Line 3: Line 3:
| issue date = 09/01/2015
| issue date = 09/01/2015
| title = Mid-Cycle Assessment Letter for St. Lucie Plant Unit 1 and Unit 2 (Report 05000335/2015005 and 05000389/2015005)
| title = Mid-Cycle Assessment Letter for St. Lucie Plant Unit 1 and Unit 2 (Report 05000335/2015005 and 05000389/2015005)
| author name = Munday J T
| author name = Munday J
| author affiliation = NRC/RGN-II/DRP
| author affiliation = NRC/RGN-II/DRP
| addressee name = Nazar M K
| addressee name = Nazar M
| addressee affiliation = Nextera Energy
| addressee affiliation = Nextera Energy
| docket = 05000335, 05000389
| docket = 05000335, 05000389
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:UNITED STATES eptember 1, 2015
-1257 September 1, 2015 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy P. O. Box 14000


Juno Beach, FL 33408-0420
==SUBJECT:==
 
MID-CYCLE ASSESSMENT LETTER FOR ST. LUCIE PLANT UNIT 1 AND UNIT 2 (REPORT 05000335/2015005 AND 05000389/2015005)
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR S T. LUCIE PLANT UNIT 1 AND UNIT 2 (REPORT 05000 335/2 0 15 00 5 AND 05000 389/201 5 00 5)


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==
On August 12, 201 5, the NRC completed its mid
On August 12, 2015, the NRC completed its mid-cycle performance review of St. Lucie Plant Unit 1 and Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
-cycle performance review of S t. Lucie Plant Unit 1 and Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from Jul y 1, 201 4 , through June 30, 201 5. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.


After reviewing St. Lucie Unit 1 performance in addressing the White finding that was the subject of Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," dated February 11, 2011, the NRC concluded your actions met the objectives of the inspection.
After reviewing St. Lucie Unit 1 performance in addressing the White finding that was the subject of Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, dated February 11, 2011, the NRC concluded your actions met the objectives of the inspection. This inspection was completed on December 19, 2014, and was documented in NRC supplemental inspection report 05000335/2014011 (Agency-wide Documents Access and Management System (ADAMS) ascension number ML15027A197).


This inspection was completed on December 19, 2014
Therefore, in accordance with the guidance in Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program, the White finding will only be considered in assessing plant performance for a total of four quarters. As a result, the NRC determined the performance at St. Lucie Plant Unit 1 to be in the Licensee Response Column of the Reactor Oversight Process (ROP) Action Matrix as of July 1, 2015, as documented in the St. Lucie Plant NRC Integrated Inspection Reports 05000335/2015002, 05000389/2015002; 05000335/2015011, 05000389/2015011; and Assessment Follow-Up Letter for St. Lucie Nuclear Plant Unit 1 (ADAMS ascension number ML15216A565). Therefore, the NRC plans to conduct ROP baseline inspections at St. Lucie Unit 1. The NRC also determined that overall, St. Lucie Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at St. Lucie Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs ROP Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at St. Lucie Unit 2.
, and was documented in NRC supplemental inspection report 05000335/2014011 (Agency
-wide Documents Access and Management System (ADAMS) ascension number ML15027A197).


Therefore, in accordance with the guidance in Inspection Manual Chapter (IMC) 0305, "Operating Reactor Assessment Program," the White finding will only be considered in assessing plant performance for a total of four quarters.
The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. The NRC also plans to conduct the following non-routine inspection during this period: Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.


As a result, the NRC determined the performance at St. Lucie Plant Unit 1 to be in the Licensee Response Column of the Reactor Oversight Process (ROP) Action Matrix as of July 1, 2015
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for St. Lucie Nuclear Plant Unit 1, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections, the full implementation of the orders mentioned above performing TI 191: Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
, as documented in the St. Lucie Plant NRC Integrated Inspection Reports 05000335/2015002, 05000389/2015002; 05000335/2015011, 05000389/2015011; and Assessment Follow-Up Letter for St. Lucie Nuclear Plant Unit 1 (ADAMS ascension number ML15216A565
). Therefore, the NRC plans to conduct ROP baseline inspections at S t. Lucie Unit 1
. The NRC also determined that overall, St. Lucie Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at St. Lucie Unit 2 during the most recent quarter was within the Licensee Response Column of the NRC's ROP Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at S t. Lucie Unit 2.


The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact LaDonna B. Suggs at (404) 997-4539 with any questions you have regarding this letter.
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. The NRC also plans to conduct the following non
-routine inspection during this period: Inspection Procedure 71003, "Post-Approval Site Inspection for License Renewal." This inspection plan does not include security
-related inspections, which will be sent via separate, non
-publicly available correspondence.


In response to the accident at Fukushima, the Commission issued Order EA
Sincerely,
-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond
/RA/
-Design-Basis External Events
Joel T. Munday, Director Division of Reactor Projects Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 Enclosure:
." This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond
St. Lucie Inspection/Activity Plan (07/01/2015 - 06/30/2017)
-design-basis external event. Additionally, the Commission issued Order EA
cc: Distribution via Listserv
-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation
." This Order requires licensees to have a reliable means of remotely monitoring wide
-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond
-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for St. Lucie Nuclear Plant Unit 1, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections
, the full implementation of the orders mentioned above performing TI 191:
Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi
-Unit Dose Assessment Plans
. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's
"Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room). Please contact LaDonna B. Suggs at (404) 997-4539 with any questions you have regarding this letter.


Sincerely,
_________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE REW1 LJB4 JTM NAME RWilliams LSuggs JMunday DATE  8/24/2015 8/25/2015 8/31/2015 E-MAIL COPY? YES NO YES NO YES NO Letter to Mano Nazar from Joel T. Munday dated September 1, 2015.
/RA/ Joel T. Munday, Director Division of Reactor Projects Docket Nos.: 50-335, 50-389 License Nos.
 
: DPR-67, NPF-16 Enclosure:
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR ST. LUCIE PLANT UNIT 1 AND UNIT 2 (REPORT 05000335/2015005 AND 05000389/2015005)
St. Lucie Inspection/Activity Plan (0 7/01/201 5 - 06/3 0/201 7) cc: Distribution via Listserv
DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROP Assessment Institute of Nuclear Power Operations (INPO)
 
Page 1 of 2      Saint Lucie 09/01/2015 10:28:13    Inspection / Activity Plan Report 22 09/01/2015 - 06/30/2017 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site ISI - UNIT 2 IN-SERVICE INSPECTION      1 2 09/14/2015 09/18/2015 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG IN-SERVICE INSPECTION      1 2 09/28/2015 10/02/2015 IP 7111108P Inservice Inspection Activities - PWR LR - POST APPROVAL LR PHASE 2      6 1, 2 11/02/2015 11/06/2015 IP 71003  Post-Approval Site Inspection for License Renewal 1, 2 11/16/2015 11/20/2015 IP 71003  Post-Approval Site Inspection for License Renewal OL RQ - REQUAL INSP      2 1, 2 11/16/2015 11/20/2015 IP 7111111B Licensed Operator Requalification Program CDBI - COMPONENT DESIGN BASES INSPECTION      7 1, 2 01/11/2016 01/15/2016 IP 7111121 Component Design Bases Inspection 1, 2 02/08/2016 02/12/2016 IP 7111121 Component Design Bases Inspection 1, 2 02/29/2016 03/04/2016 IP 7111121 Component Design Bases Inspection RP - RP PUBLIC RAD SAFETY BASELINE      3 1, 2 01/25/2016 01/29/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/25/2016 01/29/2016 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 01/25/2016 01/29/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 01/25/2016 01/29/2016 IP 71151  Performance Indicator Verification EP - EP EXERCISE INSPECTION      2 1, 2 02/22/2016 02/26/2016 IP 7111401 Exercise Evaluation 1, 2 02/22/2016 02/26/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 02/22/2016 02/26/2016 IP 71151  Performance Indicator Verification EQ - ENVIRONMENTAL QUALIFICATION INSPECTION      3 1, 2 04/11/2016 04/15/2016 IP 7111121 Component Design Bases Inspection 1, 2 04/25/2016 04/29/2016 IP 7111121 Component Design Bases Inspection PI&R - PROBLEM IDENTIFICATION AND RESOLUTION      5 1, 2 05/09/2016 05/13/2016 IP 71152B Problem Identification and Resolution 1, 2 05/23/2016 05/27/2016 IP 71152B Problem Identification and Resolution TFPI - TRIENNIAL FIRE PROTECTION INSPECTION      4 1, 2 06/06/2016 06/10/2016 IP 7111105T Fire Protection [Triennial]
1, 2 06/20/2016 06/24/2016 IP 7111105T Fire Protection [Triennial]
HS - TRIENNIAL HEAT SINK PERFORMANCE      1 1, 2 07/11/2016 07/15/2016 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activities.


