FENOC Perry Nuclear Power Station 10 Center Road FirstEnergy Nuclear Operating Company Perry, Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President 1-..:
Fax: 440-280-8029 AUgus :14, 26609 PY-CEI/OEPA-0512L Ohio Ehviro*mental Protection Agency Division of Water Pollution Control Enforcement Section, ES/DMR P.O. Box 1049 Columbus, Ohio 43216-1049
SUBJECT:
Perry Nuclear Power Plant, July NPDES Discharge Monitoring Report Enclosed are the Perry Nuclear Power Plant, NPDES monthly report forms for the month of July 2009. No violations occurred during this period.
If you have questions or require additional information, please contact Mr. Randall Killing at (440) 280-7370.
Sincerely,
/4 t
/00 Mark B. Bezilla
Enclosures:
A Station Code 004 Report B Station Code 094 Report C Stati.onCode 601 Report D Statibn'Code 602 Report E Station Code 800 Report cc: NRC-Region III NRC Resident Inspector NRR Project Manager NRC Document Control Desk (Docket No. 50-440)
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID:
FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:
PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
Draft 3IB000166*ID 004 2009-07-01 To: 2009-07-31 CCB 125 Randall Killing PARAMETER Water Flow Rate pH Zinc, Total Copper, Total Oxidants, Total Chlorine, Total Temperature Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS F
MGD S.U.
ue/l ue/l mgA/1 m-/l FREQUENCY 1/Dav 1/Day 2/Week I/Month I/Month When Disch.
When Disch.
SAMIPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2009-07-01 78 110.6 8
5 AH AA 0.05 2009-07-02 78 110.0 A14 0.05 2009-07-03 78 110.3 8.54 AR AA 0.05 2009-07-04 77 110.1 AH AA 0.05 2009-07-05 76 107.1 AB AA 0.05 2009-07-06 77 119.2 AH.
AA 0.05 2009-07-07 78 118.6 8.58 A-AA 0.05 2009-07-08 77 112.2 AE 0.05 2009-07-09 77 107.8 Al AA 0.05 2009-07-10 78 108.0 8.54 AH AA 0.05 2009-07-11 78 104.9 AH AA 0.05 2009-07-12 78 107.1 AH AA 0.05 2009-07-13 78 106.4 AH AA 0.05 2009-07-14 78 107.7 8.5 AR AA 0.05 2009-07-15 78 106.0 AH AA 0.05 2009-07-16 79 103.8 AB AA 0.05 2009-07-17 79 107.7 8.46 AH AA 0.05 2009-07-18 78 109.9 AH AA 0.05 2009-07-19 78 108.9 AH AA 0.05 2009-07-20 78 109.2 AR AA 0:05 2009-07-21 78 108.9 8.52 AH AA 0.05 2009-07-22 76 109.7 AH AA 0.05 2009-07-23 76 109.4 AH AA 0.05 2009-07-24 75 121.4 8.53 AH AA 0.05 2009-07-25 76 111.6 AH 0.05 2009-07-26 76 109.3 AH AA0.05 2009-07-27
.76 106.9 AH AA 0.05 2009-07-28 77 103.7 8.44 AH 0.05 2009-07-29 78 106.6 AR AA 0.05 2009-07-30 78 107.3 AR AA 0.05 2009-07-31 78 107.3 8.57 AR AA 0.05 Minimum 75.0 103.7 8.44 8.0 5.0 0.0 Maximum 79.0 121.4 8.58 8.0 5.0 0.05 Average 77.41935 109.27742 8
5 0.00645 Count 31 31 9
1 1 1 31 Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative familiar with the information submitted herein and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am
_____-____0___________aware that there are significant penalties fi r submitting false infDrmati)n, rvp-N deor-including the possibility of fine Iand imprisonment. (EDMR)
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID:
FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:
PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
Draft 31BOO016*ID 004 2009-07-01 To: 2009-07-31 CCB 125 Randall Killing Chlorination/Brominatior PARAMETER Drto Duration PARAMETER CODE 78739 UNITS Minutes FREQUENCY When Disch.
SAMIPLING TYPE Total 2009-07-01 100 2009-07-02 100 2009-07-03 100 2009-07-04 100 2009-07-05 100 2009-07-06 50 2009-07-07 107 2009-07-08 100 2009-07-09 100 2009-07-10 100 2009-07-11 100 2009-07-12 100 2009-07-13 100 20,09-07-14 100 2009-07-15 100 2009-07-16 98 2009-07-17 100 2009-07-18 100 2009-07-19 100 2009-07-20 100
.2009-07-21 100 2009-07-22 80 2009-07-23 100 2009-07-24 100 2009-07-25 100 2009-07-26 100 2009-07-27 100 2009-07-28 100 2009-07-29 100 2009-07-30 100 2009-07-31 100 Minimum 50.0 Maximum 107.0 Average 97,90323 Count 31 Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative familiar with the information submitted herein and based on my inquiry of those individuals immediately responsible for obtaining the information, I
"_?_
__/
believe the submitted information is true, accurate and complete. I am 3
jL.
',C~d z"
aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment. (EDMR)
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID:
FACILITY:
- LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:
Draft PERMIT NUMBER:
3IB00016*ID STATION CODE:
094 MONITORING PERIOD:
2009-07-01 To: 2009-07-31 REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
AL PARAMETER Water Zinc, Total Copper, Total Oxidants, Total Chlorine, Total Temperature Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS F
MGD S.U.
.ugll u&l m-A ma/I FREQUENCY l/Day I/Day 2/Week I/Month I/Month When Disch.
When Disch.
SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2009-07-01 2009-07-02 2009-07-03 2009-07-04 2009-07-05 2009-07-06 2009-07-07 2009-07-08 2009-07-09 2009-07-10 2009-07-11 2009-07-12 2009-07-13 2009-07-14 2009-07-15 2009-07-16 2009-07-17 2009-07-18 2009-07-19 2009-07-20 2009-07-21 2009-07-22 2009-07-23 2009-07-24 2009-07-25 2009-07-26 2009-07-27 2009-07-28 2009-07-29 2009-07-30 2009-07-31 Minimum Maximum Average Count Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative familiar with the information submitted herein and based on my inquiry of hose individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am
\\] P-r* UC*-@)*V' aware that there are significant penalties for submitting false information, i
including the possibility of fine and imprisonment. (EDMR)
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID:
FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:
PERMIT NUMBER:
STATION CODE:.
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
Draft 3IB00016*ID 094 2009-07-01 To: 2009-07-31 AL Chlorination/Bromination PARAMETER Drto Duration PARAMETER CODE 78739 UNITS Minutes FREQUENCY When Disch.
SAMPLING TYPE Total 2009-07-01 2009-07-02 2009-07-03 2009-07-04 2009-07-05 2009-07-06 2009-07-07 2009-07-08 2009-07-09 2009-07-10 2009-07-11 2009-07-12 2009-07-13 2009-07-14 2009-07-15 2009-07-16 2009-07-17 2009-07-18 2009-07-19 2009-07-20 2009-07-21 2009-07-22 2009-07-23 2009-07-24 2009-07-25 2009-07-26 2009-07-27 2009-07-28 2009-07-29 2009-07-30 2009-07-31 Minimum Maximum Average I
Count I
Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative familiar with the information submitted herein and based on my inquiry of those individuals immediately responsible for obtaining the information, I
......2"_
believe the submitted information is true, accurate and complete, I am
/
\\ 7 A*
aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment. (EDMR)
/1
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID:
- 4 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:
PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
Draft 3IB00016*ID 601 2009-07-01 To: 2009-07-31 AL PARAMETER Flow Rate PH Total Suspended Oil and Grease, Solids Total PARAMETER CODE 50050 00400 00530 00550 UNITS MGD S.U.
m/l mg/1 FREQUENCY Continuous 1 /2 Weeks 1 / 2 Weeks 1 / 2 Weeks SAMPLING TYPE 24hr Total Grab Grab Grab 2009-07-01 2009-07-02 2009-07-03 2009-07-04 2009-07-05 2009-07-06 2009-07-07 2009-07-08 2009-07-09 2009-07-10 2009-07-11 2009-07-12 2009-07-13 2009-07-14 2009-07-15 2009-07-16 2009-07-17 2009-07-18 2009-07-19 2009-07-20 2009-07-21 2009-07-22 2009-07-23 2009-07-24 2009-07-25 2009-07-26 2009-07-27 2009-07-28 2009-07-29 2009-07-30 2009-07-31 Minimum Maximum Average Count Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative familiar with the information submitted herein and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, Q P-a I enul including the possibility of fine and. imprisonment. (EDMR)
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID:
FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:
Draft PERMIT NUMBER:
3IB00016*ID STATION CODE:
602 MONITORING PERIOD :
2009-07-01 To: 2009-07-31 REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
AL Total Suspended Oil and Gr'ehse, Iron, Total Copper, Total PARAMETER Flow Rate.
