ML092440461

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan, Report 22, 09/01/2009 - 12/31/2010
ML092440461
Person / Time
Site: Saint Lucie, 07200061  NextEra Energy icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II
To:
Shared Package
ML092440450 List:
References
Download: ML092440461 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2009 11:24:28 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Saint Lucie INSP

- COMPONENT DESIGN BASIS INSPECTION (CDBI) 7 1, 2 IP Component Design Bases Inspection 7111121 08/31/2009 09/04/2009 OL EXAM

- INITIAL EXAM PREP 3

1 ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 09/14/2009 09/18/2009 OL EXAM

- INITIAL EXAM WEEK 1 3

1 ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 09/28/2009 10/01/2009 OL EXAM

- INITIAL EXAM - WEEK 2 3

1 ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 10/05/2009 10/09/2009 OL EXAM

- INITIAL EXAM - WEEK 3 3

1 ST LUCIE/OCTOBER 2009 EXAM AT POWER FACILITIES V23309 10/19/2009 10/23/2009 OL RQ

- REQUAL INSPECTION 2

1, 2 IP Licensed Operator Requalification Program 7111111B 11/16/2009 11/20/2009 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1, 2 IP Exercise Evaluation 7111401 02/22/2010 02/26/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 02/22/2010 02/26/2010 1, 2 IP Performance Indicator Verification 71151 02/22/2010 02/26/2010 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 5

1 IP Identification and Resolution of Problems 71152B 03/01/2010 03/04/2010 1, 2 IP Identification and Resolution of Problems 71152B 03/15/2010 03/19/2010 ISFSI

- ISFSI ROUTINE LOADING 2

1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 04/01/2010 06/30/2010 EB3ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 04/12/2010 04/16/2010 EB3TI172

- EB3 RCS DM BUTT WELDS 1

1, 2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 04/12/2010 04/16/2010 PSB1-RP

- RP ACCESS CONTROLS 2

1, 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/10/2010 05/14/2010 1, 2 IP Access Control to Radiologically Significant Areas 7112101 05/10/2010 05/14/2010 EB3 HS

- HEAT SINK INSPECTION 1

1, 2 IP Heat Sink Performance 7111107T 07/12/2010 07/16/2010 EB1

- MODIFICATIONS - 10CFR50.59 2

1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 07/26/2010 07/30/2010 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 08/09/2010 08/13/2010 PSB1-RP

- RP PUBLIC RADIATION PROTECTION 3

1, 2 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 08/30/2010 09/03/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 09/01/2009 11:24:28 Report 22 09/01/2009 - 12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Saint Lucie PSB1-RP

- RP PUBLIC RADIATION PROTECTION 3

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 08/30/2010 09/03/2010 1, 2 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 08/30/2010 09/03/2010 1, 2 IP Performance Indicator Verification 71151 08/30/2010 09/03/2010 EB3ISI

- UNIT 2 INSERVICE INSPECTION 1

2 IP Inservice Inspection Activities - PWR 7111108P 11/22/2010 11/26/2010 EB3TI172

- EB3 RX COOLANT SYS DM BUTT WELDS 1

2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 11/22/2010 11/26/2010 EB3SGISI

- UNIT 2 SG INSERVICE INSPECTION 1

2 IP Inservice Inspection Activities - PWR 7111108P 11/29/2010 12/03/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.