September 2010 Npde Discharge Monitoring Report
ML102930033
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 10/14/2010
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, State of OH, Environmental Protection Agency
References
L-10-291
Download: ML102930033 (9)


Text

FENOC 4 Perry Nuclear Power Station 10 Center Road FirstEnergyNuclear Operating Company Perry,Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President Fax: 440-280-8029 October 14, 2010 L-1 0-291 Ohio Environmental Protection Agency.

Division of Water Pollution Control EnforcementSection, ES/DMR P.O. Box 1049

.Columbus, Ohio 43216-1049

SUBJECT:

Perry Nuclear Power Plant, September NPDES Discharge Monitoring Report Enclosed are the Perry Nuclear Power Plant, NPDES monthly report forms for the month of September 2010. No violations occurred during this period.

If you have questions or require additional information, please contact Mr. Randall Killing at (440) 280-7370.

Sincerely, y/"i/zS (146 Mark B. Bezilla 0J

Enclosures:

A Station Code 004 Report B Station Code 094 Report C Station Code 601 Report D Station Code 602 Report E Station Code 800 Report cc: NRC Region Ill NRC Resident Inspector NRR Project Manager NRC Document Control Desk (Docket No. 50-440)

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID: STATUS: Draft FACILITY: FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER: 3IB00016 *ID LOCATION: 10 Center Rd STATION CODE: 004 North Perry,OH 44081 MONITORING PERIOD: 2010-09-01 To: 2010-09-30 COUNTY: Lake REPORTING LAB: CCB 125 DISTRICT: NEDO ANALYST: Randall Killing NO DISCHARGE INDICATOR:

Chlorine, Total PARAMETER Water Temperature Flow Rate pH Zinc, Total Recoverable Copper, Total Recoverable ResidualTotal Oxidants, Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS F MGD S.U. uA/1 u./1 mgl mg/l FREQUENCY 1/Day I/Day 2/Week I/Month I/Month When Disch. When Disch.

SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2010-09-01 82.1 90.3 AA 1.2 4.79 AH AA 0.05 2010-09-02 82.2 97.4 AH AA 0.05 2010-09-03 81.8 98.6 8.68 AH AA 0.05 2010-09-04 79.8 100.9 AH AA 0.05 2010-09-05 77.9 95.7 AH AA 0.05 2010-09-06 77.8 92.4 AH AA 0.05 2010-09-07 79.0 83.1 8.49 AH AA 0.05 2010-09-08 77.6 86.8 AH . AA 0.05 2010-09-09 76.2 87.0 AH AA 0.05 2010-09-10 75.4 91.2 8.52 AH AA 0.05 2010-09-11 75.5 84.4 AH AA 0.05 2010-09-12 75.8 83.8 AH AA 0.05 2010-09-13 75.9 82.2 AH AA 0.05 2010-09-14 75.6 83.0 8.39 AH AA 0.05 2010-09-15 75.1 83.6 AH AA 0.05 2010-09-16 75.1 83.4 AH AA 0.05 2010-09-17 72.5 85.0 8.6 AH AA 0.05 2010-09-18 72.0 83.0 AH AA 0.05 2010-09-19 73.4 82.5 AH 0.05 2010-09-20 73.4 84.1 AH AA 0.05 2010-09-21 74.3 79.3 8.43 AH AA 0.05 2010-09-22 75.0 78.3 AH 0.05 2010-09-23 75.0 79.8 AH AA 0.05 2010-09-24 77.0 85.8 8.56 AH AA 0.05 2010-09-25 78.8 93.2 AH AA 0.05 2010-09-26 75.5 85.5 AH AA 0.05 2010-09-27 74.6 83.3 AH AA 0.05 2010-09-28 74.8 82.5 8.47 AH AA 0.05 2010-09-29 74.6 81.9 AH AA 0.05 2010-09-30 73.9 81.2 AH AA 0.05 Minimum 72.0 78.3 8.39 0.0 4.79 0.0 Maximum 82.2 100.9 8.68 0.0 4.79 0.05 Average 76.25333 86.30667 0 , 4.79 0.00333 Count 30 30 8 1 1 30 iName of Responsible Ofticinl I certify under the penalty of law that I have personally examined and am familiar Stgnature ot Responsible Otficial or Authorized Submission or Authorized Representative with the information submitted herein and based on my inquiry of those individuals Representative Date/Time immediately responsible for obtaining the information, I believe the submitted fl ~~~

NU information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

. .~' ~

Page I

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID: STATUS: Draft "FACILITY: FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER: 3IB00016 *ID LOCATION: 10 Center Rd STATION CODE: 004 North Perry, OH 44081 MONITORING PERIOD: 2010-09-01 To: 2010-09-30 COUNTY: Lake REPORTING LAB: CCB 125 DISTRICT: NEDO ANALYST: Randall Killing NO DISCHARGE INDICATOR:

Chlorination/Bromination pARAMETER Duration PARAMETER CODE 78739 UNITS Minutes FREQUENCY When Disch.

SAMPLING TYPE Total 2010-09-01 100 2010-09-02 100 2010-09-03 103 2010-09-04 100 2010-09-05 100 2010-09-06 100 2010-09-07 100 2010-09-08 100 2010-09-09 100 2010-09-10 100 2010-09-11 90 2010-09-12 100 2010-09-13 60 2010-09-14 95 2010-09-15 113 2010-09-16 100 2010-09-17 100 2010-09-18 100 2010-09-19 100 2010-09-20 102 2010-09-21 100 2010-09-22 107 2010-09-23 100 2010-09-24 104 2010-09-25 100 2010-09-26 100 2010-09-27 100 2010-09-28 100 2010-09-29 100 2010-09-30 100 Minimum 60.0 Maximum 113.0 Average 99.13333 Count 30 Name of Responsible Official I cenirfy under the penalty of law that I have personally examined and am familiar Signature of Responsible Official or Authorized Submission or Authorized Representative with the information submitted herein and based on my inquiry of those individuals Representative Date/Time immediately responsible for obtaining the information, I believe the submitted V information is true, accurate and complete. I am aware that there are significant d/aJ penalties for submitting false information, including the possibility of fine and impsonment.Page 2

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID: STATUS: Draft FACILITY: FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER: 3IB00016ID LOCATION: 10 Center Rd STATION CODE: 094 North Perry, OH 44081 MONITORING PERIOD : 2010-09-01 To: 2010-09-30 COUNTY: Lake REPORTING LAB:

DISTRICT: NEDO ANALYST:

NO DISCHARGE INDICATOR: AL PARAMETER Water Temperature Flow Rate pH Zinc, Total Copper, Total Oxidants, Total Chlorine, Total Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS F MGD S.U. u/l ue/l me/I mg/1 FREQUENCY 1/Day I/Day 2/Week I/Month I/Month When Disch. When Disch.

SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2010-09-01 2010-09-02 2010-09-03 2010-09-04 2010-09-05 2010-09-06 2010-09-07 2010-09-08 2010-09-09 2010-09-10 2010-09-11 2010-09-12 2010-09-13 2010-09-14 2010-09-15 2010-09-16 2010-09-17 2010-09-18 2010-09-19 2010-09-20 2010-09-21 2010-09-22 2010-09-23 2010-09-24 2010-09-25 2010-09-26, 2010-09-27 2010-09-28 2010-09-29 2010-09-30 Minimum Maximum Average Count Name of Responsible Official I cerify under the penalty of law that I have personally examined and am familiar Signature of Responsible Official or Authorized Submission or Authorized Representative with the information submitted herein and based on my inquiry of those individuals Representative Date/Time immediately responsible forobtaining the information, I believe the submitted / 'I information is true, accurate and complete. Iam aware that there are significant A

N I if cd penalties for submitting false information, including the possibility of fine and imprisonment. .-

Page 3

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID: STATUS: Draft FACILITY: FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 094 North Perry, OH 44081 MONITORING PERIOD: 2010-09-01 To: 2010-09-30 COUNTY: Lake REPORTING LAB:

DISTRICT: NEDO ANALYST:

NO DISCHARGE INDICATOR: AL PARAMETER Chlorination/Bromination Duration PARAMETER CODE 78739 UNITS Minutes FREQUENCY When Disch.

SAMPLING TYPE Total 2010-09-01 2010-09-02 2010-09-03 2010-09-04 2010-09-05 2010-09-06 2010-09-07 2010-09-08 2010-09-09 2010-09-10 2010-09-11 2010-09-12 2010-09-13 2010-09-14 2010-09-15 2010-09-16 2010-09-17 2010-09-18 2010-09-19 2010-09-20 2010-09-21 2010-09-22 2010-09-23 2010-09-24 2010-09-25 2010-09-26 2010-09-27 2010-09-28 2010-09-29 2010-09-30 Minimum Maximum Average Count Name of Responsible Official I certify under the penalty of law that I have personally examined and am familiar Signature of Responsible Official or Authorized Submission or Authorized Representative with the information submitted herein and based on my inquiry of those individuals Representative Date/Time immediately responsible for obtaining the information, I believe the submitted IqC 7 information is true, accurate and complete. I am aware that there are significant ..- '

P NJ 0c 6t.r m penalties for submitting false information, including the possibility of fine and /7 /

imprisonment.

/ Page 4

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID: STATUS: Draft FACILITY: FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER: 3IB00016"ID LOCATION: 10 Center Rd STATION CODE: 601 North Perry, OH 44081 MONITORING PERIOD: 2010-09-01 To: 2010-09-30 COUNTY: Lake REPORTING LAB:

DISTRICT: NEDO ANALYST:

NO DISCHARGE INDICATOR: AL PARAMETER Flow Rate pH Total Suspended Oil and Grease, Solids Total PARAMETER CODE 50050 00400 00530 00550 UNITS MGD S.U. m,/1 mi _ _l FREQUENCY Continuous 1/ 2 Weeks 1/ 2 Weeks 1/ 2 Weeks SAMPLING TYPE 24hr Total Grab Grab Grab 2010-09-01 2010-09-02 2010-09-03 2010-09-04 2010-09-05 2010-09-06 2010-09-07 2010-09-08 2010-09-09 2010-09-10 2010-09-11 2010-09-12 2010-09-13 2010-09-14 2010-09-15 2010-09-16 2010-09-17 20 10-09-18 2010-09-19 2010-09-20 2010-09-21 2010-09-22 2010-09-23 2010-09-24 2010-09-25 20 10-09-26 2010-09-27 2010-09-28 2010-09-29 2010-09-30 Minimum Maximum Average Count Name of Responsible Official I certify under the penalty of law that I have personally examined and am familiar Signature of Responsible Official orAuthorized Submission or Authorized Representative with the information submitted herein and based on my inquiry of those individuals Representative Date/Time immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant (l/</

\J P*J ~de0" penalties for submitting false information, including the possibility of fine and¢ ,'

Page 5

/

Ohio EPA .- Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID: STATUS: Draft FACILITY: FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER: 3IB00016*ID LOCATION: 10 Center Rd STATION CODE: 602 North Perry, OH 44081 MONITORING PERIOD: 2010-09-01 To: 2010-09-30 COUNTY: Lake REPORTING LAB:

DISTRICT: NEDO ANALYST:

NO DISCHARGE INDICATOR: AL Total Suspended Oil and Grease, Iron, Total Copper, Total PARAMETER Flow Rate pH Solids Total Recoverable Recoverable PARAMETER CODE 50050 00400 00530 00550 00980 01119 UNITS MGD S.U. ma-/ mg/1 u -/- uA/_

FREQUENCY Continuous I / 2 Weeks 1/ 2 Weeks 1/ 2 Weeks I / 2 Weeks I / 2 Weeks SAMPLING TYPE 24hr Total Grab 24hr Composite Grab 24hr Composite 24hr Composite 2010-09-01 2010-09-02 2010-09-03 2010-09-04 2010-09-05 2010-09-06 2010-09-07 2010-09-08 2010-09-09 2010-09-10 2010-09-11 2010-09-12 2010-09-13 2010-09-14 2010-09-15 2010-09-16 2010-09-17 2010-09-18 2010-09-19 2010-09-20 2010-09-21 2010-09-22 2010-09-23 2010-09-24 2010-09-25 2010-09-26 2010-09-27 2010-09-28 2010-09-29 2010-09-30 Minimum Maximum_

Average Count Name of Responsible Official I cerify under the penalty of law that I have personally examined and am familiar Signature of Responsible Official or Authorized Submission or Authorized Representative with the information submined herein and based on my inquiry of those individuals Rep resentative Date/Time immediately responsible for obtaining the information, a/ I believe the submitted I information is true, accurate and complete. I am aware that there are significant Jr~

Ppenalties fr submitting false information, including the possibility of fine and t,mprisonment. / Page.6

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID: STATUS: Draft

'FACILITY: FirstEnergy Nuclear Gen Corp -Perry Plant PERMIT NUMBER: 3IB00016*ID 800 LOCATION: 10 Center Rd STATION CODE:

North Perry, OH 44081 MONITORING PERIOD: 2010-09-01 To: 2010-09-30 COUNTY: Lake REPORTING LAB: CCB 125 DISTRICT: NEDO ANALYST: Randall Killing NO DISCHARGE INDICATOR:

Temperature Water Temperature Zinc, Total Copper, Total PARAMETER Water Recoverable Recoverable PARAMETER CODE 00011 01094 01119 UNITS F ue/l eu*/I__

FREQUENCY I/Day 1/Mlonth I/Month SAMPLING TYPE Continuous Grab Grab 2010-09-01 77.2 1.43 AA 2.5 2010-09-02 77.9 2010-09-03 77.8 2010-09-04 75.7 2010-09-05 72.8 2010-09-06 72.5 2010-09-07 72.7 2010-09-08 71.9 2010-09-09 70.4 2010-09-10 69.6 2010-09-11 69.5 2010-09-12 69.6 2010-09-13 69.6 2010-09-14 70.2 2010-09-15 70.2 2010-09-16 69.7 2010-09-17 69.2 2010-09-18 68.8 2010-09-19 69.3 2010-09-20 68.7 2010-09-21 68.7 2010-09-22 69.2 2010-09-23 69.4 2010-09-24 69.9 2010-09-25 69.8 2010-09-26 68.8 2010-09-27 68.2 2010-09-28 67.8 2010-09-29 67.2 2010-09-30 67.7 Minimum 67.2 1.43 0.0 Maximum 77.9 1.43 0.0 Average 70.66667 1.43 0 Count 30 1 1 Name of Responsible Official I certify under the penalty oflaw that I have personally examined and am familiar Signature of Responsible Official or Authorized Submission or Authorized Representative with the information submitted herein and based on my inquiry of those individuals Representative Date/Time immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant .`7 P**

  • Cdem penalties for submitting false information, including the possibility of fine and Page 7

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY: FirstEnergy Nuclear Gen Corp - Perry Plant PERMIT NUMBER: 31B000i6"ID LOCATION: 10 Center Rd MONITORING PERIOD: 2010-09-01 To: 2010-09-30 North Perry, OH 44081 PARAMETER COMMENTS:

Station Code Parameter Name Parameter Code Date Unit Comment 004 Oxidants, Total Residual 34044 2010-09-01 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-02 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-03 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-04 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-05 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-06 mg/I No bromination event this date.

604 Oxidants, Total Residual 34044 2010-09-07 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-08 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-09 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-10 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-11 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-12 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-13 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-14 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-15 mg/ No bromination event this date.

004 Oxidants, Total Residual 34044 2010-09-16 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-17 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-18 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-19 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-20 mg/I No bromination event this date, 004 Oxidants, Total Residual 34044 2010-09-21 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-22 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-23 mg/I No bromination event this date 004 Oxidants, Total Residual. 34044 2010-09-24 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-25 mg/I No bromination event.this date 004 Oxidants, Total Residual 34044 2010-09-26 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-27 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-28 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-29 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2010-09-30 mg/l No bromination event this date