 49                   90.5                                                                             AH             AA 0.05 2008-02-19                 45                 102.3                 8.42                                                       AH             AA 0.05 2008-02-20                 43                 104.0                                                                             AH             AA 0.05 2008-02-21                 43                 103.3                                                                           'AH             AA 0.05 2008-02-22                 43                 100.3                 8.54                                                       AH             AA 0.05 2008-02-23                 43                   95.5                                                                             AH             AA 0.05 2008-02-24                 43                   90.3                                                                             AH             AA 0.05 2008-02-25                 44                   76.1                                                                             AH             AA 0.05 2008-02-26                 43                   79.2                 8.44                                                       AH             AA 0.05 2008-02-27                 43                   841                                                                             AH             AA 0.05 2008-02-28                 42                 102.1                                                                             AH             AA 0.05
3/4/2008 Page 2 ot 8 Ohio EPA -Daily Discharge Monitoring Report -Form 4500 FACILITY: LOCATION: COUNTY: DISTRICT: FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER: STATION CODE: MONITORING PERIOD: REPORTING LAB: ANALYST: NO DISCHARGE INDICATOR:
* 2008-02-29                 43                 100.5                 8.52                                                       AH             AA 0.05 Name/Title of Responsible   I certify under the penalty of law that I have personally examined and am familiar         Signature of         Date (MM/DDIYY)
3IB00016*ID 004 2008-02-01 To: 2008-02-29 CCB125 Liz Ryan PARAMETER Chlorination/Brominatior Duration PARAMETER 78739 CODE UNITS 6655 FREQUENCY When Disch.SAMPLING TYPE Total 2008-02-01 100 2008-02-02 100 2008-02-03 100 2008-02-04 100 2008-02-05 100 2008-02-06 100 2008-02-07 100 2008-02-08 100 2008-02-09 100 2008-02-10 100 2008-02-11 100 2008-02-12 100 2008-02-13 100 2008-02-14 100 2008-02-15 100 2008-02-16 100 2008-02-17 100 2008-02-18 50 2008-02-19 100 2008-02-20 100-2008-02-21 100 2008-02-22 100 2008-02-23 100 2008-02-24 100 2008-02-25 100 2008-02-26 100 2008-02-27 100 2008-02-28 100 2008-02-29 55 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MMIDDIYY)
Official or Authorized     with the information submitted herein and based on my inquiry of those                 Responsible Official or Representative         individuals immediately responsible for obtaining the information, I believe the             Authorized submitted information is true, accurate and complete. I am aware that there are           Representative significant penalties for submitting false information, including the possibility of     /g,[j/
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete.
VP,   opeeda                 fine and imprisonment.           EDMI                                                                           ?-
I am aware that there are Representative significant penalties for submitting false information, including the possibility of VPR fNhk.deOY fine and imprisonment.  
When completed mail this report to: EDMR Administrator, EDMR Administrator,... OH,
"- (-0 When completed mail this report to: EDMR Administrator, EDMR Administrator.,.
* Page I https ://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt. do?actType=viewWithXslt&f...                                                           3/4/2008
OH, Page 2 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...
 
3/4/2008 Page 3 ot8 Ohio EPA -Daily Discharge Monitoring Report -Form 4500 FACILITY: LOCATION: COUNTY: DISTRICT: FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER: 3IB00016*ID STATION CODE: 094 MONITORING PERIOD: 2008-02-01 To: 2008-02-29 REPORTING LAB: ANALYST: NO DISCHARGE INDICATOR:
Page 2 ot 8 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:                     FirstEnergy Perry Nuclear Power Pit               PERMIT NUMBER:                        3IB00016*ID LOCATION:                      10 Center Rd                                     STATION CODE:                        004 North Perry, 44081                               MONITORING PERIOD:                   2008-02-01 To: 2008-02-29 COUNTY:                        Lake                                              REPORTING LAB:                        CCB125 DISTRICT:                      NEDO                                              ANALYST:                             Liz Ryan NO DISCHARGE INDICATOR:
AL Water Zinc, Total Copper, Total Oxidants, Total Chlorine, Total Temperature Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 .4107 4107 4106 4106 FREQUENCY 1/Day 1/Day 2/Week I/Month I/Month When Disch. When Disch.SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2008-02-01 2008-02-02 2008-02-03 2008-02-04 2008-02-05 2008-02-06 2008-02-07 2008-02-08 2008-02-09 2008-02-10 2008-02-11 2008-02-12 2008-02-13 2008-02-14 2008-02-15 2008-02-16 2008-02-17 2008-02-18 2008-02-19 2008-02-20 2008-02-21 2008 22 2008-2-23 2008-02-24 2008-02-25 2008-02-26 2008-02-27 2008-02-28 2008-02-29 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
PARAMETER           Chlorination/Brominatior Duration PARAMETER                       78739 CODE UNITS                       6655 FREQUENCY                 When Disch.
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete.
SAMPLING TYPE                     Total 2008-02-01                       100 2008-02-02                       100 2008-02-03                       100 2008-02-04                       100 2008-02-05                       100 2008-02-06                       100 2008-02-07                       100 2008-02-08                       100 2008-02-09                       100 2008-02-10                       100 2008-02-11                     100 2008-02-12                       100 2008-02-13                     100 2008-02-14                     100 2008-02-15                     100 2008-02-16                     100 2008-02-17                     100 2008-02-18                       50 2008-02-19                     100 2008-02-20                     100
I am aware that there are Representative AD1 penalties for submitting false information, including the possibility ofai s n'j-n opleteda t fine and imprisonment.
    -2008-02-21                     100 2008-02-22                     100 2008-02-23                     100 2008-02-24                     100 2008-02-25                     100 2008-02-26                     100 2008-02-27                     100 2008-02-28                     100 2008-02-29                       55 Name/Title of Responsible     I certify under the penalty of law that I have personally examined and am familiar       Signature of         Date (MMIDDIYY)
I When completed mail this report to: EDMR Administrator, EDMR Administrator, ,, OH, Page 3 https://ebiz.epa.ohio.gov/edwr.web/page/reportlviewWithXslt.do?actType-viewWithXslt&f...
Official or Authorized     with the information submitted herein and based on my inquiry of those               Responsible Official or Representative         individuals immediately responsible for obtaining the information, I believe the         Authorized submitted information is true, accurate and complete. I am aware that there are         Representative significant penalties for submitting false information, including the possibility of VPR fNhk.deOY                 fine and imprisonment.     "-                                                                                     (-0 When completed mail this report to: EDMR Administrator, EDMR Administrator.,.               OH,                                         Page 2 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...                                                             3/4/2008
3/4/2008 Page 4 ot 8 Ohio EPA -Daily Discharge Monitoring Report -Form 4500 FACILITY: LOCATION: COUNTY: DISTRICT: FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER: 3IB00016*ID STATION CODE: 094 MONITORING PERIOD: 2008-02-01 To: 2008-02-29 REPORTING LAB: ANALYST: NO DISCHARGE INDICATOR:
 
AL PARAMETER Chlorination/Bromination Duration PARAMETER 78739 CODE UNITS 6655 FREQUENCY When Disch.SAMPLING TYPE Total 2008-02-01 2008-02-02 2008-02-03 2008-02-04 2008-02-05 2008-02-06 2008-02-07 2008-02-08 2008-02-09 2008-02-10 2008-02-11 2008-02-12 2008-02-13 2008-02-14 2008-02-15 2008-02-16 2008-02-17 2008-02-18 2008-02-19 2008-02-20 2008-02-21 2008-02-22 2008-02-23 2008-02-24 2008-02-25 2008-02-26 2008-02-27 2008-02-28 2008-02-29 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DDIYY)
Page 3 ot8 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:                       FirstEnergy Perry Nuclear Power Pit             PERMIT NUMBER:                           3IB00016*ID LOCATION:                      10 Center Rd                                    STATION CODE:                             094 North Perry, 44081                              MONITORING PERIOD:                       2008-02-01 To: 2008-02-29 COUNTY:                        Lake                                            REPORTING LAB:
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete.
DISTRICT:                      NEDO                                            ANALYST:
I am aware that there are Representative VP 1) ti CC/- significant penalties for submitting false information, including the possibility of When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, Page 4 https ://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...
NO DISCHARGE INDICATOR:                 AL Water                                                       Zinc, Total         Copper, Total     Oxidants, Total   Chlorine, Total Temperature                                                   Recoverable         Recoverable         Residual         Residual PARAMETER CODE               00011                 50050               00400               01094               01119             34044             50060 UNITS                   4103                 4108                 6653               .4107                 4107             4106               4106 FREQUENCY                   1/Day               1/Day               2/Week             I/Month               I/Month         When Disch.       When Disch.
3/4/2008  
SAMPLING TYPE             Continuous           Continuous               Grab                 Grab                 Grab             Grab             Grab 2008-02-01 2008-02-02 2008-02-03 2008-02-04 2008-02-05 2008-02-06 2008-02-07 2008-02-08 2008-02-09 2008-02-10 2008-02-11 2008-02-12 2008-02-13 2008-02-14 2008-02-15 2008-02-16 2008-02-17 2008-02-18 2008-02-19 2008-02-20 2008-02-21 2008 22 2008-2-23 2008-02-24 2008-02-25 2008-02-26 2008-02-27 2008-02-28 2008-02-29 Name/Title of Responsible   I certify under the penalty of law that I have personally examined and am familiar           Signature of       Date (MM/DD/YY)
.rage D oi 6 Ohio EPA -Daily Discharge Monitoring Report -Form 4500 FACILITY: LOCATION: COUNTY: DISTRICT: FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER: 3IB00016*ID STATION CODE: 601 MONITORING PERIOD: 2008-02-01 To: 2008-02-29 REPORTING LAB: ANALYST: NO DISCHARGE INDICATOR:
Official or Authorized     with the information submitted herein and based on my inquiry of those                 Responsible Official or Representative         individuals immediately responsible for obtaining the information, I believe the             Authorized submitted information is true, accurate and complete. I am aware that there are             Representative AD1*k    *finsignificant              penalties s      n'j-for submitting false information, including the possibility ofai n opleteda t               fine and imprisonment.                                                                 I When completed mail this report to: EDMR Administrator, EDMR Administrator, ,, OH,                                                         Page 3 https://ebiz.epa.ohio.gov/edwr.web/page/reportlviewWithXslt.do?actType-viewWithXslt&f...                                                               3/4/2008
AL PARAMETER Flow Rate pH Total Suspended Oil and Grease, PARAMETER Flow _ Rate pHSolids Total PARAMETER CODE 50050 00400 00530 00550 _UNITS 4108 6653 4106 -4106 FREQUENCY Continuous 1 / 2 Weeks 1 / 2 Weeks 1 / 2 Weeks SAMPLING TYPE 24hr Total Grab Grab Grab 2008-02-01 2008-02-02 2008-02-03 2008-02-04 2008-02-05 2008-02-06 2008-02-07 2008-02-08 2008-02-09 2008-02-10 2008-02-11 2008-02-12 2008-02-13 2008-02-14 2008-02-15
 
* 2008-02-16 2008-02-17 2008-02-18 2008-02-19 2008-02-20 2008-02-21 2008-02-22 2008-02-23 2008-02-24 2008-02-25 2008-02-26' 2008-02-27 2008-02-28 2008-02-29 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Page 4 ot 8 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:                     FirstEnergy Perry Nuclear Power Pit               PERMIT NUMBER:                       3IB00016*ID LOCATION:                    10 Center Rd                                    STATION CODE:                         094 North Perry, 44081                              MONITORING PERIOD:                     2008-02-01 To: 2008-02-29 COUNTY:                      Lake                                            REPORTING LAB:
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete.
DISTRICT:                    NEDO                                            ANALYST:
I am aware that there are Representative significant penalties for submitting false information, including the possibility of ai sm- 0 When co e i fine and imprnsonmentrator, Er,- 3-O When completed mail this report to: EDMR Administrator, EDMR Administrator,...
NO DISCHARGE INDICATOR:               AL PARAMETER           Chlorination/Bromination Duration PARAMETER                     78739 CODE UNITS                     6655 FREQUENCY                 When Disch.
OH, Page 5 httpsH//ebiz.epa.ohio.gov/edwr.web/page/report'viewWithXslt.do?actType=viewWithXslt&f...
SAMPLING TYPE                   Total 2008-02-01 2008-02-02 2008-02-03 2008-02-04 2008-02-05 2008-02-06 2008-02-07 2008-02-08 2008-02-09 2008-02-10 2008-02-11 2008-02-12 2008-02-13 2008-02-14 2008-02-15 2008-02-16 2008-02-17 2008-02-18 2008-02-19 2008-02-20 2008-02-21 2008-02-22 2008-02-23 2008-02-24 2008-02-25 2008-02-26 2008-02-27 2008-02-28 2008-02-29 Name/Title of Responsible   I certify under the penalty of law that I have personally examined and am familiar       Signature of         Date (MM/DDIYY)
3/4/2008  
Official or Authorized     with the information submitted herein and based on my inquiry of those               Responsible Official or Representative         individuals immediately responsible for obtaining the information, I believe the         Authorized submitted information is true, accurate and complete. I am aware that there are         Representative VP1 ) ti     CC/-           significant penalties for submitting false information, including the possibility of When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH,                                                       Page 4 https ://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...                                                         3/4/2008
,'age o ot zs Ohio EPA -Daily Discharge Monitoring Report -Form 4500 FACILITY: LOCATION: COUNTY: DISTRICT: FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER: 3IB00016*ID STATION CODE: 602 MONITORING PERIOD: 2008-02-01 To: 2008-02-29 REPORTING LAB: ANALYST: NO DISCHARGE INDICATOR:
 
AL PARAMETER Flow Rate pH Total Suspended Oil and Grease, Iron, Total Copper, Total_ _Solids. Total Recoverable Recoverable PARAMETER CODE 50050 00400 00530 00550 00980 01119 UNITS 4108 6653 4106 4106 4107 4107 FREQUENCY Continuous 1/ 2 Weeks 1 / 2 Weeks 1 /2 Weeks 1 / 2 Weeks 1 / 2 Weeks SAMPLING TYPE 24hr Total Grab 24hr Composite Grab 24hr Composite 24hr Composite 2008-02-01 2008-02-02 2008-02-03 2008-02-04 2008-02-05 2008-02-06 2008-02-07 2008-02-08 2008-02-09 2008-02-10 2008-02-11 2008-02-12 2008-02-13.
                                                                                                                                              .rage Doi 6 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:                     FirstEnergy Perry Nuclear Power Pit             PERMIT NUMBER:                       3IB00016*ID LOCATION:                    10 Center Rd                                    STATION CODE:                       601 North Perry, 44081                              MONITORING PERIOD:                   2008-02-01 To: 2008-02-29 COUNTY:                      Lake                                            REPORTING LAB:
2008-02-14 2008-02-15 2008-02-16 2008-02-17 2008-02-18 2008-02-19 2008-02-20 2008-02-21 2008-02-22 2008-02-23 2008-02-24 2008-02-25 2008-02-26 2008-02-27 2008-02-28 2008-02-29 Name/ritle of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MMIDD/YY)
DISTRICT:                    NEDO                                            ANALYST:
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete.
NO DISCHARGE INDICATOR:             AL PARAMETER               Flow Rate                 pH           Total Suspended     Oil and Grease, PARAMETER               Flow Rate _               pHSolids                               Total PARAMETER CODE               50050                 00400               00530               00550                         _
I am aware that there are Representative significant penalties for submitting false information, including the possibility ofenmt" When Co e al t fine and imprisonment.
UNITS                4108                 6653                 4106               -4106 FREQUENCY               Continuous         1 / 2 Weeks         1/ 2 Weeks           1/ 2 Weeks SAMPLING TYPE             24hr Total               Grab                 Grab               Grab 2008-02-01 2008-02-02 2008-02-03 2008-02-04 2008-02-05 2008-02-06 2008-02-07 2008-02-08 2008-02-09 2008-02-10 2008-02-11 2008-02-12 2008-02-13 2008-02-14 2008-02-15
rato, 3- A,6 When completed mail this report to: EDMR Administrator, EDMR Administrator,_
* 2008-02-16 2008-02-17 2008-02-18 2008-02-19 2008-02-20 2008-02-21 2008-02-22 2008-02-23 2008-02-24 2008-02-25 2008-02-26' 2008-02-27 2008-02-28 2008-02-29 Name/Title of Responsible   I certify under the penalty of law that I have personally examined and am familiar     Signature of       Date (MM/DD/YY)
OH, Page 6 https://ebiz.epa.ohio.gov/edwr.web/page/reportlviewWithXslt.do?
Official or Authorized     with the information submitted herein and based on my inquiry of those             Responsible Official or Representative         individuals immediately responsible for obtaining the information, I believe the       Authorized submitted information is true, accurate and complete. I am aware that there are       Representative significant ai        sm- for submitting false information, including the possibility of penalties                                                                                            0 When co     e     i         fine and imprnsonmentrator, Er,-                                                                           3-O When completed mail this report to: EDMR Administrator, EDMR Administrator,... OH,                                                   Page 5 httpsH//ebiz.epa.ohio.gov/edwr.web/page/report'viewWithXslt.do?actType=viewWithXslt&f...                                                         3/4/2008
actType=viewWithXslt&f...
 
3/4/2008 rage ui o Ohio EPA -Daily Discharge Monitoring Report -Form 4500 FACILITY: LOCATION: COUNTY: DISTRICT: FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER: STATION CODE: MONITORING PERIOD: REPORTING LAB: ANALYST: NO DISCHARGE INDICATOR:
                                                                                                                                                    ,'age o ot zs Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:                     FirstEnergy Perry Nuclear Power Pit             PERMIT NUMBER:                            3IB00016*ID LOCATION:                    10 Center Rd                                     STATION CODE:                            602 North Perry, 44081                               MONITORING PERIOD:                       2008-02-01 To: 2008-02-29 COUNTY:                      Lake                                            REPORTING LAB:
3IB00016*ID 800 2008-02-01 To: 2008-02-29 CCB 125 Liz Ryan PARAMETER Water Zinc, Total Copper, Total Temperature Recoverable Recoverable PARAMETER CODE 00011 01094 01119 UNITS 4103 4107 4107 FREQUENCY 1/Day 1/Month I/Month SAMPLING TYPE Continuous Grab Grab 2008-02-01 32 2008-02-02 32 2008-02-03 32 2008-02-04 32 AA 8.0 3 2008-02-05 32 2008-02-06 34 2008-02-07 34 2008-02-08 34 2008-02-09 34 2008-02-10 35 2008-02-11 33 2008-02-12 33 2008-02-13 32 2008-02-14 44 2008-02-15 31 2008-02-16 32 2008-02-17 33 2008-02-18 33 2008-02-19 33 2008-02-20 32 2008-02-21 32 2008-02-22 32 2008-02-23 32 2008-02-24 32 2008-02-25 32 2008-02-26 32 2008-02-27 32 2008-02-28 32 2008-02-29 33 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
DISTRICT:                    NEDO                                            ANALYST:
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete.
NO DISCHARGE INDICATOR:                   AL PARAMETER               Flow Rate                 pH           Total Suspended     Oil and Grease,         Iron, Total       Copper, Total
I am aware that there are Representative AP, significant penalties for submitting false information, including the possibility ofneni smn. I WVe p et at fine and imprisonment.
_ _Solids.                           Total           Recoverable         Recoverable PARAMETER CODE               50050                 00400               00530               00550               00980               01119 UNITS                 4108                 6653                 4106                 4106                 4107               4107 FREQUENCY             Continuous           1/ 2 Weeks         1/ 2 Weeks           1 /2 Weeks           1 / 2 Weeks         1 / 2 Weeks SAMPLING TYPE             24hr Total               Grab         24hr Composite             Grab         24hr Composite       24hr Composite 2008-02-01 2008-02-02 2008-02-03 2008-02-04 2008-02-05 2008-02-06 2008-02-07 2008-02-08 2008-02-09 2008-02-10 2008-02-11 2008-02-12 2008-02-13.
EDM- Amnto ,, OH ?- 7 o When completed mail this report to: EDMR Administrator, EDMR Administrator,.
2008-02-14 2008-02-15 2008-02-16 2008-02-17 2008-02-18 2008-02-19 2008-02-20 2008-02-21 2008-02-22 2008-02-23 2008-02-24 2008-02-25 2008-02-26 2008-02-27 2008-02-28 2008-02-29 Name/ritle of Responsible   I certify under the penalty of law that I have personally examined and am familiar           Signature of       Date (MMIDD/YY)
01-OH Page 7 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXs1t&f...
Official or Authorized     with the information submitted herein and based on my inquiry of those                 Responsible Official or Representative         individuals immediately responsible for obtaining the information, I believe the             Authorized submitted information is true, accurate and complete. I am aware that there are             Representative significant penalties for submitting false information, including the possibility ofenmt" When Co e al t               fine and imprisonment. rato,               A,6                                                                   3-When completed mail this report to: EDMR Administrator, EDMR Administrator,_ OH,                                                           Page 6 https://ebiz.epa.ohio.gov/edwr.web/page/reportlviewWithXslt.do? actType=viewWithXslt&f...                                                               3/4/2008
3/4/2008 rage 6 o0 6 Ohio EPA -Daily Discharge Monitoring Report -Form 4500 FACILITY: LOCATION: FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 PERMIT NUMBER: 3IB00016*ID MONITORING PERIOD: 2008-02-01 To: 2008-02-29 PARAMETER COMMENTS:
 
_-Station Code Parameter Name Parameter Code Date Unit Comment 004 Oxidants, Total Residual 34044 2008-02-01 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-02 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-03 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-04 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-05 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-06 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-07 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-08 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-09 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-10 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-11 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-12 4106 No bromrination event this date 004 Oxidants, Total Residual 34044 2008-02-13 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-14 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-15 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-16 4106. No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-17 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-18 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-19 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-20 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-21 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-22 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-23 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-24 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-25 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-26 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-27 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-28 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-29 4106 No bromination event this date httpsl//ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...
rage   ui o Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:                     FirstEnergy Perry Nuclear Power Pit               PERMIT NUMBER:                          3IB00016*ID LOCATION:                      10 Center Rd                                     STATION CODE:                          800 North Perry, 44081                               MONITORING PERIOD:                     2008-02-01 To: 2008-02-29 COUNTY:                      Lake                                              REPORTING LAB:                          CCB 125 DISTRICT:                    NEDO                                              ANALYST:                                Liz Ryan NO DISCHARGE INDICATOR:
3/4/2008}}
PARAMETER                 Water             Zinc, Total         Copper, Total Temperature         Recoverable         Recoverable PARAMETER CODE               00011                 01094               01119 UNITS               4103                 4107                 4107 FREQUENCY                 1/Day               1/Month               I/Month SAMPLING TYPE             Continuous               Grab                 Grab 2008-02-01                 32 2008-02-02                 32 2008-02-03                 32 2008-02-04                 32                 AA 8.0                   3 2008-02-05                 32 2008-02-06                 34 2008-02-07                 34 2008-02-08                 34 2008-02-09                 34 2008-02-10                 35 2008-02-11                 33 2008-02-12                 33 2008-02-13                 32 2008-02-14                 44 2008-02-15                 31 2008-02-16                 32 2008-02-17                 33 2008-02-18                 33 2008-02-19                 33 2008-02-20                 32 2008-02-21                 32 2008-02-22                 32 2008-02-23                 32 2008-02-24                 32 2008-02-25                 32 2008-02-26                 32 2008-02-27                 32 2008-02-28                 32 2008-02-29                 33 Name/Title of Responsible   Icertify under the penalty of law that I have personally examined and am familiar         Signature of         Date (MM/DD/YY)
Official or Authorized   with the information submitted herein and based on my inquiry of those                 Responsible Official or Representative         individuals immediately responsible for obtaining the information, I believe the           Authorized submitted information is true, accurate and complete. I am aware that there are           Representative AP, * {]d*                significant penalties smn. for submitting false information, including the possibility ofneni       I WVe       p   et at         fine and imprisonment.             EDM- Amnto               ,, OH                                               ?-7     o When completed mail this report to: EDMR Administrator, EDMR Administrator,. 01-OH                                                       Page 7 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXs1t&f...                                                             3/4/2008
 
rage 6 o06 Ohio EPA       - Daily Discharge Monitoring Report - Form 4500 FACILITY:            FirstEnergy Perry Nuclear Power Pit        PERMIT NUMBER:        3IB00016*ID LOCATION:            10 Center Rd                              MONITORING PERIOD:    2008-02-01 To: 2008-02-29 North Perry, 44081 PARAMETER COMMENTS:                                                  _-
Station Code Parameter Name                   Parameter Code     Date         Unit     Comment 004           Oxidants, Total Residual         34044             2008-02-01   4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-02   4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-03   4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-04   4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-05   4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-06   4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-07 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-08   4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-09 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-10   4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-11   4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-12 4106     No bromrination event this date 004           Oxidants, Total Residual         34044             2008-02-13 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-14 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-15 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-16 4106. No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-17 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-18 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-19 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-20 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-21 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-22 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-23 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-24 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-25 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-26 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-27 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-28 4106     No bromination event this date 004           Oxidants, Total Residual         34044             2008-02-29 4106     No bromination event this date httpsl//ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...                                 3/4/2008}}

Latest revision as of 19:33, 14 November 2019

February NPDES Discharge Monitoring Report
ML080790523
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/11/2008
From: Allen B
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, State of OH, Environmental Protection Agency
References
PY-CEI/OEPA-0483L
Download: ML080790523 (9)


Text

FENOC*10 Perry Nuclear Power Station Center Road FirstEnergy NuclearOperating Company Perry,Ohio 44081 Barry S. Allen 440-280-5382 Vice President Fax: 440-280-8029 Marchl11,'2008 PY-CEI/OEPA-0483L Ohio Environmental Protection Agency Division ofWater.(PolilUtlion Control EnforCement Section, ES/DMR P.O.,-Box 1049 Columbus, Ohio 43216-1049

SUBJECT:

Perry Nuclear Power Plant, February NPDES Discharge Monitoring Report Enclosed are the Perry Nuclear Power Plant, NPDES monthly report forms for the month of February 2008. No violations occurred during this period.

If you have questions or require additional information, please contact Mrs. Liz Ryan at (440) 280-5536.

Sincerely, Enclosures,.,

A-Station Code o004Report-BStation Code, 094 Report C Station Code 601 Report D Station Code "602 Report-E Station Code 800 Report cc: NRC Region IlI NRC Resident Inspector NRR Project Manager NRC Document Control Desk (Docket No. 50-440)

Page 1 of8 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 004 North Perry, 44081 MONITORING PERIOD: 2008-02-01 To: 2008-02-29 COUNTY: Lake REPORTING LAB: CCB125 -

DISTRICT: NEDO ANALYST: Liz Ryan NO DISCHARGE INDICATOR:

Water Zinc, Total Copper, Total Oxidants, Total Chlorine, Total PARAMETER Temperature Flow Rate pH Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 4107 4107 4106 4106 FREQUENCY I/Day ]/Day 2/Week I/Month I/Month When Disch. When Disch.

SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2008-02-01 45 69.4 8.57 AH AA 0.05 2008-02-02 44 60.5 AH AA 0.05 2008-02-03 43 64.8 AH AA 0.05 2008-02-04 43 66.2 AA 8.0 6 AH AA 0.05 2008-02-05 45 72.2 8.68 AH AA 0.05 2008-02-06 44 76.4 AH AA 0.05 2008-02-07 46 85.3 AH . AA 0.05 2008-02-08 45 83.0 8.65 AH AA 0.05 2008-02-09 46 86.4 AH AA 0.05 2008-02-10 47 90.9 AH AA 0.05 2008-02-11 44 98.9 AH AA 0.05 2008-02-12 43 85.5 8.5 AH AA 0.05 2008-02-13 45 91.4 AH AA 0.05 2008-02-14 52 91.7 AH AA 0.05 2008-02-15 47 71.7 8.63 AH AA 0.05 2008-02-16 44 92.7 AH AA 0.05 2008-02-17 47 88.1 AH AA 0.05 2008-02-18 49 90.5 AH AA 0.05 2008-02-19 45 102.3 8.42 AH AA 0.05 2008-02-20 43 104.0 AH AA 0.05 2008-02-21 43 103.3 'AH AA 0.05 2008-02-22 43 100.3 8.54 AH AA 0.05 2008-02-23 43 95.5 AH AA 0.05 2008-02-24 43 90.3 AH AA 0.05 2008-02-25 44 76.1 AH AA 0.05 2008-02-26 43 79.2 8.44 AH AA 0.05 2008-02-27 43 841 AH AA 0.05 2008-02-28 42 102.1 AH AA 0.05

  • 2008-02-29 43 100.5 8.52 AH AA 0.05 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DDIYY)

Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility of /g,[j/

VP, opeeda fine and imprisonment. EDMI  ?-

When completed mail this report to: EDMR Administrator, EDMR Administrator,... OH,

  • Page I https ://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt. do?actType=viewWithXslt&f... 3/4/2008

Page 2 ot 8 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 004 North Perry, 44081 MONITORING PERIOD: 2008-02-01 To: 2008-02-29 COUNTY: Lake REPORTING LAB: CCB125 DISTRICT: NEDO ANALYST: Liz Ryan NO DISCHARGE INDICATOR:

PARAMETER Chlorination/Brominatior Duration PARAMETER 78739 CODE UNITS 6655 FREQUENCY When Disch.

SAMPLING TYPE Total 2008-02-01 100 2008-02-02 100 2008-02-03 100 2008-02-04 100 2008-02-05 100 2008-02-06 100 2008-02-07 100 2008-02-08 100 2008-02-09 100 2008-02-10 100 2008-02-11 100 2008-02-12 100 2008-02-13 100 2008-02-14 100 2008-02-15 100 2008-02-16 100 2008-02-17 100 2008-02-18 50 2008-02-19 100 2008-02-20 100

-2008-02-21 100 2008-02-22 100 2008-02-23 100 2008-02-24 100 2008-02-25 100 2008-02-26 100 2008-02-27 100 2008-02-28 100 2008-02-29 55 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MMIDDIYY)

Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility of VPR fNhk.deOY fine and imprisonment. "- (-0 When completed mail this report to: EDMR Administrator, EDMR Administrator.,. OH, Page 2 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... 3/4/2008

Page 3 ot8 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 094 North Perry, 44081 MONITORING PERIOD: 2008-02-01 To: 2008-02-29 COUNTY: Lake REPORTING LAB:

DISTRICT: NEDO ANALYST:

NO DISCHARGE INDICATOR: AL Water Zinc, Total Copper, Total Oxidants, Total Chlorine, Total Temperature Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 .4107 4107 4106 4106 FREQUENCY 1/Day 1/Day 2/Week I/Month I/Month When Disch. When Disch.

SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2008-02-01 2008-02-02 2008-02-03 2008-02-04 2008-02-05 2008-02-06 2008-02-07 2008-02-08 2008-02-09 2008-02-10 2008-02-11 2008-02-12 2008-02-13 2008-02-14 2008-02-15 2008-02-16 2008-02-17 2008-02-18 2008-02-19 2008-02-20 2008-02-21 2008 22 2008-2-23 2008-02-24 2008-02-25 2008-02-26 2008-02-27 2008-02-28 2008-02-29 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)

Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative AD1*k *finsignificant penalties s n'j-for submitting false information, including the possibility ofai n opleteda t fine and imprisonment. I When completed mail this report to: EDMR Administrator, EDMR Administrator, ,, OH, Page 3 https://ebiz.epa.ohio.gov/edwr.web/page/reportlviewWithXslt.do?actType-viewWithXslt&f... 3/4/2008

Page 4 ot 8 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 094 North Perry, 44081 MONITORING PERIOD: 2008-02-01 To: 2008-02-29 COUNTY: Lake REPORTING LAB:

DISTRICT: NEDO ANALYST:

NO DISCHARGE INDICATOR: AL PARAMETER Chlorination/Bromination Duration PARAMETER 78739 CODE UNITS 6655 FREQUENCY When Disch.

SAMPLING TYPE Total 2008-02-01 2008-02-02 2008-02-03 2008-02-04 2008-02-05 2008-02-06 2008-02-07 2008-02-08 2008-02-09 2008-02-10 2008-02-11 2008-02-12 2008-02-13 2008-02-14 2008-02-15 2008-02-16 2008-02-17 2008-02-18 2008-02-19 2008-02-20 2008-02-21 2008-02-22 2008-02-23 2008-02-24 2008-02-25 2008-02-26 2008-02-27 2008-02-28 2008-02-29 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DDIYY)

Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative VP1 ) ti CC/- significant penalties for submitting false information, including the possibility of When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, Page 4 https ://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... 3/4/2008

.rage Doi 6 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 601 North Perry, 44081 MONITORING PERIOD: 2008-02-01 To: 2008-02-29 COUNTY: Lake REPORTING LAB:

DISTRICT: NEDO ANALYST:

NO DISCHARGE INDICATOR: AL PARAMETER Flow Rate pH Total Suspended Oil and Grease, PARAMETER Flow Rate _ pHSolids Total PARAMETER CODE 50050 00400 00530 00550 _

