ML083300420: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:MEETING REPORT
{{#Wiki_filter:MEETING REPORT DATE:                       November 5, 2008 TIME:                       2:00 p.m. Eastern PLACE:                     Two White Flint North, Room T-3A00 U.S. Nuclear Regulatory Commission Headquarters Rockville, Maryland PURPOSE:                   To discuss license termination and site decommissioning plans for the Fermi-1 reactor.
 
ATTENDEES:         SEE ATTACHED LIST BACKGROUND:
DATE:   November 5, 2008 TIME:   2:00 p.m. Eastern  
The Fermi-1 reactor is located at Lagoona Beach, Frenchtown Township, Michigan. The reactor was shutdown in 1972. DTE Energy has been stabilizing the facility by passivating residual sodium and disposing of plant components and systems. DTE Energy is currently planning to submit a license termination plan in mid-2009, and terminate their license in 2012.
 
PLACE:   Two White Flint North, Room T-3A00 U.S. Nuclear Regulatory Commission Headquarters Rockville, Maryland  
 
PURPOSE:   To discuss license termination and site decommissioning plans for the Fermi-1 reactor.
ATTENDEES: SEE ATTACHED LIST BACKGROUND:
 
The Fermi-1 reactor is located at Lagoona Beach, Frenchtown Township, Michigan. The reactor was shutdown in 1972. DTE Energy has been stabilizing the facility by passivating residual sodium and disposing of plant components and systems. DTE Energy is currently planning to submit a license termination plan in mid-2009, and terminate their license in 2012.  
 
DISCUSSION:
DISCUSSION:
The meeting was publicly noticed on October 6, 2008, by posting on the U.S. Nuclear Regulatory Commission (NRC) web site. The meeting began at approximately 2:00 p.m. EST. The following issues were discussed during the meeting:  
The meeting was publicly noticed on October 6, 2008, by posting on the U.S. Nuclear Regulatory Commission (NRC) web site. The meeting began at approximately 2:00 p.m. EST.
: 1. NRC (Ted Smith) made introductions and an opening statement, including opportunity to provide meeting feedback utilizing NRC Form 659, which was provided.  
The following issues were discussed during the meeting:
: 2. DTE Energy (Lynne Goodman and Martin Erickson) presented the site decommissioning status, characterization methodology, sensitivity analysis, draft Derived Concentration Guideline Levels (DCGLs), and the results of their historical site assessment.
: 1.     NRC (Ted Smith) made introductions and an opening statement, including opportunity to provide meeting feedback utilizing NRC Form 659, which was provided.
ACTION ITEMS:  
: 2.     DTE Energy (Lynne Goodman and Martin Erickson) presented the site decommissioning status, characterization methodology, sensitivity analysis, draft Derived Concentration Guideline Levels (DCGLs), and the results of their historical site assessment.
 
ACTION ITEMS:
NRC agreed to complete its evaluation of the relationship between Fermi-2 license termination evaluations for residual radioactivity remaining onsite from a terminated Fermi-1 license.
NRC agreed to complete its evaluation of the relationship between Fermi-2 license termination evaluations for residual radioactivity remaining onsite from a terminated Fermi-1 license.
DTE agreed to begin providing a monthly project schedule beginning in January 2009, which will reviewed during monthly telephone conferences.
DTE agreed to begin providing a monthly project schedule beginning in January 2009, which will reviewed during monthly telephone conferences.
DTE agreed to check on the availability of additional groundwater data and modeling for Fermi-2.
DTE agreed to check on the availability of additional groundwater data and modeling for Fermi-2.
Attachments:   1. Meeting Agenda 2. Attendee List  
Attachments:
: 3. DTE Energy Meeting Handout AGENDA    Public Meeting - NRC & Fermi-1 Status Report on License Termination and Site Decommissioning Planning Date  Time  Wednesday November 5, 2008 2:00 p.m. - 4:00 p.m.
: 1. Meeting Agenda
Session Time Topic  Participants 2:00 p.m.
: 2. Attendee List
Introductions, clarification of Aground rules@ concerning public portion of meeting and opening remarks NRC/Fermi-1 2:15 p.m.
: 3. DTE Energy Meeting Handout
Fermi-1 staff presentation on decommissioning status, characterization methodology, sensitivity analysis, draft DCGLs, and historical site assessment.
Fermi-1  3:45 p.m.
Opportunity for public comment NRC/Public 4:00 p.m.
Adjournment


MEETING ATTENDEES DateNovember 5, 2008 Topic: Fermi-1 License Termination Planning
AGENDA Public Meeting - NRC & Fermi-1 Status Report on License Termination and Site Decommissioning Planning Date                                             Time Wednesday November 5, 2008                           2:00 p.m. - 4:00 p.m.
Session Time                          Topic                             Participants Introductions, clarification of Aground 2:00 p.m.        rules@ concerning public portion of meeting          NRC/Fermi-1 and opening remarks Fermi-1 staff presentation on 2:15 p.m.        decommissioning status, characterization              Fermi-1 methodology, sensitivity analysis, draft DCGLs, and historical site assessment.
3:45 p.m.              Opportunity for public comment                  NRC/Public 4:00 p.m.                        Adjournment


NAME AFFILIATION Lynne Goodman DTE Martin Erickson DTE Kenneth Lindsey DTE Ted Smith NRC/FSME Christepher McKenney NRC/FSME Matt Meyer NRC/FSME Bruce Watson NRC/FSME Hans Arlt NRC/FSME}}
MEETING ATTENDEES Date: November 5, 2008 Topic: Fermi-1 License Termination Planning NAME               AFFILIATION Lynne Goodman             DTE Martin Erickson           DTE Kenneth Lindsey           DTE Ted Smith                 NRC/FSME Christepher McKenney     NRC/FSME Matt Meyer               NRC/FSME Bruce Watson             NRC/FSME Hans Arlt                 NRC/FSME}}

Latest revision as of 11:54, 14 November 2019

Summary of 11/5/2008 Meeting License Amendment and Site Decommissioning Plans for Fermi-1 Reactor
ML083300420
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/05/2008
From:
NRC/FSME/DWMEP/DURLD/RDB
To:
References
Download: ML083300420 (3)


Text

MEETING REPORT DATE: November 5, 2008 TIME: 2:00 p.m. Eastern PLACE: Two White Flint North, Room T-3A00 U.S. Nuclear Regulatory Commission Headquarters Rockville, Maryland PURPOSE: To discuss license termination and site decommissioning plans for the Fermi-1 reactor.

ATTENDEES: SEE ATTACHED LIST BACKGROUND:

The Fermi-1 reactor is located at Lagoona Beach, Frenchtown Township, Michigan. The reactor was shutdown in 1972. DTE Energy has been stabilizing the facility by passivating residual sodium and disposing of plant components and systems. DTE Energy is currently planning to submit a license termination plan in mid-2009, and terminate their license in 2012.

DISCUSSION:

The meeting was publicly noticed on October 6, 2008, by posting on the U.S. Nuclear Regulatory Commission (NRC) web site. The meeting began at approximately 2:00 p.m. EST.

The following issues were discussed during the meeting:

1. NRC (Ted Smith) made introductions and an opening statement, including opportunity to provide meeting feedback utilizing NRC Form 659, which was provided.
2. DTE Energy (Lynne Goodman and Martin Erickson) presented the site decommissioning status, characterization methodology, sensitivity analysis, draft Derived Concentration Guideline Levels (DCGLs), and the results of their historical site assessment.

ACTION ITEMS:

NRC agreed to complete its evaluation of the relationship between Fermi-2 license termination evaluations for residual radioactivity remaining onsite from a terminated Fermi-1 license.

DTE agreed to begin providing a monthly project schedule beginning in January 2009, which will reviewed during monthly telephone conferences.

DTE agreed to check on the availability of additional groundwater data and modeling for Fermi-2.

Attachments:

1. Meeting Agenda
2. Attendee List
3. DTE Energy Meeting Handout

AGENDA Public Meeting - NRC & Fermi-1 Status Report on License Termination and Site Decommissioning Planning Date Time Wednesday November 5, 2008 2:00 p.m. - 4:00 p.m.

Session Time Topic Participants Introductions, clarification of Aground 2:00 p.m. rules@ concerning public portion of meeting NRC/Fermi-1 and opening remarks Fermi-1 staff presentation on 2:15 p.m. decommissioning status, characterization Fermi-1 methodology, sensitivity analysis, draft DCGLs, and historical site assessment.

3:45 p.m. Opportunity for public comment NRC/Public 4:00 p.m. Adjournment

MEETING ATTENDEES Date: November 5, 2008 Topic: Fermi-1 License Termination Planning NAME AFFILIATION Lynne Goodman DTE Martin Erickson DTE Kenneth Lindsey DTE Ted Smith NRC/FSME Christepher McKenney NRC/FSME Matt Meyer NRC/FSME Bruce Watson NRC/FSME Hans Arlt NRC/FSME