ML100620830

From kanterella
Jump to navigation Jump to search
Inspection/Activity Plan 03/01/2010 - 06/30/2011
ML100620830
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/03/2010
From:
NRC/RGN-II
To:
Shared Package
ML100620086 List:
References
Download: ML100620830 (2)


Text

Page 1 of 2 Saint Lucie 03/03/2010 07:30:26 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 03/01/2010 03/05/2010 IP 71152B Identification and Resolution of Problems 1, 2 03/15/2010 03/19/2010 IP 71152B Identification and Resolution of Problems EB3ISI - UNIT 1 INSERVICE INSPECTION 1 1 04/12/2010 04/16/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - EB3 RCS DM BUTT WELDS 1 1, 2 04/12/2010 04/16/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds PSB1-RP - RP ACCESS CONTROLS 2 1, 2 05/10/2010 05/14/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 1, 2 05/10/2010 05/14/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 05/10/2010 05/14/2010 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/10/2010 05/14/2010 IP 71124.04 Occupational Dose Assessment EB3 HS - HEAT SINK INSPECTION 2 1, 2 07/12/2010 07/16/2010 IP 7111107T Heat Sink Performance EB1 - MODIFICATIONS - 10CFR50.59 2 1, 2 07/26/2010 07/30/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 08/09/2010 08/13/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications DRP/BR3 - TI - 2515/180 1 1, 2 08/01/2010 09/30/2010 IP 2515/180 Inspection of Procedures and Processes for Managing Fatigue PSB1-RP - RP PUBLIC RADIATION PROTECTION 3 1, 2 08/30/2010 09/03/2010 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 08/30/2010 09/03/2010 IP 71124.07 Public Radiation Safety 1, 2 08/30/2010 09/03/2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 08/30/2010 09/03/2010 IP 71151 Performance Indicator Verification TI-177 - GASEOUS INTRUSION 2 1, 2 10/25/2010 10/29/2010 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 01/10/2011 01/14/2011 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - RP OCCUPATIONAL WEEK 1 3 1, 2 01/10/2011 01/14/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 01/10/2011 01/14/2011 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 01/10/2011 01/14/2011 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 01/10/2011 01/14/2011 IP 71151 Performance Indicator Verification EB3SGISI - UNIT 2 SG INSERVICE INSPECTION 1 2 01/17/2011 01/21/2011 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Saint Lucie 03/03/2010 07:30:26 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL PREP WEEK 5 1 01/24/2011 02/04/2011 V23334 ST LUCIE/FEBRUARY 2011 EXAM AT POWER FACILITIES PSB1-RP - RP OCCUPATIONAL WEEK 2 2 1, 2 02/07/2011 02/11/2011 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 02/07/2011 02/11/2011 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 02/14/2011 02/18/2011 IP 7111402 Alert Notification System Evaluation 1, 2 02/14/2011 02/18/2011 IP 7111403 Emergency Response Organization Augmentation Testing 1, 2 02/14/2011 02/18/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 02/14/2011 02/18/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 02/14/2011 02/18/2011 IP 71151-EP01 Drill/Exercise Performance 1, 2 02/14/2011 02/18/2011 IP 71151-EP02 ERO Drill Participation 1, 2 02/14/2011 02/18/2011 IP 71151-EP03 Alert & Notification System OL EXAM - INITIAL EXAM WEEK 1 7 1 02/21/2011 02/25/2011 V23334 ST LUCIE/FEBRUARY 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 2 6 1 02/28/2011 03/04/2011 V23334 ST LUCIE/FEBRUARY 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 3 6 1 03/14/2011 03/18/2011 V23334 ST LUCIE/FEBRUARY 2011 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure