L-10-116, March NPDES Discharge Monitoring Report
| ML101120650 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 04/14/2010 |
| From: | Bezilla M FirstEnergy Nuclear Operating Co |
| To: | Office of Nuclear Reactor Regulation, State of OH, Environmental Protection Agency |
| References | |
| L-10-116 | |
| Download: ML101120650 (9) | |
Text
'Perry Nuclear Power Station 10 Center Road FirstEnergy Nuclear Operating Company Perry, Ohio 44081 Mark B. Bezi/la 1,,.
440-280-5382 Vice President Fax: 440-280-8029 April 14, 20.10.
'L --1'0'-'-'!16 Ohio Environmental'Protection Agency Division of Water.Pollution Control Enforcement Section,.ES/DMR P.O. Box 1049 Columbis, Ohio 43216-1049
SUBJECT:
Perry Nuclear Power Plant, March NPDES Discharge Monitoring Report-Enclosed are the Perry Nuclear'Power Plant, NPDES monthly report forms for the month of March 2010. No violations occurred during this period.
If you have questions or require additional information, please contact
.Mr. Randall Killing at (440) 280-7370.
Sincerely,,..,
-2/,.
K/:.. ; __
"" 7 i, V
Mark B. BeziIla
Enclosures:
A Station' Code b04 Report B Station Code 094 Report C Station Code 601 Report' D Station Code&602 Report E. Station Code 800 Report cc: NRC Region III NRC Resident Inspector NRR Project Manager NRC Document Control Desk (Docket No. 50-440) n..
'ntfl
- SUBMISSION ID: -
FACILITY:
- LOCATION:
COUNTY:
DISTRICT:
Ohio EPA -Daily Dischirge Monitoring Repo*t - Form 4500 STATUS:Drf FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER:'-
31B00016*ID 10 Center Rd STATION CODE:
004 North Perry, OH 44081 MONITORING PERIOD:
"2010-03-01 To: 2010-03-31 Lake REPORTING LAB:
CCB125 NEDO ANALYST:
Randall Killing NO DISCHARGE INDICATOR:
Zinc, Total Copper, Total Oxidants, Total Chlorine, Total PARAMETER Water Temperature Flow Rate pH Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS F
MGD S.U.
ug/l ug/1 m,/l m/
FREQUENCY 1/Day 1/Day 2/Week I/Month 1/Month When Disch.
When Disch.
SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2010-03-01.48 4 8.5 AH 0.06 2010-03-02 48 45.5 8.34 AH AA 0.05 2010-03-03 47 48.3 AH AA 0.05 2010-03-04 47 55.4 AH 0.06 2010-03-05 46 55.5 8.36 AH AA 0.05 2010-03-06
- 45.
55.2 AA 1.2 4.74 AH AA 0.05 2010-03-07 44 53.4 AH AA 0.05 2010-03-08 44 51.3 AH AA 0.05 2010-03-09 44 52.5 8.3 AH AA 0.05 2010-03-10 45 50.2 AH 0.05 2010-03-11 45 51.4 AN AA 0.05 2010-03-12 45 61.5 8.4 AH AA 0.05 2010-03-13 45
.58.6 AH AA 0.05 2010-03-14 44 56.7 AH AA 0.05 2010-03-15 43 53.0 AH AA 0.05 2010-03-16 44 55.2 8.51 AH AA 0.05 2010-03-17 44 55.5 AH AA 0.05 2010-03-18 45 52.9 AH AA 0.05 2010-03-19 45 56.9 8.48 AN AA0.05 2010-03-20 45 55.6 AH AA 0.05 2010-03-21 45 54.4 AH AA 0.05 2010-03-22 44 55.1 AH AA 0.05 2010-03-23 44 54.8 8.45 AN AA 0.05 2010-03-24 44 55.5 AH AA 0.05 2010-03-25 44 53.9 AH 0.06 2010-03-26 43 58.8 8.32 AN AA 0.05 2010-03-27 44 53.3 AH AA 0.05 2010-03-28 47 45.0 AN AA 0.05 2010-03-29 46 44.7 AH AA 0.05 2010-03-30 47 43.2 8.4 AH AA 0.05 2010-03-31 48 41.9 AH AA 0.05 Minimum 43.0 41.9 8.3 0.0 4.74 0.0 Maximum 48.0 61.5
.8.51
- 0.0 4.74 0.06 Average 45.12903 52.7 0
4.74 0.00742 Count 31 31 9
1 1
31 Name of Responsible Official I certify under the penalty of law that I have personally examined and am familia Signature of Responsible Official or Authorized Submission or Authorized Representative with the information submitted herein and based on my inquiry of those Representative Date/Time individuals immediately responsible for obtaining the information, I believe the
/",
submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
.1' PagelI
SUBMISSION ID:
FACILITY:
LOCATION:
COUNTY:
DISTRICT:
Ohio EPA -Daily Discharge oftoring Report - Form 4500 STATUS:
Draft FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER:
3IB00016*ID 10 Center Rd STATION CODE:
004 North Perry, OH 44081 MONITORING PERIOD:
2010-03-01 To: 2010-03-31 Lake REPORTING LAB:
CCB125 NEDO ANALYST:
Randall Killing NO DISCHARGE INDICATOR:
Chlorination/Brominatior
- PARAMETER.Duain-.""'
Duration_________
PARAMETER CODE 78739 UNITS Minutes FREQUENCY When Disch.
SAMPLING TYPE Total 2010-03-01.
160 2010-03-02 100 2010-03-03 100 2010-03-04 100 2010-03-05 100 2010-03-06 100 2010-03-07 100 2010-03-08 100 2010-03-09 104 2010-03-10 105 2010-03-11 100 2010-03-12 100 2010-03-13 100 2010-03-14 100 2010-03-15 113 2010-03-16 100 2010-03-17 109 2010-03-18 100 2010-03-19 100 2010-03-20 100 2010-03-21 100
.2010-03-22 105 2010-03-23 100 2010-03-24 100 2010-03-25 100 2010-03-26 100 2010-03-27 100 2010-03-28 100 2010-03-29 100
.2010-03-30 100
- 2010-03-31 100 Minimum 100.0 Maximum 113.0 Average 101.16129 Count 31 Name of Responsible Official I certify under the penalty of law that I have personally examined and am familiar Signature of Responsible Official or Authorized Submission or Authorized Representative with the information submitted herein and based on my inquiry of those Representative Date/Time individuals immediately responsible for obtaining the information, I believe the v)p d r
msubmitted information is true, accurate and complete. I as aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
Page 2
SUBMISSION ID; FACILITY:
LOCATION:
COUNTY:
DISTRICT:
Ohio EPA - Daily Discharge Monitoring Re'poýrt - Form 4500 STATUS:
Draft FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER:
3IB0016*ID 10 Center Rd STATION CODE:
094 North Perry, OH 44081 MONITORING PERIOD:
2010-03-01 To: 2010-03-31 Lake REPORTING LAB:
NEDO ANALYST:
NO DISCHARGE INDICATOR:
AL PARAMETER Water Temperature Flow Rate' pH Zinc, Total Copper, Total Oxidants, Total Chlorine, Total Recoverable Recoverable Residual Residual' PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS F
MGD S.U.
u/l ugl mg /l mg/1 FREQUENCY 1/Day 1/Day 2/Week I/Month 1/Month When Disch.
When Disch.
SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2010-03-01 2010-03-02 2010-03-03 2010-03-04 2010-03-05 2010-03-06 2010-03-07 2010-03-08 2010-03-09 2010-03-10 2010-03-11 2010-03-12 2010-03-13 2010-03-14 2010-03-15 2010-03-16 2010-03-17 2010-03-18 2010-03-19 2010-03-20 2010-03-21.
2010-03-22 2010-03-23 2010-03-24 2010-03-25 2010-03-26 2010-03-27 2010-03-28 2010-03-29 2010-03-30 2010-03-31 Minimum Maximum Average Count Name of Responsible Official Icertify under the penalty of law that I have personally examined and am familia Signature of Responsible Official or Authorized Submission or Authorized Representative with the information submitted herein and based on my inquiry of those Representative Date/Time individuals immediately responsible for obtaining the information, I believe the
./
Al P /
dsubmitted information is true, accurate and complete. I am aware that there are
/.,X significant penalties for submitting false information, including the possibility of fine and imprisonment.
u'-/
Page 3
" SUBMISSION ID:
FACILITY: -.
LOCATION:
COUNTY:
DISTRICT:
Ohio EPA -Daily Discharge Mqnitoring Report-Form 4500 STATUS:
z Draft FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER:
3IB00016*ID 10 Center Rd
- STATION CODE:
094 North Perry, OH 44081 MONITORING PERIOD:
2010-03-01 To: 2010-03-31 Lake REPORTING LAB:
NEDO ANALYST:
.NO DISCHARGE INDICATOR:
AL Chlorination/Bromination PARAMETER Duration PARAMETER CODE 78739 UNITS Minutes FREQUENCY When Disch.
SAMPLING TYPE Total
.2010-03-01 2010-03-02 2010-03-03 2010-03-04 2010-03-05 2010-03-06 2010-03-07 2010-03-08 2010-03-09 2010-03-10 2010-03-11 2010-03-12 2010-03-13 2010-03-14 2010-03-15 2010-03-16 2010-03-17 2010-03-18 2010-03-19 2010-03-20 2010-03-21 2010-03-22 2010-03-23 2010-03-24 2010-03-25 2010-03-26 2010-03-27 2010-03-28 2010-03-29 2010-03-30 2010-03-31 Minimum Maximum Average Count Name of Responsible Official I certify under the penalty of law that I have personally examined and am familia Signature of Responsible Official or Authorized Submission or Authorized Representative with the information submitted herein and based on my inquiry of those.
Representative Date/Time individuals immediately responsible for obtaining the information, I believe the f1.-<
submitted information is true, accurate and complete. I am aware that there are VP
-significant penalties for submitting false information, including the possibility of
/
fine and imprisonment.
2/
.")
Page 4
SUBMISSION ID:
FACILITY:
LOCATION:
COUNTY:
DISTRICT:
Ohio EPA - Daily Discharge Mdnito ring Report - Firm 4500 STATUS:
Draft FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER:
3IB00016*ID 10 Center Rd STATION CODE:
601 North Perry, OH 44081 MONITORING PERIOD:
2010-03-01 To: 2010-03-31 Lake REPORTING LAB:
NEDO ANALYST:
NO DISCHARGE INDICATOR:
AL PARAMETER Flow Rate Total Suspended Oil and Grease, PH Solids Total PARAMETER CODE 50050 00400 00530 00550 UNITS MGD S.U.
mg/l mg/l FREQUENCY Continuous 1 / 2 Weeks 1 / 2 Weeks 1 / 2 Weeks SAMPLING TYPE 24hr-Total Grab Grab Grab 2010-03-01 2010-03-02 2010-03-03 2010-03-04 2010-03-05 2010-03-06 2010-03-07 2010-03-08 2010-03-09 2010-03-10 2010-03-11 2010-03-12 2010-03-13 2010-03-14 2010-03-15 2010-03-16 2010-03-17 2010-03-18 2010-03-19 2010-03-20 2010-03-21 2010-03-22 2010-03-23 2010-03-24 2010-03-25 2010-03-26 2010-03-27 2010-03-28 2010-03-29 2010-03-30 2010-03-31 Minimum Maximum Average Count Name of Responsible Official I certify under the penalty of law that I have personally examined and am familia Signature of Responsible Official or Authorized Submission or Authorized Representative with the information submitted herein and based on my inquiry of those Representative Date/Time individuals immediately responsible for obtaining the information, I believe the o
submitted information is true, accurate and complete. I am aware that there are Nuc) caK
- d *0/
significant penalties for submitting fase infrmation, including the possibilit of fine and imprisonment.
f th i
//
Page 5
SUBMISSION ID:
FACILITY:
LOCATION:
COUNTY:
DISTRICT:
Ohio EPA - Daily Discharge" Monitoring Report - Form 4500 STATUS:.
Draft'.
FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER:
31B00016*ID 10 Center Rd STATION CODE:
602 North Perry, OH 44081 MONITORING PERIOD:
2010-03-01 To: 2010-03-31 Lake REPORTING LAB:
NEDO ANALYST:
NO DISCHARGE INDICATOR:
AL PARAMETER Flow Rate pH Total Suspended Oil and Grease, Iron, Total Copper, Total Solids Total Recoverable Recoverable PARAMETER CODE 50050 00400 00530 00550 00980 01119 UNITS MGD S.U.
m,/l mu//l
___u_/l FREQUENCY Continuous 1 / 2 Weeks 1 / 2 Weeks 1 / 2 Weeks 1 / 2 Weeks 1 / 2 Weeks SAMPLING TYPE 24hr Total Grab 24hr Composite Grab 24hr Composite
,24hr Composite 2010-03-01 2010-03-02 2010-03-03 2010-03-04 2010-03-05 2010-03-06 2010-03-07 2010-03-08 2010-03-09 2010-03-10 2010-03-11.
2010-03-12 2010-03-13 2010-03-14 2010-03-15 2010-03-16 2010-03-17 2010-03-18 2010-03-19 2010-03-20 2010-03-21 2010-03-22 2010-03-23 2010-03-24 2010-03-25 2010-03-26 2010-03-27 2010-03-28 2010-03-29 2010-03-30 2010-03-31 Minimum Maximum Average Count Name of Responsible Official I certify under the penalty of law that I have personally examined and am familia Signature of Responsible Official or Authorized Submission or Authorized Representative with the information submitted herein and based on my inquiry of those Representative Date/Time individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are V]*) P~k]
i 0*J e r significant penalties for submitting false information, including the possibility offnadmroet-.*,.
S fine and imprisonment.
111
ýý
./
Page 6
Ohio EPA - Daily Discharge"Mofiitoring Repok t 1Form 4500 SUBMISSION ID:
WACILITY:
LOCATION:
COUNTY:
DISTRICT:
STATUS:
FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER:
10 Center Rd STATION CODE:
North Perry, OH 44081 MONITORING PERIOD:
Lake REPORTING LAB:
NEDO ANALYST:
NO DISCHARGE INDICATOR:
Draft 3IB00016*ID 800 2010-03-01 To: 2010-03-31 CCB125 Randall Killing.
Zinc, Total Copper, Total PARAMETER Water Temperature Recoverable Recoverable PARAMETER CODE 00011 01094 01119 UNITS F
ug/1 ug/I FREQUENCY I/Day l/Month I/Month SAMPLING TYPE Continuous Grab Grab 2010-03-01 35 2010-03-02 35 2010-03-03 35 2010-03-04 34 2010-03-05 34 2010-03-06 34 13.4 AA 2.5 2010-03-07 34 2010-03-08 34 2010-03-09 34 2010-03-10 34 2010-03-11 34 2010-03-12 34.
2010-03-13 34 2010-03-14 34 2010-03-15 34 2010-03-16 35 2010-03-17 35 2010-03-18 35 2010-03-19 35 2010-03-20 36 2010-03-21 36 2010-03-22 34 2010-03-23 34 2010-03-24 34 2010-03-25 34 2010-03-26 34
.2010-03-27 35 2010-03-28 36 2010-03-29 37 2010-03-30 37 2010-03-31 38 Minimum 34.0 13.4 0.0 Maximum 38.0 13.4 0.0 Average 34.77419 13.4 0
Count 31 1
1 Name of Responsible Official I certify under the penalty of law that I have personally examined and am familiar Signature of Responsible Official or Authorized Submission or Authorized Representative with the information submitted herein and based on my inquiry of those Representative Date/Time individuals immediately responsible for obtaining the information, I believe the tC' submitted information is true, accurate and complete. I am aware that there are V] P M* U d 7
significant penalties for submitting false information, including the possibility of j
fine and imprisonment.
//
/
Page 7
Ohio EPA - Daily Discharge'Monitoring Report-Form 4500 FirstEnergy Nuclear Gen Corp P Perry Plant PERMIT NUMBER:
.3IB00016*ID 10 Center Rd MONITORING PERIOD:
2010-03-01 To: 2010-03-31 North Perry, OH 44081 FACILITY:
L.OCATION:
PARAMETER COMMENTS:
Station Code Parameter Name Parameter Code Date Unit Comment 004 Oxidants, Total Residual 34044 2010-03-01, mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-02 mg/1 No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-03 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-.04 mg/l No.bromination event this date 004 Oxidants, Total Residual 34044 2010-03-05 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-06 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-07 mg/1 No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-08 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-09 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-10 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-11 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-12 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-13 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-14 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-15 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-16 mg/I No bromination event this date 004 Oxidants, Total Residual
- 34044, 2010-03-17 mg/l
-No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-18 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-19 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-20 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-21 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-22 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 20110-03-23 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-24 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-25 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-26 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-27 mg/i No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-28 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-29 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-30.
mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-03-31 mg/I No bromination event this date