|
|
(One intermediate revision by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML082750537 | | | number = ML082750537 |
| | issue date = 09/30/2008 | | | issue date = 09/30/2008 |
| | title = 2008-09 - Post Exam Analysis | | | title = 09 - Post Exam Analysis |
| | author name = Arbour W | | | author name = Arbour W |
| | author affiliation = Southern California Edison Co | | | author affiliation = Southern California Edison Co |
| | addressee name = Garchow S M | | | addressee name = Garchow S |
| | addressee affiliation = NRC/RGN-IV/DRS/OB | | | addressee affiliation = NRC/RGN-IV/DRS/OB |
| | docket = 05000206, 05000361, 05000362 | | | docket = 05000206, 05000361, 05000362 |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:SOUTHLRN CAllrolmlA | | {{#Wiki_filter:SOUTHLRN CAllrolmlA |
| ..... EDISON \I1 rnrsu,\ "'TLH.\ lno.\\/ | | ..... EDISON |
| September 30, 2008 Mr. Steve Region Texas Health Resources 611 Ryan Plaza, Suite # Arlington, TX | | \I1 rnrsu,\ "'TLH.\ lno.\\/ C"l1Ip"n~ |
| | September 30, 2008 Mr. Steve Garchow USNRC Region IV Texas Health Resources Tower 611 Ryan Plaza, Suite # 400 Arlington, TX 76011-4005 |
|
| |
|
| ==Dear Mr. Garchow:== | | ==Dear Mr. Garchow:== |
| | |
| Please fmd enclosed the following for the September 2008 San Onofre Written exam; SONGS September 2008 ES-403-1, Written Examination Grading Quality Checklist Exam Seating Chart Exam Analysis for the September 2008 SONGS Exam Exam Proctor Fonus documenting applicant questions and clarifications Each Applicants original answer sheet and exam coversheet A clean copy of each answer sheet Copies ofES-201-3 Examination Security Agreement forms Please contact me at (949) 368-3807 or (760) 504-9071 with any questions. | | Please fmd enclosed the following for the September 2008 San Onofre Written exam; SONGS September 2008 ES-403-1, Written Examination Grading Quality Checklist Exam Seating Chart Exam Analysis for the September 2008 SONGS Exam Exam Proctor Fonus documenting applicant questions and clarifications Each Applicants original answer sheet and exam coversheet A clean copy of each answer sheet Copies ofES-201-3 Examination Security Agreement forms Please contact me at (949) 368-3807 or (760) 504-9071 with any questions. |
| Respectfully, Willia Arbour Simulator Support / Exam Supervisor San Onofre Nuclear Generating Station r 0 Bux 128 Clemente, CA 92672 2008 NRC Written Exam Analysis Common Question 6 This question was missed by 4 of 9 applicants. | | Respectfully, |
| Topic: Safety Injection and Containment Spray The question is technically accurate, as written. Applicants did not recall the con-ect answer. Common Question 34 This question was missed by 3 of 9 applicants. | | ,,//.zv~ 7L Willia Arbour Simulator Support / Exam Supervisor San Onofre Nuclear Generating Station r0 Bux 128 |
| Topic: Containment Purge The question is technically accurate, as written. Applicants did not recall the correct answer. Common Question 37 This question was missed by 5 of 9 applicants. | | ~al1 Clemente, CA 92672 |
| Topic: Condenser Air Removal The question is technically accurate, as written. Common Question 46 This question was missed by 5 of 9 applicants. | | |
| | 2008 NRC Written Exam Analysis Common Question 6 This question was missed by 4 of 9 applicants. |
| | Topic: Safety Injection and Containment Spray The question is technically accurate, as written. Applicants did not recall the con-ect answer. |
| | Common Question 34 This question was missed by 3 of 9 applicants. |
| | Topic: Containment Purge The question is technically accurate, as written. Applicants did not recall the correct answer. |
| | Common Question 37 This question was missed by 5 of 9 applicants. |
| | Topic: Condenser Air Removal The question is technically accurate, as written. |
| | Common Question 46 This question was missed by 5 of 9 applicants. |
| Topic: Pressurizer Pressure Control Malfunction The question is technically accurate, as written. | | Topic: Pressurizer Pressure Control Malfunction The question is technically accurate, as written. |
| 2008 NRC Written Exam Common Question 60 This question was missed by 3 of 9 applicants. | | |
| | 2008 NRC Written Exam Analysis Common Question 60 This question was missed by 3 of 9 applicants. |
| Topic: Loss of Source Range Nuclear Instrumentation The question is technically accurate, as written Common Question 64 This question was missed by 3 of 9 applicants. | | Topic: Loss of Source Range Nuclear Instrumentation The question is technically accurate, as written Common Question 64 This question was missed by 3 of 9 applicants. |
| Topic: High Reactor Coolant Activity The question is technically accurate, as written. Common Question 76 This question was missed by 3 of 3 applicants. | | Topic: High Reactor Coolant Activity The question is technically accurate, as written. |
| | Common Question 76 This question was missed by 3 of 3 applicants. |
| Topic: Inadequate Core Cooling The question is technically accurate, as written. Applicants confused inadequate core cooling with insufficient subcooling. | | Topic: Inadequate Core Cooling The question is technically accurate, as written. Applicants confused inadequate core cooling with insufficient subcooling. |
| A notification has been written to include the analysis and the review of questions missed in the initial license training program. Not # 200161004}} | | A notification has been written to include the analysis and the review of questions missed in the initial license training program. Not # 200161004}} |
|
---|
Category:Letter
MONTHYEARIR 05000361/20240052024-10-0404 October 2024 NRC Inspection Report 05000361/2024005 and 05000362/2024005 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 07200041/20244012024-08-16016 August 2024 San Onofe Nuclear Generating Station, Security Baseline Inspection Report 07200041/2024401 IR 05000361/20240042024-08-0909 August 2024 NRC Inspection Report 05000361/2024004 and 05000362/2024004 ML24191A2472024-07-0202 July 2024 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24141A0802024-05-15015 May 2024 (Songs), Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Operating Report IR 05000361/20240022024-04-0101 April 2024 – NRC Inspection Report 050-00361/2024-002 and 050-00362/2024-002 ML24094A0642024-03-27027 March 2024 Independent Spent Fuel Storage Installation, Decommissioning Funding Status Report 2023 ML24065A0152024-02-28028 February 2024 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation 2023 ML24044A0812024-02-14014 February 2024 LTR-24-0008: NRC Response to Paul Blanch Email Safety of Spent Nuclear Fuel at SONGS ISFSI IR 05000361/20240012024-02-13013 February 2024 NRC Inspection Report 050-00361/2024-001 and 050-00362/2024-001 (1) ML24037A0542024-01-30030 January 2024 (Songs), Units 2 and 3, Submittal of Annual Corporate Financial Reports ML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan ML24017A2432024-01-15015 January 2024 LTR-24-0008 Paul Blanch, E-mails Request for Formal Response to Requests for Meeting to Discuss Safety Issues with NRC Staff IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 And Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Services December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 – NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commissions Analysis of Southern California Edisons Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 2024-09-18
[Table view] Category:License-Operator
MONTHYEARML13123A3292012-11-0101 November 2012 2012-10-Final Outlines ML13123A3242012-11-0101 November 2012 SO-2012-10-Draft Written Exam Comments ML13123A3202012-11-0101 November 2012 SO-2012-10-DRAFT Outline Comments ML13123A3172012-11-0101 November 2012 SO-2012-10-DRAFT Operating Test Comments ML13123A3142012-11-0101 November 2012 10 Draft Written Exam ML13123A3072012-11-0101 November 2012 SO-2010-10-DRAFT Outlines ML13123A3052012-11-0101 November 2012 SO-2010-10-DRAFT Operating Test ML12346A2462012-11-0101 November 2012 SO-2012-10-Final Operating Test ML12346A2442012-11-0101 November 2012 2012-10-Final Written Exam ML13123A2872012-10-31031 October 2012 2012-10 Post Exam Analysis ML13127A2742012-10-25025 October 2012 SONGS - 2012-11-Public Forms ML1227804132012-10-0404 October 2012 NRC Initial Operator Licensing Examination Approval ML1134902672011-12-15015 December 2011 Notification of NRC Initial Operator Licensing Examination 05000361/2012-301; 05000362/2012-301 ML1204801812011-10-28028 October 2011 SO-2011-11 - Final Outlines ML1201306202011-10-28028 October 2011 2011-11 Final OP Test ML1201306242011-10-28028 October 2011 2011-11-Final Written Exam ML1204706862011-10-28028 October 2011 2011-11-Draft Written Exam ML1204801742011-10-28028 October 2011 2011-11-Draft Written Exam Comments ML1204801792011-10-28028 October 2011 2011-11-Draft OP Test Comments ML1127203872011-09-29029 September 2011 Generic Fundamentals Examination Results ML1108908322011-03-30030 March 2011 Generic Fundamentals Examination Results ML1032102252010-10-18018 October 2010 SONGS-2010-10-DRAFT Outline Comments ML1032007162010-10-15015 October 2010 SONGS-2010-10-DRAFT Outlines ML1032102432010-10-15015 October 2010 SONGS NRC 2010 RO Written Exam Worksheet ML1032102632010-10-15015 October 2010 SONGS-2010-10-Draft Written Examination Comments ML1032102712010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test ML1032102782010-10-15015 October 2010 SONGS-2010-10-Final Outlines ML1032102902010-10-15015 October 2010 SONGS-2010-10-Final Operating Test ML1032102942010-10-15015 October 2010 SONGS-2010-10-Post Examination Analysis ML1100409732010-10-15015 October 2010 SONGS-2010-10-Public Forms ML1032102752010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test Comments ML1021001992010-07-23023 July 2010 Response to Regulatory Summary (RIS) 2010-08 IR 05000361/20103012010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML1017402122010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML0934300852009-12-0909 December 2009 10-Public Forms, Exam Assignment Tickler ML0932006062009-11-16016 November 2009 2009-10-Final Operating Test ML0932005962009-11-16016 November 2009 2009-10-Draft Operating Test Comments ML0932005992009-11-16016 November 2009 2009-10-Draft Outline Comments ML0932006022009-11-16016 November 2009 2009-10-Draft Written Exam Comments ML0932006072009-11-16016 November 2009 2009-10-Final Outlines ML0932006112009-11-16016 November 2009 2009-10 - Final Written Exam ML0932006492009-11-16016 November 2009 SO-2009-10-DRAFT Written Exam ML0932006522009-11-16016 November 2009 SO-2009-10-DRAFT Operating Test ML0932006552009-11-16016 November 2009 SO-2009-10-DRAFT Outlines ML0932006482009-10-30030 October 2009 SO-2009-10-Post Exam Analysis ML0907902422009-02-12012 February 2009 2009-02 - Public Forms ML0904203942009-02-0505 February 2009 2009-02 - Draft Exam Outline ML0904203912009-02-0505 February 2009 2009-02 - Final Exam Outline ML0904203782009-02-0505 February 2009 2009-02 - Final Operating Exam ML0912711002009-02-0404 February 2009 2009-02 - Draft Operating Test Comments 2012-11-01
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML13123A3292012-11-0101 November 2012 2012-10-Final Outlines ML13123A3242012-11-0101 November 2012 SO-2012-10-Draft Written Exam Comments ML13123A3202012-11-0101 November 2012 SO-2012-10-DRAFT Outline Comments ML13123A3172012-11-0101 November 2012 SO-2012-10-DRAFT Operating Test Comments ML13123A3142012-11-0101 November 2012 10 Draft Written Exam ML13123A3072012-11-0101 November 2012 SO-2010-10-DRAFT Outlines ML13123A3052012-11-0101 November 2012 SO-2010-10-DRAFT Operating Test ML12346A2462012-11-0101 November 2012 SO-2012-10-Final Operating Test ML12346A2442012-11-0101 November 2012 2012-10-Final Written Exam ML13123A2872012-10-31031 October 2012 2012-10 Post Exam Analysis ML13127A2742012-10-25025 October 2012 SONGS - 2012-11-Public Forms ML1227804132012-10-0404 October 2012 NRC Initial Operator Licensing Examination Approval ML1134902672011-12-15015 December 2011 Notification of NRC Initial Operator Licensing Examination 05000361/2012-301; 05000362/2012-301 ML1204801812011-10-28028 October 2011 SO-2011-11 - Final Outlines ML1201306202011-10-28028 October 2011 2011-11 Final OP Test ML1201306242011-10-28028 October 2011 2011-11-Final Written Exam ML1204706862011-10-28028 October 2011 2011-11-Draft Written Exam ML1204801742011-10-28028 October 2011 2011-11-Draft Written Exam Comments ML1204801792011-10-28028 October 2011 2011-11-Draft OP Test Comments ML1127203872011-09-29029 September 2011 Generic Fundamentals Examination Results ML1108908322011-03-30030 March 2011 Generic Fundamentals Examination Results ML1032102252010-10-18018 October 2010 SONGS-2010-10-DRAFT Outline Comments ML1032007162010-10-15015 October 2010 SONGS-2010-10-DRAFT Outlines ML1032102432010-10-15015 October 2010 SONGS NRC 2010 RO Written Exam Worksheet ML1032102632010-10-15015 October 2010 SONGS-2010-10-Draft Written Examination Comments ML1032102712010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test ML1032102782010-10-15015 October 2010 SONGS-2010-10-Final Outlines ML1032102902010-10-15015 October 2010 SONGS-2010-10-Final Operating Test ML1032102942010-10-15015 October 2010 SONGS-2010-10-Post Examination Analysis ML1100409732010-10-15015 October 2010 SONGS-2010-10-Public Forms ML1032102752010-10-15015 October 2010 SONGS-2010-10-Draft Operating Test Comments ML1021001992010-07-23023 July 2010 Response to Regulatory Summary (RIS) 2010-08 IR 05000361/20103012010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML1017402122010-06-22022 June 2010 Notification of NRC Initial Operator Licensing Examination 05000361-10-301; 05000362-10-301 ML0934300852009-12-0909 December 2009 10-Public Forms, Exam Assignment Tickler ML0932006062009-11-16016 November 2009 2009-10-Final Operating Test ML0932005962009-11-16016 November 2009 2009-10-Draft Operating Test Comments ML0932005992009-11-16016 November 2009 2009-10-Draft Outline Comments ML0932006022009-11-16016 November 2009 2009-10-Draft Written Exam Comments ML0932006072009-11-16016 November 2009 2009-10-Final Outlines ML0932006112009-11-16016 November 2009 2009-10 - Final Written Exam ML0932006492009-11-16016 November 2009 SO-2009-10-DRAFT Written Exam ML0932006522009-11-16016 November 2009 SO-2009-10-DRAFT Operating Test ML0932006552009-11-16016 November 2009 SO-2009-10-DRAFT Outlines ML0932006482009-10-30030 October 2009 SO-2009-10-Post Exam Analysis ML0907902422009-02-12012 February 2009 2009-02 - Public Forms ML0904203942009-02-0505 February 2009 2009-02 - Draft Exam Outline ML0904203912009-02-0505 February 2009 2009-02 - Final Exam Outline ML0904203782009-02-0505 February 2009 2009-02 - Final Operating Exam ML0912711002009-02-0404 February 2009 2009-02 - Draft Operating Test Comments 2012-11-01
[Table view] |
Text
SOUTHLRN CAllrolmlA
..... EDISON
\I1 rnrsu,\ "'TLH.\ lno.\\/ C"l1Ip"n~
September 30, 2008 Mr. Steve Garchow USNRC Region IV Texas Health Resources Tower 611 Ryan Plaza, Suite # 400 Arlington, TX 76011-4005
Dear Mr. Garchow:
Please fmd enclosed the following for the September 2008 San Onofre Written exam; SONGS September 2008 ES-403-1, Written Examination Grading Quality Checklist Exam Seating Chart Exam Analysis for the September 2008 SONGS Exam Exam Proctor Fonus documenting applicant questions and clarifications Each Applicants original answer sheet and exam coversheet A clean copy of each answer sheet Copies ofES-201-3 Examination Security Agreement forms Please contact me at (949) 368-3807 or (760) 504-9071 with any questions.
Respectfully,
,,//.zv~ 7L Willia Arbour Simulator Support / Exam Supervisor San Onofre Nuclear Generating Station r0 Bux 128
~al1 Clemente, CA 92672
2008 NRC Written Exam Analysis Common Question 6 This question was missed by 4 of 9 applicants.
Topic: Safety Injection and Containment Spray The question is technically accurate, as written. Applicants did not recall the con-ect answer.
Common Question 34 This question was missed by 3 of 9 applicants.
Topic: Containment Purge The question is technically accurate, as written. Applicants did not recall the correct answer.
Common Question 37 This question was missed by 5 of 9 applicants.
Topic: Condenser Air Removal The question is technically accurate, as written.
Common Question 46 This question was missed by 5 of 9 applicants.
Topic: Pressurizer Pressure Control Malfunction The question is technically accurate, as written.
2008 NRC Written Exam Analysis Common Question 60 This question was missed by 3 of 9 applicants.
Topic: Loss of Source Range Nuclear Instrumentation The question is technically accurate, as written Common Question 64 This question was missed by 3 of 9 applicants.
Topic: High Reactor Coolant Activity The question is technically accurate, as written.
Common Question 76 This question was missed by 3 of 3 applicants.
Topic: Inadequate Core Cooling The question is technically accurate, as written. Applicants confused inadequate core cooling with insufficient subcooling.
A notification has been written to include the analysis and the review of questions missed in the initial license training program. Not # 200161004