pH Solids Total Recoverable Recoverable PARAMETER CODE 50050 00400 00530 00550 00980 01119 UNITS MGD S.U.
ma/I mgoI u.l ug/_
FREQUENCY Continuous 1 /2 Weeks 1 / 2 Weeks 1 / 2 Weeks 1 / 2 Weeks 1 / 2 Weeks SAMPLING TYPE 24hr Total Grab 24hr Composite Grab 24hr Composite 24hr Composite 2009-07-01 2009-07-02 2009-07-03 2009-07-04 2009-07-05 2009-07-06 2009-07-07 2009-07-08 2009-07-09 2009-07-10 2009-07-11 2009-07-12 2009-07-13 2009-07-14 2009-07-15 2009-07-16 2009-07-17 2009-07-18 2009-07-19 2009-07-20 2009-07-21 2009-07-22 2009-07-23 2009-07-24 2009-07-25 2009-07-26 2009-07-27 2009-07-28 2009-07-29 2009-07-30 2009-07-31 Minimum Maximum Average Count Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative familiar with the information submitted herein and based on my inquiry of
-tose individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information, e (xv-including the possibility of fine and imprisonment. (EDMR)
/
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 SUBMISSION ID:
FACILITY:
LOCATION:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 Lake NEDO STATUS:
PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
Draft 3IB00016*ID 800 2009-07-01 To: 2009-07-31 CCB 125 Randall Killing COUNTY:
DISTRICT:
Water Zinc, Total Copper, Total Temperature Recoverable Recoverable PARAMETER CODE 00011 01094 01119 UNITS F
u/I un/I FREQUENCY 1/Day I/Month l/Month SAMPLING TYPE Continuous Grab Grab 2009-07-01 74 AA 6.0 AA 4.0 2009-07-02 73 2009-07-03 72 2009-07-04 72 2009-07-05 71 2009-07-06 73 2009-07-07 73 2009-07 73 2009-07-09 73 2009-07-10 73 2009-07-11 71 2009-07-12 73 2009-07-13 73 2009-07-14 73 2009-07-15 73 2009-07-16 73 2009-07-17 74 2009-07-18 73 2009-07-19 73 2009-07-20 73 2009-07-21 73 2009-07-22 72 2009-07-23 72 2009-07-24 71 2009-07-25.
72 2009-07-26 72 2009-07-27 73 2009-07-28 74 2009-07-29 74 2009-07-30 74 2009-07-31 75 Minimum 71.0 0.0 0.0 Maximum 75.0 0.0 0.0 Average 72.83871 0
0 Count 31 1
1 Name of Responsible Signature of Responsible Official or Authorized Submission Official or Authorized I certify under the penalty of law that I have personally examined and am Representative Date/Time Representative familiar with the information submitted herein and based on my inquiry of those individuals immediately responsible for obtaining the information, I
(] ti ~.l',r
. believe the submitted information is true, accurate and complete. I am 4
aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment. (EDMR)
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
It LOCATION:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, OH 44081 PERMIT NUMBER:
3IB00016*ID MONITORING PERIOD':
2009-07-01 To: 2009-07-31 PARAMETER COMMENTS:
Station Code Parameter Name Parameter Code Date Unit Comment 004 Oxidants, Total Residual 34044 2009-07-01 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-02 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-03 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-04 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-05 mg/i No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-06 mg/1 No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-07 mg/1 No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-08 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-09 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-10 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-11 mg/1 No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-12 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-13 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-14 mg/i No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-15 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-16 mg/1 No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-17 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-18 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-19 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-20 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-21 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-22 mg/1 No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-23 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-24 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-25 mg/l No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-26 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-27 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-28, mg/i No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-29 mg/1 No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-30 mg/I No bromination event this date 004 Oxidants, Total Residual 34044 2009-07-31 mg/I No bromination event this date