ML112360287: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 08/23/2011
| issue date = 08/23/2011
| title = 8/11/2011- Summary of Public Meeting to Discuss the Perry Nuclear Plant, Unit 1, End of Cycle Plant Performance Assessment
| title = 8/11/2011- Summary of Public Meeting to Discuss the Perry Nuclear Plant, Unit 1, End of Cycle Plant Performance Assessment
| author name = Cameron J L
| author name = Cameron J
| author affiliation = NRC/RGN-III/DRP/B6
| author affiliation = NRC/RGN-III/DRP/B6
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 23, 2011 LICENSEE:       FirstEnergy Nuclear Operating Company FACILITY:       Perry Nuclear Power Plant
-4352 August 23, 2011 LICENSEE: FirstEnergy Nuclear Operating Company
 
FACILITY: Perry Nuclear Power Plant


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE AUGUST 11, 2011
OF THE AUGUST 11, 2011, PUBLIC MEETING TO DISCUSS THE PERRY NUCLEAR POWER PLANT, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 11, 2011, the Nuclear Regulatory Commission (NRC) held a public meeting at the Perry Township Community Building in Perry, OH. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company management to discuss the NRC=s assessment of the safety performance of Perry Nuclear Power Plant, Unit 1, for the period from January 1 through December 31, 2010. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML111960211 and ML112240823, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
, PUBLIC MEETING TO DISCUSS THE PERRY NUCLEAR POWER PLANT, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 11, 201 1, the Nuclear Regulatory Commission (NRC) held a public meeting at the Perry Township Community Building in Perry , OH. The meeting was between NRC Region III management an d FirstEnergy Nuclear Operating Company management to discuss the NRC=s assessment of the safety performance of Perry Nuclear Power Plant , Unit 1 , for the period from January 1 through December 31, 20 10. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML111960211 and ML1 12240823 , respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Perry Nuclear Power Plant, Unit 1, in calendar year 2010, which was documented in the March 4, 2011, end-of-cycle assessment letter, as ML110620306. As part of this regulatory performance meeting, FirstEnergy briefly responded to the NRC=s assessment. The FirstEnergy presentation can be found in ADAMS as ML112280573. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
The NRC began the meeting with an overview of the NRC
Sincerely,
=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC
                                              /RA/
=s assessment of the performance of Perry Nuclear Power Plant , Unit 1, in calendar year 20 10, which was documented in the March 4, 20 1 1, end-of-cycle assessment letter, as ML1 10620306. As part of this regulatory performance meeting, FirstEnergy briefly responded to the NRC
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-440 License Nos. NPF-58
=s assessment. The FirstEnergy presentation can be found in ADAMS as ML112280573
. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
Sincerely,
      /RA/
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50
-440 License Nos. NPF-58


==Enclosure:==
==Enclosure:==
As Stated cc w/encl:      Distribution via ListServ


As Stated cc w/encl:
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 23, 2011 LICENSEE:                 FirstEnergy Nuclear Operating Company FACILITY:                 Perry Nuclear Power Plant
Distribution via ListServ
 
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
-4352 August 23, 2011 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE AUGUST 11, 2011, PUBLIC MEETING TO DISCUSS THE PERRY NUCLEAR POWER PLANT, UNIT 1, END
OF THE AUGUST 11, 2011, PUBLIC MEETING TO DISCUSS THE PERRY NUCLEAR POWER PLANT, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 11, 2011, the Nuclear Regulatory Commission (NRC) held a public meeting at the Perry Township Community Building in Perry, OH. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company management to discuss the NRC=s assessment of the safety performance of Perry Nuclear Power Plant, Unit 1, for the period from January 1 through December 31, 2010. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML111960211 and ML112240823, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 11, 2011, the Nuclear Regulatory Commission (NRC) held a public meeting at the Perry Township Community Building in Perry, OH. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company management to discuss the NRC=s assessment of the safety performance of Perry Nuclear Power Plant, Unit 1, for the period from January 1 through December 31, 2010. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML111960211 and ML112240823, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.
The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Perry Nuclear Power Plant, Unit 1, in calendar year 2010, which was documented in the March 4, 2011, end-of-cycle assessment letter, as ML110620306. As part of this regulatory performance meeting, FirstEnergy briefly responded to the NRC=s assessment. The FirstEnergy presentation can be found in ADAMS as ML112280573. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
The NRC began the meeting with an overview of the NRC
Sincerely,
=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC
                                                                          /RA/
=s assessment of the performance of Perry Nuclear Power Plant, Unit 1, in calendar year 2010, which was documented in the March 4, 201 1, end-of-cycle assessment letter, as ML1 10620306. As part of this regulatory performance meeting, FirstEnergy briefly responded to the NRC
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-440 License Nos. NPF-58
=s assessment. The FirstEnergy presentation can be found in ADAMS as ML112280573
. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
Sincerely, /RA/ Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50
-440 License Nos. NPF-58


==Enclosure:==
==Enclosure:==
 
As Stated cc w/encl:               Distribution via ListServ DOCUMENT NAME:                       G:\DRPIII\1-Secy\1-Work In Progress\EOC Mtg Summary\Perry 2010 EOC Public Meeting Summary.docx G Publicly Available                       G Non-Publicly Available                 G Sensitive             G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII                                 RIII NAME               PJSmagacz                           JCameron DATE               08/23/11                             08/23/11 OFFICIAL RECORD COPY
As Stated cc w/encl:
Distribution via ListServ DOCUMENT NAME:
G:\DRPIII\1-Secy\1-Work In Progress
\EOC Mtg Summary
\Perry 2010 EOC Public Meeting Summary.docx G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII   RIII           NAME PJSmagacz JCameron     DATE 08/23/11 08/23/11     OFFICIAL RECORD COPY


Letter to FirstEnergy Nuclear Operating Company from J. Cameron dated August 23, 2011.
Letter to FirstEnergy Nuclear Operating Company from J. Cameron dated August 23, 2011.
Line 69: Line 48:


==SUMMARY==
==SUMMARY==
OF THE AUGUST 11, 201 1 , PUBLIC MEETING TO DISCUSS THE PERRY NUCLEAR POWER PLANT, UNIT 1, END
OF THE AUGUST 11, 2011, PUBLIC MEETING TO DISCUSS THE PERRY NUCLEAR POWER PLANT, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:
-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION
Daniel Merzke RidsNrrPMPerry Resource RidsNrrDorlLpI3-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
: Daniel Merzke RidsNrrPMPerry Resource RidsNrrDorlLpI3
-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource


Enclosure   Meeting Participants NRC J. Cameron, Chief, Branch 6, Division of Reactor Projects, Region III M. Marshfield, Senior Resident Inspector, Perry T. Hartman
Enclosure Meeting Participants NRC J. Cameron, Chief, Branch 6, Division of Reactor Projects, Region III M. Marshfield, Senior Resident Inspector, Perry T. Hartman, Resident Inspector, Perry M. Phalen, Senior Health Physicist, Region III P. Chandrathil, Public Affairs Officer, Region III H. Logaras, Regional Government Liaison Specialist, Region III FirstEnergy Nuclear Operating Company M. Bezilla, Site Vice President, Perry J. Grabnar, Director of Site Operations H. Hanson, Director of Performance Improvement Ohio Department of Health R. Leidy, Health Physicist Ohio Emergency Management Agency E. Filppi}}
, Resident Inspector, Perry M. Phalen, Senior Health Physicist, Region III P. Chandrathil, Public Affairs Officer, Region III H. Logaras, Regional Government Liaison Specialist, Region III FirstEnergy Nuclear Operating Company M. Bezilla, Site Vice President, Perry J. Grabnar, Director of Site Operations H. Hanson, Director of Performance Improvement Ohio Department of Health R. Leidy, Health Physicist Ohio Emergency Management Agency E. Filppi}}

Latest revision as of 15:43, 12 November 2019

8/11/2011- Summary of Public Meeting to Discuss the Perry Nuclear Plant, Unit 1, End of Cycle Plant Performance Assessment
ML112360287
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/23/2011
From: Jamnes Cameron
NRC/RGN-III/DRP/B6
To:
NRC/RGN-III
References
Download: ML112360287 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 23, 2011 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant

SUBJECT:

SUMMARY

OF THE AUGUST 11, 2011, PUBLIC MEETING TO DISCUSS THE PERRY NUCLEAR POWER PLANT, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 11, 2011, the Nuclear Regulatory Commission (NRC) held a public meeting at the Perry Township Community Building in Perry, OH. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company management to discuss the NRC=s assessment of the safety performance of Perry Nuclear Power Plant, Unit 1, for the period from January 1 through December 31, 2010. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML111960211 and ML112240823, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Perry Nuclear Power Plant, Unit 1, in calendar year 2010, which was documented in the March 4, 2011, end-of-cycle assessment letter, as ML110620306. As part of this regulatory performance meeting, FirstEnergy briefly responded to the NRC=s assessment. The FirstEnergy presentation can be found in ADAMS as ML112280573. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-440 License Nos. NPF-58

Enclosure:

As Stated cc w/encl: Distribution via ListServ

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 23, 2011 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant

SUBJECT:

SUMMARY

OF THE AUGUST 11, 2011, PUBLIC MEETING TO DISCUSS THE PERRY NUCLEAR POWER PLANT, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On August 11, 2011, the Nuclear Regulatory Commission (NRC) held a public meeting at the Perry Township Community Building in Perry, OH. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company management to discuss the NRC=s assessment of the safety performance of Perry Nuclear Power Plant, Unit 1, for the period from January 1 through December 31, 2010. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML111960211 and ML112240823, respectively. A list of principal NRC and licensee meeting participants can be found in the Enclosure.

The NRC began the meeting with an overview of the NRC=s Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC=s assessment of the performance of Perry Nuclear Power Plant, Unit 1, in calendar year 2010, which was documented in the March 4, 2011, end-of-cycle assessment letter, as ML110620306. As part of this regulatory performance meeting, FirstEnergy briefly responded to the NRC=s assessment. The FirstEnergy presentation can be found in ADAMS as ML112280573. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-440 License Nos. NPF-58

Enclosure:

As Stated cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\DRPIII\1-Secy\1-Work In Progress\EOC Mtg Summary\Perry 2010 EOC Public Meeting Summary.docx G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME PJSmagacz JCameron DATE 08/23/11 08/23/11 OFFICIAL RECORD COPY

Letter to FirstEnergy Nuclear Operating Company from J. Cameron dated August 23, 2011.

SUBJECT:

SUMMARY

OF THE AUGUST 11, 2011, PUBLIC MEETING TO DISCUSS THE PERRY NUCLEAR POWER PLANT, UNIT 1, END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:

Daniel Merzke RidsNrrPMPerry Resource RidsNrrDorlLpI3-2 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

Enclosure Meeting Participants NRC J. Cameron, Chief, Branch 6, Division of Reactor Projects, Region III M. Marshfield, Senior Resident Inspector, Perry T. Hartman, Resident Inspector, Perry M. Phalen, Senior Health Physicist, Region III P. Chandrathil, Public Affairs Officer, Region III H. Logaras, Regional Government Liaison Specialist, Region III FirstEnergy Nuclear Operating Company M. Bezilla, Site Vice President, Perry J. Grabnar, Director of Site Operations H. Hanson, Director of Performance Improvement Ohio Department of Health R. Leidy, Health Physicist Ohio Emergency Management Agency E. Filppi