Text
- FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Station 10 Center Road Perry, Ohio 44081 Mark B. Bezilla Vice President May 14,2009 PY-CEI/OEPA-0507L Ohio Environmental Protection Agency Division of Water Pollution Control Enforcement Section, ES/DMR P.O. Box 1049 Columbus, Ohio 43216-1049
SUBJECT:
Perry Nuclear Power Plant, April NPDES Discharge Monitoring Report Enclosed are the Perry Nuclear Power Plant, NPDES monthly report forms for the month of April 2009. No violations occurred during this period.
If you have questions or require additional information, please contact Mr. Randall Killing at (440) 280-7370.
Sincerely, Mar B. Bezilla
Enclosures:
A Station Code 004 Report B Station Code 094 Report C Station Code 601 Report.
D Station Code 602 Report E Station Code 800 Report cc: NRC Region III NRC Resident Inspector NRR Project Manager
.. NRC.Document Control Desk (Docket No. 50-440) 440-280-5382 Fax: 440-280-8029
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit PERMIT NUMBER:
10 Center Rd STATION CODE:
North Perry, 44081 MONITORING PERIOD:
Lake REPORTING LAB:
NEDO ANALYST:
NO DISCHARGE INDICATOR:
31B00016*ID 004 2009-04-01 To: 2009404-30 CCB-125 Randall Killing PARAMETER Flow Rate pH Zinc, Total Copper, Total Oxidants, Total Chlorine, Total Temperature Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 4107 4107 4106 4106 FREQUENCY 1/Day I/Day 2/Week I/Month I/Month When Disch.
When Disch.
SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2009-04-01 44 68.2 AE AA 0.05 2009-04-02 46
47 67.3 AH AA 0.05 2009-04-05 48 67.3 AH AA 0.05 2009-04-06 48 59.5 AH AA 0,05 2009-04-07 47 72.6 8.08 AH AA 0.05 2009-04-08 45 80.5 AH AA 0,05 2009-04-09 45 77.5 AH AA 0.05 2009-04-10 46 78.7 8.04 AH AA 0.05 2009-04-11 46 83.9 AH 0.08 2009-04-12 47 83.1 AH AA 0.05 2009-04-13 46 90.1 AH AA 0.05 2009-04-14 46 69.1 8.08 7.5 AA 4.0 AH AA 0.05 2009-04-15 46 77.7 AH AA 0.05 2009-04-16 46 92.8 AH AA 0.05 2009-04-17 47 70.4 8.1 AH AA 0.05 2009-04-18 47 73.2 AH AA 0.05 2009-04-19 48 72.9 A-H AA 0.05 2009-04-20 49 72.2 AH AA O.05 2009-04-21 50 67.8 7.83 AH 0.1 2009-04-22 49 72.0 AH 0.2 2009-04-23 51 81.3 AlE AA 0.05 2009-04-24 50 79.5 8.03 AH AA 0.05 2009-04-25 52 90.0 AH AA 0.05 2009-04-26 52 100.3 AH AA 0.05 2009-04-27 53 99.5 AH AA 0.05 2009-04-28 54 96.6 8.06 AH AA 0.05 2009-04-29 55 95.6 AH AA.05 2009-04-30 55 92.4 AH AA 0.05 Name/Title of Responsible I certify under the penalty oflaw that I have personally examined and arn familiar Signature of Date (MM/DD/YY)
Official or-Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the infonnation, I believe the Authorized submitted information is true, accurateand complete. I am aware that there are Representative significant pe g
g the possibility of kVP 1 tciea(
fine and imprisonment.4a
-rf Z
When completed mail this report.to: EDMR Administrator, EDMR Administrator,,,OH, Page 4 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...
5/5/2009
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
31BOO016*ID 004 2009-04-01 To: 2009-04-30 CCB-125 Randall Killing Chlorination/Bromnination PARAMETERDraon Duration PARAMETER 78739 CODE UNITS 6655 FREQUENCY When Disch.
SAMPLING TYPE Total 2009-04-01 30 2009-04-02 30 2009-04-03 30 2009-04-04 30 2009-04-05 70 2009-04-06 80 2009-04-07 100 2009-04-08 100
.2009-04-09 100 2009-04-10 45 2009-04-11 30 2009-04-12 65 2009-04-13 110 2009-04-14 100 2009-04-15 40 2009-04-16 60 2009-04-17 30 2009-04-18 110 2009-04-19 60 2009-04-20 110 2009-04-21 100 2009-04-22 80 2009-04-23 70 2009-04-24 65 2009-04-25 75 2009-04-26 98 2009-04-27 95 2009-04-28 99 2009-04-29 70 2009-04-30 72 Name/Title of Responsible I certify under the penalty of law thlat I have personally examined and am familiar Signature of Date (MMI/DD/I Y)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaininggte intoniation, I believe the Authorized submitted information is true, accurateand complete. I am aware that there are Re resentative significant penalties for submitting false information, including the possibility of ci P
ucl0a fine and imprisonment.
'C.
When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, Page 2 https://ebiz.epa. ohio.gov/edwr.web/page/report/viewWitlhXslt.do?actType=viewWithXslt&f...
5/5/2009
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
3IB00016*ID STATION CODE:
094 MONITORING PERIOD:
2009-04-01 To: 2009-04-30 REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
AL Water Zinc, Total Copper, Total Oxidants, Total Chlorine, Total PARAMETER Temperature Flow Rate Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 4107 4107 4106 4106 FREQUENCY 1/Day 1/Day 2/Week 1/Month 1/Month When Disch.
When Disch.
SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2009-04-01 2009-04-02 2009-04-03 2009-04-04 2009-04-05 2009-04-06 2009-04-07 2009-04-08 2009-04-09 2009-04140 2009-04-11 2009-04-12 2009-04-13 2009-04-14 2009-04-15 2009-04-16 2009-04-17 2009-04-18 2009-04-19 2009-04-20 2009-04-21 2009-04-22 2009-04-23 2009-04-24 2009-04-25 2009-04-26 2009-04-27 2009-04-28 2009-04-29 2009-04-30 Name/Title of Responsible 1 certify under tie penalt oflaw that I have peronally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the infonation submited herein and based o my inquiry of those Responsible Official or Representative individuals immediately responsible fr obtaining tie infnration, I believe the Authorized submitted informationistre, -CCvrateandcomplete lam aware that there are R~presentative significant penalties fr submitting fase infmation, including the possibility of Fine and impriomn.'
When completed mail this report to: EDMR Administrator EDMR Administrator,,OH, Page 3 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do ?actType=viewWithXslt&f..
5/5/2009
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
3IB00016*ID 094 2009-04-01 To: 2009-04-30 AL Chlorination/Bromination PARAMETER Duration PARAMETER 78739 CODE UNITS 6655 FREQUENCY When Disch.
SAMPLING TYPE Total 2009-04-01 2009-04-02 2009-04-03 2009-04-04 2009-04-05 2009-04-06 2009-04-07 2009-04-08 2009-04-09 2009-04-10 2009-04-11 2009-04-12 2009-04-13 2009-04-14 2009-04-15.
2009-04-16 2009-04-17 2009-04-18 2009-04-19 2009-04-20 2009-04-21 2009-04-22 2009-04-23 2009-04-24 2009-04-25 2009-04-26 2009-04-27
'2009-04-28 2009-04-29 2009-04-30 Name/Title of Responsible I certify under the penalty of lawv that I have peronally examined and amn familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submitted herein and based o ryily inquir of those Responsible Official or Representative individuals immediately responsible for obtaining the intonnation, I believe the Authorized submitted infonnation is true, accurate and complete. I am aware that there are Re resentative significant penalties for submitting false information, including the possibility of XZ ii t(
fine and imprisonment.r' When completed mail this report to: E.L)IMK Aomlnistrator,.DMRIVIK AOdministrator,,, OH-t, Paget4 /
/
https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...
5/5/2009
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power PIt 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
31B00016*ID STATION CODE:
601 MONITORING PERIOD:
2009-04-01 To: 2009-04-30 REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
AL PARAMETER Flow Rate pH Total Suspended Oil and Grease, Solids Total PARAMETER CODE 50050 00400 00530 00550 UNITS 4108 6653 4106 4106 FREQUENCY Continuous 1/ 2 Weeks 1/2 Weeks 1/2 Weeks SAMPLING TYPE 24hr Total Grab Grab Grab 2009-04-01 2009-04-02 2009-04-03
-2009-04-04 2009-04-05 2009-04-06 2009-04-07 2009-04-08 2009-04-09 2009-04-10 2009-04-11 2009-04-12 2009-04-13 2009-04-14 2009-04-15 2009-04-16 2009-04-17 2009-04-18 2009-04-19 2009-04-20 2009-04-21 2009-04-22 2009-04-23 2009-04-24 2009-04-25 2009-04-26 2009-04-27 2009-04-28 2009-04-29 2009-04-30 Name/Title of Responsible I certify under tie penalty oflaw that I have persofaallyexainined an amiliar Signature of Date (MM/DD/YY)
Official or Authorized with the information subined herein and based on yy inquir of those Responsible Official or Representative individuals immediately responsible fr obtaining the in'nnation, I believe the Authorized ubmitted information is truvaccurateand complete. I am aware that there are Representative significant penaltiesfrsubmittingflseintonnation, incuding the possibility of fine and imprisonment.
When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH,
/."
PageI /
/
https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f...
5/5/2009
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
3IB00016*ID STATION CODE:
602 MONITORING PERIOD:
2009-04-01 To: 2009-04-30 REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
AL Total Suspended Oil and Grease, Iron, Total Copper, Total PARAMETER Flow Rate pH Solids Total Recoverable Recoverable PARAMETER CODE 50050 00400 00530 00550 00980 01119 UNITS 4108 6653 4106 4106 4107 4107 FREQUENCY Continuous 1 / 2 Weeks i / 2 Weeks 1/2 Weeks 1 /2 Weeks 1/ 2 Weeks SAMPLING TYPE 24hr Total Grab 241r Composite Grab 24hr Composite 241h Composite 2009-04-01 2009-04-02 2009-04-03 2009-04-04 2009-04-05 2009-04-06 2009-04-07 2009-04-08 2009-04-09 2009-04-10 2009-04-11 2009-04-12 2009-04-13 2009-04-14 2009-04-15 2009-04-16 2009-04-17 2009-04-18 2009-04-19 2009-04-20 2009-04-21 2009-04-22 2009-04-23 2009-04-24 2009-04-25.
2009-04-26 2009-04-27 2009-04-28 2009-04-29 2009-04-30 Name/Title of Responsible I certify under the penalt of law that I have peronally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submited herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible fr obtaining the infnnation, I believe the Authorized submitted information is true,accurate and complete. I am aware that there are Representative significant penalties fr Submitting flse information, including the possibility of V P MG dear fine and imprisonment When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, Page/ P
/....
https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f..
5/5/2009
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
31B00016*ID 800 2009-04-01 To: 2009-04-30 CCB-125 Randall Killing Water Zinc, Total Copper, Total Temperature Recoverable Recoverable PARAMETER CODE 00011 01094 01119 UNITS 4103 4107 4107 FREQUENCY 1/Day 1/Month I/Month SAMPLING TYPE Continuous Grab Grab 2009-04-01 41 2009-04-02 42 2009-04-03 43 2009-04-04 43 2009-04-05 44 2009-04-06 45 2009-04-07 44 2009-04-08 41 2009-04-09 41 2009-04-10 43 2009-04-11 43 2009-04-12 43 2009-04-13 43 2009-04-14 43 46.8 AA 4.0 2009-04-15 43 2009-04-16 43 2009-04-17 43 2009-04-18 45 2009-04-19 46 2009-04-20 46 2009-04-21 46 2009-04-22 47 2009-04-23 48 2009-04-24 48 2009-04-25 49 2009-04-26 49 2009-04-27 50 2009-04-28 52 2009-04-29 53 2009-04-30 52 ellll 0 esC f
lgpU}on e
CI cerify Ilunder theG penaHlty otla t.\\Ihat I ha*.ve peronl~t)Ily examinedIl ann am iarmllar nami~t~ e* Uo atretl kDII¢IIU Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the infonnation, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility of C?.
Vpý d 'rfine and imprisonment.
.K/
When completed mail this report to: EDMR Administrator, EDMR Administrator., OH, Page
-https://ebiz.epa.ohio gov/edwr.web/page/reportlviewWithXslt.do?actType=viewWithXslt&f...
5/5/2009
Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 PERMIT NUMBER:
3IB00016*ID MONITORING PERIOD:
2009-04-01 To: 2009-04-30 PARAMETER COMMENTS:
Station Code Parameter Name Parameter Code Date Unit Comment 004 Oxidants, Total Residual 34044 2009-04-01 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-02 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-03 4106 No bromination eventthis date 004 Oxidants, Total Residual 34044 2009-04-04 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-05 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-06 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-07 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-08 4106 No bromnination event this date 004 Oxidants, Total Residual 34044 2009-04-09 4106 No bromination event this date 004 Oxidants, Total Residual 34(044 2009-04-10 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-11 4106 No bromnination event this date 004 Oxidants, Total Residual 34044 2009-04-12 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-13 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-14 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-15 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-16 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-17 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-18 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-19 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-20 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-21 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-22 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-23 4106 No bromination event this date 004 Oxidants, total Residual 34044 2009-04-24 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-25 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-26 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-27 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-28 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-29 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2009-04-30 4106 No bromination event this date https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt&f..