_________________
This report shows only on-site and announced inspection procedures. Enclosure
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE REW1 LJB4 JTM NAME RWilliams LSuggs JMunday DATE 8/24/2015 8/25/2015 8/31/2015 E-MAIL COPY?
YES NO YES NO YES NO Letter to Mano Nazar from Joel T. Munday dated September 1, 2015.


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR ST. LUCIE PLANT UNIT 1 AND UNIT 2 (REPORT 05000 335/2 015005 AND 05000 389/2015005) DISTRIBUTION
Page 2 of 2      Saint Lucie 09/01/2015 10:28:13    Inspection / Activity Plan Report 22 09/01/2015 - 06/30/2017 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site RP - RAD HAZARDS ANALYSIS      1 1, 2 09/26/2016 09/30/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls ISI - UNIT 1 IN-SERVICE INSPECTION    1 1 10/03/2016 10/07/2016 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG IN-SERVICE INSPECTION    1 1 10/10/2016 10/14/2016 IP 7111108P Inservice Inspection Activities - PWR EP - EP PROGRAM INSPECTION      4 1, 2 01/23/2017 01/27/2017 IP 7111402 Alert and Notification System Testing 1, 2 01/23/2017 01/27/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 01/23/2017 01/27/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 01/23/2017 01/27/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 01/23/2017 01/27/2017 IP 71151  Performance Indicator Verification ISI - UNIT 2 IN-SERVICE INSPECTION & RVH EXAM    2 2 03/13/2017 03/17/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 1    3 1, 2 03/13/2017 03/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/13/2017 03/17/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/13/2017 03/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/13/2017 03/17/2017 IP 71124.04 Occupational Dose Assessment 1, 2 03/13/2017 03/17/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 03/13/2017 03/17/2017 IP 71151  Performance Indicator Verification SGISI - UNIT 2 SG IN-SERVICE INSPECTION    1 2 03/20/2017 03/24/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 2    2 1, 2 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/27/2017 03/31/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/27/2017 03/31/2017 IP 71124.04 Occupational Dose Assessment 1, 2 03/27/2017 03/31/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 03/27/2017 03/31/2017 IP 71151  Performance Indicator Verification MODS - PLANT MODIFICATIONS INSPECTION    3 1, 2 06/05/2017 06/09/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 06/19/2017 06/23/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.
: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROP Assessment Institute of Nuclear Power Operations (INPO)


