{{#Wiki_filter:July 18, 2013
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION uly 18, 2013


==SUBJECT:==
==SUBJECT:==
Line 24: Line 24:


==Dear Mr. Hobbs:==
==Dear Mr. Hobbs:==
On June 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Crystal River Nuclear Generating Plant Unit 3. The inspection covered one or more of the  
On June 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Crystal River Nuclear Generating Plant Unit 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on June 7, 2013, with you and other members of your staff.


key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on June 7, 2013, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
 
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.


The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Line 34: Line 32:
No findings were identified during this inspection.
No findings were identified during this inspection.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
 
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. LIMITED INTERNAL DISTRIBUTION PERMITTE D In accordance with 10 CFR 2.390(b)(1)(ii), t he NRC is waiving the affidavit requirements for your response, if any. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).


Sincerely,
Sincerely,
/RA by S. Sandal for/
/RA by S. Sandal for/
Daniel W. Rich, Chief Reactor Projects, Branch 3 Division of Reactor Projects  
Daniel W. Rich, Chief Reactor Projects, Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72 Enclosure: NRC Inspection Report 05000302/2013404 w/ attachment: Supplemental Information (OUO)
 
cc w/encl. (see page 3) ____________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRP SIGNATURE Via email SRS:/RA/ SRS for DWR NAME DLanyi SSandal DRich DATE 6/26/2013 7/17/2013 7/17/2013 7/ /2013 7/ /2013 7/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO cc w/o encl:   Blair P. Wunderly Dan Westcott   Plant Manager Supervisor, Licensing Crystal River Nuclear Plant (NA2C)
Docket No.: 50-302 License No.: DPR-72  
Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution Cynthia Becker David G. Black  (Acting) Chief Manager, Fleet Security  Florida Bureau of Radiation Control Duke Energy Corporation  Department of Health Electronic Mail Distribution  P.O. Box 8413 Jupiter, FL 33468 John Elnitsky Vice President, Project Management and Joseph W. Donahue Construction  Vice President - Nuclear Oversight Duke Energy Corporation  Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution Lara S. Nichols  David. A. Cummings Deputy General Counsel  Associate General Counsel Duke Energy Corporation  Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution M. Christopher Nolan  Kate Nolan Director, Regulatory Affairs  Associate General Counsel Duke Energy Corporation Duke Energy Corporation Electronic Mail Distribution  Electronic Mail Distribution Matt Widener  Attorney General Manager, Nuclear Security  Department of Legal Affairs Duke Energy Corporation  The Capitol PL-01 Electronic Mail Distribution  Tallahassee, FL 32399-1050 Mike Delowery  Bryan Koon Manager, Decommissioning Planning Director Duke Energy Corporation  Florida Division of Emergency Management Electronic Mail Distribution  2555 Shumard Oak Blvd.
 
Enclosure: NRC Inspection Report 05000302/2013404 w/ attachment: Supplemental Information (OUO) cc w/encl. (see page 3)  
 
____________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRP SIGNATURE Via email SRS:/RA/ SRS for DWR NAME DLanyi SSandal DRich DATE 6/26/2013 7/17/2013 7/17/2013 7/ /2013 7/ /2013 7/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO cc w/o encl: Dan Westcott Supervisor, Licensing Duke Energy Corporation Electronic Mail Distribution David G. Black
 
Manager, Fleet Security Duke Energy Corporation Electronic Mail Distribution John Elnitsky Vice President, Project Management and Construction Duke Energy Corporation Electronic Mail Distribution
 
Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution M. Christopher Nolan
 
Director, Regulatory Affairs Duke Energy Corporation Electronic Mail Distribution Matt Widener Manager, Nuclear Security Duke Energy Corporation Electronic Mail Distribution
 
Mike Delowery Manager, Decommissioning Planning Duke Energy Corporation Electronic Mail Distribution
 
Phyllis Dixon Manager, Decommissioning Support Duke Energy Corporation Electronic Mail Distribution
 
Richard Biddleman Superintendent, NOS Crystal River Nuclear Plant Duke Energy Corporation Electronic Mail Distribution  
 
Blair P. Wunderly Plant Manager Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution  
 
Cynthia Becker (Acting) Chief  
 
Florida Bureau of Radiation Control Department of Health P.O. Box 8413 Jupiter, FL 33468  
 
Joseph W. Donahue Vice President - Nuclear Oversight Duke Energy Corporation Electronic Mail Distribution  
 
David. A. Cummings Associate General Counsel Duke Energy Corporation Electronic Mail Distribution Kate Nolan Associate General Counsel Duke Energy Corporation Electronic Mail Distribution Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050  
 
Bryan Koon Director Florida Division of Emergency Management  
 
2555 Shumard Oak Blvd.
 
Tallahassee, FL 32399 Chairman Board of County Commissioners
 
Citrus County


110 N. Apopka Avenue  
Tallahassee, FL 32399 Phyllis Dixon Manager, Decommissioning Support Chairman Duke Energy Corporation  Board of County Commissioners Electronic Mail Distribution  Citrus County 110 N. Apopka Avenue Richard Biddleman  Inverness, FL 36250 Superintendent, NOS Crystal River Nuclear Plant Duke Energy Corporation Electronic Mail Distribution Letter to Terry Hobbs from Daniel Rich dated July 18, 2013.


Inverness, FL 36250 SECURITY RELATED INFORMATION Letter to Terry Hobbs from Daniel Rich dated July 18, 2013. SUBJECT: CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 - NRC INSPECTION REPORT 05000302/2013404 Distribution w/encl
SUBJECT: CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 - NRC INSPECTION REPORT 05000302/2013404 Distribution w/encl:
: C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS RidsNrrPMCrystal River Resource
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS RidsNrrPMCrystal River Resource
}}
}}

Latest revision as of 16:51, 4 November 2019

IR 05000302-13-404, on 06/07/13, Crystal River Nuclear Generating Plant, Unit 3
ML13199A220
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/18/2013
From: Rich D
NRC/RGN-II/DRP/RPB3
To: Hobbs T
Progress Energy Florida
References
IR-13-404
Download: ML13199A220 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION uly 18, 2013

SUBJECT:

CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 - NRC INSPECTION REPORT 05000302/2013404

Dear Mr. Hobbs:

On June 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Crystal River Nuclear Generating Plant Unit 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on June 7, 2013, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA by S. Sandal for/

Daniel W. Rich, Chief Reactor Projects, Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72 Enclosure: NRC Inspection Report 05000302/2013404 w/ attachment: Supplemental Information (OUO)

cc w/encl. (see page 3) ____________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRP SIGNATURE Via email SRS:/RA/ SRS for DWR NAME DLanyi SSandal DRich DATE 6/26/2013 7/17/2013 7/17/2013 7/ /2013 7/ /2013 7/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO cc w/o encl: Blair P. Wunderly Dan Westcott Plant Manager Supervisor, Licensing Crystal River Nuclear Plant (NA2C)

Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution Cynthia Becker David G. Black (Acting) Chief Manager, Fleet Security Florida Bureau of Radiation Control Duke Energy Corporation Department of Health Electronic Mail Distribution P.O. Box 8413 Jupiter, FL 33468 John Elnitsky Vice President, Project Management and Joseph W. Donahue Construction Vice President - Nuclear Oversight Duke Energy Corporation Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution Lara S. Nichols David. A. Cummings Deputy General Counsel Associate General Counsel Duke Energy Corporation Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution M. Christopher Nolan Kate Nolan Director, Regulatory Affairs Associate General Counsel Duke Energy Corporation Duke Energy Corporation Electronic Mail Distribution Electronic Mail Distribution Matt Widener Attorney General Manager, Nuclear Security Department of Legal Affairs Duke Energy Corporation The Capitol PL-01 Electronic Mail Distribution Tallahassee, FL 32399-1050 Mike Delowery Bryan Koon Manager, Decommissioning Planning Director Duke Energy Corporation Florida Division of Emergency Management Electronic Mail Distribution 2555 Shumard Oak Blvd.

Tallahassee, FL 32399 Phyllis Dixon Manager, Decommissioning Support Chairman Duke Energy Corporation Board of County Commissioners Electronic Mail Distribution Citrus County 110 N. Apopka Avenue Richard Biddleman Inverness, FL 36250 Superintendent, NOS Crystal River Nuclear Plant Duke Energy Corporation Electronic Mail Distribution Letter to Terry Hobbs from Daniel Rich dated July 18, 2013.

SUBJECT: CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 - NRC INSPECTION REPORT 05000302/2013404 Distribution w/encl: