(4 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML14122A037 | | | number = ML14122A037 |
| | issue date = 05/08/2014 | | | issue date = 05/08/2014 |
| | title = April 23, 2014 Summary of Meeting with Southern Nuclear Operating Company to Discuss Grid Design Criteria (TAC No. MF3716) | | | title = April 23, 2014 Summary of Meeting with Southern Nuclear Operating Company to Discuss Grid Design Criteria |
| | author name = Williams S A | | | author name = Williams S |
| | author affiliation = NRC/NRR/DORL/LPLII-1 | | | author affiliation = NRC/NRR/DORL/LPLII-1 |
| | addressee name = | | | addressee name = |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:LICENSEE: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 8, 2014 LICENSEE: Southern Nuclear Operating Company FACILITY: Joseph M. Farley, Unit 1 and 2 |
| FACILITY: | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 8, 2014 Southern Nuclear Operating Company Joseph M. Farley, Unit 1 and 2 SUMMARY OF APRIL 23, 2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY TO DISCUSS GRID DESIGN CRITERIA (TAC NO. MF3716) On Apri123, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company (SNC) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
| | ==SUMMARY== |
| The purpose of the meeting was to discuss the design criteria being proposed by SNC for new grid voltage protective relaying at Edwin Hatch Nuclear Plant and Joseph M. Farley Nuclear plant. The meeting notice and agenda, dated April 9, 2014, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 14099A342. | | OF APRIL 23, 2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY TO DISCUSS GRID DESIGN CRITERIA (TAC NO. MF3716) |
| A list of attendees is provided in Enclosure | | On Apri123, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company (SNC) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the design criteria being proposed by SNC for new grid voltage protective relaying at Edwin Hatch Nuclear Plant and Joseph M. Farley Nuclear plant. |
| : 1. The licensee's presentation can be found at ADAMS Accession No. ML 141 08A005. SNC stated that they have initiated the design process for implementing the changes at both plants and presented the proposed design criteria for the new voltage protective relaying.
| | The meeting notice and agenda, dated April 9, 2014, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML14099A342. A list of attendees is provided in Enclosure 1. The licensee's presentation can be found at ADAMS Accession No. ML14108A005. |
| SNC described the methodology being used to determine the voltage setpoints and time delays. SNC provided a step by step example of how the voltage setpoint analytical limits will be derived. | | SNC stated that they have initiated the design process for implementing the changes at both plants and presented the proposed design criteria for the new voltage protective relaying. SNC described the methodology being used to determine the voltage setpoints and time delays. |
| The NRC Staff found the information provided by SNC to be a useful description of the licensee's plans for this future license amendment. | | SNC provided a step by step example of how the voltage setpoint analytical limits will be derived. |
| No regulatory decisions or commitments were made during the meeting. | | The NRC Staff found the information provided by SNC to be a useful description of the licensee's plans for this future license amendment. No regulatory decisions or commitments were made during the meeting. |
| Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-348, 50-364, 50-321, 50-366 | | Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-348, 50-364, 50-321, 50-366 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| List of Attendees cc w/encl: Distribution via Listserv LIST OF ATTENDEES APRIL 23,2014. | | List of Attendees cc w/encl: Distribution via Listserv |
| MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY GRID DESIGN CRITERIA Nuclear Regulatory Commission Staff Robert Pascarelli, NRRIDORL Robert Martin, NRRIDORL Jake Zimmerman, NRRIDE, Electrical Engineering Branch Roy Mathew, NRRIDE, Electrical Engineering Branch Singh Matharu, NRRIDE, Electrical Engineering Branch Khadijah
| |
| : Hemphill, NRRIDSS, Technical Specifications Branch Matthew Hamm, NRRIDSS, Technical Specifications Branch Licensee Participants Ken McElroy, SNC Licensing Manager Jamie Coleman, SNC Licensing Engineer Bonnie Goodwin -SNC Fleet Design Manager (Eiec/I&C)
| |
| Roy Lyon -SNC Fleet Design Engineer (Eiec/I&C)
| |
| John Minley-SNC Fleet Design Engineer (Eiec/I&C Ashley Williams
| |
| -Farley Site Project Lead Tim Piette -Hatch Site Project Supervisor Enclosure LICENSEE:
| |
| FACILITY:
| |
| May 8, 2014 Southern Nuclear Operating Company Joseph M. Farley, Unit 1 and 2
| |
|
| |
|
| ==SUBJECT:==
| | LIST OF ATTENDEES APRIL 23,2014. MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY GRID DESIGN CRITERIA Nuclear Regulatory Commission Staff Robert Pascarelli, NRRIDORL Robert Martin, NRRIDORL Jake Zimmerman, NRRIDE, Electrical Engineering Branch Roy Mathew, NRRIDE, Electrical Engineering Branch Singh Matharu, NRRIDE, Electrical Engineering Branch Khadijah Hemphill, NRRIDSS, Technical Specifications Branch Matthew Hamm, NRRIDSS, Technical Specifications Branch Licensee Participants Ken McElroy, SNC Licensing Manager Jamie Coleman, SNC Licensing Engineer Bonnie Goodwin - SNC Fleet Design Manager (Eiec/I&C) |
| | | Roy Lyon - SNC Fleet Design Engineer (Eiec/I&C) |
| SUMMARY OF APRIL 23,2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY TO DISCUSS GRID DESIGN CRITERIA (TAC NO. MF3716) On Apri123, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company (SNC) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
| | John Minley- SNC Fleet Design Engineer (Eiec/I&C Ashley Williams - Farley Site Project Lead Tim Piette - Hatch Site Project Supervisor Enclosure |
| The purpose of the meeting was to discuss the design criteria being proposed by SNC for new grid voltage protective relaying at Edwin Hatch Nuclear Plant and Joseph M. Farley Nuclear plant. The meeting notice and agenda, dated April 9, 2014, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 14099A342.
| |
| A list of attendees is provided in Enclosure
| |
| : 1. The licensee's presentation can be found at ADAMS Accession No. ML 14108A005.
| |
| SNC stated that they have initiated the design process for implementing the changes at both plants and presented the proposed design criteria for the new voltage protective relaying. | |
| SNC described the methodology being used to determine the voltage setpoints and time delays. SNC provided a step by step example of how the voltage setpoint analytical limits will be derived. | |
| The NRC Staff found the information provided by SNC to be a useful description of the licensee's plans for this future license amendment.
| |
| No regulatory decisions or commitments were made during the meeting.
| |
| IRA/ Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-348, 50-364, 50-321, 50-366
| |
| | |
| ==Enclosure:==
| |
|
| |
|
| List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
| | ML14122A037 OFFICE LPL2-1/PM LPL2-1/LA LPL2-1/BC LPL2-1/PM NAME SWilliams SFigueroa RPascarelli SWilliams DATE 5/7114 5/6/14 5/8/14 5/8/14}} |
| PUBLIC LPL2-1 R/F RidsNrrDorllp2-1 Resource RidsNrrPMSummer Resource RidsNrrLASFigueroa Resource RidsAcrsAcnw
| |
| _MaiiCTR Resource RidsRgn2MaiiCenter Resource RPascarelli, NRR RMartin, NRR ADAMS Accession No. ML14122A037 OFFICE LPL2-1/PM LPL2-1/LA LPL2-1/BC NAME SWilliams SFigueroa RPascarelli DATE 5/7114 5/6/14 5/8/14 OFFICIAL RECORD COPY JZimmerman, NRR RMathew, NRR SMatharu, NRR KHemphill, NRR MHamm, NRR LPL2-1/PM SWilliams 5/8/14}}
| |
Letter Sequence Meeting |
---|
|
|
MONTHYEARML14108A0052014-04-23023 April 2014 April 23, 2014, Public Meeting Presentation Slides, Southern Nuclear Company, SNC Degraded Grid Design Criteria. Project stage: Request ML14120A2252014-04-23023 April 2014 April 23, 2014, Category 1 Public Meeting, J.M. Farley Presentation Slides, Residual Heat Removal Autoclosure Interlock Deletion. Project stage: Request ML14122A0372014-05-0808 May 2014 April 23, 2014 Summary of Meeting with Southern Nuclear Operating Company to Discuss Grid Design Criteria Project stage: Meeting ML14108A3762014-05-0808 May 2014 Summary of Meeting with Southern Nuclear Operating Company to Discuss Deletion of the Residual Heat Removal Autoclosure Interlock Project stage: Meeting 2014-04-23
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24270A2112024-10-0404 October 2024 September 23, 2024, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Proposed LAR to Be Excepted from Footnote 11 Listed in Regulatory Guide 1.183, Rev. 0, for Farley 1 & 2 ML24226B2112024-08-22022 August 2024 Regulatory Audit Summary in Support of License Amendment Requests to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions ML24213A2462024-08-0505 August 2024 Summary of Closed Meeting SNC Fleet - Physical Barriers Exemption ML24198A0772024-07-18018 July 2024 Summary of Observation Public Meeting Held with SNC Regarding Previous LAR to Revise TS 3.6.5 Completion Time Increase Using Risk-Informed Process for Evaluation to Increase for Farley Nuclear Plant, Units 1 and 2 ML24156A1772024-06-11011 June 2024 Summary of June 6, 2024, Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding the Physical Barrier Exemptions for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch Nuclear Plant, Units 1 and 2, and Vogtle ML24138A0092024-05-17017 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting for Joseph M. Farley, Units 1 and 2 Docket No. 50-348, and 50-364 -Meeting Number 20240474 ML24123A0502024-05-0202 May 2024 2023 Annual Assessment Public Meeting Summary Meeting Number 20240479 ML24093A0612024-04-18018 April 2024 April 1, 2024, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Proposed Alternative Requests to the Extend Examination Intervals for Joseph M. Farley Nuclear Plant and Vogtle ML24096A1832024-04-12012 April 2024 Summary of April 3, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Proposed License Amendment Request to Revise Technical Specification 3.6.5 ML24012A1592024-01-30030 January 2024 Summary of January 8, 2024, Meeting Held with Southern Nuclear Operating Company, Inc., to Discuss a RAI License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Head Bolts ML24019A1932024-01-30030 January 2024 Summary of January 8, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed LAR for Vogtle Electric Generating Plant, Units 1, 2, 3, & 4; Hatch, Units 1 & 2; Farley, Units 1 & 2 ML23356A0282023-12-27027 December 2023 December 11, 2023, Pre-Application Meeting with SNC Regarding a Proposed Fleet LAR to Revise TS 5.3.1 to Relocate Training Qualification Requirements from TS to Their Qatr/Ndqam ML23338A2592023-12-0808 December 2023 Summary of Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Reactor Pressure Vessel Head Closure Bolts for Hatch, Units 1 & 2 (EPID No. L-2022-LLA- 0120) ML23311A1302023-11-17017 November 2023 Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0 ML23244A0312023-09-18018 September 2023 MTS - Meeting Summary - Pre-Submittal Meeting on August 02, 2023 - RICT 45-day Extension for TS 3.7.1 & 3.7.2 ML23146A1672023-05-31031 May 2023 Public Meeting Summary2022 Annual Assessment Meeting for Joseph M. Farley, Units 1 and 2 Docket No. 50?348, and 50?364 Meeting Number 20230610 ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML23094A1092023-04-14014 April 2023 Summary of Conference Call Held with SNC, Regarding Regulatory Issue Summary 2000-11, Supplement 2, NRC Emergency Telecommunications System, for Joseph M. Farley Nuclear Plant, Units 1 and 2, and SNC Emergency Operations Facility ML23088A3882023-04-0303 April 2023 Summary of March 28, 2023, Observation Public Meeting Held with SNC, Regarding a License Amendment Request Regarding the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plan, Units 1 and 2 ML23088A2362023-03-28028 March 2023 SNC Presentation - Public Meeting - 03-28-2023 - Page from ML22231B055 ML22243A1912022-09-0707 September 2022 Public Pre-Submittal Meeting on August 1, 2022 - Revise TS Table 1.1-1 Modes to Relax RPV Head Closure Studs ML22200A0432022-07-22022 July 2022 Summary of June 22, 2022, Pre-Submittal Meeting W/Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Re-Write TS 3.7.2, Plant Service Water and Ultimate Heat Sink for Edwin I. Hatch Nuclear ML22172A2142022-07-11011 July 2022 June 16, 2022, Summary of Public Meeting with Southern Nuclear Operating Company, Inc., a Proposed License Amendment Request to Modify the Technical Specifications Regarding Pressurizer Safety Valve Setpoints at the Joseph M. Farley Nuclear ML22108A1382022-04-18018 April 2022 Annual Assessment Public Meeting Summary ML21313A1172021-11-18018 November 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Change the Technical Specification Related to Technical Specification 5.5.16 for Joseph M. Farley Nuclear Plant ML21288A3312021-11-0404 November 2021 Summary of October 14, 2021, Public Meeting with SNC, Inc., Regarding Proposed LAR to Modify the TSs to Increase Containment Peak Pressure to Address Several Nuclear Safety Advisory Letters L-2021-LRM-0097 ML21278A5572021-10-25025 October 2021 Meeting Summary - Pre-Submittal Meeting on October 5, 2021 - Hatch NFPA 805 License Amendment Request ML21251A5372021-09-20020 September 2021 September 7, 2021, Summary of Follow-Up, Public, Pre-Licensing Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 for Edwin I. Hatch Nuclear Plant, Units 1 and 2 ML21229A0072021-09-10010 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Adopt TSTF-505 ML21232A2622021-09-0101 September 2021 Summary of Public Meeting with Southern Nuclear Operating Company Regarding Proposed LAR to Remove Function 1.f (Main Steam Line Isolation-Turbine Building Area Temperature-High) from TS Table 3.3.6.1A-7 for Hatch Units 1&2 (L-2021-LRM-0081 ML21176A1712021-07-0606 July 2021 Summary of June 24, 2021, Public Meeting Regarding a Proposed LAR to Permanently Remove the Encapsulation Vessels Around Containment Sump Recirculation Valves ML21124A1232021-05-0404 May 2021 April 27, 2021, Public Meeting Summary Joseph M. Farley Nuclear Plant Units 1 and 2, Edwin I. Hatch Nuclear Plant Units 1 and 2, Docket No. 50-348, 50-364, 50-321, 50-366, Meeting Number ML21117A030 ML21102A3112021-04-19019 April 2021 Corrected - 03/31/2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed Licensing Action Request to Change the Quality Assurance Topical Report ML21092A0082021-04-0808 April 2021 Summary of March 31, 2021, Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed Licensing Action Request to Change the Technical Specification Related to Heat Flux Hot Channel Factor ML21063A3282021-03-12012 March 2021 Public Mtg Summary March 4, 2021 with Southern Nuclear Operating Company, Inc., a Proposed LAR to Change the TS Related to Heat Flux Hot Channel Factor for Joseph M. Farley Nuclear Plant, Units 1 & 2, and Vogtle Electric Generating Plant, U ML21047A2622021-02-19019 February 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Change the Core Power Distribution Monitoring System ML21028A0532021-02-0303 February 2021 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Supplement National Fire Protection Association (NFPA)-805, Performance-Based Standard for Fire Protection for ML20318A0752020-11-16016 November 2020 Summary of November 12, 2020, Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request for the Emergency Plan ML20289A4242020-11-0404 November 2020 Summary of Public Meeting with Southern Nuclear Operating Company, Inc. Regarding Proposed License Amendment Request to Remove Function 1.f from Technical Specification Table 3.3.6.1A-7 for Hatch, Units 1 and 2 ML20217L3692020-08-13013 August 2020 Summary of Meeting Joseph M. Farley Nuclear Plant, Units 1 and 2; Edwin I. Hatch, Units 1 and 2; and Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 a LAR for the Emergency Plan (EPID Nos. L-2020-LLA0150 and L-2020-LLA-015 ML20162A1622020-06-16016 June 2020 June 10, 2020, Summary of Public Mtg with Southern Nuclear Operating Company, Inc., a Proposed License Amendment Request for a One-Time Completion Time for the Emergency Diesel Generator Using a Risk-Informed Approach ML20154K7242020-06-0202 June 2020 EOC Meeting Summary ML19149A4222019-05-29029 May 2019 Summary of Public Meeting Concerning Annual Assessment of the Farley Nuclear Plant, Units 1 and 2, Docket Nos. 05000348 and 05000361 ML19123A3542019-05-0202 May 2019 Public Meeting Summary - Hatch Nuclear Plant, Docket Nos. 50-321 and 50-366 ML19114A0062019-04-30030 April 2019 Summary of July 31, 2018, Pre-Application Meeting with Southern Nuclear to Discuss Proposed Changes to Secondary Containment Technical Specifications (EPID L-2018-LEM-0047 ML19059A3672019-03-0707 March 2019 March 5, 2019, Meeting Summary Regarding Pre-Application Meeting to Discuss Proposed Amendment to Revise Technical Specification 3.3.1 and 3.3.2 ML19038A3462019-02-15015 February 2019 Summary of Meeting with the Nuclear Regulatory Commission and Southern Nuclear Operating Company, Inc. Regarding Pre-Submittal of a License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation ML18318A2532018-11-26026 November 2018 Summary of Pre-Application Meeting to Discuss the Joseph M. Farley Nuclear Plant, Units 1 and 2, Spent Fuel Pool Criticality Analyses and Measurement Uncertainty Recapture Amendments ML18306A3132018-11-0707 November 2018 Summary of October 16, 2018, Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Joseph M. Farley Unit 1 & 2, Electrical Distribution System as It Relates to the Risk-Informed Completion Times Amendment 2024-08-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 8, 2014 LICENSEE: Southern Nuclear Operating Company FACILITY: Joseph M. Farley, Unit 1 and 2
SUBJECT:
SUMMARY
OF APRIL 23, 2014, MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY TO DISCUSS GRID DESIGN CRITERIA (TAC NO. MF3716)
On Apri123, 2014, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Southern Nuclear Operating Company (SNC) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the design criteria being proposed by SNC for new grid voltage protective relaying at Edwin Hatch Nuclear Plant and Joseph M. Farley Nuclear plant.
The meeting notice and agenda, dated April 9, 2014, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML14099A342. A list of attendees is provided in Enclosure 1. The licensee's presentation can be found at ADAMS Accession No. ML14108A005.
SNC stated that they have initiated the design process for implementing the changes at both plants and presented the proposed design criteria for the new voltage protective relaying. SNC described the methodology being used to determine the voltage setpoints and time delays.
SNC provided a step by step example of how the voltage setpoint analytical limits will be derived.
The NRC Staff found the information provided by SNC to be a useful description of the licensee's plans for this future license amendment. No regulatory decisions or commitments were made during the meeting.
Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-348, 50-364, 50-321, 50-366
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES APRIL 23,2014. MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY GRID DESIGN CRITERIA Nuclear Regulatory Commission Staff Robert Pascarelli, NRRIDORL Robert Martin, NRRIDORL Jake Zimmerman, NRRIDE, Electrical Engineering Branch Roy Mathew, NRRIDE, Electrical Engineering Branch Singh Matharu, NRRIDE, Electrical Engineering Branch Khadijah Hemphill, NRRIDSS, Technical Specifications Branch Matthew Hamm, NRRIDSS, Technical Specifications Branch Licensee Participants Ken McElroy, SNC Licensing Manager Jamie Coleman, SNC Licensing Engineer Bonnie Goodwin - SNC Fleet Design Manager (Eiec/I&C)
Roy Lyon - SNC Fleet Design Engineer (Eiec/I&C)
John Minley- SNC Fleet Design Engineer (Eiec/I&C Ashley Williams - Farley Site Project Lead Tim Piette - Hatch Site Project Supervisor Enclosure
ML14122A037 OFFICE LPL2-1/PM LPL2-1/LA LPL2-1/BC LPL2-1/PM NAME SWilliams SFigueroa RPascarelli SWilliams DATE 5/7114 5/6/14 5/8/14 5/8/14