State of Ohio Water Withdrawal Report for the Perry Nuclear Power Plant
ML100280037
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 01/21/2010
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, State of OH, Dept of Natural Resources
References
FOIA/PA-2010-0209, PY-CEI/ODNR-0049L
Download: ML100280037 (3)


Text

FENOC Perry Nuclear Power Station 10 Center Road FirstEnergyNuclear Operating Company Perry Ohio 44081 -

Mark B. Bezilla . 440-280-5382 Fax: 440-280-8029 Vice President 1'Z January 21, 2010.

PY-CEI/ODNR-0049L . -

Ohio Department of Natural Resources Division of Soil and Water Resources Water Planning Program 2045 Morse Road, Bid. B-2 Columbus, Ohio 43229-6693

SUBJECT:

State of Ohio Water Withdrawal Report for the Perry Nuclear Power Plant Enclosed is the State of Ohio Water Withdrawal Report for the Perry Nuclear Power Plant for the year ending December 31, 2009.

If you have questions or require additional information, please contact Mr. Randall Killing at (440) 280-7370.

Sincerely,

,B /

Mark7Be.zi Mark B. Bezilla /

1/

Enclosure cc: NRC Region III NRC Resident Inspector NRR Project Manager NRC Document Control Desk (Docket No. 50-440)

STATE OF OHIO SEND TO: OHIO DEPARTMENT OF NATURAL RESOURCES S

WATER WITHDRAWAL DIVISION OF SOIL AND WATER RESOURCES WATER PLANNING PROGRAM FACILITY REGISTRATION 2045 MORSE ROAD, BLD. B-2 COLUMBUS, OHIO 43229-6693 ANNUAL REPORT FORM (614) 265-6938 AUTHOR/TY: Ohio Revised Code Section 1521.16 requires that any owner of a facility, or combination of facilities, with the capacity to withdraw more than 100,000 gallons of water daily, registersuch facilities and file an annual report with the ODNR, Division of Soil and Water Resources.

Water Withdrawal Report for the Year Ending December 31, 2009 According to our records the Contact is listed as: Please Make Corrections Below Contact Name: RANDALL KILLING Company Name:,FIRST ENERGY NUCLEAR GENERATION CORP.......

Address: 10 CENTER RD. CCB125

.PERRYOH 44081 . . ...... ..... ..

.................... . ......... . ....... . '::: ::..-: '...... ======

=

====

==

==

=

Phone: 440/280-7370 ....... ............

Facility Owner: Please Make Corrections Below (Notify us if facility ownership has changed)

Owner Name:

Company Name:

  • ... FIRST

..... ..... ENERGY

............... ...................... GENERATION

..... . . NUCLEAR ............. ...... CORP

~

BOX~ 97~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~.

Address: P0':Address:~ ... ......

PERRYOH 44081 Phone: 440/259-3737 Facility Name and Withdrawal Mode:

  • County: LA K E _- --.... -..... o ...... ..........................

Registration Number: 0!483 Facility Name: FE-PERRY ELECTRIC GENERATING STATION Registration Date: ..-..... ........... AOT7/. . . . ...... .............

Please note changes in facility status, or naming, in the gray spaces next to the well or intake number(s) below.

's WELL (Ground Water) Identification urface Water) Identification

  • i2 Faiit' INAK

... .'... ." 1,

  • V
  • __ __ ____ WITHDRAWALS NOTE: This pag(emay be photocopied if additional space is required. Please be sure to sign and date each copy.

GROUND WATER (in Units of Millions of Gallons) Registration Number b' SOURCE JAN. FEB. MARCH APRIL MAY JUNE JULY AUG. SEPT OCT. NOV. DEC. TOTAL PER YE WELL NO.

WELL NO.

WELL NO. . .zi WELL NO. . .

WELL NO.

WELL NO.

WELL NO.

WELL NO.

WELL NO:

WELL NO.

WELL NO.

WELL NO.

TOTAL GRAND TOTAL DAYS IN TOTAL OPERATION DAYS OPERATION Are ground water withdrawal amounts based on metered readings? yes no (circle one) If "no," how were the reported withdrawal amounts determined?

(Attach separate sheet, if necessary)

SURFACE WATER, in Units of Millions of Gallons)

,SOURCE JAN. FEB. MARCH APRIL MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. TOTAL PER YEAR

.3 S24.7 X7o 7).37)-3kt>Y ,,-.5-.3cl1,.737o 7"i 9, 7 ,.q7*3

1. 7 INTAKE ,,

INTAKE

  • INTAKE INTAKE TOTAL )Cs-$ ' i237)ý ;)7 '- 3j ,-3V 7 ..1- 97 q*7o7.-ii0 7t[E1 QRAN*TOTAL MAXIMUM 1'3, 0 /00 .3, 1 7 1343 Nj & j q -1 q IIiu MINIMUM -q~4

',~ q(9,. 1D. LC So~p7. 0 1 DAYS IN rTOTAL OPERATION DAYS OPERATION13 -6 J 3 3 33&> 3 -i Are surface water withdrawal amounts based on metered readings? yes (0 (circle one) If "no," how were the reported withdrawal amounts determined?

(Attach separate sheet, if necessary) 3 - j F ', 1 , i ,, . /, . ' , , - - .

RETURN FLOW (in Units of Millions of Gallons)

SOURCE JAN. FEB. MARCH APRIL MAY J UNE JULY AUG. SEPT. OCT. NOV. DEC. TOTAL PER YEAR FLOW iS07 4qq

- 13*7). a j.?.3 1-7R.333* .3)*,OL'-j3j /-t 1737 i">-/ a).7 /-7t FLOW

  • *, GRAND TOTAL TOTAL Ii4-07 ifqq ).;L 37)... ;LQ 3- )79g 36*1. C 3)*L 'o) ( , 1 -7/37 iH),q I D7.q TS-A Are return flow amounts based on metered readings? ( e no (circle one) If "no," how were the reported return flow amounts determined?

(Attach separate sheet, if necessary)

NOTE: Is the information originally supplied on your registration form still correct? C no (circle one) ..

If "no," please attach a separate sheet indicating the nature of the change. If needed, a new registration form will b& forwarded to You so that you may provide this office with the necessary revisions.

Owner or authorized representati 's si nafure . Date DNR 7805e (12/04/G9)