UNITS 4108 6653 4106 -4106 FREQUENCY Continuous 1 / 2 Weeks 1/ 2 Weeks 1/ 2 Weeks SAMPLING TYPE 24hr Total Grab Grab Grab 2008-02-01 2008-02-02 2008-02-03 2008-02-04 2008-02-05 2008-02-06 2008-02-07 2008-02-08 2008-02-09 2008-02-10 2008-02-11 2008-02-12 2008-02-13 2008-02-14 2008-02-15

  • 2008-02-16 2008-02-17 2008-02-18 2008-02-19 2008-02-20 2008-02-21 2008-02-22 2008-02-23 2008-02-24 2008-02-25 2008-02-26' 2008-02-27 2008-02-28 2008-02-29 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)

Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant ai sm- for submitting false information, including the possibility of penalties 0 When co e i fine and imprnsonmentrator, Er,- 3-O When completed mail this report to: EDMR Administrator, EDMR Administrator,... OH, Page 5 httpsH//ebiz.epa.ohio.gov/edwr.web/page/report'viewWithXslt.do?actType=viewWithXslt&f... 3/4/2008

,'age o ot zs Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 602 North Perry, 44081 MONITORING PERIOD: 2008-02-01 To: 2008-02-29 COUNTY: Lake REPORTING LAB:

DISTRICT: NEDO ANALYST:

NO DISCHARGE INDICATOR: AL PARAMETER Flow Rate pH Total Suspended Oil and Grease, Iron, Total Copper, Total

_ _Solids. Total Recoverable Recoverable PARAMETER CODE 50050 00400 00530 00550 00980 01119 UNITS 4108 6653 4106 4106 4107 4107 FREQUENCY Continuous 1/ 2 Weeks 1/ 2 Weeks 1 /2 Weeks 1 / 2 Weeks 1 / 2 Weeks SAMPLING TYPE 24hr Total Grab 24hr Composite Grab 24hr Composite 24hr Composite 2008-02-01 2008-02-02 2008-02-03 2008-02-04 2008-02-05 2008-02-06 2008-02-07 2008-02-08 2008-02-09 2008-02-10 2008-02-11 2008-02-12 2008-02-13.

2008-02-14 2008-02-15 2008-02-16 2008-02-17 2008-02-18 2008-02-19 2008-02-20 2008-02-21 2008-02-22 2008-02-23 2008-02-24 2008-02-25 2008-02-26 2008-02-27 2008-02-28 2008-02-29 Name/ritle of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MMIDD/YY)

Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility ofenmt" When Co e al t fine and imprisonment. rato, A,6 3-When completed mail this report to: EDMR Administrator, EDMR Administrator,_ OH, Page 6 https://ebiz.epa.ohio.gov/edwr.web/page/reportlviewWithXslt.do? actType=viewWithXslt&f... 3/4/2008

rage ui o Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 800 North Perry, 44081 MONITORING PERIOD: 2008-02-01 To: 2008-02-29 COUNTY: Lake REPORTING LAB: CCB 125 DISTRICT: NEDO ANALYST: Liz Ryan NO DISCHARGE INDICATOR:

PARAMETER Water Zinc, Total Copper, Total Temperature Recoverable Recoverable PARAMETER CODE 00011 01094 01119 UNITS 4103 4107 4107 FREQUENCY 1/Day 1/Month I/Month SAMPLING TYPE Continuous Grab Grab 2008-02-01 32 2008-02-02 32 2008-02-03 32 2008-02-04 32 AA 8.0 3 2008-02-05 32 2008-02-06 34 2008-02-07 34 2008-02-08 34 2008-02-09 34 2008-02-10 35 2008-02-11 33 2008-02-12 33 2008-02-13 32 2008-02-14 44 2008-02-15 31 2008-02-16 32 2008-02-17 33 2008-02-18 33 2008-02-19 33 2008-02-20 32 2008-02-21 32 2008-02-22 32 2008-02-23 32 2008-02-24 32 2008-02-25 32 2008-02-26 32 2008-02-27 32 2008-02-28 32 2008-02-29 33 Name/Title of Responsible Icertify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)

Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative AP, * {]d* significant penalties smn. for submitting false information, including the possibility ofneni I WVe p et at fine and imprisonment. EDM- Amnto ,, OH  ?-7 o When completed mail this report to: EDMR Administrator, EDMR Administrator,. 01-OH Page 7 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXs1t&f... 3/4/2008

rage 6 o06 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd MONITORING PERIOD: 2008-02-01 To: 2008-02-29 North Perry, 44081 PARAMETER COMMENTS: _-

Station Code Parameter Name Parameter Code Date Unit Comment 004 Oxidants, Total Residual 34044 2008-02-01 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-02 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-03 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-04 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-05 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-06 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-07 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-08 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-09 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-10 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-11 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-12 4106 No bromrination event this date 004 Oxidants, Total Residual 34044 2008-02-13 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-14 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-15 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-16 4106. No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-17 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-18 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-19 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-20 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-21 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-22 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-23 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-24 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-25 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-26 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-27 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-28 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-02-29 4106 No bromination event this date httpsl//ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f... 3/4/2008