Page 1 of 2 09/01/2015 10:28:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Saint LucieInspection / Activity Plan 09/01/2015
This report shows only on-site and announced inspection procedures.
-06/30/2017 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/14/2015 09/18/2015 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/28/2015 10/02/2015 LR-POST APPROVAL LR PHASE 2 6 1, 2 IP Post-Approval Site Inspection for License Renewal 7100311/02/201511/06/2015 1, 2 IP Post-Approval Site Inspection for License Renewal 7100311/16/201511/20/2015OL RQ-REQUAL INSP 2 1, 2 IP Licensed Operator Requalification Program7111111B11/16/201511/20/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 7 1, 2 IP Component Design Bases Inspection711112101/11/2016 01/15/2016 1, 2 IP Component Design Bases Inspection7111121 02/08/2016 02/12/2016 1, 2 IP Component Design Bases Inspection7111121 02/29/2016 03/04/2016 RP-RP PUBLIC RAD SAFETY BASELINE 3 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 01/25/2016 01/29/2016 1, 2 IP Radiological Environmental Monitoring Program71124.07 01/25/2016 01/29/2016 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 01/25/2016 01/29/2016 1, 2 IP Performance Indicator Verification71151 01/25/2016 01/29/2016 EP-EP EXERCISE INSPECTION 2 1, 2 IP Exercise Evaluation7111401 02/22/2016 02/26/2016 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 02/22/2016 02/26/2016 1, 2 IP Performance Indicator Verification71151 02/22/2016 02/26/2016 EQ-ENVIRONMENTAL QUALIFICATION INSPECTION 3 1, 2 IP Component Design Bases Inspection711112104/11/2016 04/15/2016 1, 2 IP Component Design Bases Inspection7111121 04/25/2016 04/29/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 IP Problem Identification and Resolution71152B 05/09/2016 05/13/2016 1, 2 IP Problem Identification and Resolution71152B 05/23/2016 05/27/2016 TFPI-TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 IP Fire Protection [Triennial]7111105T 06/06/2016 06/10/2016 1, 2 IP Fire Protection [Triennial]7111105T 06/20/2016 06/24/2016 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T07/11/2016 07/15/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Page 2 of 2 09/01/2015 10:28:13 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site Saint LucieInspection / Activity Plan 09/01/2015
Enclosure
-06/30/2017 RP-RAD HAZARDS ANALYSIS 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/26/2016 09/30/2016 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/03/2016 10/07/2016 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/10/2016 10/14/2016 EP-EP PROGRAM INSPECTION 4 1, 2 IP A lert and Notification System Testing7111402 01/23/2017 01/27/2017 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 01/23/2017 01/27/2017 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 01/23/2017 01/27/2017 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 01/23/2017 01/27/2017 1, 2 IP Performance Indicator Verification71151 01/23/2017 01/27/2017 ISI-UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 IP Inservice Inspection Activities - PWR7111108P 03/13/2017 03/17/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/13/2017 03/17/2017 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/13/2017 03/17/2017 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/13/2017 03/17/2017 1, 2 IP Occupational Dose Assessment71124.04 03/13/2017 03/17/2017 1, 2 IP Radiation Monitoring Instrumentation71124.05 03/13/2017 03/17/2017 1, 2 IP Performance Indicator Verification71151 03/13/2017 03/17/2017 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 03/20/2017 03/24/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/27/2017 03/31/2017 1, 2 IP Occupational ALARA Planning and Controls71124.02 03/27/2017 03/31/2017 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 03/27/2017 03/31/2017 1, 2 IP Occupational Dose Assessment71124.04 03/27/2017 03/31/2017 1, 2 IP Radiation Monitoring Instrumentation71124.05 03/27/2017 03/31/2017 1, 2 IP Performance Indicator Verification71151 03/27/2017 03/31/2017 MODS-PLANT MODIFICATIONS INSPECTION 3 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 06/05/2017 06/09/2017 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 06/19/2017 06/23/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 08:06, 31 October 2019

Mid-Cycle Assessment Letter for St. Lucie Plant Unit 1 and Unit 2 (Report 05000335/2015005 and 05000389/2015005)
ML15244B091
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/01/2015
From: Joel Munday
Division Reactor Projects II
To: Nazar M
Nextera Energy
References
IR 2015005
Download: ML15244B091 (7)


Text

UNITED STATES eptember 1, 2015

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR ST. LUCIE PLANT UNIT 1 AND UNIT 2 (REPORT 05000335/2015005 AND 05000389/2015005)

Dear Mr. Nazar:

On August 12, 2015, the NRC completed its mid-cycle performance review of St. Lucie Plant Unit 1 and Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

After reviewing St. Lucie Unit 1 performance in addressing the White finding that was the subject of Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, dated February 11, 2011, the NRC concluded your actions met the objectives of the inspection. This inspection was completed on December 19, 2014, and was documented in NRC supplemental inspection report 05000335/2014011 (Agency-wide Documents Access and Management System (ADAMS) ascension number ML15027A197).

Therefore, in accordance with the guidance in Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program, the White finding will only be considered in assessing plant performance for a total of four quarters. As a result, the NRC determined the performance at St. Lucie Plant Unit 1 to be in the Licensee Response Column of the Reactor Oversight Process (ROP) Action Matrix as of July 1, 2015, as documented in the St. Lucie Plant NRC Integrated Inspection Reports 05000335/2015002, 05000389/2015002; 05000335/2015011, 05000389/2015011; and Assessment Follow-Up Letter for St. Lucie Nuclear Plant Unit 1 (ADAMS ascension number ML15216A565). Therefore, the NRC plans to conduct ROP baseline inspections at St. Lucie Unit 1. The NRC also determined that overall, St. Lucie Unit 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at St. Lucie Unit 2 during the most recent quarter was within the Licensee Response Column of the NRCs ROP Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at St. Lucie Unit 2.

The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. The NRC also plans to conduct the following non-routine inspection during this period: Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for St. Lucie Nuclear Plant Unit 1, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections, the full implementation of the orders mentioned above performing TI 191: Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact LaDonna B. Suggs at (404) 997-4539 with any questions you have regarding this letter.

Sincerely,

/RA/

Joel T. Munday, Director Division of Reactor Projects Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 Enclosure:

St. Lucie Inspection/Activity Plan (07/01/2015 - 06/30/2017)

cc: Distribution via Listserv

_________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE REW1 LJB4 JTM NAME RWilliams LSuggs JMunday DATE 8/24/2015 8/25/2015 8/31/2015 E-MAIL COPY? YES NO YES NO YES NO Letter to Mano Nazar from Joel T. Munday dated September 1, 2015.

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR ST. LUCIE PLANT UNIT 1 AND UNIT 2 (REPORT 05000335/2015005 AND 05000389/2015005)

DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROP Assessment Institute of Nuclear Power Operations (INPO)

Page 1 of 2 Saint Lucie 09/01/2015 10:28:13 Inspection / Activity Plan Report 22 09/01/2015 - 06/30/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 09/14/2015 09/18/2015 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 09/28/2015 10/02/2015 IP 7111108P Inservice Inspection Activities - PWR LR - POST APPROVAL LR PHASE 2 6 1, 2 11/02/2015 11/06/2015 IP 71003 Post-Approval Site Inspection for License Renewal 1, 2 11/16/2015 11/20/2015 IP 71003 Post-Approval Site Inspection for License Renewal OL RQ - REQUAL INSP 2 1, 2 11/16/2015 11/20/2015 IP 7111111B Licensed Operator Requalification Program CDBI - COMPONENT DESIGN BASES INSPECTION 7 1, 2 01/11/2016 01/15/2016 IP 7111121 Component Design Bases Inspection 1, 2 02/08/2016 02/12/2016 IP 7111121 Component Design Bases Inspection 1, 2 02/29/2016 03/04/2016 IP 7111121 Component Design Bases Inspection RP - RP PUBLIC RAD SAFETY BASELINE 3 1, 2 01/25/2016 01/29/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/25/2016 01/29/2016 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 01/25/2016 01/29/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 01/25/2016 01/29/2016 IP 71151 Performance Indicator Verification EP - EP EXERCISE INSPECTION 2 1, 2 02/22/2016 02/26/2016 IP 7111401 Exercise Evaluation 1, 2 02/22/2016 02/26/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 02/22/2016 02/26/2016 IP 71151 Performance Indicator Verification EQ - ENVIRONMENTAL QUALIFICATION INSPECTION 3 1, 2 04/11/2016 04/15/2016 IP 7111121 Component Design Bases Inspection 1, 2 04/25/2016 04/29/2016 IP 7111121 Component Design Bases Inspection PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 05/09/2016 05/13/2016 IP 71152B Problem Identification and Resolution 1, 2 05/23/2016 05/27/2016 IP 71152B Problem Identification and Resolution TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 06/06/2016 06/10/2016 IP 7111105T Fire Protection [Triennial]

1, 2 06/20/2016 06/24/2016 IP 7111105T Fire Protection [Triennial]

HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 07/11/2016 07/15/2016 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Saint Lucie 09/01/2015 10:28:13 Inspection / Activity Plan Report 22 09/01/2015 - 06/30/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RAD HAZARDS ANALYSIS 1 1, 2 09/26/2016 09/30/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 10/03/2016 10/07/2016 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 10/10/2016 10/14/2016 IP 7111108P Inservice Inspection Activities - PWR EP - EP PROGRAM INSPECTION 4 1, 2 01/23/2017 01/27/2017 IP 7111402 Alert and Notification System Testing 1, 2 01/23/2017 01/27/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 01/23/2017 01/27/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 01/23/2017 01/27/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 01/23/2017 01/27/2017 IP 71151 Performance Indicator Verification ISI - UNIT 2 IN-SERVICE INSPECTION & RVH EXAM 2 2 03/13/2017 03/17/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 1 3 1, 2 03/13/2017 03/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/13/2017 03/17/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/13/2017 03/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/13/2017 03/17/2017 IP 71124.04 Occupational Dose Assessment 1, 2 03/13/2017 03/17/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 03/13/2017 03/17/2017 IP 71151 Performance Indicator Verification SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 03/20/2017 03/24/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 2 2 1, 2 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/27/2017 03/31/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/27/2017 03/31/2017 IP 71124.04 Occupational Dose Assessment 1, 2 03/27/2017 03/31/2017 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 03/27/2017 03/31/2017 IP 71151 Performance Indicator Verification MODS - PLANT MODIFICATIONS INSPECTION 3 1, 2 06/05/2017 06/09/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 06/19/2017 06/23/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure