IR 05000482/2013404: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 04/19/2013 | | issue date = 04/19/2013 | ||
| title = IR 05000482-13-404, 03/07/2013, Wolf Creek Generating Station, Security Inspection | | title = IR 05000482-13-404, 03/07/2013, Wolf Creek Generating Station, Security Inspection | ||
| author name = Haire M | | author name = Haire M | ||
| author affiliation = NRC/RGN-IV/DRS/EB-1 | | author affiliation = NRC/RGN-IV/DRS/EB-1 | ||
| addressee name = Sunseri M | | addressee name = Sunseri M | ||
| addressee affiliation = Wolf Creek Nuclear Operating Corp | | addressee affiliation = Wolf Creek Nuclear Operating Corp | ||
| docket = 05000482 | | docket = 05000482 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON ril 19, 2013 | ||
==SUBJECT:== | |||
WOLF CREEK GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000482/2013404 | |||
SUBJECT: WOLF CREEK GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000482/2013404 | |||
==Dear Mr. Sunseri:== | ==Dear Mr. Sunseri:== | ||
On March 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Wolf Creek Generating Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's | On March 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Wolf Creek Generating Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 7, 2013, with you, and other members of your staff. | ||
The | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | ||
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
There were no findings identified during this inspection. | There were no findings identified during this inspection. | ||
Line 37: | Line 34: | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response | However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). | ||
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | |||
NRC | |||
Sincerely, | |||
Supplemental Information | /RA/ | ||
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-482 License No.: NPF-42 Nonpublic Enclosure: | |||
NRC Inspection Report 05000482/2013404 w/Attachment: Supplemental Information | |||
}} | }} |
Latest revision as of 20:28, 4 November 2019
ML13109A504 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 04/19/2013 |
From: | Mark Haire Region 4 Engineering Branch 1 |
To: | Matthew Sunseri Wolf Creek |
References | |
IR-13-404 | |
Download: ML13109A504 (3) | |
Text
UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON ril 19, 2013
SUBJECT:
WOLF CREEK GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000482/2013404
Dear Mr. Sunseri:
On March 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Wolf Creek Generating Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 7, 2013, with you, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
There were no findings identified during this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-482 License No.: NPF-42 Nonpublic Enclosure:
NRC Inspection Report 05000482/2013404 w/Attachment: Supplemental Information