ML100620830
| ML100620830 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/03/2010 |
| From: | NRC/RGN-II |
| To: | |
| Shared Package | |
| ML100620086 | List: |
| References | |
| Download: ML100620830 (2) | |
Text
Inspection / Activity Plan Page 1 of 2 03/03/2010 07:30:26 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Saint Lucie PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 5
1 IP Identification and Resolution of Problems 71152B 03/01/2010 03/05/2010 1, 2 IP Identification and Resolution of Problems 71152B 03/15/2010 03/19/2010 EB3ISI
- UNIT 1 INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 04/12/2010 04/16/2010 EB3TI172
1, 2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 04/12/2010 04/16/2010 PSB1-RP
- RP ACCESS CONTROLS 2
1, 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/10/2010 05/14/2010 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/10/2010 05/14/2010 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/10/2010 05/14/2010 1, 2 IP Occupational Dose Assessment 71124.04 05/10/2010 05/14/2010 EB3 HS
- HEAT SINK INSPECTION 2
1, 2 IP Heat Sink Performance 7111107T 07/12/2010 07/16/2010 EB1
- MODIFICATIONS - 10CFR50.59 2
1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 07/26/2010 07/30/2010 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 08/09/2010 08/13/2010 DRP/BR3
- TI - 2515/180 1
1, 2 IP Inspection of Procedures and Processes for Managing Fatigue 2515/180 08/01/2010 09/30/2010 PSB1-RP
- RP PUBLIC RADIATION PROTECTION 3
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/30/2010 09/03/2010 1, 2 IP Public Radiation Safety 71124.07 08/30/2010 09/03/2010 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 08/30/2010 09/03/2010 1, 2 IP Performance Indicator Verification 71151 08/30/2010 09/03/2010 TI-177
- GASEOUS INTRUSION 2
1, 2 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 10/25/2010 10/29/2010 EB3ISI
- UNIT 2 INSERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 01/10/2011 01/14/2011 PSB1-RP
- RP OCCUPATIONAL WEEK 1 3
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 01/10/2011 01/14/2011 1, 2 IP Occupational ALARA Planning and Controls 71124.02 01/10/2011 01/14/2011 1, 2 IP Radiation Monitoring Instrumentation 71124.05 01/10/2011 01/14/2011 1, 2 IP Performance Indicator Verification 71151 01/10/2011 01/14/2011 EB3SGISI
- UNIT 2 SG INSERVICE INSPECTION 1
2 IP Inservice Inspection Activities - PWR 7111108P 01/17/2011 01/21/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Inspection / Activity Plan Page 2 of 2 03/03/2010 07:30:26 Report 22 03/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Saint Lucie OL EXAM
- INITIAL PREP WEEK 5
1 ST LUCIE/FEBRUARY 2011 EXAM AT POWER FACILITIES V23334 01/24/2011 02/04/2011 PSB1-RP
- RP OCCUPATIONAL WEEK 2 2
1, 2 IP Radiation Monitoring Instrumentation 71124.05 02/07/2011 02/11/2011 1, 2 IP Performance Indicator Verification 71151 02/07/2011 02/11/2011 PSB1EP
- EMERGENCY PREPAREDNESS INSPECTION 1
1, 2 IP Alert Notification System Evaluation 7111402 02/14/2011 02/18/2011 1, 2 IP Emergency Response Organization Augmentation Testing 7111403 02/14/2011 02/18/2011 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 02/14/2011 02/18/2011 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 02/14/2011 02/18/2011 1, 2 IP Drill/Exercise Performance 71151-EP01 02/14/2011 02/18/2011 1, 2 IP ERO Drill Participation 71151-EP02 02/14/2011 02/18/2011 1, 2 IP Alert & Notification System 71151-EP03 02/14/2011 02/18/2011 OL EXAM
- INITIAL EXAM WEEK 1 7
1 ST LUCIE/FEBRUARY 2011 EXAM AT POWER FACILITIES V23334 02/21/2011 02/25/2011 OL EXAM
- INITIAL EXAM WEEK 2 6
1 ST LUCIE/FEBRUARY 2011 EXAM AT POWER FACILITIES V23334 02/28/2011 03/04/2011 OL EXAM
- INITIAL EXAM WEEK 3 6
1 ST LUCIE/FEBRUARY 2011 EXAM AT POWER FACILITIES V23334 03/14/2011 03/18/2011 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure