ML110630117: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML110630117
| number = ML110630117
| issue date = 03/04/2011
| issue date = 03/04/2011
| title = McGuire Inspection / Activity Plan, Report 22, 03/01/2011 - 06/30/2012
| title = Inspection / Activity Plan, Report 22, 03/01/2011 - 06/30/2012
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRP
| author affiliation = NRC/RGN-II/DRP
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity Plan Page 1 of 1 03/04/2011 12:10:18 Report 22 03/01/2011
{{#Wiki_filter:Page 1 of 1                                                                                 McGuire 03/04/2011     12:10:18                                                         Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit         Planned Dates                                                                                                                                   No. of Staff Number        Start     End     Inspection Activity                                                           Title                                           on Site EB3 ISI       - UNIT 2 INSERVICE INSPECTION                                                                                         1 2       03/07/2011   03/11/2011   IP 7111108P            Inservice Inspection Activities - PWR OL EXAM       - INITIAL EXAM PREP                                                                                                   6 1         05/23/2011   05/27/2011     V23350              MCGUIRE/MAY 2011 EXAM AT POWER FACILITIES TI-177       - TI-177 GAS INTRUSION                                                                                                 3 1, 2       06/27/2011  07/01/2011   IP 2515/177            Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System OL EXAM      - INITIAL EXAM WEEK                                                                                                    7 1          06/27/2011   07/01/2011     V23350              MCGUIRE/MAY 2011 EXAM AT POWER FACILITIES PSB1-RP       - RP PUBLIC RADIATION PROTECTION INSP                                                                                 4 1, 2       06/27/2011  07/01/2011   IP 2515/179            Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 1, 2      06/27/2011   07/01/2011  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1, 2      06/27/2011   07/01/2011  IP 71124.05            Radiation Monitoring Instrumentation 1, 2      06/27/2011   07/01/2011  IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment 1, 2      06/27/2011   07/01/2011  IP 71124.07            Radiological Environmental Monitoring Program 1, 2      06/27/2011   07/01/2011  IP 71151                Performance Indicator Verification ISFSI         - ISFSI DRY RUN FOR MAGANASTOR                                                                                         6 1, 2       07/11/2011   07/15/2011   IP 60854                Preoperational Testing Of An ISFSI ISFSI        - ISFSI FIRST CAMPAIGN OF MAGNASTOR                                                                                   4 1, 2       07/23/2011   07/28/2011   IP 60855                Operation Of An ISFSI PSB1EP       - EMERGENCY PREPAREDNESS EXERCISE                                                                                     3 1, 2       08/08/2011  08/12/2011   IP 7111401              Exercise Evaluation 1, 2      08/08/2011   08/12/2011  IP 7111404              Emergency Action Level and Emergency Plan Changes 1, 2      08/08/2011   08/12/2011  IP 71151                Performance Indicator Verification EB3 ISI       - UNIT 1 IN-SERVICE INSPECTION                                                                                         1 1         09/26/2011   09/30/2011   IP 7111108P            Inservice Inspection Activities - PWR EB3SGISI     - UNIT 1 SG IN-SERVICE INSPECTION                                                                                     1 1         09/26/2011   09/30/2011   IP 7111108P            Inservice Inspection Activities - PWR CDBI         - COMPONENT DESIGN BASES INSPECTION                                                                                   6 1, 2       02/13/2012   02/17/2012  IP 7111121              Component Design Bases Inspection 1, 2      03/05/2012   03/09/2012  IP 7111121              Component Design Bases Inspection 1, 2      03/19/2012   03/23/2012  IP 7111121              Component Design Bases Inspection 1, 2      04/02/2012   04/06/2012   IP 7111121              Component Design Bases Inspection EB3 HS       - TRIENNIAL HEAT SINK INSPECTION                                                                                       1 1, 2       03/05/2012   03/09/2012   IP 7111107T            Heat Sink Performance This report does not include INPO and OUTAGE activities.
-06/30/2012 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site McGuire EB3 ISI-UNIT 2 INSERVICE INSPECTION 1 2   IP Inservice Inspection Activities - PWR 7111108P 03/07/2011 03/11/2011 OL EXAM-INITIAL EXAM PREP 6 1     MCGUIRE/MAY 2011 EXAM AT POWER FACILITIES V23350 05/23/2011 05/27/2011 TI-177-TI-177 GAS INTRUSION 3 1, 2  IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 06/27/2011 07/01/2011 OL EXAM-INITIAL EXAM WEEK 7 1    MCGUIRE/MAY 2011 EXAM AT POWER FACILITIES V23350 06/27/2011 07/01/2011 PSB1-RP-RP PUBLIC RADIATION PROTECTION INSP 4 1, 2  IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 06/27/2011 07/01/2011 1, 2   IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/27/2011 07/01/2011 1, 2   IP Radiation Monitoring Instrumentation 71124.05 06/27/2011 07/01/2011 1, 2   IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/27/2011 07/01/2011 1, 2   IP Radiological Environmental Monitoring Program 71124.07 06/27/2011 07/01/2011 1, 2   IP Performance Indicator Verification 71151 06/27/2011 07/01/2011 ISFSI-ISFSI DRY RUN FOR MAGANASTOR 6 1, 2   IP Preoperational Testing Of An ISFSI 60854 07/11/2011 07/15/2011 ISFSI-ISFSI FIRST CAMPAIGN OF MAGNASTOR 4 1, 2   IP Operation Of An ISFSI 60855 07/23/2011 07/28/2011 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 1, 2  IP Exercise Evaluation 7111401 08/08/2011 08/12/2011 1, 2   IP Emergency Action Level and Emergency Plan Changes 7111404 08/08/2011 08/12/2011 1, 2   IP Performance Indicator Verification 71151 08/08/2011 08/12/2011 EB3 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1     IP Inservice Inspection Activities - PWR 7111108P 09/26/2011 09/30/2011 EB3SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1     IP Inservice Inspection Activities - PWR 7111108P 09/26/2011 09/30/2011 CDBI-COMPONENT DESIGN BASES INSPECTION 6 1, 2   IP Component Design Bases Inspection 7111121 02/13/2012 02/17/2012 1, 2   IP Component Design Bases Inspection 7111121 03/05/2012 03/09/2012 1, 2   IP Component Design Bases Inspection 7111121 03/19/2012 03/23/2012 1, 2   IP Component Design Bases Inspection 7111121 04/02/2012 04/06/2012 EB3 HS-TRIENNIAL HEAT SINK INSPECTION 1 1, 2   IP Heat Sink Performance 7111107T 03/05/2012 03/09/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 03:27, 13 November 2019

Inspection / Activity Plan, Report 22, 03/01/2011 - 06/30/2012
ML110630117
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 03/04/2011
From:
Division Reactor Projects II
To:
Duke Energy Carolinas
Shared Package
ML110630104 List:
References
IR-11-001
Download: ML110630117 (1)


Text

Page 1 of 1 McGuire 03/04/2011 12:10:18 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB3 ISI - UNIT 2 INSERVICE INSPECTION 1 2 03/07/2011 03/11/2011 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL EXAM PREP 6 1 05/23/2011 05/27/2011 V23350 MCGUIRE/MAY 2011 EXAM AT POWER FACILITIES TI-177 - TI-177 GAS INTRUSION 3 1, 2 06/27/2011 07/01/2011 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System OL EXAM - INITIAL EXAM WEEK 7 1 06/27/2011 07/01/2011 V23350 MCGUIRE/MAY 2011 EXAM AT POWER FACILITIES PSB1-RP - RP PUBLIC RADIATION PROTECTION INSP 4 1, 2 06/27/2011 07/01/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 1, 2 06/27/2011 07/01/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 06/27/2011 07/01/2011 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 06/27/2011 07/01/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/27/2011 07/01/2011 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 06/27/2011 07/01/2011 IP 71151 Performance Indicator Verification ISFSI - ISFSI DRY RUN FOR MAGANASTOR 6 1, 2 07/11/2011 07/15/2011 IP 60854 Preoperational Testing Of An ISFSI ISFSI - ISFSI FIRST CAMPAIGN OF MAGNASTOR 4 1, 2 07/23/2011 07/28/2011 IP 60855 Operation Of An ISFSI PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 08/08/2011 08/12/2011 IP 7111401 Exercise Evaluation 1, 2 08/08/2011 08/12/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 08/08/2011 08/12/2011 IP 71151 Performance Indicator Verification EB3 ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 09/26/2011 09/30/2011 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 09/26/2011 09/30/2011 IP 7111108P Inservice Inspection Activities - PWR CDBI - COMPONENT DESIGN BASES INSPECTION 6 1, 2 02/13/2012 02/17/2012 IP 7111121 Component Design Bases Inspection 1, 2 03/05/2012 03/09/2012 IP 7111121 Component Design Bases Inspection 1, 2 03/19/2012 03/23/2012 IP 7111121 Component Design Bases Inspection 1, 2 04/02/2012 04/06/2012 IP 7111121 Component Design Bases Inspection EB3 HS - TRIENNIAL HEAT SINK INSPECTION 1 1, 2 03/05/2012 03/09/2012 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.