ML091950304

From kanterella
Jump to navigation Jump to search
June NPDES Discharge Monitoring Report
ML091950304
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/09/2009
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, State of OH, Environmental Protection Agency
References
PY-CEI/OEPA-0509L
Download: ML091950304 (9)


Text

FENOC Perry Nuclear Power Station 10 Center Road FirstEnergy Nuclear Operating Company Perry, Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President Fax: 440-280-8029 July 9, 2009 PY-CEI/OEPA-0509i Ohio Environmental Protection Agency Division of Water Pollution Control Enforcement Section, ES/DMR P.O. Box 1049 Columbus, Ohio 43216-1049

SUBJECT:

Perry Nuclear Power Plant, June NPDES Discharge Monitoring Report Enclosed are the Perry Nuclear Power Plant, NPDES monthly report forms for the month of June 2009. No violations occurred during this period.

If you have questions or require additional information, please contact Mr. Randall Killing at (440) 280-7370.

Sincerely, 7:-

Mark B. Bezilla

/

Enclosures:

A Station Code 004 Report B Station Code 094 Report C Station Code 601 Report D Station Code 602 Report E Station Code 800 Report cc: NRC Region III NRC Resident Inspector NRR Project Manager NRC Document Control Desk (Docket No. 50-440)

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID:

FACILITY:

LOCATION:

COUNTY:

DISTRICT:

FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:

PERMIT NUMBER:

STATION CODE:

MONITORING PERIOD:

REPORTING LAB:

ANALYST:

NO DISCHARGE INDICATOR:

Draft 3IB00016*ID 004 2009-06-01 To: 2009-06-30 CCB125 Randall Killing Water Zinc, Total Copper, Total Oxidants, Total Chlorine, Total Temperature Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS F

MGD S.U.

ugl u/l m,/1 mg/l FREQUENCY I/Day 1/Day 2/Week I/Month I/Month When Disch.

When Disch.

SAMPLING TYPE Continuous Continuous Grab.

Grab Grab Grab Grab 2009-06-01 66 72.5 AH AA 0.05 2009-06-02 67 74.4 8.11 AH AH 2009-06-03 66 72.5 AH AA 0.05 2009-06-04 68 65.1 AH AA 0.05 2009-06-05 65 73.0 8.54 AH AA 0.05 2009-06-06 65 70.1 AA 6.0 4.7 AH AA 0.05 2009-06-07 66 68.9 AH AA 0.05 2009-06-08 67 70.8 AH AA 0.05 2009-06-09 64 75.1 8.34 AH AA 0.05 2009-06-10 67 84.4 AH AA 0.05 2009-06-11 66 82.8 AH AA 0.05 2009-06-12 66 81.9 8.32 AH AA 0.05 2009-06-13 66 94.3 AH AA 0.05 2009-06-14 66 91.9 AH AA 0.05 2009-06-15 66 108.7 AH AA 0.05 2009-06-16 66 118.0 8.04 AH AA 0.05 2009-06-17 65 118.6 AH AA 0.05 2009-06-18 65 107.8 AH AA 0.05 2009-06-49 67 107.3 8.2 AR AA 0.05 2009-06-20 68 101.7 AH AA 0.05 2009-06-21 70 114.2 AH AA 0.05 2009-06-22 69 106.1 AH AA 0.05, 2009-06-23 69 94.4 8.07 AH AA 0.05 2009-06-24 69 93.0 AH AA 0.05 2009-06-25 71 95.4 AH AA 0.05 2009-06-26 74 107.4 8.26 AH AA 0.05 2009-06-27 76 113.7 AH AA 0.05 2009-06-28 76 107.2 AH AA 0.05 2009-06-29 79 108.2 AH AA 0.05 2009-06-30 79 108.9 8.54 AH A A 0.05 Minimum 64.0 65.1 8.04 0.0 4.7 0.0 Maximum 79.0 118.6 8.54 0.0 4.7 0.0 Average 68.46667 92.94333 0

4.7 0

Count 30 30 9

1 1

29 Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative familiar with the information submitted herein and based on my inquiry of those individuals immediately responsible for obtaining the information, I a

i__

,,i/___,

__/

/__

believe the submitted information is true, accurate and complete. I am

/,

aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment. (EDMR) 4.',?'Par

./I_,____

/

Pagel1

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID:

FACILITY:

LOCATION:

COUNTY:

DISTRICT:

FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:

PERMIT NUMBER:

STATION CODE:

MONITORING PERIOD:

REPORTING LAB:

ANALYST:

NO DISCHARGE INDICATOR:

Draft 3IB00016*ID 004 2009-06-01 To: 2009-06-30 CCB125 Randall Killing

/

Chlorination/Bromination PARAMETER Duration PARAMETER CODE 78739 UNITS Minutes FREQUENCY When Disch.

