{{#Wiki_filter:September 8, 2008  
{{#Wiki_filter:UNITED STATES
 
                                NUC LE AR RE G UL AT O RY C O M M I S S I O N
Randall K. Edington, Executive  Vice President, Nuclear/CNO Mail Station 7602 Arizona Public Service Company P.O. Box 52034  
                                                    R E GI ON I V
Phoenix, AZ 85072-2034  
                                        612 EAST LAMAR BLVD , SU I TE 400
  SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNIT 1- NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000528/2008005) AND REQUEST FOR INFORMATION  
                                        AR LI N GTON , TEXAS 76011-4125
                                          September 8, 2008
Dear Mr. Edington:  
Randall K. Edington, Executive
From October 8 to 22, 2008, reactor inspectors from the U. S. Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline inservice inspection at Palo Verde Nuclear Generating Station, Unit 1, using NRC Inspection Procedure 71111.08  
   Vice President, Nuclear/CNO
and Temporary Instruction 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds.Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Section A of the  
Mail Station 7602
enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  
Arizona Public Service Company
P.O. Box 52034
Phoenix, AZ 85072-2034
SUBJECT:       PALO VERDE NUCLEAR GENERATING STATION, UNIT 1- NOTIFICATION
                OF INSPECTION (NRC INSPECTION REPORT 05000528/2008005) AND
                REQUEST FOR INFORMATION
Dear Mr. Edington:
From October 8 to 22, 2008, reactor inspectors from the U. S. Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline inservice inspection at
Palo Verde Nuclear Generating Station, Unit 1, using NRC Inspection Procedure 71111.08
and Temporary Instruction 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
These documents have been divided into two groups. The first group (Section A of the
enclosure) identifies information to be provided prior to the inspection to ensure that the
inspectors are adequately prepared. The second group (Section B of the enclosure) identifies
the information the inspectors will need upon arrival at the site. It is important that all of these
documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Dan Hautala of your licensing
organization. Our inspection dates are subject to change based on your updated schedule of
outage activities. If there are any questions about this inspection or the material requested,
please contact the lead inspector W. Sifre at (817) 860-8193 (Wayne.Sifre@nrc.gov ).


We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Dan Hautala of your licensing organization.  Our inspection dates are subject to change based on your updated schedule of outage activities.  If there are any questions about this inspection or the material requested, please contact the lead inspector W. Sifre at (817) 860-8193 (Wayne.Sifre@nrc.gov
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter
). UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
and its enclosure will be available electronically for public inspection in the NRC Public
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Document Room or from the Publicly Available Records (PARS) component of NRC's
      Sincerely,         /RA/  
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
      Russell L. Bywater, Chief       Engineering Branch 1       Division of Reactor Safety  
                                              Sincerely,
Dockets:   50-528 Licenses: NPF-41  
                                                        /RA/
                                              Russell L. Bywater, Chief
Enclosure: Inservice Inspection Document Request  
                                              Engineering Branch 1
cc w/enclosure:  
                                              Division of Reactor Safety
Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007  
Dockets: 50-528
Licenses: NPF-41
Mr. Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800  
Enclosure:
Rosemead, CA 91770  
Inservice Inspection Document Request
Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor  
cc w/enclosure:
Phoenix, AZ 85003  
Mr. Steve Olea
Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040  
Arizona Corporation Commission
1200 W. Washington Street
Mr. Scott Bauer, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034  
Phoenix, AZ 85007
Phoenix, AZ 85072-2034 
Mr. Douglas Kent Porter
Mr. Dwight C. Mims Vice President Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Mail Station 7605
Senior Counsel
P.O. Box 52034 Phoenix, AZ  85072-2034  
Southern California Edison Company
Mr. Jeffrey T. Weikert Assistant General Counsel
Law Department, Generation Resources
El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX  79901
P.O. Box 800
Mr. Eric Tharp Los Angeles Department of Water & Power
Rosemead, CA 91770
Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100
Chairman
Mr. James Ray
Maricopa County Board of Supervisors
Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM  87107-4224 Mr. Geoffrey M. Cook Southern California Edison Company
301 W. Jefferson, 10th Floor
5000 Pacific Coast Hwy. Bldg. D21 San Clemente, CA  92672
Phoenix, AZ 85003
Mr. Robert Henry Salt River Project
Mr. Aubrey V. Godwin, Director
6504 East Thomas Road Scottsdale, AZ  85251
Arizona Radiation Regulatory Agency
Mr. Brian Almon Public Utility Commission
4814 South 40 Street
William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX  78701-3326
Phoenix, AZ 85040
Ms. Karen O' Regan Environmental Program Manager
Mr. Scott Bauer, Director
City of Phoenix Office of Environmental Programs 200 West Washington Street Phoenix, AZ  85003 
Regulatory Affairs
 
Palo Verde Nuclear Generating Station
Mr. John C. Taylor Director, Nuclear Generation El Paso Electric Company 340 East Palm Lane, Suite 310 Phoenix, AZ  85004
Mail Station 7636
P.O. Box 52034
Chief, Radiological Emergency Preparedness Section National Preparedness Directorate Technological Hazards Division Department of Homeland Security 1111 Broadway, Suite 1200
Phoenix, AZ 85072-2034
Oakland, CA  94607-4052 
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov ) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov ) DRS Director (Roy.Caniano@nrc.gov ) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Ryan.Treadway@nrc.gov ) Resident Inspector (Michelle.Catts@nrc.gov ) Branch Chief, DRP/D (Michael.Hay@nrc.gov) Senior Project Engineer, DRP/D (Don Allen@nrc.gov ) Public Affairs Officer (Victor.Dricks@nrc.gov ) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov ) RITS Coordinator (Marisa.Herrera@nrc.gov ) DRS STA (Dale.Powers@nrc.gov) Mark Cox, OEDO RIV Coordinator (Mark.Cox@nrc.gov ) ROPreports PV Site Secretary (Patricia.Coleman@nrc.gov ) 
   
   
   
    SUNSI Review Completed:  _
RLB__ ADAMS:  Yes Initials:
_RLB__    Publicly Available                Non-Sensitive
 
S:DRS/REPORTS/PV ISI ltr-WCS.      ML082530206 
EB 1 EB 1  C: EB 1 WCSifre MRYoung  RLBywater /RA/ /RA/  /RA/ 9/5 /08 9/5 /08  9/ 8/08 OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax
 
INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates:  October 8 - 22, 2008
Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities"
    TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt      Welds"
Inspectors:  W. Sifre, Senior Reactor Inspector (Lead Inspector - ISI)    M. Young, Reactor Inspector


A. Information Requested for the In-Office Preparation Week
Mr. Dwight C. Mims
The following information (Section A of this enclosure) should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com preferred), in care of W. Sifre, by September 24, 2008, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. *Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.  
Vice President
A.1 ISI/Welding Programs and Schedule Information
Regulatory Affairs and Plant Improvement
  a) A detailed schedule (including preliminary dates) of:
Palo Verde Nuclear Generating Station
Mail Station 7605
P.O. Box 52034
Phoenix, AZ 85072-2034
Mr. Jeffrey T. Weikert
Assistant General Counsel
El Paso Electric Company
Mail Location 167
123 W. Mills
El Paso, TX 79901
Mr. Eric Tharp
Los Angeles Department of Water & Power
Southern California Public Power Authority
P.O. Box 51111, Room 1255-C
Los Angeles, CA 90051-0100
Mr. James Ray
Public Service Company of New Mexico
2401 Aztec NE, MS Z110
Albuquerque, NM 87107-4224
Mr. Geoffrey M. Cook
Southern California Edison Company
5000 Pacific Coast Hwy. Bldg. D21
San Clemente, CA 92672
Mr. Robert Henry
Salt River Project
6504 East Thomas Road
Scottsdale, AZ 85251
Mr. Brian Almon
Public Utility Commission
William B. Travis Building
P.O. Box 13326
1701 North Congress Avenue
Austin, TX 78701-3326
Ms. Karen O' Regan
Environmental Program Manager
City of Phoenix
Office of Environmental Programs
200 West Washington Street
Phoenix, AZ 85003


  i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems and containment, performed as part of your ASME Section XI, Risk Informed (if applicable), and augmented ISI programs during the upcoming outage.  
Mr. John C. Taylor
  Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per ASME Section XI, IWX-2400, (Do not provide separately if other documentation requested contains this information).  
Director, Nuclear Generation
ii) Reactor pressure vessel head (RPVH) examinations planned for the upcoming refueling outage.  
El Paso Electric Company
iii) Examinations planned for Alloy 82/182/600 components that are not included in the Section XI scope (If applicable).  
340 East Palm Lane, Suite 310
iv) Examinations planned as part of your Boric Acid Corrosion Control Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).  
Phoenix, AZ 85004
 
Chief, Radiological Emergency Preparedness Section
v) Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs)).  
National Preparedness Directorate
b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.
Technological Hazards Division
c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code Class 1 & 2 systems since the beginning of the last refueling outage. This should include the previous Section XI pressure test(s) conducted during start up and  
Department of Homeland Security
any evaluations associated with the results of the pressure tests. Also, include in the list the NDE reports with relevant conditions in the RPVH penetration nozzles which have been accepted for continued service. The list of NDE reports should include a brief description of the SSC where the relevant condition was identified.  
1111 Broadway, Suite 1200
d) A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 systems which have been  
Oakland, CA 94607-4052
fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated in this refueling outage.  
 
e) If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to  
Electronic distribution by RIV:
be examined and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these examinations.  
Regional Administrator (Elmo.Collins@nrc.gov )
f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.  
DRP Director (Dwight.Chamberlain@nrc.gov)
g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).  
DRP Deputy Director (Anton.Vegel@nrc.gov )
h) Please provide copies of the most recent self assessments for the ISI, Welding, and Alloy 600 Programs.
DRS Director (Roy.Caniano@nrc.gov )
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Ryan.Treadway@nrc.gov )
Resident Inspector (Michelle.Catts@nrc.gov )
Branch Chief, DRP/D (Michael.Hay@nrc.gov)
Senior Project Engineer, DRP/D (Don Allen@nrc.gov )
Public Affairs Officer (Victor.Dricks@nrc.gov )
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov )
DRS STA (Dale.Powers@nrc.gov)
Mark Cox, OEDO RIV Coordinator (Mark.Cox@nrc.gov )
ROPreports
PV Site Secretary (Patricia.Coleman@nrc.gov )
SUNSI Review Completed: _RLB__ ADAMS: Yes              Initials: _RLB__
                Publicly Available                                Non-Sensitive
S:DRS/REPORTS/PV ISI ltr-WCS.                                          ML082530206
EB 1                  EB 1                                                  C: EB 1
WCSifre              MRYoung                                              RLBywater
/RA/                  /RA/                                                  /RA/
9/5 /08              9/5 /08                                              9/ 8/08
OFFICIAL RECORD COPY T=Telephone                E=E-mail      F=Fax
 
                        INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates:              October 8 - 22, 2008
Inspection Procedures:          IP 71111.08 Inservice Inspection (ISI) Activities
                                TI 2515/172 Reactor Coolant System Dissimilar Metal Butt
                                Welds
Inspectors:                    W. Sifre, Senior Reactor Inspector (Lead Inspector - ISI)
                                M. Young, Reactor Inspector
A.      Information Requested for the In-Office Preparation Week
The following information (Section A of this enclosure) should be sent to the Region IV office in
hard copy or electronic format (ims.certrec.com preferred), in care of W. Sifre, by September 24,
2008, to facilitate the selection of specific items that will be reviewed during the onsite
inspection week. The inspector will select specific items from the information requested below
and then request from your staff additional documents needed during the onsite inspection
week (Section B of this enclosure). We ask that the specific items selected from the lists be
available and ready for review on the first day of inspection. *Please provide requested
documentation electronically if possible. If requested documents are large and only hard copy
formats are available, please inform the inspector(s), and provide subject documentation during
the first day of the onsite inspection. If you have any questions regarding this information
request, please call the inspector as soon as possible.
A.1      ISI/Welding Programs and Schedule Information
        a)      A detailed schedule (including preliminary dates) of:
                i)     Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
                        and containment, performed as part of your ASME Section XI, Risk
                        Informed (if applicable), and augmented ISI programs during the
                        upcoming outage.
                        Provide a status summary of the NDE inspection activities vs. the
                        required inspection period percentages for this Interval by category per
                        ASME Section XI, IWX-2400, (Do not provide separately if other
                        documentation requested contains this information).
                ii)     Reactor pressure vessel head (RPVH) examinations planned for the
                        upcoming refueling outage.
                iii)   Examinations planned for Alloy 82/182/600 components that are not
                        included in the Section XI scope (If applicable).
                iv)     Examinations planned as part of your Boric Acid Corrosion Control
                        Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).
 
          v)       Welding activities that are scheduled to be completed during the
                  upcoming outage (ASME Class 1, 2, or 3 structures, systems, or
                  components (SSCs)).
    b)   A copy of ASME Section XI Code Relief Requests and associated NRC Safety
          Evaluations applicable to the examinations identified above.
    c)   A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant,
          Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
          Class 1 & 2 systems since the beginning of the last refueling outage. This should
          include the previous Section XI pressure test(s) conducted during start up and
          any evaluations associated with the results of the pressure tests. Also, include in
          the list the NDE reports with relevant conditions in the RPVH penetration nozzles
          which have been accepted for continued service. The list of NDE reports should
          include a brief description of the SSC where the relevant condition was identified.
    d)   A list with a brief description (e.g., system, material, pipe size, weld number, and
          NDE performed) of the welds in Code Class 1 and 2 systems which have been
          fabricated due to component repair/replacement activities since the beginning of
          the last refueling outage, or are planned to be fabricated in this refueling outage.
    e)   If reactor vessel weld examinations required by the ASME Code are scheduled to
          occur during the upcoming outage, provide a detailed description of the welds to
          be examined and the extent of the planned examination. Please also provide
          reference numbers for applicable procedures that will be used to conduct these
          examinations.
    f)   Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
          Section XI of the ASME Code that have been identified since the beginning of the
          last refueling outage.
    g)   A list of any temporary non-code repairs in service (e.g., pinhole leaks).
    h)   Please provide copies of the most recent self assessments for the ISI, Welding,
          and Alloy 600 Programs.
A.2 Reactor Pressure Vessel Head (RPVH)
A.2 Reactor Pressure Vessel Head (RPVH)
  a) Provide the detailed scope of the planned NDE of the reactor vessel head which identifies the types of NDE methods to be used on each specific part of the vessel head to fulfill commitments made in response to NRC Bulletin 2002-02 and NRC Order EA-03-009. Also, include examination scope expansion criteria and planned expansion sample sizes if relevant conditions are identified (if applicable).  
    a)   Provide the detailed scope of the planned NDE of the reactor vessel head which
b) A list of the standards and/or requirements that will be used to evaluate indications identified during NDE of the reactor vessel head (e.g., the specific industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).
          identifies the types of NDE methods to be used on each specific part of the
A.3 Boric Acid Corrosion Control Program (BACCP)
          vessel head to fulfill commitments made in response to NRC Bulletin 2002-02
  a) Copy of the procedures that govern the scope, equipment and implementation of the inspections required to identify boric acid leakage and the procedures for boric acid leakage/corrosion evaluation.  
          and NRC Order EA-03-009. Also, include examination scope expansion criteria
b) Please provide a list of leaks (including Code class of the components) that have been identified since the last refueling outage and associated corrective action documentation. If during the last cycle, the Unit was shutdown, please provide documentation of containment walkdown inspections performed as part of the  
          and planned expansion sample sizes if relevant conditions are identified (if
BACCP. c) Please provide a copy of the most recent self-assessment performed for the BACCP.
          applicable).
    b)   A list of the standards and/or requirements that will be used to evaluate
          indications identified during NDE of the reactor vessel head (e.g., the specific
          industry or procedural standards which will be used to evaluate potential leakage
          and/or flaw indications).
 
A.3 Boric Acid Corrosion Control Program (BACCP)
    a)     Copy of the procedures that govern the scope, equipment and implementation of
          the inspections required to identify boric acid leakage and the procedures for
          boric acid leakage/corrosion evaluation.
    b)     Please provide a list of leaks (including Code class of the components) that have
          been identified since the last refueling outage and associated corrective action
          documentation. If during the last cycle, the Unit was shutdown, please provide
          documentation of containment walkdown inspections performed as part of the
          BACCP.
    c)     Please provide a copy of the most recent self-assessment performed for the
          BACCP.
A.4 Steam Generator Tube (SGT) Inspections
A.4 Steam Generator Tube (SGT) Inspections
  a) A detailed schedule of:  
    a)     A detailed schedule of:
i) SGT inspection, data analyses, and repair activities for the upcoming outage (if occurring).  
          i)     SGT inspection, data analyses, and repair activities for the upcoming
ii) SG secondary side inspection activities for the upcoming outage (if occurring).  
                  outage (if occurring).
b) Please provide a copy of your SG ISI Inspection Program and Plan. Please include a copy of the Operational Assessment from last outage and a copy of the  
          ii)     SG secondary side inspection activities for the upcoming outage (if
following documents as they become available:
                  occurring).
i) Degradation Assessment ii) Condition Monitoring Assessment  
    b)     Please provide a copy of your SG ISI Inspection Program and Plan. Please
c) If you are planning on modifying your Technical Specifications such that they are consistent with TSTF-449, please provide copies of your correspondence with the NRC regarding deviations from the STS.  
          include a copy of the Operational Assessment from last outage and a copy of the
d) Copy of SG history documentation given to vendors performing eddy current (ET) testing of the SGs during the upcoming outage.  
          following documents as they become available:
e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy Current Technique Specification Sheets (ETSS). Additionally, please provide a copy of EPRI Appendix H ETSS Qualification Records.  
          i)     Degradation Assessment
f) Identify and quantify any SGT leakage experienced during the previous operating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition (If applicable).  
          ii)     Condition Monitoring Assessment
g) Provide past history of the condition and issues pertaining to the secondary side of the steam generators (including items such as loose parts, fouling, top of tube  
    c)     If you are planning on modifying your Technical Specifications such that they are
sheet condition, crud removal amounts, etc.).
          consistent with TSTF-449, please provide copies of your correspondence with
h) Please provide copies of your most recent self assessments of the SG monitoring, loose parts monitoring, and secondary side water chemistry control programs.  
          the NRC regarding deviations from the STS.
i) Please also indicate where the primary, secondary, and resolution analyses are scheduled to take place.  
    d)     Copy of SG history documentation given to vendors performing eddy current (ET)
j) Please provide a summary of the scope of the SGT examinations, including examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the percentage of tubes to be examined. *Do not provide these documents separately if already included in other information requested.   A.5 Metals Reliability (MRP-139) Program Activities
          testing of the SGs during the upcoming outage.
  a) A list of, with verification that, the baseline inspections of all applicable Dissimilar Metal Butt Welds (DMBWs) have been completed by December 31, 2007.  
    e)     Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs have been included in the inspection program and that the schedules for the baseline inspections are consistent with the baseline schedules in MRP-139.  
          Current Technique Specification Sheets (ETSS). Additionally, please provide a
c) A list and schedule (examination dates) of all DMBW examinations planned for the upcoming refueling outage. If none are scheduled, then data from previous examinations should be available for review.  
          copy of EPRI Appendix H ETSS Qualification Records.
d) A list and schedule for any welding to be performed on DMBWs in the upcoming outage. If no welding will be performed then provide records of previous welding  
    f)     Identify and quantify any SGT leakage experienced during the previous operating
on DMBWs and postweld NDE documentation.  
          cycle. Also provide documentation identifying which SG was leaking and
e) A list and schedule of any stress improvement (SI) activities planned for the upcoming refueling outage. If none are scheduled then have qualification reports for any SIs previously performed.  
          corrective actions completed or planned for this condition (If applicable).
f) Documentation and description of how the baseline and inservice inspection specifications in MRP-139 are satisfied at your facility.  
    g)     Provide past history of the condition and issues pertaining to the secondary side
A.6 Additional information related to all ISI activities
          of the steam generators (including items such as loose parts, fouling, top of tube
  a) A list with a brief description of ISI, BACCP, and SGT inspection related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Unit 1). For example, a list based upon data base searches using key words related to piping or SG tube degradation such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/SGT examinations.  
          sheet condition, crud removal amounts, etc.).
b) Please provide names and phone numbers for the following program leads:  
 
ISI contacts (Examination, planning) Containment Exams  
    h)     Please provide copies of your most recent self assessments of the SG
RPVH Exams
          monitoring, loose parts monitoring, and secondary side water chemistry control
Snubbers and Supports Repair and Replacement Program Manager Licensing Contact Site Welding Engineer Boric Acid Corrosion Control Program SG Inspection Activities (site lead and vendor contact)  
          programs.
    i)     Please also indicate where the primary, secondary, and resolution analyses are
B. Information to be provided onsite to the inspector(s) at the entrance meeting (October 8, 2008):
          scheduled to take place.
  B.1 ISI / Welding Programs and Schedule Information
    j)     Please provide a summary of the scope of the SGT examinations, including
  a) Updated schedules for ISI/NDE activities, including SGT inspections, planned welding activities, and schedule showing contingency repair plans, if available.  
          examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the
b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists provided from section A of this enclosure, please provide copies of the following documentation for each subject weld:  
          percentage of tubes to be examined. *Do not provide these documents
i) Weld data sheet (traveler) ii) Weld configuration and system location iii) Applicable Code Edition and Addenda for weldment iv) Applicable Code Edition and Addenda for welding procedures  
          separately if already included in other information requested.
v) Applicable weld procedures (WPS) used to fabricate the welds vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v vii) Copies of mechanical test reports identified in the PQRs above viii) Copies of the nonconformance reports for the selected welds (If applicable) ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (If RT was performed) x) Copies of the preservice examination records for the selected welds. xi) Copies of welder performance qualifications records applicable to the selected welds, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (at least six months prior to the date of subject work) xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable  
A.5 Metals Reliability (MRP-139) Program Activities
c) For the ISI related corrective action issues selected by the inspector(s) from section A of this enclosure, provide a copy of the corrective actions and supporting documentation.  
    a)     A list of, with verification that, the baseline inspections of all applicable Dissimilar
d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems selected by the inspector from section A above, provide a copy of the examination records, examiner qualification records, and associated corrective action documents.  
          Metal Butt Welds (DMBWs) have been completed by December 31, 2007.
e) A copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval.
    b)     Verification that baseline inspection of hot leg and cold leg temperature DMBWs
 
          have been included in the inspection program and that the schedules for the
f) For the NDEs selected by the inspector from section A of this enclosure, provide copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME Code, Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also,  
          baseline inspections are consistent with the baseline schedules in MRP-139.
include qualification documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers) and NDE personnel qualification records.  
    c)     A list and schedule (examination dates) of all DMBW examinations planned for
B.2 Reactor Pressure Vessel Head (RPVH)
          the upcoming refueling outage. If none are scheduled, then data from previous
  a) Provide the NDE personnel qualification records for the examiners who will perform examinations of the RPVH.
          examinations should be available for review.
b) Provide drawings showing the following (If a visual examination is planned for the upcoming refueling outage):  
    d)     A list and schedule for any welding to be performed on DMBWs in the upcoming
i) RPVH and CRDM nozzle configurations ii) RPVH insulation configuration
          outage. If no welding will be performed then provide records of previous welding
The drawings listed above should include fabrication drawings for the nozzle attachment welds as applicable.
          on DMBWs and postweld NDE documentation.
c) Copy of NDE reports from the last RPVH examination.  
    e)     A list and schedule of any stress improvement (SI) activities planned for the
d) Copy of evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95% minimum coverage required by  
          upcoming refueling outage. If none are scheduled then have qualification reports
NRC Order EA-03-009 (If a visual examination is planned for the upcoming refueling outage).  
          for any SIs previously performed.
e) Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the RPVH. If no explicit procedures exist which govern this activity, provide a description of the process to be followed including personnel responsibilities and expectations.
    f)     Documentation and description of how the baseline and inservice inspection
f) Provide a copy of the updated calculation of effective degradation years (EDY) for the RPVH susceptibility ranking.  
          specifications in MRP-139 are satisfied at your facility.
g) Provide copy of the vendor qualification report(s) that demonstrates the detection capability of the NDE equipment used for the RPVH examinations. Also, identify any changes in equipment configurations used for the RPVH examinations which differ from that used in the vendor qualification report(s).  
A.6 Additional information related to all ISI activities
B.3 Boric Acid Corrosion Control Program (BACCP)
    a)     A list with a brief description of ISI, BACCP, and SGT inspection related issues
  a) Please provide boric acid walkdown inspection results, an updated list of boric acid leaks identified so far this outage, associated corrective action documentation, and overall status of planned boric acid inspections.  
          (e.g., condition reports) entered into your corrective action program since the
 
          beginning of the last refueling outage (for Unit 1). For example, a list based upon
b) Please provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage. Please include a status of corrective actions to repair and/or clean these boric acid leaks. Please identify specifically which known leaks, if any, have remained in service or will remain in service as active leaks.
          data base searches using key words related to piping or SG tube degradation
B.4 Steam Generator Tube (SGT) Inspections
          such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust,
  a) Copies of the Examination Technique Specification Sheets (ETSS) and associated justification for any revisions.  
          corrosion, boric acid, or errors in piping/SGT examinations.
b) Copy of the guidance to be followed if a loose part or foreign material is identified in the SGs.  
    b)     Please provide names and phone numbers for the following program leads:
c) Please provide a copy of the ET procedures used to perform the SGT inspections (specifically calibration and flaw characterization/sizing procedures, etc.). Also include documentation for the specific equipment to be used.  
          ISI contacts (Examination, planning)
d) Please provide copies of your responses to NRC and industry operating experience communications such as Generic Letters, Information Notices, etc. (as applicable to SGT inspections) *Do not provide these documents separately if already included in other information requested such as the degradation assessment.  
          Containment Exams
e) List of corrective action documents generated by the vendor and/or site with respect to SG inspection activities.  
          RPVH Exams
B.5 Codes and Standards
 
  a) Ready access to (i.e., copies provided to the inspector(s) for use during the inspection at the onsite inspection location, or room number and location where available):  
          Snubbers and Supports
i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the inservice inspection program and the repair/replacement program.
          Repair and Replacement Program Manager
ii) EPRI and industry standards referenced in the procedures used to perform the SGT eddy current examination.  
          Licensing Contact
Inspector Contact Information:  
          Site Welding Engineer
Wayne C. Sifre Matthew R.Young Senior Reactor Inspector Reactor Inspector 817-860-8193   817-276-6545 wayne.sifre@nrc.gov
          Boric Acid Corrosion Control Program
  matthew.young@nrc.gov
          SG Inspection Activities (site lead and vendor contact)
  Mailing Address: US NRC Region IV Attn: W. Sifre 612 East Lamar Blvd, Suite 400  
B. Information to be provided onsite to the inspector(s) at the entrance meeting
    (October 8, 2008):
B.1 ISI / Welding Programs and Schedule Information
    a)     Updated schedules for ISI/NDE activities, including SGT inspections, planned
          welding activities, and schedule showing contingency repair plans, if available.
    b)     For ASME Code Class 1 and 2 welds selected by the inspector from the lists
          provided from section A of this enclosure, please provide copies of the following
          documentation for each subject weld:
          i)     Weld data sheet (traveler)
          ii)     Weld configuration and system location
          iii)   Applicable Code Edition and Addenda for weldment
          iv)     Applicable Code Edition and Addenda for welding procedures
          v)     Applicable weld procedures (WPS) used to fabricate the welds
          vi)     Copies of procedure qualification records (PQRs) supporting the WPS
                  from B.1.b.v
          vii)   Copies of mechanical test reports identified in the PQRs above
          viii)   Copies of the nonconformance reports for the selected welds (If
                  applicable)
          ix)     Radiographs of the selected welds and access to equipment to allow
                  viewing radiographs (If RT was performed)
          x)     Copies of the preservice examination records for the selected welds.
          xi)     Copies of welder performance qualifications records applicable to the
                  selected welds, including documentation that welder maintained
                  proficiency in the applicable welding processes specified in the WPS (at
                  least six months prior to the date of subject work)
          xii)   Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
    c)     For the ISI related corrective action issues selected by the inspector(s) from
          section A of this enclosure, provide a copy of the corrective actions and
          supporting documentation.
    d)     For the NDE reports with relevant conditions on Code Class 1 & 2 systems
          selected by the inspector from section A above, provide a copy of the
          examination records, examiner qualification records, and associated corrective
          action documents.
    e)     A copy of (or ready access to) most current revision of the ISI Program Manual
          and Plan for the current Interval.
 
    f)     For the NDEs selected by the inspector from section A of this enclosure, provide
          copy of the NDE procedures used to perform the examinations (including
          calibration and flaw characterization/sizing procedures). For ultrasonic
          examination procedures qualified in accordance with ASME Code, Section XI,
          Appendix VIII, provide documentation supporting the procedure qualification
          (e.g., the EPRI performance demonstration qualification summary sheets). Also,
          include qualification documentation of the specific equipment to be used (e.g.,
          ultrasonic unit, cables, and transducers including serial numbers) and NDE
          personnel qualification records.
B.2 Reactor Pressure Vessel Head (RPVH)
    a)     Provide the NDE personnel qualification records for the examiners who will
          perform examinations of the RPVH.
    b)     Provide drawings showing the following (If a visual examination is planned for the
          upcoming refueling outage):
          i)       RPVH and CRDM nozzle configurations
          ii)     RPVH insulation configuration
          The drawings listed above should include fabrication drawings for the nozzle
          attachment welds as applicable.
    c)     Copy of NDE reports from the last RPVH examination.
    d)     Copy of evaluation or calculation demonstrating that the scope of the visual
          examination of the upper head will meet the 95% minimum coverage required by
          NRC Order EA-03-009 (If a visual examination is planned for the upcoming
          refueling outage).
    e)     Provide a copy of the procedures that will be used to identify the source of any
          boric acid deposits identified on the RPVH. If no explicit procedures exist which
          govern this activity, provide a description of the process to be followed including
          personnel responsibilities and expectations.
    f)     Provide a copy of the updated calculation of effective degradation years (EDY)
          for the RPVH susceptibility ranking.
    g)     Provide copy of the vendor qualification report(s) that demonstrates the detection
          capability of the NDE equipment used for the RPVH examinations. Also, identify
          any changes in equipment configurations used for the RPVH examinations which
          differ from that used in the vendor qualification report(s).
B.3 Boric Acid Corrosion Control Program (BACCP)
    a)     Please provide boric acid walkdown inspection results, an updated list of boric
          acid leaks identified so far this outage, associated corrective action
          documentation, and overall status of planned boric acid inspections.
 
        b)     Please provide any engineering evaluations completed for boric acid leaks
              identified since the end of the last refueling outage. Please include a status of
              corrective actions to repair and/or clean these boric acid leaks. Please identify
              specifically which known leaks, if any, have remained in service or will remain in
              service as active leaks.
B.4     Steam Generator Tube (SGT) Inspections
        a)     Copies of the Examination Technique Specification Sheets (ETSS) and
              associated justification for any revisions.
        b)     Copy of the guidance to be followed if a loose part or foreign material is identified
              in the SGs.
        c)     Please provide a copy of the ET procedures used to perform the SGT
              inspections (specifically calibration and flaw characterization/sizing procedures,
              etc.). Also include documentation for the specific equipment to be used.
        d)     Please provide copies of your responses to NRC and industry operating
              experience communications such as Generic Letters, Information Notices, etc.
              (as applicable to SGT inspections) *Do not provide these documents separately if
              already included in other information requested such as the degradation
              assessment.
        e)     List of corrective action documents generated by the vendor and/or site with
              respect to SG inspection activities.
B.5     Codes and Standards
        a)     Ready access to (i.e., copies provided to the inspector(s) for use during the
              inspection at the onsite inspection location, or room number and location where
              available):
              i)       Applicable Editions of the ASME Code (Sections V, IX and XI) for the
                        inservice inspection program and the repair/replacement program.
              ii)     EPRI and industry standards referenced in the procedures used to
                        perform the SGT eddy current examination.
Inspector Contact Information:
Wayne C. Sifre                 Matthew R.Young
Senior Reactor Inspector       Reactor Inspector
817-860-8193                   817-276-6545
wayne.sifre@nrc.gov             matthew.young@nrc.gov
Mailing Address:
US NRC Region IV
Attn: W. Sifre
612 East Lamar Blvd, Suite 400
Arlington, TX 76011
Arlington, TX 76011
}}
}}

Latest revision as of 13:09, 14 November 2019

IR 05000528-08-005, on 10/8-22/2008, Palo Verde Nuclear Generating Station, Unit 1 - Notification of Inspection
ML082530206
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/08/2008
From: Russ Bywater
Region 4 Engineering Branch 1
To: Edington R
Arizona Public Service Co
References
IR-08-005
Download: ML082530206 (12)


See also: IR 05000528/2008005

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

September 8, 2008

Randall K. Edington, Executive

Vice President, Nuclear/CNO

Mail Station 7602

Arizona Public Service Company

P.O. Box 52034

Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNIT 1- NOTIFICATION

OF INSPECTION (NRC INSPECTION REPORT 05000528/2008005) AND

REQUEST FOR INFORMATION

Dear Mr. Edington:

From October 8 to 22, 2008, reactor inspectors from the U. S. Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inservice inspection at

Palo Verde Nuclear Generating Station, Unit 1, using NRC Inspection Procedure 71111.08

and Temporary Instruction 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

These documents have been divided into two groups. The first group (Section A of the

enclosure) identifies information to be provided prior to the inspection to ensure that the

inspectors are adequately prepared. The second group (Section B of the enclosure) identifies

the information the inspectors will need upon arrival at the site. It is important that all of these

documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Dan Hautala of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector W. Sifre at (817) 860-8193 (Wayne.Sifre@nrc.gov ).

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Russell L. Bywater, Chief

Engineering Branch 1

Division of Reactor Safety

Dockets: 50-528

Licenses: NPF-41

Enclosure:

Inservice Inspection Document Request

cc w/enclosure:

Mr. Steve Olea

Arizona Corporation Commission

1200 W. Washington Street

Phoenix, AZ 85007

Mr. Douglas Kent Porter

Senior Counsel

Southern California Edison Company

Law Department, Generation Resources

P.O. Box 800

Rosemead, CA 91770

Chairman

Maricopa County Board of Supervisors

301 W. Jefferson, 10th Floor

Phoenix, AZ 85003

Mr. Aubrey V. Godwin, Director

Arizona Radiation Regulatory Agency

4814 South 40 Street

Phoenix, AZ 85040

Mr. Scott Bauer, Director

Regulatory Affairs

Palo Verde Nuclear Generating Station

Mail Station 7636

P.O. Box 52034

Phoenix, AZ 85072-2034

Mr. Dwight C. Mims

Vice President

Regulatory Affairs and Plant Improvement

Palo Verde Nuclear Generating Station

Mail Station 7605

P.O. Box 52034

Phoenix, AZ 85072-2034

Mr. Jeffrey T. Weikert

Assistant General Counsel

El Paso Electric Company

Mail Location 167

123 W. Mills

El Paso, TX 79901

Mr. Eric Tharp

Los Angeles Department of Water & Power

Southern California Public Power Authority

P.O. Box 51111, Room 1255-C

Los Angeles, CA 90051-0100

Mr. James Ray

Public Service Company of New Mexico

2401 Aztec NE, MS Z110

Albuquerque, NM 87107-4224

Mr. Geoffrey M. Cook

Southern California Edison Company

5000 Pacific Coast Hwy. Bldg. D21

San Clemente, CA 92672

Mr. Robert Henry

Salt River Project

6504 East Thomas Road

Scottsdale, AZ 85251

Mr. Brian Almon

Public Utility Commission

William B. Travis Building

P.O. Box 13326

1701 North Congress Avenue

Austin, TX 78701-3326

Ms. Karen O' Regan

Environmental Program Manager

City of Phoenix

Office of Environmental Programs

200 West Washington Street

Phoenix, AZ 85003

Mr. John C. Taylor

Director, Nuclear Generation

El Paso Electric Company

340 East Palm Lane, Suite 310

Phoenix, AZ 85004

Chief, Radiological Emergency Preparedness Section

National Preparedness Directorate

Technological Hazards Division

Department of Homeland Security

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Ryan.Treadway@nrc.gov )

Resident Inspector (Michelle.Catts@nrc.gov )

Branch Chief, DRP/D (Michael.Hay@nrc.gov)

Senior Project Engineer, DRP/D (Don Allen@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

DRS STA (Dale.Powers@nrc.gov)

Mark Cox, OEDO RIV Coordinator (Mark.Cox@nrc.gov )

ROPreports

PV Site Secretary (Patricia.Coleman@nrc.gov )

SUNSI Review Completed: _RLB__ ADAMS: Yes Initials: _RLB__

Publicly Available Non-Sensitive

S:DRS/REPORTS/PV ISI ltr-WCS. ML082530206

EB 1 EB 1 C: EB 1

WCSifre MRYoung RLBywater

/RA/ /RA/ /RA/

9/5 /08 9/5 /08 9/ 8/08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates: October 8 - 22, 2008

Inspection Procedures: IP 71111.08 Inservice Inspection (ISI) Activities

TI 2515/172 Reactor Coolant System Dissimilar Metal Butt

Welds

Inspectors: W. Sifre, Senior Reactor Inspector (Lead Inspector - ISI)

M. Young, Reactor Inspector

A. Information Requested for the In-Office Preparation Week

The following information (Section A of this enclosure) should be sent to the Region IV office in

hard copy or electronic format (ims.certrec.com preferred), in care of W. Sifre, by September 24,

2008, to facilitate the selection of specific items that will be reviewed during the onsite

inspection week. The inspector will select specific items from the information requested below

and then request from your staff additional documents needed during the onsite inspection

week (Section B of this enclosure). We ask that the specific items selected from the lists be

available and ready for review on the first day of inspection. *Please provide requested

documentation electronically if possible. If requested documents are large and only hard copy

formats are available, please inform the inspector(s), and provide subject documentation during

the first day of the onsite inspection. If you have any questions regarding this information

request, please call the inspector as soon as possible.

A.1 ISI/Welding Programs and Schedule Information

a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400, (Do not provide separately if other

documentation requested contains this information).

ii) Reactor pressure vessel head (RPVH) examinations planned for the

upcoming refueling outage.

iii) Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope (If applicable).

iv) Examinations planned as part of your Boric Acid Corrosion Control

Program (Mode 3 walkdowns, bolted connection walkdowns, etc.).

v) Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs)).

b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

Class 1 & 2 systems since the beginning of the last refueling outage. This should

include the previousSection XI pressure test(s) conducted during start up and

any evaluations associated with the results of the pressure tests. Also, include in

the list the NDE reports with relevant conditions in the RPVH penetration nozzles

which have been accepted for continued service. The list of NDE reports should

include a brief description of the SSC where the relevant condition was identified.

d) A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated in this refueling outage.

e) If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h) Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the

vessel head to fulfill commitments made in response to NRC Bulletin 2002-02

and NRC Order EA-03-009. Also, include examination scope expansion criteria

and planned expansion sample sizes if relevant conditions are identified (if

applicable).

b) A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the reactor vessel head (e.g., the specific

industry or procedural standards which will be used to evaluate potential leakage

and/or flaw indications).

A.3 Boric Acid Corrosion Control Program (BACCP)

a) Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b) Please provide a list of leaks (including Code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the Unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

BACCP.

c) Please provide a copy of the most recent self-assessment performed for the

BACCP.

A.4 Steam Generator Tube (SGT) Inspections

a) A detailed schedule of:

i) SGT inspection, data analyses, and repair activities for the upcoming

outage (if occurring).

ii) SG secondary side inspection activities for the upcoming outage (if

occurring).

b) Please provide a copy of your SG ISI Inspection Program and Plan. Please

include a copy of the Operational Assessment from last outage and a copy of the

following documents as they become available:

i) Degradation Assessment

ii) Condition Monitoring Assessment

c) If you are planning on modifying your Technical Specifications such that they are

consistent with TSTF-449, please provide copies of your correspondence with

the NRC regarding deviations from the STS.

d) Copy of SG history documentation given to vendors performing eddy current (ET)

testing of the SGs during the upcoming outage.

e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy

Current Technique Specification Sheets (ETSS). Additionally, please provide a

copy of EPRI Appendix H ETSS Qualification Records.

f) Identify and quantify any SGT leakage experienced during the previous operating

cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition (If applicable).

g) Provide past history of the condition and issues pertaining to the secondary side

of the steam generators (including items such as loose parts, fouling, top of tube

sheet condition, crud removal amounts, etc.).

h) Please provide copies of your most recent self assessments of the SG

monitoring, loose parts monitoring, and secondary side water chemistry control

programs.

i) Please also indicate where the primary, secondary, and resolution analyses are

scheduled to take place.

j) Please provide a summary of the scope of the SGT examinations, including

examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the

percentage of tubes to be examined. *Do not provide these documents

separately if already included in other information requested.

A.5 Metals Reliability (MRP-139) Program Activities

a) A list of, with verification that, the baseline inspections of all applicable Dissimilar

Metal Butt Welds (DMBWs) have been completed by December 31, 2007.

b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

c) A list and schedule (examination dates) of all DMBW examinations planned for

the upcoming refueling outage. If none are scheduled, then data from previous

examinations should be available for review.

d) A list and schedule for any welding to be performed on DMBWs in the upcoming

outage. If no welding will be performed then provide records of previous welding

on DMBWs and postweld NDE documentation.

e) A list and schedule of any stress improvement (SI) activities planned for the

upcoming refueling outage. If none are scheduled then have qualification reports

for any SIs previously performed.

f) Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

A.6 Additional information related to all ISI activities

a) A list with a brief description of ISI, BACCP, and SGT inspection related issues

(e.g., condition reports) entered into your corrective action program since the

beginning of the last refueling outage (for Unit 1). For example, a list based upon

data base searches using key words related to piping or SG tube degradation

such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust,

corrosion, boric acid, or errors in piping/SGT examinations.

b) Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

B. Information to be provided onsite to the inspector(s) at the entrance meeting

(October 8, 2008):

B.1 ISI / Welding Programs and Schedule Information

a) Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i) Weld data sheet (traveler)

ii) Weld configuration and system location

iii) Applicable Code Edition and Addenda for weldment

iv) Applicable Code Edition and Addenda for welding procedures

v) Applicable weld procedures (WPS) used to fabricate the welds

vi) Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii) Copies of mechanical test reports identified in the PQRs above

viii) Copies of the nonconformance reports for the selected welds (If

applicable)

ix) Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

x) Copies of the preservice examination records for the selected welds.

xi) Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

proficiency in the applicable welding processes specified in the WPS (at

least six months prior to the date of subject work)

xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

c) For the ISI related corrective action issues selected by the inspector(s) from

section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems

selected by the inspector from section A above, provide a copy of the

examination records, examiner qualification records, and associated corrective

action documents.

e) A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f) For the NDEs selected by the inspector from section A of this enclosure, provide

copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used (e.g.,

ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

B.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the NDE personnel qualification records for the examiners who will

perform examinations of the RPVH.

b) Provide drawings showing the following (If a visual examination is planned for the

upcoming refueling outage):

i) RPVH and CRDM nozzle configurations

ii) RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle

attachment welds as applicable.

c) Copy of NDE reports from the last RPVH examination.

d) Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95% minimum coverage required by

NRC Order EA-03-009 (If a visual examination is planned for the upcoming

refueling outage).

e) Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the RPVH. If no explicit procedures exist which

govern this activity, provide a description of the process to be followed including

personnel responsibilities and expectations.

f) Provide a copy of the updated calculation of effective degradation years (EDY)

for the RPVH susceptibility ranking.

g) Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the NDE equipment used for the RPVH examinations. Also, identify

any changes in equipment configurations used for the RPVH examinations which

differ from that used in the vendor qualification report(s).

B.3 Boric Acid Corrosion Control Program (BACCP)

a) Please provide boric acid walkdown inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and overall status of planned boric acid inspections.

b) Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please identify

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4 Steam Generator Tube (SGT) Inspections

a) Copies of the Examination Technique Specification Sheets (ETSS) and

associated justification for any revisions.

b) Copy of the guidance to be followed if a loose part or foreign material is identified

in the SGs.

c) Please provide a copy of the ET procedures used to perform the SGT

inspections (specifically calibration and flaw characterization/sizing procedures,

etc.). Also include documentation for the specific equipment to be used.

d) Please provide copies of your responses to NRC and industry operating

experience communications such as Generic Letters, Information Notices, etc.

(as applicable to SGT inspections) *Do not provide these documents separately if

already included in other information requested such as the degradation

assessment.

e) List of corrective action documents generated by the vendor and/or site with

respect to SG inspection activities.

B.5 Codes and Standards

a) Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the

inservice inspection program and the repair/replacement program.

ii) EPRI and industry standards referenced in the procedures used to

perform the SGT eddy current examination.

Inspector Contact Information:

Wayne C. Sifre Matthew R.Young

Senior Reactor Inspector Reactor Inspector

817-860-8193 817-276-6545

wayne.sifre@nrc.gov matthew.young@nrc.gov

Mailing Address:

US NRC Region IV

Attn: W. Sifre

612 East Lamar Blvd, Suite 400

Arlington, TX 76011