ML082461002: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Robinson Inspection / Activity Plan 09/01/2008
{{#Wiki_filter:Page 1 of 2                                                                                      Robinson 09/02/2008    16:50:55                                                                Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit                                                                                                                          No. of Staff   Planned Dates        Inspection Number      Inspection Activity                                                    Title                                        on Site       Start    End            Type TI-171         - B.5.B PHASE 2&3                                                                                         3 2            IP 2515/171            Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies               09/08/2008 09/12/2008 Generic Safety Inspectio EB3ISI         - INSERVICE INSPECTION                                                                                     1 2            IP 7111108P            Inservice Inspection Activities - PWR                                                                 10/06/2008 10/10/2008 Baseline Inspections PSB1-RP         - RAD PROTECTION OCCUPATIONAL WK1                                                                         2 2            IP 7112101              Access Control to Radiologically Significant Areas                                                   10/13/2008 10/17/2008 Baseline Inspections 2           IP 7112102              ALARA Planning and Controls                                                                           10/13/2008 10/17/2008 Baseline Inspections 2           IP 7112202              Radioactive Material Processing and Transportation                                                   10/13/2008 10/17/2008 Baseline Inspections 2           IP 71151-OR01          Occupational Exposure Control Effectiveness                                                           10/13/2008 10/17/2008 Baseline Inspections 2           IP 71151-PR01          RETS/ODCM Radiological Effluent                                                                       10/13/2008 10/17/2008 Baseline Inspections PSB1-RP         - RAD PROTECTION OCCUPATIONAL WK2                                                                         2 2            IP 7112101              Access Control to Radiologically Significant Areas                                                   10/20/2008 10/24/2008 Baseline Inspections 2           IP 7112102              ALARA Planning and Controls                                                                           10/20/2008 10/24/2008 Baseline Inspections 2           IP 7112202              Radioactive Material Processing and Transportation                                                   10/20/2008 10/24/2008 Baseline Inspections 2           IP 71151-OR01          Occupational Exposure Control Effectiveness                                                           10/20/2008 10/24/2008 Baseline Inspections 2           IP 71151-PR01          RETS/ODCM Radiological Effluent                                                                       10/20/2008 10/24/2008 Baseline Inspections EB3TI172       - EB3 TI-172 RCS DM BUTT WELDS                                                                             1 2            IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds                                                   11/17/2008 11/21/2008 Generic Safety Inspectio PSB1-RP         - RAD PROTECTION PRE-INSPECTION VISIT                                                                     1 2            IP 7112101              Access Control to Radiologically Significant Areas                                                   12/15/2008 12/17/2008 Baseline Inspections PSB1-RP         - RADIATION PROTECTIO PUBLIC BASELINE INSP                                                                 4 2            IP 7112101              Access Control to Radiologically Significant Areas                                                   01/12/2009 01/16/2009 Baseline Inspections 2           IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                                         01/12/2009 01/16/2009 Baseline Inspections 2           IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                             01/12/2009 01/16/2009 Baseline Inspections 2           IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program         01/12/2009 01/16/2009 Baseline Inspections 2           IP 71151-OR01          Occupational Exposure Control Effectiveness                                                           01/12/2009 01/16/2009 Baseline Inspections 2           IP 71151-PR01          RETS/ODCM Radiological Effluent                                                                       01/12/2009 01/16/2009 Baseline Inspections OL RQ           - REQUAL INSPECTION                                                                                       2 2            IP 7111111B            Licensed Operator Requalification Program                                                             03/02/2009 03/06/2009 Baseline Inspections PSB1EP         - EMERGENCY PREPAREDNESS EXERCISE                                                                         3 2            IP 2515/175            Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review                 05/18/2009 05/22/2009 Baseline Inspections 2           IP 7111401              Exercise Evaluation                                                                                   05/18/2009 05/22/2009 EP Baseline Inspection 2            IP 7111404              Emergency Action Level and Emergency Plan Changes                                                     05/18/2009 05/22/2009 EP Baseline Inspection 2           IP 71151-EP02          ERO Drill Participation                                                                               05/18/2009 05/22/2009 Baseline Inspections 2           IP 71151-EP03          Alert & Notification System                                                                           05/18/2009 05/22/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.
-12/31/2009 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 09/02/2008 16:50:55 Report 22 3 TI-171-B.5.B PHASE 2&3 Generic Safety Inspecti o Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 09/08/2008 09/12/2008 2  2515/171 IP 1 EB3ISI-INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 10/06/2008 10/10/2008 2  7111108P IP 2 PSB1-RP-RAD PROTECTION OCCUPATIONAL WK1 Baseline Inspections A ccess Control to Radiologically Significant Areas 10/13/2008 10/17/2008 2   7112101 IP Baseline Inspections A LARA Planning and Controls 10/13/2008 10/17/2008 2   7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/13/2008 10/17/2008 2   7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/13/2008 10/17/2008 2   71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/13/2008 10/17/2008 2  71151-PR01 IP 2 PSB1-RP-RAD PROTECTION OCCUPATIONAL WK2 Baseline Inspections A ccess Control to Radiologically Significant Areas 10/20/2008 10/24/2008 2   7112101 IP Baseline Inspections A LARA Planning and Controls 10/20/2008 10/24/2008 2   7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 10/20/2008 10/24/2008 2   7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 10/20/2008 10/24/2008 2   71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 10/20/2008 10/24/2008 2  71151-PR01 IP 1 EB3TI172-EB3 TI-172 RCS DM BUTT WELDS Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 11/17/2008 11/21/2008 2  2515/172 IP 1 PSB1-RP-RAD PROTECTION PRE-INSPECTION VISIT Baseline Inspections A ccess Control to Radiologically Significant Areas 12/15/2008 12/17/2008 2  7112101 IP 4 PSB1-RP-RADIATION PROTECTIO PUBLIC BASELINE INSP Baseline Inspections A ccess Control to Radiologically Significant Areas 01/12/2009 01/16/2009 2   7112101 IP Baseline Inspections Radiation Monitoring Instrumentation and Protective Equipment 01/12/2009 01/16/2009 2   7112103 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/12/2009 01/16/2009 2   7112201 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 01/12/2009 01/16/2009 2   7112203 IP Baseline Inspections Occupational Exposure Control Effectiveness 01/12/2009 01/16/2009 2   71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 01/12/2009 01/16/2009 2  71151-PR01 IP 2 OL RQ-REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 03/02/2009 03/06/2009 2  7111111B IP 3 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 05/18/2009 05/22/2009 2   2515/175 IP EP Baseline Inspection Exercise Evaluation 05/18/2009 05/22/2009 2  7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 05/18/2009 05/22/2009 2   7111404 IP Baseline Inspections ERO Drill Participation 05/18/2009 05/22/2009 2   71151-EP02 IP Baseline Inspections A lert & Notification System 05/18/2009 05/22/2009 2  71151-EP03 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Robinson Inspection / Activity Plan 09/01/2008
 
-12/31/2009 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 09/02/2008 16:50:55 Report 22 3 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections A lert & Notification System 05/18/2009 05/22/2009 2  71151-EP03 IP 1 EB3-HS-HEAT SINK Baseline Inspections Heat Sink Performance 06/01/2009 06/05/2009 2  7111107B IP 3 OL EXAM-INITIAL EXAM PREP Not Applicable ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 07/06/2009 07/10/2009 2  V23310 3 OL EXAM-INITIAL EXAM - WEEK 1 Not Applicable ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 07/27/2009 07/31/2009 2  V23310 2 OL EXAM-INTIAL EXAM - WEEK2 Not Applicable ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 08/10/2009 08/14/2009 2  V23310 4 EB1-MODS-MODIFICATIONS-10CFR50.59 Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 09/28/2009 10/02/2009 2  7111117B IP This report does not include INPO and OUTAGE activities.
Page 2 of 2                                                                                  Robinson 09/02/2008    16:50:55                                                            Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit                                                                                                              No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                Title                                on Site       Start    End            Type PSB1EP         - EMERGENCY PREPAREDNESS EXERCISE                                                               3 2            IP 71151-EP03          Alert & Notification System                                                               05/18/2009 05/22/2009 Baseline Inspections EB3-HS         - HEAT SINK                                                                                     1 2            IP 7111107B            Heat Sink Performance                                                                     06/01/2009 06/05/2009 Baseline Inspections OL EXAM         - INITIAL EXAM PREP                                                                             3 2              V23310              ROBINSON/JULY 2009 EXAM AT POWER FACILITIES                                               07/06/2009 07/10/2009 Not Applicable OL EXAM         - INITIAL EXAM - WEEK 1                                                                         3 2              V23310              ROBINSON/JULY 2009 EXAM AT POWER FACILITIES                                               07/27/2009 07/31/2009 Not Applicable OL EXAM         - INTIAL EXAM - WEEK2                                                                           2 2              V23310              ROBINSON/JULY 2009 EXAM AT POWER FACILITIES                                               08/10/2009 08/14/2009 Not Applicable EB1-MODS - MODIFICATIONS-10CFR50.59                                                                             4 2            IP 7111117B            Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications             09/28/2009 10/02/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 14:26, 14 November 2019

Inspection / Activity Plan, 09/01/2008 - 12/31/2009, Report 22
ML082461002
Person / Time
Site: Robinson, 07200003  Duke Energy icon.png
Issue date: 09/02/2008
From:
NRC/RGN-II/DRP/RPB4
To:
Shared Package
ML082460989 List:
References
Download: ML082461002 (2)


Text

Page 1 of 2 Robinson 09/02/2008 16:50:55 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TI-171 - B.5.B PHASE 2&3 3 2 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 09/08/2008 09/12/2008 Generic Safety Inspectio EB3ISI - INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/06/2008 10/10/2008 Baseline Inspections PSB1-RP - RAD PROTECTION OCCUPATIONAL WK1 2 2 IP 7112101 Access Control to Radiologically Significant Areas 10/13/2008 10/17/2008 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 10/13/2008 10/17/2008 Baseline Inspections 2 IP 7112202 Radioactive Material Processing and Transportation 10/13/2008 10/17/2008 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 10/13/2008 10/17/2008 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 10/13/2008 10/17/2008 Baseline Inspections PSB1-RP - RAD PROTECTION OCCUPATIONAL WK2 2 2 IP 7112101 Access Control to Radiologically Significant Areas 10/20/2008 10/24/2008 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 10/20/2008 10/24/2008 Baseline Inspections 2 IP 7112202 Radioactive Material Processing and Transportation 10/20/2008 10/24/2008 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 10/20/2008 10/24/2008 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 10/20/2008 10/24/2008 Baseline Inspections EB3TI172 - EB3 TI-172 RCS DM BUTT WELDS 1 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 11/17/2008 11/21/2008 Generic Safety Inspectio PSB1-RP - RAD PROTECTION PRE-INSPECTION VISIT 1 2 IP 7112101 Access Control to Radiologically Significant Areas 12/15/2008 12/17/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTIO PUBLIC BASELINE INSP 4 2 IP 7112101 Access Control to Radiologically Significant Areas 01/12/2009 01/16/2009 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/12/2009 01/16/2009 Baseline Inspections 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/12/2009 01/16/2009 Baseline Inspections 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 01/12/2009 01/16/2009 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 01/12/2009 01/16/2009 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 01/12/2009 01/16/2009 Baseline Inspections OL RQ - REQUAL INSPECTION 2 2 IP 7111111B Licensed Operator Requalification Program 03/02/2009 03/06/2009 Baseline Inspections PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 2 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 05/18/2009 05/22/2009 Baseline Inspections 2 IP 7111401 Exercise Evaluation 05/18/2009 05/22/2009 EP Baseline Inspection 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/18/2009 05/22/2009 EP Baseline Inspection 2 IP 71151-EP02 ERO Drill Participation 05/18/2009 05/22/2009 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System 05/18/2009 05/22/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Robinson 09/02/2008 16:50:55 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 2 IP 71151-EP03 Alert & Notification System 05/18/2009 05/22/2009 Baseline Inspections EB3-HS - HEAT SINK 1 2 IP 7111107B Heat Sink Performance 06/01/2009 06/05/2009 Baseline Inspections OL EXAM - INITIAL EXAM PREP 3 2 V23310 ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 07/06/2009 07/10/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 1 3 2 V23310 ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 07/27/2009 07/31/2009 Not Applicable OL EXAM - INTIAL EXAM - WEEK2 2 2 V23310 ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 08/10/2009 08/14/2009 Not Applicable EB1-MODS - MODIFICATIONS-10CFR50.59 4 2 IP 7111117B Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 09/28/2009 10/02/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.