SAMPLING TYPE Total 2009-06-01 100 2009-06-02 0

2009-06-03 110 2009-06-04 108 2009-06-05 100 2009-06-06 100 2009-06-07 102 2009-06-08 100 2009-06-09 100 2009-06-10 100 2009-06-11 100 2009-06-12 100 2009-06-13 100 2009-06-14 100 2009-06-15 100 2009-06-16 101 2009-06-17 100 2009-06-18 100 2009-06-19 100 2009-06-20 100 2009-06-21 100 2009-06-22 100 2009-06-23 80 2009-06-24 100 2009-06-25 100 2009-06-26 100 2009-06-27 100 2009-06-28 100 2009-06-29 100 2009-06-30 100 Minimum 0.0 Maximum 110.0 Average 96.7 Count 30

  • Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative familiar with the information submitted herein and based on my inquiry of those individuals immediately responsible for obtaining the information, I a

b [aelieve the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, inluding the possibility of fine and imprisonment. (EDMR) 7-LI Page 2

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID:

FACILITY:

LOCATION:

COUNTY:

DISTRICT:

FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:

Draft PERMIT NUMBER:

31B00016*ID STATION CODE:

094 MONITORING PERIOD:

2009-06-01 To: 2009-06-30 REPORTING LAB:

ANALYST:

NO DISCHARGE INDICATOR:

AL Water Zinc, Total Copper, Total Oxidants, Total Chlorine, Total Temperature Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS F

MGD S.U.

uml ua/l m-/A

.m/1 FREQUENCY 1/Day 1/Day 2/Week 1/Month I/Month When Disch.

When Disch.

SAMPLING TYPE Continuous Continuous -

Grab Grab Grab Grab Grab 2009-06-01 2009-06-02 2009-06-03 2009-06-04 2009-06-05 2009-06-06 2009-06-07 2009-06-08 2009-06-09 2009-06-10 2009-06-11 2009-06-12 2009-06-13 2009-06-14 2009-06-15 2009-06-16 2009-06-17 2009-06-18 2009-06-19 2009-06-20 2009-06-21 2009-06-22 2009-06&23 2009-06-24 2009-06-25 2009-06-26 2009-06-27 2009-06-28 2009-06-29 2009-06-30 Minimum Maximum Average Count Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative

_familiar with the information submitted herein and based on my inquiry of those individuals immediately responsible for obtaining the information, I Vbelieve the submitted information is true,.accurate and complete. I am....

  • J

"/7_/

aware that there are significant penalties for submitting false information, 7/'

/5/

V including the possibility of fine and imprisonment. (EDMR) t j-,"'

Page 3

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID:

FACILITY:

LOCATION:

COUNTY:

DISTRICT:

FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:

Draft PERMIT NUMBER:

31BOO016*ID STATION CODE:

094 MONITORING PERIOD:

2009-06-01 To: 2009-06-30 REPORTING LAB:

ANALYST:

NO DISCHARGE INDICATOR:

AL Chlorination/Bromination PARAMETER Duration PARAMETER CODE 78739 UNITS Minutes FREQUENCY When Disch.

SAMPLING TYPE Total 2009-06-01 2009-06-02 2009-06-03 2009-06-04 2009-06-05 2009-06-06 2009-06-07 2009-06-08 2009-06-09 2009-06-10 2009-06-11 2009-06-12 2009-06-13 2009-06-14 2009-06-15 2009-06-16 2009-06-17 2009-06-18 2009-06-19 2009-06-20 2009-06-21 2009-06-22 2009-06-23 2009-06-24 2009-06-25 2009-06-26 2009-06-27 2009-06-28 2009-06-29 2009-06-30 Minimum Maximum Average Count Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative familiar with the information submitted herein and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information,

-7

/

'/

.Iv/

  • [*.*fl I including the possibility of fine and imprisonment. (EDMR)

£ l\\

/

C

/

Page 4

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ED:

FACILITY:

LOCATION:

COUNTY:

DISTRICT:

FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:

PERMIT NUMBER:

STATION CODE:

MONITORING PERIOD:

REPORTING LAB:

ANALYST: '

NO DISCHARGE INDICATOR:

Draft 3IB000166*ID 601 2009-06-01 To: 2009-06-30 AL PARAMETER Flow Rate pH Total Suspended Oil and Grease, Solids Total PARAMEETER CODE 50050 00400 00530 00550 UNITS MGD S.U.

m_/l m_

FREQUENCY Continuous 1 /2 Weeks 1 / 2 Weeks 1 / 2 Weeks SAMPLING TYPE 24hr Total Grab Grab Grab 2009-06-01 2009-06-02 2009-06-03 2009-06-04 2009-06-05 2009-06-06 2009-06-07 2009-06-08 2009-06-09 2009-06-10 2009-06-11 2009-06-12 2009-06-13 2009-06-14 2009-06-15 2009-06-16 2009-06-17 2009-06-18 2009-06-19 2009-06-20 2009-06-21 2009-06-22 2009-06-23 2009-06-24 2009-06-25 2009-06-26 2009-06-27 2009-06-28 2009-06-29 2009-06-30 Minimum Maximum Average Count Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative familiar with the information submitted herein and based on my inquiry of those individuals immediately responsible for obtaining the information, I A

believe the submitted information is true, accurate and complete. I am./

//.

/

ae r aware that there are significant penalties for submitting false information,

/7*,/,

.K-

)

_,:I//~l~/'

/

including the possibility of fine and imprisonment. (EDMR) iv,",Jr2 7 7

Page 5

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID:

FACILITY:

LOCATION:

COUNTY:

DISTRICT:

FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:

PERIMIT NUMBER:

STATION CODE:

MONITORING PERIOD:

REPORTING LABL ANALYST:

NO DISCHARGE INDICATOR:

Draft 31B00016*ID 602 2009-06-01 To: 2009-06-30 AL PARAMETER Flow Rae PH Total Suspended Oil and Grease, Iron, Total Copper, Total Solids Total Recoverable Recoverable PARAMETER CODE 50050 00400 00530 00550 00980 01119 UNITS MGD S.U.

mg/I mg.l ug/1 ua/l FREQUENCY Continuous 1 / 2.Weeks I / 2 Weeks 1 / 2 Weeks 1 / 2 Weeks 1 / 2 Weeks SAMPLING TYPE 24hr Total Grab 24hr Composite Grab 24hr Composite 24hr Composite 2009-06-01 2009-06-02 2009-06-03 2009-06-04 2009-06-05 2009-06-06 2009-06-07 2009-06-08 2009-06-09 2009-06-10 2009-06-11 2009-06-12 2009-06-13 2009-06-14 2009-06-15 2009-06-16 2009-06-17 2009-06-18 2009-06-19 2009-06-20

.2009:06-21 2009-06-22 2009-06-23 2009-06-24 2009-06-25 2009-06-26 2009-06-27 2009-06-28 2009-06-29 2009-06-30 Minimum Maximum Average Count U

Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative familiar with the information submitted herein and based on my inquiry of cthose individuals immediately responsible for obtaining the information, I - _

\\p 7._//_,_

believe the submitted inf6rmation is true, accurate and complete. I am "KZ aware that there are significant penalties for submitting false information,

/)-'/

7("

including-the. possibility of fine and imprisonment. (EDMR) 7/

Page 6

Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ED:

FACILITY:

LOCATION:

COUNTY:

DISTRICT:

FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:

PERMIT NUMBER:

STATION CODE:

MONITORING PERIOD:

REPORTING LAB:

ANALYST:

NO DISCHARGE INDICATOR:

Draft 3IB00016*ID 800 2009-06-01 To: 2009-06-30 CCB125 Randall Killing Water Zinc, Total Copper, Total Temperature Recoverable Recoverable PARAMETER CODE 00011 01094 01119.

UNITS F

ug/1 ue/l FREQUENCY 1/Day I/Month 1/Month SAMPLING TYPE Continuous Grab Grab 2009-06-01 59 2009-06-02 60 2009-06-03 59 2009-06-04 60 2009-06-05 58 2009-06-06 57 33.7 AA 4.0 2009-06-07 60 2009-06-08 58 2009-06-09 53 2009-06-10 61 2009-06-11 60 2009-06-12 58 2009-06-13 61 2009-06-14 63 2009-06-15 61 2009-06-16 61 2009-06-17 57 2009-06-18 58 2009-06-19 61 2009-06-20 61 2009-06-21 64 2009-06-22 67 2009-06-23 67 2009-06-24 66 2009-06-25 67 2009-06-26 74 2009-06-27 74 2009-06-28 74 2009-06-29 74 2009-06-30 74 Minimum 53.0 33.7 0.0 Maximum 74.0 33.7 0.0 Average 62.9 33.7 0

Count 30 1

1 Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative tfamiliar with the information submitted herein and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information,

/'-

/f,,.

including the possibility of fine and imprisonment, (EDMR) 1Z Page 7

Ohio EPA - Daily DiScharge Monitoring Report w Form 4500 FACILITY:

LOCATION:

FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 PERMIT NUMBER:

MONITORING PERIOD:

3IB00016*ID 2009-06-01 To: 2009-06-30 PARAMETER COMMENTS:

Station Code Parameter Name Parameter Code Date Unit Comment 004 Oxidants, Total Residual 34044 2009-06-01 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-02 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-03 mg/1 No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-04 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-05 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-06 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-07 mg/1 No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-08 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-09 mg/1 No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-10 mg/I" No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-11 mg/1 No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-12 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-13 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-14 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-15 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-16 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-17 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-18 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-19 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-20 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-21 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-22 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-23 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-24 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-25 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-26 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-27 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-28 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-29 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-06-30 mg/l No bromination event this date 004 Chlorine, Total Residual 50060 2009-06-02 mg/I No chlorination event this date